Changes in PJM Queue between June 1st and July 14th, 2022.
Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.
Fully new queue positions appear as individual rows with all fields highlighted green.
## old_obs new_obs changes additions removals
## 8509 8533 178 24 0
## Creating HTML table for first ${limit_html} rows
| QueueNumber | chng_type | Name | CommercialName | State | County | Status | TransmissionOwner | MaximumFacilityOutput | MWEnergy | MWCapacity | MWInService | CapacityorEnergy | ProjectType | Fuel | ProjectACOrDC | RightsMW | InitialStudy | FeasibilityStudy | FeasibilityStudyStatus | SystemImpactStudy | SystemImpactStudyStatus | FacilitiesStudy | FacilitiesStudyStatus | InterimInterconnectionServiceAgreement | InterimInterconnectionServiceAgreementStatus | WholesaleMarketParticipationAgreement | ConstructionServiceAgreement | ConstructionServiceAgreementStatus | UpgradeConstructionServiceAgreement | UpgradeConstructionServiceAgreementStatus | BackfeedDate | QueueDate | LongTermFirmServiceStartDate | LongTermFirmServiceEndDate | TestEnergyDate | WithdrawalDate | WithdrawnRemarks | ProjectedInServiceDate | RevisedInServiceDate | ActualInServiceDate | SuspensionDate | AttachmentType | AlternateQueue | SlideQueue |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AA1-146 | + | Nelson | Invenergy Nelson Expansion LLC | IL | Lee | Under Construction | ComEd | 190 | 190 | 157 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1146_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1146_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa1146_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa1_146_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa1_146_csa.pdf | Document Posted | N/A | N/A | 10/31/2022 | 10/31/2014 | N/A | N/A | 1/31/2023 | 3/31/2023 | 3/31/2023 | N/A | N | No | ||||||||
| AA1-146 | - | Nelson | Invenergy Nelson Expansion LLC | IL | Lee | Under Construction | ComEd | 190 | 190 | 157 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1146_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1146_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa1146_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa1_146_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa1_146_csa.pdf | Document Posted | N/A | N/A | 8/31/2022 | 10/31/2014 | N/A | N/A | 10/31/2022 | 3/31/2023 | 3/31/2023 | N/A | N | No | ||||||||
| AA2-030 | + | Nelson | Invenergy Nelson Expansion LLC | IL | Lee | Under Construction | ComEd | 380 | 190 | 157 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2030_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2030_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2030_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_030_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_030_csa.pdf | Document Posted | N/A | N/A | 10/31/2022 | 12/23/2014 | N/A | N/A | 1/31/2023 | 3/31/2023 | 3/31/2023 | N/A | N | No | ||||||||
| AA2-030 | - | Nelson | Invenergy Nelson Expansion LLC | IL | Lee | Under Construction | ComEd | 380 | 190 | 157 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2030_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2030_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2030_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_030_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_030_csa.pdf | Document Posted | N/A | N/A | 8/31/2022 | 12/23/2014 | N/A | N/A | 11/30/2022 | 3/31/2023 | 3/31/2023 | N/A | N | No | ||||||||
| AA2-048 | + | Allenwood-Larrabee 34kV | Lakewood-Farmingdale Road Solar Farm & Storage Facility | NJ | Monmouth | Engineering and Procurement | JCPL | 7 | 7 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2048_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/aa2048_wmpa.pdf | Not Required | N/A | N/A | 10/3/2022 | 2/18/2015 | N/A | N/A | 10/30/2022 | 8/31/2022 | 8/31/2022 | N/A | N | No | ||||||||||
| AA2-048 | - | Allenwood-Larrabee 34kV | Lakewood-Farmingdale Road Solar Farm & Storage Facility | NJ | Monmouth | Engineering and Procurement | JCPL | 7 | 7 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2048_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/aa2048_wmpa.pdf | Not Required | N/A | N/A | 2/18/2015 | N/A | N/A | 8/31/2022 | 8/31/2022 | 8/31/2022 | N/A | N | No | |||||||||||
| AA2-116 | + | Cook-East Elkhart 345kV | Indeck Niles Energy Center | MI | Cass | In Service | AEP | 994 | 994 | 994 | 994 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2116_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2116_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_116_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_116_csa.pdf | Document Posted | N/A | N/A | 6/24/2021 | 4/28/2015 | N/A | N/A | 12/27/2021 | 3/15/2022 | 3/15/2022 | 12/27/2021 | N/A | N | No | ||||||
| AA2-116 | - | Cook-East Elkhart 345kV | Indeck Niles Energy Center | MI | Cass | Partially in Service - Under Construction | AEP | 994 | 994 | 994 | 994 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2116_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2116_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_116_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_116_csa.pdf | Document Posted | N/A | N/A | 6/24/2021 | 4/28/2015 | N/A | N/A | 12/27/2021 | 3/15/2022 | 3/15/2022 | 12/27/2021 | N/A | N | No | ||||||
| AB1-087 | + | Sullivan 345kV #1 | Sullivan Generating Station 1 | IN | Sullivan | Engineering and Procurement | AEP | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1087_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1087_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1087_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_087_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_087_csa.pdf | Document Posted | N/A | N/A | 10/1/2015 | N/A | N/A | 6/1/2025 | 6/1/2025 | N/A | N | No | ||||||||||
| AB1-087 | - | Sullivan 345kV #1 | IN | Sullivan | Active | AEP | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1087_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1087_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1087_fac.pdf | Document Posted | N/A | N/A | 10/1/2015 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AB1-088 | + | Sullivan 345kV #2 | Sullivan Generating Station 2 | IN | Sullivan | Engineering and Procurement | AEP | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1088_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1088_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_088_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_088_csa.pdf | Document Posted | N/A | N/A | 9/30/2015 | N/A | N/A | 6/1/2025 | 6/1/2025 | N/A | N | No | ||||||||||
| AB1-088 | - | Sullivan 345kV #2 | IN | Sullivan | Active | AEP | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1088_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1088_fac.pdf | Document Posted | N/A | N/A | 9/30/2015 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AB1-122 | + | Kendall-Tazewell & Dresden-Mole Creek | Three Rivers Energy Center | IL | Grundy | Under Construction | ComEd | 1160 | 1150 | 1150 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1122_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1122_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1122_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_122_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_122_csa.pdf | Document Posted | N/A | N/A | 7/12/2022 | 10/29/2015 | N/A | N/A | 1/2/2023 | 5/30/2023 | 5/30/2023 | N/A | N | No | ||||||||
| AB1-122 | - | Kendall-Tazewell & Dresden-Mole Creek | Three Rivers Energy Center | IL | Grundy | Under Construction | ComEd | 1160 | 1150 | 1150 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1122_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1122_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1122_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_122_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_122_csa.pdf | Document Posted | N/A | N/A | 7/1/2022 | 10/29/2015 | N/A | N/A | 1/2/2023 | 5/30/2023 | 5/30/2023 | N/A | N | No | ||||||||
| AB1-173 | + | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 19.8 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 6/24/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB1-173 | - | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 19.8 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 5/23/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB1-173A | + | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 39.6 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 6/24/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB1-173A | - | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 39.6 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 5/23/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB2-017 | + | NJ | Atlantic | Withdrawn | JCPL | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 1/4/2016 | N/A | N/A | 1/27/2016 | Customer Milestone Not Met | N/A | Y | No | ||||||||||||||||||||||
| AB2-017 | - | N/A | N/A | Withdrawn | JCPL | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 1/4/2016 | N/A | N/A | 1/27/2016 | Customer Milestone Not Met | N/A | Y | No | ||||||||||||||||||||||
| AB2-031 | + | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 59.6 | 20 | 13.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf | Document Posted | N/A | N/A | 2/11/2016 | N/A | N/A | 6/24/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB2-031 | - | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 59.6 | 20 | 13.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf | Document Posted | N/A | N/A | 2/11/2016 | N/A | N/A | 5/23/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB2-161 | + | Waverly #2 DP 115kV | Waverly Solar | VA | Sussex | Engineering and Procurement | Dominion | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf | Document Posted | N/A | N/A | 4/30/2016 | N/A | N/A | 10/21/2023 | 9/16/2022 | 9/16/2022 | N/A | N | No | |||||||||
| AB2-161 | - | Waverly #2 DP 115kV | Waverly Solar | VA | Sussex | Engineering and Procurement | Dominion | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf | Document Posted | N/A | N/A | 4/30/2016 | N/A | N/A | 9/16/2022 | 9/16/2022 | N/A | N | No | ||||||||||
| AC1-010 | + | Gloucester 26kV | National Park NJ | NJ | Gloucester | Engineering and Procurement | PSEG | 6 | 6 | 2.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1010_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1010_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_010_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_010_csa.pdf | Document Posted | N/A | N/A | 6/20/2016 | N/A | N/A | 1/2/2023 | 12/10/2021 | 12/10/2021 | N/A | N | No | ||||||||||
| AC1-010 | - | Gloucester 26kV | National Park NJ | NJ | Gloucester | Engineering and Procurement | PSEG | 6 | 6 | 2.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1010_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1010_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_010_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_010_csa.pdf | Document Posted | N/A | N/A | 6/20/2016 | N/A | N/A | 11/1/2022 | 12/10/2021 | 12/10/2021 | N/A | N | No | ||||||||||
| AC1-026 | + | Sayreville | NJ | Atlantic | Withdrawn | JCPL | 1.3 | 1.3 | 0 | Energy | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 7/18/2016 | N/A | N/A | 8/9/2016 | N/A | Y | No | ||||||||||||||||||||||
| AC1-026 | - | Sayreville | N/A | N/A | Withdrawn | JCPL | 1.3 | 1.3 | 0 | Energy | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 7/18/2016 | N/A | N/A | 8/9/2016 | N/A | Y | No | ||||||||||||||||||||||
| AC1-033 | + | Kewanee 138 kV | Midland Wind Farm | IL | Henry | Engineering and Procurement | ComEd | 100.8 | 100.8 | 13.1 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1033_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1033_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1033_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_033_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_033_csa.pdf | Document Posted | N/A | N/A | 8/10/2016 | N/A | N/A | 4/15/2024 | 4/15/2024 | N/A | N | No | ||||||||||
| AC1-033 | - | Kewanee | IL | Henry | Active | ComEd | 100.8 | 100.8 | 13.1 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1033_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1033_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ac1_033_isa2.pdf | Interim Study | N/A | N/A | N/A | 8/10/2016 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||
| AC1-053 | + | Lanesville-Brokaw | Top Hat Wind Energy Center | IL | Logan | Engineering and Procurement | ComEd | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1053_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1053_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1053_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_053_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_053_csa.pdf | Document Posted | N/A | N/A | 8/31/2016 | N/A | N/A | 12/15/2025 | 12/15/2025 | N/A | N | No | ||||||||||
| AC1-053 | - | Lanesville-Brokaw | IL | Logan | Active | ComEd | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1053_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1053_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1053_fac.pdf | Document Posted | N/A | N/A | 8/31/2016 | N/A | N/A | 12/1/2018 | N/A | N | No | |||||||||||||||||
| AC1-065 | + | Harmony Village-Shackleford 115kV | Walnut Solar I | VA | King and Queen | Engineering and Procurement | Dominion | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1065_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1065_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1065_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_065_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_065_csa.pdf | Document Posted | N/A | N/A | 9/20/2016 | N/A | N/A | 10/1/2023 | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||
| AC1-065 | - | Harmony Village-Shackleford 115kV | Walnut Solar I | VA | King and Queen | Engineering and Procurement | Dominion | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1065_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1065_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1065_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_065_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_065_csa.pdf | Document Posted | N/A | N/A | 9/20/2016 | N/A | N/A | 12/31/2022 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC1-082 | + | Ravenswood-Hemlock 69kV | Great Bend | OH | Meigs | Suspended | AEP | 48 | 48 | 29 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1082_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1082_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1082_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_082_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_082_csa.pdf | Document Posted | N/A | N/A | 9/30/2016 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | ||||||||||
| AC1-082 | - | Ravenswood-Hemlock 69kV | Great Bend | OH | Meigs | Engineering and Procurement | AEP | 48 | 48 | 29 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1082_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1082_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1082_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_082_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_082_csa.pdf | Document Posted | N/A | N/A | 9/30/2016 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | ||||||||||
| AC1-120 | + | Mitchell-Mountain Run 115kV | Cricket Solar | VA | Culpeper | Engineering and Procurement | Dominion | 60 | 60 | 39.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1120_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_120_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_120_csa.pdf | Document Posted | N/A | N/A | 10/27/2016 | N/A | N/A | 6/30/2024 | 12/1/2022 | 12/1/2022 | N/A | N | No | |||||||||
| AC1-120 | - | Mitchell-Mountain Run 115kV | Cricket Solar | VA | Culpeper | Engineering and Procurement | Dominion | 60 | 60 | 39.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1120_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_120_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_120_csa.pdf | Document Posted | N/A | N/A | 10/27/2016 | N/A | N/A | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||||
| AC1-121 | + | Mitchell-Mountain Run 115kV | Cricket Solar | VA | Culpeper | Engineering and Procurement | Dominion | 20 | 20 | 13.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1121_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1121_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_121_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_121_csa.pdf | Document Posted | N/A | N/A | 10/27/2016 | N/A | N/A | 6/30/2024 | 12/1/2022 | 12/1/2022 | N/A | N | No | |||||||||
| AC1-121 | - | Mitchell-Mountain Run 115kV | Cricket Solar | VA | Culpeper | Engineering and Procurement | Dominion | 20 | 20 | 13.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1121_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1121_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_121_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_121_csa.pdf | Document Posted | N/A | N/A | 10/27/2016 | N/A | N/A | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||||
| AC1-141 | + | Cook-East Elkhart 345kV | Indeck Niles Energy Center | MI | Cass | In Service | AEP | 1085 | 91 | 91 | 91 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1141_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_141_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/24/2021 | 10/28/2016 | N/A | N/A | 12/27/2021 | 3/15/2022 | 3/15/2022 | 12/27/2021 | N/A | N | No | ||||||||
| AC1-141 | - | Cook-East Elkhart 345kV | Indeck Niles Energy Center | MI | Cass | Partially in Service - Under Construction | AEP | 1085 | 91 | 91 | 91 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1141_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_141_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/24/2021 | 10/28/2016 | N/A | N/A | 12/27/2021 | 3/15/2022 | 3/15/2022 | 12/27/2021 | N/A | N | No | ||||||||
| AC1-161 | + | Septa 500kV | Cavalier | VA | Isle of Wight | Under Construction | Dominion | 240 | 240 | 168.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1161_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1161_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_161_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_161_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 10/14/2022 | 1/1/2023 | 1/1/2023 | N/A | N | No | |||||||||
| AC1-161 | - | Septa 500kV | Cavalier | VA | Isle of Wight | Engineering and Procurement | Dominion | 240 | 240 | 168.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1161_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1161_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_161_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_161_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/31/2022 | 1/1/2023 | 1/1/2023 | N/A | N | No | |||||||||
| AC1-164 | + | Chickahominy 230kV | Keydet Solar Center One | VA | Charles City | Partially in Service - Under Construction | Dominion | 320 | 320 | 220.8 | 175 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1164_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1164_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1164_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_164_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf | Document Posted | N/A | N/A | 11/11/2021 | 10/31/2016 | N/A | N/A | 11/22/2021 | 6/30/2023 | 6/30/2023 | 12/27/2021 | N/A | N | No | ||||||
| AC1-164 | - | Chickahominy 230kV | Keydet Solar Center One | VA | Charles City | Partially in Service - Under Construction | Dominion | 320 | 320 | 220.8 | 100 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1164_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1164_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1164_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_164_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf | Document Posted | N/A | N/A | 11/11/2021 | 10/31/2016 | N/A | N/A | 11/22/2021 | 6/30/2023 | 6/30/2023 | 12/27/2021 | N/A | N | No | ||||||
| AC1-167 | + | Mark Center 69kV | Mark Center Solar Project | OH | Defiance | Engineering and Procurement | AEP | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1167_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1167_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1167_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_167_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_167_csa.pdf | Document Posted | N/A | N/A | 11/1/2016 | N/A | N/A | 6/30/2024 | 6/30/2024 | N/A | N | No | ||||||||||
| AC1-167 | - | Mark Center 69kV | OH | Defiance | Active | AEP | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1167_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1167_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1167_fac.pdf | Document Posted | N/A | N/A | 11/1/2016 | N/A | N/A | 12/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-189 | + | Chinquapin-Everetts 230kV | Pitt Solar | NC | Pitt | Suspended | Dominion | 80 | 80 | 53.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1189_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1189_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1189_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_189_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_189_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 9/1/2024 | 9/1/2024 | 9/1/2024 | N/A | N | No | |||||||||
| AC1-189 | - | Chinquapin-Everetts 230kV | Pitt Solar | NC | Pitt | Engineering and Procurement | Dominion | 80 | 80 | 53.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1189_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1189_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1189_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_189_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_189_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 9/1/2024 | 9/1/2024 | 9/1/2024 | N/A | N | No | |||||||||
| AC1-191 | + | Elmont 115kV | Springfield Solar | VA | Hanover | Suspended | Dominion | 80 | 80 | 53.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1191_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1191_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1191_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_191_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_191_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 3/31/2024 | 3/31/2024 | N/A | N | No | ||||||||||
| AC1-191 | - | Elmont 115kV | Springfield Solar | VA | Hanover | Engineering and Procurement | Dominion | 80 | 80 | 53.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1191_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1191_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1191_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_191_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_191_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 3/31/2024 | 3/31/2024 | N/A | N | No | ||||||||||
| AC1-221 | + | Halifax-Person 230kV | Alton Post Office Solar | VA | Halifax | Suspended | Dominion | 29.2 | 29.2 | 14.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 6/1/2023 | 6/1/2023 | N/A | N | No | ||||||||||
| AC1-221 | - | Halifax-Person 230kV | Alton Post Office Solar | VA | Halifax | Engineering and Procurement | Dominion | 29.2 | 29.2 | 14.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 6/1/2023 | 6/1/2023 | N/A | N | No | ||||||||||
| AC1-222 | + | Crystal Hill-Halifax 115kV | Halifax County Solar | VA | Halifax | Suspended | Dominion | 44.7 | 44.7 | 22.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1222_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1222_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1222_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_222_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_222_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2023 | 11/19/2022 | 11/19/2022 | N/A | N | No | |||||||||
| AC1-222 | - | Crystal Hill-Halifax 115kV | Halifax County Solar | VA | Halifax | Engineering and Procurement | Dominion | 44.7 | 44.7 | 22.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1222_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1222_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1222_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_222_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_222_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 11/19/2022 | 11/19/2022 | N/A | N | No | ||||||||||
| AC2-050 | + | Tabernacle 12kV | Seneca Energy | NJ | Burlington | Withdrawn | AEC | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2050_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2050_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2050_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2050_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2050_wmpa.pdf | Not Required | N/A | N/A | 2/10/2017 | N/A | N/A | 6/27/2022 | 11/30/2025 | 11/30/2025 | N/A | N | No | |||||||||
| AC2-050 | - | Tabernacle 12kV | Seneca Energy | NJ | Burlington | Engineering and Procurement | AEC | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2050_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2050_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2050_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2050_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2050_wmpa.pdf | Not Required | N/A | N/A | 2/10/2017 | N/A | N/A | 11/30/2025 | 11/30/2025 | N/A | N | No | ||||||||||
| AC2-061 | + | Hillsboro-Clinton 138kV | Dodson Creek Solar | OH | Ross | Engineering and Procurement | AEP | 117 | 117 | 58.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2061_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2061_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_061_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_061_csa.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 7/30/2024 | 7/30/2024 | N/A | N | No | ||||||||||
| AC2-061 | - | Hillsboro-Clinton 138kV | OH | Ross | Active | AEP | 117 | 117 | 58.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2061_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2061_fac.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-092 | + | Susquehanna-Lackawanna 500kV | Freedom Generation Plant | PA | Luzerne | Engineering and Procurement | PPL | 1105 | 55 | 65 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2092_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2092_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_092_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 2/28/2017 | N/A | N/A | 6/1/2022 | 6/1/2022 | N/A | N | No | ||||||||||||
| AC2-092 | - | Susquehanna-Lackawanna 500kV | Freedom Generation Plant | PA | Luzerne | Engineering and Procurement | PPL | 1105 | 55 | 65 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2092_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2092_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_092_isa.pdf | Document Posted | N/A | N/A | N/A | 2/28/2017 | N/A | N/A | 6/1/2022 | 6/1/2022 | N/A | N | No | |||||||||||||
| AC2-100 | + | Halifax-Person 230kV | Powells Creek Solar | VA | Halifax | Engineering and Procurement | Dominion | 50 | 50 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2100_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2100_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2100_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_100_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_100_csa.pdf | Document Posted | N/A | N/A | 3/10/2017 | N/A | N/A | 1/1/2023 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC2-100 | - | Halifax-Person 230kV | Powells Creek Solar | VA | Halifax | Engineering and Procurement | Dominion | 50 | 50 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2100_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2100_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2100_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_100_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_100_csa.pdf | Document Posted | N/A | N/A | 3/10/2017 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AC2-112 | + | Stuarts Draft-Waynesboro 115kV | Augusta Solar | VA | Augusta | Engineering and Procurement | Dominion | 150 | 150 | 103.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2112_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2112_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2112_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_112_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_112_csa.pdf | Document Posted | N/A | N/A | 3/17/2017 | N/A | N/A | 12/15/2023 | 12/15/2023 | N/A | N | No | ||||||||||
| AC2-112 | - | Stuarts Draft-Waynesboro 115kV | Augusta Solar | VA | Augusta | Suspended | Dominion | 150 | 150 | 103.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2112_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2112_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2112_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_112_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_112_csa.pdf | Document Posted | N/A | N/A | 3/17/2017 | N/A | N/A | 12/15/2023 | 12/15/2023 | N/A | N | No | ||||||||||
| AC2-120 | + | Ripley 69kV | Ripley Solar | MD | Charles | Under Construction | SMECO | 27.5 | 27.5 | 10.45 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2120_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2120_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2120_wmpa.pdf | Not Required | N/A | N/A | 3/23/2017 | N/A | N/A | 9/5/2022 | 7/13/2022 | 7/13/2022 | N/A | N | No | |||||||||
| AC2-120 | - | Ripley 69kV | Ripley Solar | MD | Charles | Engineering and Procurement | SMECO | 27.5 | 27.5 | 10.45 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2120_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2120_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2120_wmpa.pdf | Not Required | N/A | N/A | 3/23/2017 | N/A | N/A | 10/1/2020 | 7/13/2022 | 7/13/2022 | N/A | N | No | |||||||||
| AC2-174 | + | Double Tollgate 34.5kV | Double Tollgate Solar Project | VA | Clarke | Engineering and Procurement | APS | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2174_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2174_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2174_wmpa.pdf | Not Required | N/A | N/A | 3/31/2017 | N/A | N/A | 12/31/2019 | 12/31/2019 | N/A | N | No | |||||||||||
| AC2-174 | - | Double Tollgate 34.5kV | Double Tollgate Solar Project | VA | Clarke | Suspended | APS | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2174_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2174_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2174_wmpa.pdf | Not Required | N/A | N/A | 3/31/2017 | N/A | N/A | 12/31/2019 | 12/31/2019 | N/A | N | No | |||||||||||
| AD1-025 | + | Hopewell-Surry 230 kV | VA | Surry | Active | Dominion | 150 | 150 | 94.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1025_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1025_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1025_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_025_isa2.pdf | Interim Study | N/A | N/A | N/A | 6/28/2017 | N/A | N/A | 9/30/2019 | N/A | N | No | ||||||||||||||
| AD1-025 | - | Hopewell-Surry 230 kV | VA | Surry | Active | Dominion | 150 | 150 | 94.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1025_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1025_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ad1_025_isa2.pdf | Interim Study | N/A | N/A | N/A | 6/28/2017 | N/A | N/A | 9/30/2019 | N/A | N | No | |||||||||||||||
| AD1-055 | + | Crystal Hill-Halifax 115 kV | Halifax County Solar | VA | Halifax | Engineering and Procurement | Dominion | 64.7 | 20 | 15.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1055_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1055_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_055_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_055_csa.pdf | Document Posted | N/A | N/A | 8/14/2017 | N/A | N/A | 12/1/2023 | 11/19/2022 | 11/19/2022 | N/A | N | No | |||||||||
| AD1-055 | - | Crystal Hill-Halifax 115 kV | Halifax County Solar | VA | Halifax | Engineering and Procurement | Dominion | 64.7 | 20 | 15.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1055_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1055_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_055_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_055_csa.pdf | Document Posted | N/A | N/A | 8/14/2017 | N/A | N/A | 11/19/2022 | 11/19/2022 | N/A | N | No | ||||||||||
| AD1-088 | + | Briery-Clover 230 kV | VA | Mecklenburg | Active | Dominion | 105 | 105 | 71.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1088_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1088_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_088_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/15/2017 | N/A | N/A | 9/2/2019 | N/A | N | No | ||||||||||||||
| AD1-088 | - | Briery-Clover 230 kV | VA | Mecklenburg | Active | Dominion | 105 | 105 | 71.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1088_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ad1_088_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/15/2017 | N/A | N/A | 9/2/2019 | N/A | N | No | |||||||||||||||
| AD1-103 | + | Beaver-Davis Besse 345 kV II | OH | Huron | Withdrawn | ATSI | 500.4 | 500.4 | 65.052 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1103_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/22/2017 | N/A | N/A | 7/13/2022 | 12/18/2020 | N/A | N | No | |||||||||||||||||
| AD1-103 | - | Beaver-Davis Besse 345 kV II | OH | Huron | Active | ATSI | 500.4 | 500.4 | 65.052 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1103_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/22/2017 | N/A | N/A | 12/18/2020 | N/A | N | No | ||||||||||||||||||
| AD1-106 | + | North Waldo-Wild Creek 138 kV | Chestnut Solar | OH | Marion | Engineering and Procurement | AEP | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1106_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1106_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_106_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_106_csa.pdf | Document Posted | N/A | N/A | 9/22/2017 | N/A | N/A | 12/31/2025 | 12/31/2025 | N/A | N | No | ||||||||||
| AD1-106 | - | North Waldo-Wild Creek 138 kV | OH | Marion | Active | AEP | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1106_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1106_fac.pdf | Document Posted | N/A | N/A | 9/22/2017 | N/A | N/A | 6/12/2019 | N/A | N | No | |||||||||||||||||
| AD1-118 | + | Lemoyne | OH | Wood | Active | ATSI | 700 | 60 | 60 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1118_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1118_imp.pdf | Document Posted | Not Required | N/A | N/A | 9/27/2017 | N/A | N/A | 9/1/2018 | N/A | N | No | ||||||||||||||||||
| AD1-118 | - | Lemoyne | OH | Wood | Active | ATSI | 700 | 60 | 60 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1118_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1118_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2017 | N/A | N/A | 9/1/2018 | N/A | N | No | ||||||||||||||||||
| AD1-144 | + | Kings Fork 34.5 kV | TWE Myrtle Solar Project | VA | City of Suffolk | In Service | Dominion | 15 | 15 | 9.7 | 15 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1144_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1144_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad1144_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad1144_wmpa.pdf | Not Required | N/A | N/A | 4/15/2020 | 9/30/2017 | N/A | N/A | 5/5/2020 | 6/1/2020 | 6/1/2020 | 6/29/2020 | N/A | N | No | |||||||
| AD1-144 | - | Kings Fork 34.5 kV | TWE Myrtle Solar Project | VA | City of Suffolk | Partially in Service - Under Construction | Dominion | 15 | 15 | 9.7 | 15 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1144_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1144_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad1144_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad1144_wmpa.pdf | Not Required | N/A | N/A | 4/15/2020 | 9/30/2017 | N/A | N/A | 5/5/2020 | 6/1/2020 | 6/1/2020 | 6/29/2020 | N/A | N | No | |||||||
| AD1-148 | + | Brokaw-Lanesville | IL | Logan | Active | ComEd | 185 | 0 | 36.3 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1148_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1148_imp.pdf | Document Posted | Not Required | N/A | N/A | 9/30/2017 | N/A | N/A | 11/30/2018 | N/A | N | No | ||||||||||||||||||
| AD1-148 | - | Brokaw-Lanesville | IL | Logan | Active | ComEd | 185 | 0 | 36.3 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1148_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1148_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2017 | N/A | N/A | 11/30/2018 | N/A | N | No | ||||||||||||||||||
| AD1-152 | + | Clover-Sedge Hill 230 kV | VA | Halifax | Active | Dominion | 80 | 80 | 48 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1152_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf | Interim Study | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_152_csa.pdf | Document Posted | N/A | N/A | 9/30/2017 | N/A | N/A | 12/31/2022 | 12/31/2020 | N/A | N | No | |||||||||||
| AD1-152 | - | Clover-Sedge Hill 230 kV | VA | Halifax | Active | Dominion | 80 | 80 | 48 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1152_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/30/2017 | N/A | N/A | 12/31/2022 | 12/31/2020 | N/A | N | No | |||||||||||||
| AD2-014 | + | Steubenville 69 kV | Steubenville Solar | OH | Jefferson | Engineering and Procurement | AEP | 49.5 | 49.5 | 20.79 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2014_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_014_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_014_csa.pdf | Document Posted | N/A | N/A | 11/8/2017 | N/A | N/A | 5/15/2024 | 5/15/2024 | N/A | N | No | ||||||||||
| AD2-014 | - | Steubenville 69 kV | OH | Jefferson | Active | AEP | 49.5 | 49.5 | 20.79 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2014_fac.pdf | Document Posted | N/A | N/A | 11/8/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AD2-020 | + | Valley 138 kV | MI | Van Buren | Active | AEP | 100 | 100 | 61.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2020_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2020_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2020_fac.pdf | Document Posted | N/A | N/A | 11/29/2017 | N/A | N/A | 12/1/2020 | N/A | N | No | |||||||||||||||||
| AD2-020 | - | Valley 138 kV | MI | Van Buren | Active | AEP | 100 | 100 | 61.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2020_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2020_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/29/2017 | N/A | N/A | 12/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-062 | + | Roxbury-Greene 138 kV | PA | Franklin | Active | PENELEC | 80.3 | 80.3 | 53.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2062_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2062_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2062_fac.pdf | Document Posted | N/A | N/A | 2/23/2018 | N/A | N/A | 6/1/2020 | N/A | N | No | |||||||||||||||||
| AD2-062 | - | Roxbury-Greene 138 kV | PA | Franklin | Active | PENELEC | 80.3 | 80.3 | 53.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2062_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2062_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 2/23/2018 | N/A | N/A | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-072 | + | Van Arsdell-Mercer Industrial 69kV | Mercer County Solar Project | KY | Mercer | Engineering and Procurement | EKPC | 95 | 95 | 63.75 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2072_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2072_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2072_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_072_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_072_csa.pdf | Document Posted | N/A | N/A | 3/14/2018 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | ||||||||||
| AD2-072 | - | Van Arsdell-Mercer Industrial 69kV | Mercer County Solar Project | KY | Mercer | Suspended | EKPC | 95 | 95 | 63.75 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2072_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2072_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2072_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_072_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_072_csa.pdf | Document Posted | N/A | N/A | 3/14/2018 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | ||||||||||
| AD2-085 | + | Myrtle-Windsor DP 115kV | Knoxville Solar | VA | Isle of Wight | Engineering and Procurement | Dominion | 51 | 51 | 19.38 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2085_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2085_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_085_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_085_csa.pdf | Document Posted | N/A | N/A | 3/20/2018 | N/A | N/A | 6/30/2025 | 6/30/2025 | N/A | N | No | ||||||||||
| AD2-085 | - | Myrtle-Windsor DP 115kV | Carver Solar I | VA | Isle of Wight | Engineering and Procurement | Dominion | 51 | 51 | 19.38 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2085_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2085_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_085_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_085_csa.pdf | Document Posted | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | ||||||||||
| AD2-114 | + | South Bend 500kV | South Bend Generating Station | PA | Armstrong | Withdrawn | APS | 1200 | 410 | 400 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2114_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2114_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_114_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_114_csa.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 6/1/2023 | 10/20/2021 | 6/1/2023 | 6/1/2023 | N/A | N | No | |||||||||
| AD2-114 | - | South Bend 500kV | South Bend Generating Station | PA | Armstrong | Engineering and Procurement | APS | 1200 | 410 | 400 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2114_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2114_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_114_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_114_csa.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 6/1/2023 | 6/1/2023 | 6/1/2023 | N/A | N | No | ||||||||||
| AD2-116 | + | Hokes-Grantley 69 kV | Cottontail Solar 2 | PA | York | Under Construction | ME | 20 | 20 | 13 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2116_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2116_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_116_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_116_csa.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 10/1/2022 | 10/31/2022 | 10/31/2022 | N/A | N | No | |||||||||
| AD2-116 | - | Hokes-Grantley 69 kV | Cottontail Solar 2 | PA | York | Under Construction | ME | 20 | 20 | 13 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2116_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2116_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_116_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_116_csa.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 5/15/2022 | 5/15/2022 | N/A | N | No | ||||||||||
| AD2-134 | + | Shady Oaks | IL | Lee | Active | ComEd | 215.4 | 105.9 | 21.2 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2134_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2134_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ad2_134_isa2.pdf | Interim Study | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_134_csa.pdf | Document Posted | N/A | N/A | 3/23/2018 | N/A | N/A | 10/31/2021 | 10/31/2021 | N/A | N | No | ||||||||||||
| AD2-134 | - | Shady Oaks | IL | Lee | Active | ComEd | 217.8 | 108.33 | 21.7 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2134_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2134_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ad2_134_isa2.pdf | Interim Study | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_134_csa.pdf | Document Posted | N/A | N/A | 3/23/2018 | N/A | N/A | 10/31/2021 | 10/31/2021 | N/A | N | No | ||||||||||||
| AE1-034 | + | Larrabee 230 kV | NJ | Atlantic | Withdrawn | JCPL | 1104 | 1104 | 310.224 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1034_fea.pdf | Document Posted | N/A | N/A | 6/7/2018 | N/A | N/A | 4/19/2019 | 6/1/2024 | N/A | N | No | ||||||||||||||||||||
| AE1-034 | - | Larrabee 230 kV | N/A | N/A | Withdrawn | JCPL | 1104 | 1104 | 310.224 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1034_fea.pdf | Document Posted | N/A | N/A | 6/7/2018 | N/A | N/A | 4/19/2019 | 6/1/2024 | N/A | N | No | ||||||||||||||||||||
| AE1-073 | + | Bremo-Kidds Store 115 kV | VA | Accomack | Withdrawn | Dominion | 75 | 75 | 48 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1073_fea.pdf | Document Posted | N/A | N/A | 7/31/2018 | N/A | N/A | 3/13/2019 | 12/1/2021 | N/A | N | No | ||||||||||||||||||||
| AE1-073 | - | Bremo-Kidds Store 115 kV | N/A | N/A | Withdrawn | Dominion | 75 | 75 | 48 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1073_fea.pdf | Document Posted | N/A | N/A | 7/31/2018 | N/A | N/A | 3/13/2019 | 12/1/2021 | N/A | N | No | ||||||||||||||||||||
| AE1-084 | + | Barterbrook-Stuarts Draft 115 kV | Round Hill Solar | VA | Augusta | Suspended | Dominion | 83 | 83 | 49.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1084_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1084_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1084_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_084_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_084_csa.pdf | Document Posted | N/A | N/A | 8/30/2018 | N/A | N/A | 10/31/2023 | 10/31/2023 | N/A | N | No | ||||||||||
| AE1-084 | - | Barterbrook-Stuarts Draft 115 kV | Round Hill Solar | VA | Augusta | Engineering and Procurement | Dominion | 83 | 83 | 49.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1084_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1084_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1084_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_084_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_084_csa.pdf | Document Posted | N/A | N/A | 8/30/2018 | N/A | N/A | 10/31/2023 | 10/31/2023 | N/A | N | No | ||||||||||
| AE1-133 | + | Elizabeth City-Tanglewood 230 kV | NC | Alamance | Withdrawn | Dominion | 300 | 300 | 201 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1133_fea.pdf | Document Posted | N/A | N/A | 9/24/2018 | N/A | N/A | 3/11/2019 | 9/1/2022 | N/A | N | No | ||||||||||||||||||||
| AE1-133 | - | Elizabeth City-Tanglewood 230 kV | N/A | N/A | Withdrawn | Dominion | 300 | 300 | 201 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1133_fea.pdf | Document Posted | N/A | N/A | 9/24/2018 | N/A | N/A | 3/11/2019 | 9/1/2022 | N/A | N | No | ||||||||||||||||||||
| AE1-164 | + | Old Chapel 138 kV | VA | Accomack | Withdrawn | APS | 40 | 40 | 24 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1164_fea.pdf | Document Posted | N/A | N/A | 9/24/2018 | N/A | N/A | 2/19/2019 | 12/30/2021 | N/A | N | No | ||||||||||||||||||||
| AE1-164 | - | Old Chapel 138 kV | N/A | N/A | Withdrawn | APS | 40 | 40 | 24 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1164_fea.pdf | Document Posted | N/A | N/A | 9/24/2018 | N/A | N/A | 2/19/2019 | 12/30/2021 | N/A | N | No | ||||||||||||||||||||
| AE1-187 | + | North Lebanon- Cleona 69 kV | PA | Adams | Withdrawn | ME | 20 | 20 | 12.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1187_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1187_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/26/2018 | N/A | N/A | 11/26/2019 | 4/1/2021 | N/A | N | No | |||||||||||||||||
| AE1-187 | - | North Lebanon- Cleona 69 kV | N/A | N/A | Withdrawn | ME | 20 | 20 | 12.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1187_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1187_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/26/2018 | N/A | N/A | 11/26/2019 | 4/1/2021 | N/A | N | No | |||||||||||||||||
| AE1-244 | + | Gilbert Storage 34.5 kV | NJ | Atlantic | Withdrawn | JCPL | 19.8 | 19.8 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1244_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1244_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/28/2018 | N/A | N/A | 12/19/2019 | 9/30/2020 | N/A | N | No | |||||||||||||||||
| AE1-244 | - | Gilbert Storage 34.5 kV | N/A | N/A | Withdrawn | JCPL | 19.8 | 19.8 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1244_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1244_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/28/2018 | N/A | N/A | 12/19/2019 | 9/30/2020 | N/A | N | No | |||||||||||||||||
| AE2-006 | + | Twittys Creek 34.5 kV | Twittys Creek Solar | VA | Charlotte | In Service | Dominion | 13.8 | 0 | 2.9 | 0 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2006_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2006_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2006_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2006_wmpa.pdf | Not Required | N/A | N/A | 10/8/2018 | N/A | N/A | 12/8/2020 | 12/31/2020 | 12/31/2020 | 12/8/2020 | N/A | N | No | ||||||||
| AE2-006 | - | Twittys Creek 34.5 kV | Twittys Creek Solar | VA | Charlotte | Partially in Service - Under Construction | Dominion | 13.8 | 0 | 2.9 | 0 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2006_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2006_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2006_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2006_wmpa.pdf | Not Required | N/A | N/A | 10/8/2018 | N/A | N/A | 12/8/2020 | 12/31/2020 | 12/31/2020 | 12/8/2020 | N/A | N | No | ||||||||
| AE2-055 | + | Shingletown-Boalsburg 46 kV | Windmill Road | PA | Centre | Engineering and Procurement | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2055_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2055_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2055_wmpa.pdf | Not Required | N/A | N/A | 1/31/2019 | N/A | N/A | 5/1/2023 | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AE2-055 | - | Shingletown-Boalsburg 46 kV | Windmill Road | PA | Centre | Suspended | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2055_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2055_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2055_wmpa.pdf | Not Required | N/A | N/A | 1/31/2019 | N/A | N/A | 5/1/2022 | 12/31/2021 | 12/31/2021 | N/A | N | No | ||||||||||
| AE2-059 | + | Derry Tap-Derry Bus 69 kV | PA | Northumberland | Suspended | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_059_csa.pdf | Document Posted | N/A | N/A | 2/2/2019 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||||
| AE2-059 | - | Derry Tap-Derry Bus 69 kV | PA | Northumberland | Engineering and Procurement | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_059_csa.pdf | Document Posted | N/A | N/A | 2/1/2019 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||||
| AE2-074 | + | Potter 46 kV | Potter Solar | PA | Potter | Engineering and Procurement | APS | 35 | 35 | 15.11 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2074_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2074_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2074_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2074_wmpa.pdf | Not Required | N/A | N/A | 2/19/2019 | N/A | N/A | 9/30/2023 | 9/30/2023 | N/A | N | No | |||||||||||
| AE2-074 | - | Potter 46 kV | PA | Potter | Active | APS | 35 | 35 | 15.11 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2074_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2074_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 2/19/2019 | N/A | N/A | 12/31/2020 | N/A | N | No | |||||||||||||||||
| AE2-078 | + | Poolesville 34.5 kV | Mantura | VA | Surry | Withdrawn | Dominion | 20 | 20 | 13.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2078_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2078_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2078_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2078_wmpa.pdf | Not Required | N/A | N/A | 2/21/2019 | N/A | N/A | 6/6/2022 | 6/1/2022 | 6/1/2022 | N/A | N | No | ||||||||||
| AE2-078 | - | Poolesville 34.5 kV | Mantura | VA | Surry | Engineering and Procurement | Dominion | 20 | 20 | 13.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2078_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2078_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2078_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2078_wmpa.pdf | Not Required | N/A | N/A | 2/21/2019 | N/A | N/A | 6/1/2022 | 6/1/2022 | N/A | N | No | |||||||||||
| AE2-079 | + | Poolesville 34.5 kV | Mantura II | VA | Surry | Withdrawn | Dominion | 20 | 20 | 13.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2079_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2079_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2079_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2079_wmpa.pdf | Not Required | N/A | N/A | 2/21/2019 | N/A | N/A | 4/22/2022 | 6/1/2022 | 6/1/2022 | N/A | N | No | ||||||||||
| AE2-079 | - | Poolesville 34.5 kV | Mantura II | VA | Surry | Engineering and Procurement | Dominion | 20 | 20 | 13.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2079_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2079_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2079_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2079_wmpa.pdf | Not Required | N/A | N/A | 2/21/2019 | N/A | N/A | 6/1/2022 | 6/1/2022 | N/A | N | No | |||||||||||
| AE2-116 | + | Midland 23 kV III | PA | Adams | Withdrawn | DL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2116_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 2/28/2019 | N/A | N/A | 12/3/2019 | 9/1/2021 | N/A | N | No | ||||||||||||||
| AE2-116 | - | Midland 23 kV III | N/A | N/A | Withdrawn | DL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2116_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 2/28/2019 | N/A | N/A | 12/3/2019 | 9/1/2021 | N/A | N | No | ||||||||||||||
| AE2-119 | + | Shawville-Phillipsburg 34.5 kV | PA | Adams | Withdrawn | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2119_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 2/28/2019 | N/A | N/A | 12/16/2019 | 9/1/2021 | N/A | N | No | |||||||||||||||||||
| AE2-119 | - | Shawville-Phillipsburg 34.5 kV | N/A | N/A | Withdrawn | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2119_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 2/28/2019 | N/A | N/A | 12/16/2019 | 9/1/2021 | N/A | N | No | |||||||||||||||||||
| AE2-129 | + | Philipsburg-Clarence 34.5 kV | Philipsburg-Clarence 34.5 kV | PA | Clearfield | Engineering and Procurement | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2129_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2129_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2129_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2129_wmpa.pdf | Not Required | N/A | N/A | 2/28/2019 | N/A | N/A | 11/1/2022 | 11/1/2022 | N/A | N | No | |||||||||||
| AE2-129 | - | Philipsburg-Clarence 34.5 kV | Philipsburg-Clarence 34.5 kV | PA | Clearfield | Engineering and Procurement | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2129_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2129_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2129_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2129_wmpa.pdf | Not Required | N/A | N/A | 2/28/2019 | N/A | N/A | 6/1/2022 | 6/1/2022 | N/A | N | No | |||||||||||
| AE2-133 | + | Penns Tap-Richfield Tie 69 kV | Cottontail Solar 6 | PA | Snyder | Suspended | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2133_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2133_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2133_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_133_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_133_csa.pdf | Document Posted | N/A | N/A | 3/1/2019 | N/A | N/A | 12/21/2022 | 12/21/2022 | N/A | N | No | ||||||||||
| AE2-133 | - | Penns Tap-Richfield Tie 69 kV | Cottontail Solar 6 | PA | Snyder | Engineering and Procurement | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2133_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2133_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2133_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_133_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_133_csa.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 12/21/2022 | 12/21/2022 | N/A | N | No | ||||||||||
| AE2-139 | + | East Towanda-Grover 230 kV | PA | McKean | Active | PENELEC | 100.5 | 100.5 | 60.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2139_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2139_imp.pdf | Document Posted | N/A | N/A | 3/8/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | |||||||||||||||||||
| AE2-139 | - | East Towanda-Grover 230 kV | PA | McKean | Active | PENELEC | 100.5 | 100.5 | 60.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2139_fea.pdf | Document Posted | N/A | N/A | 3/8/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | |||||||||||||||||||||
| AE2-182 | + | Briery-Clover 230 kV | VA | Mecklenburg | Active | Dominion | 122 | 17 | 11.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2182_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2182_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2182_fac.pdf | Document Posted | N/A | N/A | 3/18/2019 | N/A | N/A | 3/1/2021 | N/A | N | No | |||||||||||||||||
| AE2-182 | - | Briery-Clover 230 kV | VA | Mecklenburg | Active | Dominion | 122 | 17 | 11.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2182_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2182_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/18/2019 | N/A | N/A | 3/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-198 | + | NJ | Mercer | Withdrawn | PSEG | 2.8 | 2.75 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/19/2019 | N/A | N/A | 4/1/2019 | N/A | Y | No | |||||||||||||||||||||||
| AE2-198 | - | NJ | Mercer | Withdrawn | PSEG | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/19/2019 | N/A | N/A | 4/1/2019 | N/A | Y | No | ||||||||||||||||||||||||||
| AE2-199 | + | NJ | Camden | Withdrawn | AEC | 2 | 2 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/19/2019 | N/A | N/A | 4/1/2019 | N/A | Y | No | |||||||||||||||||||||||
| AE2-199 | - | NJ | Camden | Withdrawn | AEC | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/19/2019 | N/A | N/A | 4/1/2019 | N/A | Y | No | ||||||||||||||||||||||||||
| AE2-200 | + | NJ | Salem | Withdrawn | AEC | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/19/2019 | N/A | N/A | 4/1/2019 | N/A | Y | No | |||||||||||||||||||||||
| AE2-200 | - | NJ | Salem | Withdrawn | AEC | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/19/2019 | N/A | N/A | 4/1/2019 | N/A | Y | No | ||||||||||||||||||||||||||
| AE2-217 | + | East Springfield-London 138 kV | Sloopy Solar Energy Center | OH | Clark | Suspended | ATSI | 180 | 180 | 108 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2217_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2217_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2217_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_217_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_217_csa.pdf | Document Posted | N/A | N/A | 3/21/2019 | N/A | N/A | 9/30/2026 | 9/30/2026 | N/A | N | No | ||||||||||
| AE2-217 | - | East Springfield-London 138 kV | Sloopy Solar Energy Center | OH | Clark | Engineering and Procurement | ATSI | 180 | 180 | 108 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2217_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2217_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2217_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_217_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_217_csa.pdf | Document Posted | N/A | N/A | 3/21/2019 | N/A | N/A | 9/30/2025 | 9/30/2025 | N/A | N | No | ||||||||||
| AE2-218 | + | Eldean 138 kV | Eldean Solar | OH | Miami | Suspended | Dayton | 178 | 178 | 106 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2218_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2218_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2218_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_218_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_218_csa.pdf | Document Posted | N/A | N/A | 3/21/2019 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | ||||||||||
| AE2-218 | - | Eldean 138 kV | Eldean Solar | OH | Miami | Engineering and Procurement | Dayton | 178 | 178 | 106 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2218_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2218_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2218_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_218_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_218_csa.pdf | Document Posted | N/A | N/A | 3/21/2019 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | ||||||||||
| AE2-230 | + | Bartonsville-Meadow Brook 138 kV | VA | Frederick | Active | APS | 70 | 70 | 42 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2230_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2230_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2230_fac.pdf | Document Posted | N/A | N/A | 3/22/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | |||||||||||||||||
| AE2-230 | - | Bartonsville-Meadow Brook 138 kV | VA | Frederick | Active | APS | 70 | 70 | 42 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2230_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2230_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-232 | + | Oyster Creek 230 kV II | NJ | Atlantic | Withdrawn | JCPL | 400 | 400 | 112.4 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2232_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2232_imp.pdf | Document Posted | N/A | N/A | 3/22/2019 | N/A | N/A | 3/26/2020 | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AE2-232 | - | Oyster Creek 230 kV II | N/A | N/A | Withdrawn | JCPL | 400 | 400 | 112.4 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2232_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2232_imp.pdf | Document Posted | N/A | N/A | 3/22/2019 | N/A | N/A | 3/26/2020 | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AE2-233 | + | Carson-Rogers Rd 500 kV | VA | Accomack | Withdrawn | Dominion | 94 | 94 | 67.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2233_fea.pdf | Document Posted | N/A | N/A | 3/22/2019 | N/A | N/A | 10/2/2019 | 6/1/2022 | N/A | N | No | ||||||||||||||||||||
| AE2-233 | - | Carson-Rogers Rd 500 kV | N/A | N/A | Withdrawn | Dominion | 94 | 94 | 67.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2233_fea.pdf | Document Posted | N/A | N/A | 3/22/2019 | N/A | N/A | 10/2/2019 | 6/1/2022 | N/A | N | No | ||||||||||||||||||||
| AE2-254 | + | Garrard County-Tommy-Gooch 69 kV | Turkey Creek Solar | KY | Garrard | Under Construction | EKPC | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2254_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2254_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2254_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_254_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_254_csa.pdf | Document Posted | N/A | N/A | 9/22/2020 | 3/26/2019 | N/A | N/A | 9/23/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AE2-254 | - | Garrard County-Tommy-Gooch 69 kV | Turkey Creek Solar | KY | Garrard | Engineering and Procurement | EKPC | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2254_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2254_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2254_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_254_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_254_csa.pdf | Document Posted | N/A | N/A | 3/26/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | |||||||||||
| AE2-274 | + | Siegfried-Hauto 69 kV | PA Solar Park | PA | Carbon | In Service | PPL | 20 | 0 | 0.8 | 0 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2274_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2274_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_274_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_274_csa.pdf | Document Posted | N/A | N/A | 3/28/2019 | N/A | N/A | 12/1/2021 | 12/1/2021 | 1/17/2020 | N/A | N | No | |||||||||
| AE2-274 | - | Siegfried-Hauto 69 kV | PA Solar Park | PA | Carbon | In Service | PPL | 0 | Energy | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2274_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2274_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_274_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_274_csa.pdf | Document Posted | N/A | N/A | 3/28/2019 | N/A | N/A | 12/1/2021 | 12/1/2021 | 1/17/2020 | N/A | N | No | ||||||||||||
| AE2-295 | + | Eldred 230 kV | PA | Schuylkill | Withdrawn | PPL | 174.8 | 174.8 | 25.7 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2295_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2295_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/29/2019 | N/A | N/A | 7/7/2022 | 5/31/2022 | N/A | N | No | |||||||||||||||||
| AE2-295 | - | Eldred 230 kV | PA | Schuylkill | Active | PPL | 174.8 | 174.8 | 25.7 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2295_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2295_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-317 | + | Pequest River 115 kV | NJ | Atlantic | Withdrawn | JCPL | 80 | 80 | 48 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2317_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2317_imp.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 4/7/2020 | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AE2-317 | - | Pequest River 115 kV | N/A | N/A | Withdrawn | JCPL | 80 | 80 | 48 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2317_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2317_imp.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 4/7/2020 | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AE2-318 | + | Ford-Cedarville 138 kV | Clermont County Solar Project | OH | Clermont | Engineering and Procurement | DEOK | 100 | 100 | 67.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2318_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2318_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2318_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_318_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_318_csa.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 3/1/2025 | 3/1/2025 | N/A | N | No | ||||||||||
| AE2-318 | - | Ford-Cedarville 138 kV | OH | Clermont | Active | DEOK | 100 | 100 | 67.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2318_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2318_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2318_fac.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | |||||||||||||||||
| AE2-324 | + | Galion-Roberts South II 138 kV | OH | Marion | Withdrawn | ATSI | 120.3 | 20.3 | 20.3 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2324_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2324_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/30/2019 | N/A | N/A | 6/24/2022 | 12/1/2022 | N/A | N | No | |||||||||||||||||
| AE2-324 | - | Galion-Roberts South II 138 kV | OH | Marion | Active | ATSI | 120.3 | 20.3 | 20.3 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2324_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2324_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-328 | + | Briery DP-Clover 230 kV | VA | Accomack | Withdrawn | Dominion | 100 | 100 | 68.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2328_fea.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 9/23/2019 | 4/1/2022 | N/A | N | No | ||||||||||||||||||||
| AE2-328 | - | Briery DP-Clover 230 kV | N/A | N/A | Withdrawn | Dominion | 100 | 100 | 68.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2328_fea.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 9/23/2019 | 4/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-021 | + | Bethelboro-Connellsville #1 25 kV | Dunbar Solar Farm | PA | Fayette | Engineering and Procurement | APS | 14 | 14 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1021_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1021_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1021_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1021_wmpa.pdf | Not Required | N/A | N/A | 11/8/2023 | 4/15/2019 | N/A | N/A | 12/1/2023 | 12/1/2023 | N/A | N | No | ||||||||||
| AF1-021 | - | Bethelboro-Connellsville #1 25 kV | Dunbar Solar Farm | PA | Fayette | Suspended | APS | 14 | 14 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1021_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1021_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1021_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1021_wmpa.pdf | Not Required | N/A | N/A | 4/15/2019 | N/A | N/A | 11/15/2021 | 11/15/2021 | N/A | N | No | |||||||||||
| AF1-022 | + | Lake Lynn-Uniontown 25 kV | Gans Solar Farm | PA | Fayette | Engineering and Procurement | APS | 14 | 14 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1022_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1022_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1022_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1022_wmpa.pdf | Not Required | N/A | N/A | 11/8/2023 | 4/15/2019 | N/A | N/A | 12/1/2023 | 12/1/2023 | N/A | N | No | ||||||||||
| AF1-022 | - | Lake Lynn-Uniontown 25 kV | Gans Solar Farm | PA | Fayette | Suspended | APS | 14 | 14 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1022_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1022_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1022_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1022_wmpa.pdf | Not Required | N/A | N/A | 4/15/2019 | N/A | N/A | 11/15/2021 | 11/15/2021 | N/A | N | No | |||||||||||
| AF1-024 | + | Freeland Municipal Authority | PA | Adams | Withdrawn | PPL | 19.9 | 19.9 | 9.7 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 5/1/2019 | N/A | N/A | 5/21/2019 | 12/31/2021 | N/A | N | No | |||||||||||||||||||||
| AF1-024 | - | Freeland Municipal Authority | N/A | N/A | Withdrawn | PPL | 19.9 | 19.9 | 9.7 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 5/1/2019 | N/A | N/A | 5/21/2019 | 12/31/2021 | N/A | N | No | |||||||||||||||||||||
| AF1-032 | + | Suffolk 34.5 kV | Stratford Solar Center | VA | City of Suffolk | Under Construction | Dominion | 15 | 15 | 9.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1032_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1032_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1032_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1032_wmpa.pdf | Not Required | N/A | N/A | 5/18/2019 | N/A | N/A | 6/27/2022 | 2/28/2023 | 2/28/2023 | N/A | N | No | ||||||||||
| AF1-032 | - | Suffolk 34.5 kV | Stratford Solar Center | VA | City of Suffolk | Under Construction | Dominion | 15 | 15 | 9.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1032_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1032_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1032_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1032_wmpa.pdf | Not Required | N/A | N/A | 5/17/2019 | N/A | N/A | 6/15/2022 | 2/28/2023 | 2/28/2023 | N/A | N | No | ||||||||||
| AF1-044 | + | Wye Mills-Longwood 69 kV | MD | Allegany | Withdrawn | DPL | 45 | 45 | 18.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1044_fea.pdf | Document Posted | N/A | N/A | 6/28/2019 | N/A | N/A | 2/7/2020 | 11/30/2021 | N/A | N | No | ||||||||||||||||||||
| AF1-044 | - | Wye Mills-Longwood 69 kV | N/A | N/A | Withdrawn | DPL | 45 | 45 | 18.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1044_fea.pdf | Document Posted | N/A | N/A | 6/28/2019 | N/A | N/A | 2/7/2020 | 11/30/2021 | N/A | N | No | ||||||||||||||||||||
| AF1-045 | + | Cedarville-Ford 138 kV | Clermont County Solar Project | OH | Clermont | Engineering and Procurement | DEOK | 152.2 | 52.2 | 31.3 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1045_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1045_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1045_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/af1_045_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/af1_045_csa.pdf | Document Posted | N/A | N/A | 6/28/2019 | N/A | N/A | 3/1/2025 | 3/1/2025 | N/A | N | No | ||||||||||
| AF1-045 | - | Cedarville-Ford 138 kV | OH | Clermont | Active | DEOK | 152.2 | 52.2 | 31.3 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1045_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1045_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1045_fac.pdf | Document Posted | N/A | N/A | 6/28/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | |||||||||||||||||
| AF1-081 | + | Cumberland 230 kV | NJ | Atlantic | Withdrawn | AEC | 238 | 160 | 96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1081_fea.pdf | Document Posted | N/A | N/A | 8/28/2019 | N/A | N/A | 2/27/2020 | 6/30/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-081 | - | Cumberland 230 kV | N/A | N/A | Withdrawn | AEC | 238 | 160 | 96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1081_fea.pdf | Document Posted | N/A | N/A | 8/28/2019 | N/A | N/A | 2/27/2020 | 6/30/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-087 | + | Bakers Pond-Bell Ave 115 kV II | VA | Accomack | Withdrawn | Dominion | 75 | 0 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1087_fea.pdf | Document Posted | N/A | N/A | 8/30/2019 | N/A | N/A | 2/18/2020 | 6/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-087 | - | Bakers Pond-Bell Ave 115 kV II | N/A | N/A | Withdrawn | Dominion | 75 | 0 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1087_fea.pdf | Document Posted | N/A | N/A | 8/30/2019 | N/A | N/A | 2/18/2020 | 6/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-241 | + | Watson 12.47 kV | PA | Adams | Withdrawn | PPL | 15 | 15 | 9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1241_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 2/24/2020 | 7/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-241 | - | Watson 12.47 kV | N/A | N/A | Withdrawn | PPL | 15 | 15 | 9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1241_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 2/24/2020 | 7/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-242 | + | Wilcox-Paper City 46 kV | PA | Adams | Withdrawn | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1242_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 3/19/2020 | 8/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-242 | - | Wilcox-Paper City 46 kV | N/A | N/A | Withdrawn | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1242_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 3/19/2020 | 8/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-258 | + | Rockawalkin 69 kV | Hebron Solar | MD | Wicomico | In Service | DPL | 15 | 0 | 3.2 | 0 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1258_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1258_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1258_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1258_wmpa.pdf | Not Required | N/A | N/A | 9/30/2019 | N/A | N/A | 9/1/2023 | 9/1/2023 | 11/5/2020 | N/A | N | No | |||||||||
| AF1-258 | - | Rockawalkin 69 kV | Hebron Solar | MD | Wicomico | Partially in Service - Under Construction | DPL | 15 | 0 | 3.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1258_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1258_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1258_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1258_wmpa.pdf | Not Required | N/A | N/A | 9/30/2019 | N/A | N/A | 9/1/2023 | 9/1/2023 | 11/5/2020 | N/A | N | No | ||||||||||
| AF1-262 | + | Upper Pittsgrove 12 kV | NJ | Salem | Active | AEC | 2 | 0 | 0.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1262_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1262_imp.pdf | Document Posted | Not Required | N/A | N/A | 9/30/2019 | N/A | N/A | 7/1/2020 | N/A | N | No | ||||||||||||||||||
| AF1-262 | - | Upper Pittsgrove 12 kV | NJ | Salem | Active | AEC | 2 | 0 | 0.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1262_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1262_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 7/1/2020 | N/A | N | No | ||||||||||||||||||
| AF1-275 | + | Cole 345 kV | OH | Franklin | Active | AEP | 250 | 50 | 50 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1275_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1275_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-275 | - | Cole 345 kV | OH | Franklin | Active | AEP | 250 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1275_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1275_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-291A | + | Bartonsville-Meadow Brook 138 kV | VA | Frederick | Active | APS | 80 | 10 | 6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1291a_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1291a_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1291a_fac.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | |||||||||||||||||
| AF1-291A | - | Bartonsville-Meadow Brook 138 kV | VA | Frederick | Active | APS | 80 | 10 | 6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1291a_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1291a_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-303 | + | Vernon 115 kV | NJ | Atlantic | Withdrawn | JCPL | 107 | 107 | 21.4 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1303_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 2/18/2020 | 5/31/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-303 | - | Vernon 115 kV | N/A | N/A | Withdrawn | JCPL | 107 | 107 | 21.4 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1303_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 2/18/2020 | 5/31/2022 | N/A | N | No | ||||||||||||||||||||
| AF2-028 | + | Pumphrey 115 kV | MD | Baltimore County | Active | BGE | Energy | Merchant Transmission | Not Required | https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/af2028_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/16/2019 | N/A | N/A | N/A | EE | No | ||||||||||||||||||||||||
| AF2-028 | - | Pumphrey 115 kV | MD | Baltimore County | Active | BGE | Energy | Merchant Transmission | Not Required | https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/af2028_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/15/2019 | N/A | N/A | N/A | EE | No | ||||||||||||||||||||||||
| AF2-058 | + | Fairton 12 kV | NJ | Cumberland | Withdrawn | AEC | 5 | 2.5 | 0 | Energy | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2058_fea.pdf | Document Posted | N/A | N/A | 1/24/2020 | N/A | N/A | 9/1/2020 | 3/31/2021 | N/A | Y | No | ||||||||||||||||||||
| AF2-058 | - | Fairton 12 kV | NJ | Cumberland | Withdrawn | AEC | Energy | Generation Interconnection | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2058_fea.pdf | Document Posted | N/A | N/A | 1/24/2020 | N/A | N/A | 9/1/2020 | 3/31/2021 | N/A | Y | No | ||||||||||||||||||||||||
| AF2-075 | + | Bartonsville-Meadow Brook 138 kV III | VA | Frederick | Active | APS | 130 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2075_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2075_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af2075_fac.pdf | Document Posted | N/A | N/A | 1/31/2020 | N/A | N/A | 12/1/2022 | N/A | N | No | |||||||||||||||||
| AF2-075 | - | Bartonsville-Meadow Brook 138 kV III | VA | Frederick | Active | APS | 130 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2075_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2075_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-111 | + | North Clark-Spurlock 345 kV | KY | Mason | Active | EKPC | 250 | 250 | 150 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2111_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2111_imp.pdf | Document Posted | N/A | N/A | 2/28/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | |||||||||||||||||||
| AF2-111 | - | North Clark-Spurlock 345 kV | KY | Mason | Active | EKPC | 250 | 250 | 150 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2111_fea.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||
| AF2-169 | + | BL England 138 kV | NJ | Atlantic | Withdrawn | AEC | 552 | 552 | 155 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 3/19/2020 | N/A | N/A | 6/9/2020 | 6/1/2023 | N/A | N | No | |||||||||||||||||||||
| AF2-169 | - | BL England 138 kV | N/A | N/A | Withdrawn | AEC | 552 | 552 | 155 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 3/19/2020 | N/A | N/A | 6/9/2020 | 6/1/2023 | N/A | N | No | |||||||||||||||||||||
| AF2-282 | + | Edelle 12.47 kV | LK-Justus | PA | Lackawanna | Withdrawn | PPL | 3 | 3 | 0 | Energy | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2282_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2282_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af2282_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af2282_wmpa.pdf | Not Required | N/A | N/A | 3/27/2020 | N/A | N/A | 6/28/2022 | 2/1/2023 | 2/1/2023 | N/A | Y | No | ||||||||||
| AF2-282 | - | Edelle 12.47 kV | LK-Justus | PA | Lackawanna | Engineering and Procurement | PPL | 3 | 3 | 0 | Energy | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2282_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2282_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af2282_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af2282_wmpa.pdf | Not Required | N/A | N/A | 3/27/2020 | N/A | N/A | 2/1/2023 | 2/1/2023 | N/A | Y | No | |||||||||||
| AF2-286 | + | Shermansdale 12.47 kV | PE-Windy Hill | PA | Perry | Withdrawn | PPL | 3 | 3 | 0 | Energy | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2286_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2286_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af2286_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af2286_wmpa.pdf | Not Required | N/A | N/A | 3/27/2020 | N/A | N/A | 6/28/2022 | 2/1/2023 | 2/1/2023 | N/A | Y | No | ||||||||||
| AF2-286 | - | Shermansdale 12.47 kV | PE-Windy Hill | PA | Perry | Engineering and Procurement | PPL | 3 | 3 | 0 | Energy | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2286_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2286_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af2286_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af2286_wmpa.pdf | Not Required | N/A | N/A | 3/27/2020 | N/A | N/A | 2/1/2023 | 2/1/2023 | N/A | Y | No | |||||||||||
| AF2-294 | + | Thompson 34.5 kV | PA | Wayne | Active | PENELEC | 17 | 17 | 10.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2294_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2294_imp.pdf | Document Posted | In Progress | Not Required | N/A | N/A | 3/29/2020 | N/A | N/A | 6/1/2021 | N/A | N | No | |||||||||||||||||
| AF2-294 | - | Thompson 34.5 kV | PA | Wayne | Active | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2294_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2294_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/28/2020 | N/A | N/A | 6/1/2021 | N/A | N | No | ||||||||||||||||||
| AF2-307 | + | Hope-Blevins Valley Tap 69 kV | KY | Bath | Active | EKPC | 66 | 66 | 39.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2307_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2307_imp.pdf | Document Posted | N/A | N/A | 3/30/2020 | N/A | N/A | 9/1/2023 | N/A | N | No | |||||||||||||||||||
| AF2-307 | - | Hope-Blevins Valley Tap 69 kV | KY | Bath | Active | EKPC | 66 | 66 | 39.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2307_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2020 | N/A | N/A | 9/1/2023 | N/A | N | No | ||||||||||||||||||||
| AF2-317 | + | Hill Topper 345 kV | IL | Logan | Active | ComEd | 65 | 0 | 15.68 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2317_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2317_imp.pdf | Document Posted | Not Required | N/A | N/A | 3/30/2020 | N/A | N/A | 4/30/2020 | N/A | N | No | ||||||||||||||||||
| AF2-317 | - | Hill Topper 345 kV | IL | Logan | Active | ComEd | 65 | 0 | 15.68 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2317_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2317_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2020 | N/A | N/A | 4/30/2020 | N/A | N | No | ||||||||||||||||||
| AF2-340 | + | PA | Adams | Withdrawn | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2020 | N/A | N/A | 4/10/2020 | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AF2-340 | - | N/A | N/A | Withdrawn | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2020 | N/A | N/A | 4/10/2020 | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AF2-348 | + | North Clark-Spurlock 345 kV | KY | Madison | Active | EKPC | 250 | 250 | 150 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2348_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2348_imp.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 7/1/2022 | N/A | N | No | |||||||||||||||||||
| AF2-348 | - | North Clark-Spurlock 345 kV | KY | Madison | Active | EKPC | 250 | 250 | 150 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2348_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 7/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF2-355 | + | West Gerrard-J.K. Smith 345 nkV | KY | Madison | Active | EKPC | 225 | 225 | 135 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2355_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2355_imp.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 7/1/2022 | N/A | N | No | |||||||||||||||||||
| AF2-355 | - | West Gerrard-J.K. Smith 345 nkV | KY | Madison | Active | EKPC | 225 | 225 | 135 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2355_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 7/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF2-360 | + | Keeney-Steele 230 kV | MD | Allegany | Withdrawn | DPL | 125 | 125 | 75 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2020 | N/A | N/A | 5/1/2020 | 12/15/2023 | N/A | N | No | |||||||||||||||||||||
| AF2-360 | - | Keeney-Steele 230 kV | N/A | N/A | Withdrawn | DPL | 125 | 125 | 75 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2020 | N/A | N/A | 5/1/2020 | 12/15/2023 | N/A | N | No | |||||||||||||||||||||
| AF2-366 | + | Glidden-Waterman 138 kV | IL | Adams | Active | ComEd | 94.9 | 94.9 | 56.94 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2366_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||||
| AF2-366 | - | Glidden-Waterman 138 kV | N/A | N/A | Active | ComEd | 94.9 | 94.9 | 56.94 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2366_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||||
| AF2-389 | + | Pokagon-Corey 69 kV | MI | Cass | Active | AEP | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2389_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2389_imp.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 10/31/2023 | N/A | N | No | |||||||||||||||||||
| AF2-389 | - | Pokagon-Corey 69 kV | MI | Cass | Active | AEP | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2389_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 10/31/2023 | N/A | N | No | ||||||||||||||||||||
| AF2-393 | + | Nelson-Dixon 138 kV | IL | Adams | Active | ComEd | 60 | 60 | 55 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2393_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2393_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 9/1/2024 | N/A | N | No | ||||||||||||||||||
| AF2-393 | - | Nelson-Dixon 138 kV | N/A | N/A | Active | ComEd | 60 | 60 | 55 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2393_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2393_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 9/1/2024 | N/A | N | No | ||||||||||||||||||
| AF2-394 | + | Nelson-Dixon 138 kV | IL | Adams | Active | ComEd | 40 | 40 | 40 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2394_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2394_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 9/1/2024 | N/A | N | No | ||||||||||||||||||
| AF2-394 | - | Nelson-Dixon 138 kV | N/A | N/A | Active | ComEd | 40 | 40 | 40 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2394_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2394_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 9/1/2024 | N/A | N | No | ||||||||||||||||||
| AF2-395 | + | Flatlick 765 kV | OH | Vinton | Active | AEP | 1045 | 51.1 | 89.6 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2395_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2395_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/csa/af2_395_csa.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 5/1/2022 | N/A | N | No | ||||||||||||||||
| AF2-395 | - | Flatlick 765 kV | OH | Vinton | Active | AEP | 1045 | 51.1 | 89.6 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2395_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2395_imp.pdf | Document Posted | Not Required | N/A | N/A | 3/31/2020 | N/A | N/A | 5/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-396 | + | Stinger 138 kV | MI | Cass | Active | AEP | 200 | 200 | 200 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2396_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2396_imp.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | |||||||||||||||||||
| AF2-396 | - | Stinger 138 kV | MI | Cass | Active | AEP | 200 | 200 | 200 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2396_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||
| AF2-413 | + | Raritan River 230 kV | NJ | Atlantic | Active | JCPL | 250 | 250 | 250 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2413_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF2-413 | - | Raritan River 230 kV | N/A | N/A | Active | JCPL | 250 | 250 | 250 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2413_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF2-417 | + | West Damascus Tap-West Damascus 69 kV | PA | Adams | Active | PPL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2417_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2417_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 4/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-417 | - | West Damascus Tap-West Damascus 69 kV | N/A | N/A | Active | PPL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2417_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2417_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 4/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-421 | + | East Hazelton-Weatherly Tap 69 | PA | Adams | Active | PPL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2421_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2421_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 3/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-421 | - | East Hazelton-Weatherly Tap 69 | N/A | N/A | Active | PPL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2421_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2421_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 3/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-425 | + | Sunbury-Eldred #2 69 kV | PA | Adams | Active | PPL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2425_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2425_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 3/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-425 | - | Sunbury-Eldred #2 69 kV | N/A | N/A | Active | PPL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2425_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2425_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2020 | N/A | N/A | 3/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-439 | + | Roxbury-Carlisle 115 kV | PA | Adams | Withdrawn | PENELEC | 50 | 50 | 26 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2439_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2439_imp.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 4/23/2021 | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-439 | - | Roxbury-Carlisle 115 kV | N/A | N/A | Withdrawn | PENELEC | 50 | 50 | 26 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2439_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2439_imp.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 4/23/2021 | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AG1-045 | + | Redbud-Gaylord 34.5 kV | VA | Frederick | Active | APS | 36 | 36 | 18 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1045_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1045_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 7/2/2020 | N/A | N/A | 12/1/2023 | N/A | N | No | |||||||||||||||||
| AG1-045 | - | Redbud-Gaylord 34.5 kV | VA | Frederick | Active | APS | 36 | 36 | 18 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1045_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1045_imp.pdf | Document Posted | In Progress | Not Required | N/A | N/A | 7/2/2020 | N/A | N/A | 12/1/2023 | N/A | N | No | |||||||||||||||||
| AG1-064 | + | Plaza 34.5 kV | Bermuda Energy | VA | City of Richmond | Withdrawn | Dominion | 19.1 | 19.1 | 8 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1064_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1064_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1064_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1064_wmpa.pdf | Not Required | N/A | N/A | 7/30/2020 | N/A | N/A | 6/24/2022 | 12/1/2023 | N/A | N | No | |||||||||||
| AG1-064 | - | Plaza 34.5 kV | Bermuda Energy | VA | City of Richmond | Engineering and Procurement | Dominion | 19.1 | 19.1 | 8 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1064_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1064_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1064_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1064_wmpa.pdf | Not Required | N/A | N/A | 7/30/2020 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||
| AG1-065 | + | Plaza 34.5 kV | Bermuda Energy | VA | City of Richmond | Withdrawn | Dominion | 19.1 | 19.1 | 8 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1065_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1065_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1065_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1065_wmpa.pdf | Not Required | N/A | N/A | 7/30/2020 | N/A | N/A | 6/24/2022 | 12/1/2023 | N/A | N | No | |||||||||||
| AG1-065 | - | Plaza 34.5 kV | Bermuda Energy | VA | City of Richmond | Engineering and Procurement | Dominion | 19.1 | 19.1 | 8 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1065_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1065_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1065_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1065_wmpa.pdf | Not Required | N/A | N/A | 7/30/2020 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||
| AG1-080 | + | Delair-Locust Street 69 kV | NJ | Camden | Active | PSEG | 19.9 | 19.9 | 10.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1080_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1080_imp.pdf | Document Posted | Not Required | N/A | N/A | 7/31/2020 | N/A | N/A | 12/23/2022 | N/A | N | No | ||||||||||||||||||
| AG1-080 | - | Delair-Locust Street 69 kV | NJ | Camden | Active | PSEG | 19.9 | 19.9 | 10.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1080_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1080_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/31/2020 | N/A | N/A | 12/23/2022 | N/A | N | No | ||||||||||||||||||
| AG1-507 | + | Calumet 138 kV | IL | Cook | Active | ComEd | 296 | 296 | 296 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1507_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1507_imp.pdf | Document Posted | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AG1-507 | - | Calumet 138 kV | IL | Cook | Active | ComEd | 296 | 296 | 296 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1507_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1507_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2020 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AG2-050 | + | Randle Cliff 13.8 kV | CHESAPEAKE BEACH BESS | N/A | N/A | Engineering and Procurement | BGE | Energy | Generation Interconnection | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2050_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2050_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag2050_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag2050_wmpa.pdf | Not Required | N/A | N/A | 11/25/2020 | N/A | N/A | 5/1/2023 | 5/1/2023 | N/A | Y | No | |||||||||||||||
| AG2-050 | - | Randle Cliff 13.8 kV | CHESAPEAKE BEACH BESS | MD | Calvert | Engineering and Procurement | BGE | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2050_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2050_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag2050_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag2050_wmpa.pdf | Not Required | N/A | N/A | 11/25/2020 | N/A | N/A | 5/1/2023 | 5/1/2023 | N/A | Y | No | |||||||||||
| AG2-185 | + | Effort Mountain-Gilbert 138 kV | PA | Monroe | Active | PPL | 40 | 10 | 6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/26/2021 | N/A | N/A | 5/1/2024 | N/A | N | No | ||||||||||||||||||||||
| AG2-185 | - | Effort Mountain-Gilbert 138 kV | PA | Monroe | Active | PPL | 40 | 10 | 6 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 2/26/2021 | N/A | N/A | 5/1/2024 | N/A | N | No | ||||||||||||||||||||||
| AG2-390 | + | Upper Providence 34.5 kV | PA | Adams | Active | PECO | 5 | 5 | 0 | Energy | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/30/2021 | N/A | N/A | 6/21/2022 | N/A | Y | No | ||||||||||||||||||||||
| AG2-390 | - | Upper Providence 34.5 kV | N/A | N/A | Active | PECO | 5 | 5 | 0 | Energy | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/30/2021 | N/A | N/A | 6/21/2022 | N/A | Y | No | ||||||||||||||||||||||
| AG2-399 | + | Harrisville Jct - All Min 25 kV | PA | Adams | Engineering and Procurement | APS | 3 | 3 | 0 | Energy | Generation Interconnection | Solar | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag2399_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag2399_wmpa.pdf | Not Required | N/A | N/A | 3/31/2021 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | Y | No | ||||||||||||||||
| AG2-399 | - | Harrisville Jct - All Min 25 kV | N/A | N/A | Engineering and Procurement | APS | 3 | 3 | 0 | Energy | Generation Interconnection | Solar | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag2399_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag2399_wmpa.pdf | Not Required | N/A | N/A | 3/31/2021 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | Y | No | ||||||||||||||||
| AG2-422 | + | Bustleton 13 kV | Burlington Energy Storage | NJ | Atlantic | Withdrawn | PSEG | 1.2 | 1.2 | 0 | Energy | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2422_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2422_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag2422_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag2422_wmpa.pdf | Not Required | N/A | N/A | 3/31/2021 | N/A | N/A | 12/12/2023 | 12/12/2023 | N/A | Y | No | |||||||||||
| AG2-422 | - | Bustleton 13 kV | Burlington Energy Storage | N/A | N/A | Withdrawn | PSEG | 1.2 | 1.2 | 0 | Energy | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2422_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2422_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag2422_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag2422_wmpa.pdf | Not Required | N/A | N/A | 3/31/2021 | N/A | N/A | 12/12/2023 | 12/12/2023 | N/A | Y | No | |||||||||||
| AG2-495 | + | Phillipsburg Bus I 34.5 kV | PA | Adams | Withdrawn | PENELEC | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2021 | N/A | N/A | 2/9/2022 | N/A | Y | No | ||||||||||||||||||||||
| AG2-495 | - | Phillipsburg Bus I 34.5 kV | N/A | N/A | Withdrawn | PENELEC | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2021 | N/A | N/A | 2/9/2022 | N/A | Y | No | ||||||||||||||||||||||
| AH1-100 | + | Effort Mountain-Gilbert 138 kV II | PA | Monroe | Active | PPL | 45.2 | 0 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 7/30/2021 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-100 | - | Effort Mountain-Gilbert 138 kV II | PA | Monroe | Active | PPL | 45.2 | 45.2 | 0 | Energy | Generation Interconnection | Storage | In Progress | N/A | N/A | 7/30/2021 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-109 | + | Krendale - Unionville 12.47 kV | OH | Adams | Active | APS | 3 | 3 | 0 | Energy | Generation Interconnection | Solar | Not Required | Not Required | N/A | N/A | 8/2/2021 | N/A | N/A | 12/1/2023 | N/A | Y | No | |||||||||||||||||||||
| AH1-109 | - | Krendale - Unionville 12.47 kV | OH | Adams | Active | APS | 3 | 3 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 8/2/2021 | N/A | N/A | 12/1/2023 | N/A | Y | No | ||||||||||||||||||||||
| AH1-116 5132083 | + | PJM-MECS | N/A | N/A | Withdrawn | New Covert Generating Company, LLC | 1200 | 1200 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 8/12/2021 | 6/1/2023 | 6/1/2024 | 6/15/2022 | N/A | PP | No | ||||||||||||||||||||||||
| AH1-116 5132083 | - | PJM-MECS | N/A | N/A | Active | 1200 | 1200 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 8/12/2021 | 6/1/2023 | 6/1/2024 | N/A | PP | No | ||||||||||||||||||||||||||
| AH1-149 | + | Moselem-Saint Peters Tap 69 kV | PA | Berks | Active | ME | 8.4 | 8.375 | 4.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 8/28/2021 | N/A | N/A | 9/19/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-149 | - | Moselem-Saint Peters Tap 69 kV | PA | Berks | Active | ME | 8.4 | 8.375 | 4.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 8/27/2021 | N/A | N/A | 9/19/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-235 | + | Kilgore Compressor Facility 138 kV | OH | Harrison | Active | AEP | 8 | 8 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/25/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-235 | - | Kilgore Compressor Facility 138 kV | OH | Harrison | Active | AEP | 8 | 8 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/9/2021 | N/A | N/A | 12/25/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-276 | + | Leasure 12.47kV | VA | Campbell | Withdrawn | PENELEC | 5 | 4.99 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/9/2021 | N/A | N/A | 6/15/2022 | 11/1/2023 | N/A | Y | No | |||||||||||||||||||||
| AH1-276 | - | Leasure 12.47kV | VA | Campbell | Active | PENELEC | 5 | 4.99 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/9/2021 | N/A | N/A | 11/1/2023 | N/A | Y | No | ||||||||||||||||||||||
| AH1-317 | + | Greene - Beatty 345 kV | OH | Madison | Active | AEP | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-317 | - | Greene - Beatty 345 kV | OH | Madison | Active | AEP | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/9/2021 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-350 | + | Sunnyside – Carrolton 138 kV | OH | Stark | Active | AEP | 92.4 | 92.4 | 55.44 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/11/2021 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-350 | - | Sunnyside – Carrolton 138 kV | OH | Stark | Active | AEP | 92.4 | 92.4 | 55.44 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-526 | + | South Canton - Sammis 345 kV | OH | Carroll | Active | ATSI | 80 | 80 | 80 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/11/2021 | N/A | N/A | 10/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-526 | - | South Canton - Sammis 345 kV | OH | Carroll | Active | ATSI | 80 | 80 | 80 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 10/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-651 | + | Southampton- Handsom 115kV | VA | Southampton | Active | Dominion | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/24/2021 | N/A | N/A | 12/31/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-651 | - | Southampton- Handsom 115kV | VA | Southampton | Active | Dominion | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/23/2021 | N/A | N/A | 12/31/2024 | N/A | N | No | ||||||||||||||||||||||
| AH2-159 | + | Buckskin – Worley 69 kV | OH | Highland | Active | AEP | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/1/2022 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH2-159 | - | Buckskin 69 kV | OH | Highland | Active | AEP | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/1/2022 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH2-160 | + | Buckskin – Worley 69 kV | OH | Highland | Active | AEP | 69 | 20 | 12 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/2/2022 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH2-160 | - | Buckskin 69 kV | OH | Highland | Active | AEP | 69 | 20 | 12 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/2/2022 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH2-174 | + | PA- Fort Hill 12.47 kV | OH | Perry | Active | Unknown | 2 | 2 | 0 | Energy | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | 6/21/2024 | N/A | Y | No | ||||||||||||||||||||||
| AH2-174 | - | PA- Fort Hill 12.47 kV | OH | Perry | Active | PENELEC | 2 | 2 | 0 | Energy | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | 6/21/2024 | N/A | Y | No | ||||||||||||||||||||||
| AH2-188 | + | Youst Solar | PA | Tioga | Withdrawn | PENELEC | 35 | 35 | 21 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/8/2022 | N/A | N/A | 6/3/2022 | 12/31/2025 | N/A | N | No | |||||||||||||||||||||
| AH2-188 | - | Youst Solar | PA | Tioga | Active | PENELEC | 35 | 35 | 21 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/8/2022 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH2-238 | + | Clubhouse- Purdy 115kV | VA | Greensville | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | 12/31/2027 | N/A | N | No | ||||||||||||||||||||||
| AH2-238 | - | Clubhouse- Purdy 115kV | VA | Greensville | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | 12/31/2027 | N/A | N | No | ||||||||||||||||||||||
| AH2-262 | + | Catoctin-Carroll 138 kV | MD | Frederick | Active | APS | 17 | 17 | 10.2 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | 3/1/2026 | N/A | N | No | ||||||||||||||||||||||
| AH2-262 | - | Catocin-Carroll 138 kV | MD | Frederick | Active | APS | 17 | 17 | 10.2 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | 3/1/2026 | N/A | N | No | ||||||||||||||||||||||
| AH2-273 | + | Eagle Road 138 kV | OH | Union | Active | ATSI | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/11/2022 | N/A | N/A | 12/31/2026 | N/A | N | No | ||||||||||||||||||||||
| AH2-353 | + | Jefferson - Hanging Rock 765 kV | KY | N/A | Active | AEP | 1000 | 1000 | 600 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | 12/31/2028 | N/A | N | No | ||||||||||||||||||||||
| AH2-353 | - | Jefferson - Hanging Rock 765 kV | KY | N/A | Active | EKPC | 1000 | 1000 | 600 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | 12/31/2028 | N/A | N | No | ||||||||||||||||||||||
| AH2-383 | + | Goddard - Flemingsburg 138 kV | KY | Fleming | Active | EKPC | 70 | 70 | 56 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/11/2022 | N/A | N/A | 6/10/2027 | N/A | N | No | ||||||||||||||||||||||
| AH2-383 | - | Goddard - Flemingsburg 138 kV | KY | Fleming | Active | EKPC | 70 | 70 | 56 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | 6/10/2027 | N/A | N | No | ||||||||||||||||||||||
| AI1-001 | + | Larrabee 230 kV | NJ | Monmouth | Active | JCPL | 2100 | 2100 | 369.6 | Capacity | Generation Interconnection | Wind | In Progress | N/A | N/A | 4/1/2022 | N/A | N/A | 10/10/2029 | N/A | N | No | ||||||||||||||||||||||
| AI1-011 | + | Buckingham- Farmville 230kV | VA | Cumberland | Active | Dominion | 131 | 46 | 27.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 4/1/2022 | N/A | N/A | 12/31/2026 | N/A | N | No | ||||||||||||||||||||||
| AI1-012 | + | Buckingham- Farmville 230kV | VA | Cumberland | Active | Dominion | 131 | 0 | 18.4 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 4/1/2022 | N/A | N/A | 12/31/2026 | N/A | N | No | ||||||||||||||||||||||
| AI1-037 5178816 | + | PJM-WEC | N/A | N/A | Withdrawn | 314 | Energy | Long-Term Firm Transmission | Withdrawn | N/A | N/A | 4/8/2022 | 6/1/2023 | 6/1/2027 | 6/3/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-037 5178816 | - | PJM-WEC | N/A | N/A | Active | 314 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 4/7/2022 | 6/1/2023 | 6/1/2027 | N/A | PP | No | |||||||||||||||||||||||||||
| AI1-039 | + | Moshannon - Milesburg 230 kV | PA | Clearfield | Active | PENELEC | 200 | 200 | 160 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 4/18/2022 | N/A | N/A | 6/30/2025 | N/A | N | No | ||||||||||||||||||||||
| AI1-040 | + | Ridgway - Elko 138 kV | PA | Elk | Active | APS | 250 | 250 | 150 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 4/29/2022 | N/A | N/A | 3/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AI1-044 | + | Bedford 12.47 kV | PA | Bedford | Active | PENELEC | 7.5 | 7.5 | 4.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 5/12/2022 | N/A | N/A | 5/1/2026 | N/A | N | No | ||||||||||||||||||||||
| AI1-046 | + | Smithburg 500 kV | NJ | Monmouth | Active | JCPL | 1600 | 1600 | 281.6 | Capacity | Generation Interconnection | Wind | In Progress | N/A | N/A | 5/25/2022 | N/A | N/A | 12/31/2031 | N/A | N | No | ||||||||||||||||||||||
| AI1-047 5189719 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 314 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 5/26/2022 | 6/1/2023 | 6/1/2024 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-047 5189719 | - | N/A | N/A | Active | 314 | Energy | Long-Term Firm Transmission | N/A | N/A | 5/26/2022 | 6/1/2023 | 6/1/2024 | N/A | PP | No | |||||||||||||||||||||||||||||
| AI1-048 5189716 | + | PJM-WEC | N/A | N/A | Withdrawn | Invenergy LLC | 518 | Energy | Long-Term Firm Transmission | N/A | N/A | 5/26/2022 | 6/1/2024 | 6/1/2027 | 6/3/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-048 5189716 | - | N/A | N/A | Active | 518 | Energy | Long-Term Firm Transmission | N/A | N/A | 5/26/2022 | 6/1/2024 | 6/1/2027 | N/A | PP | No | |||||||||||||||||||||||||||||
| AI1-049 5189731 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 832 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 5/26/2022 | 6/1/2024 | 6/1/2025 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-049 5189731 | - | N/A | N/A | Active | 832 | Energy | Long-Term Firm Transmission | N/A | N/A | 5/26/2022 | 6/1/2024 | 6/1/2025 | N/A | PP | No | |||||||||||||||||||||||||||||
| AI1-050 5189732 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 832 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 5/26/2022 | 6/1/2025 | 6/1/2026 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-050 5189732 | - | N/A | N/A | Active | 832 | Energy | Long-Term Firm Transmission | N/A | N/A | 5/26/2022 | 6/1/2025 | 6/1/2026 | N/A | PP | No | |||||||||||||||||||||||||||||
| AI1-051 5189733 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 832 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 5/26/2022 | 6/1/2026 | 6/1/2027 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-051 5189733 | - | N/A | N/A | Active | 832 | Energy | Long-Term Firm Transmission | N/A | N/A | 5/26/2022 | 6/1/2026 | 6/1/2027 | N/A | PP | No | |||||||||||||||||||||||||||||
| AI1-052 5192320 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 832 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 5/26/2022 | 6/1/2027 | 6/1/2032 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-052 5192320 | - | N/A | N/A | Active | 832 | Energy | Long-Term Firm Transmission | N/A | N/A | 5/26/2022 | 6/1/2027 | 6/1/2032 | N/A | PP | No | |||||||||||||||||||||||||||||
| AI1-054 5200922 | + | PJM-WEC | N/A | N/A | Withdrawn | Invenergy LLC | 134 | Energy | Long-Term Firm Transmission | N/A | N/A | 6/20/2022 | 6/1/2023 | 6/1/2024 | 6/21/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-055 5200930 | + | PJM-WEC | N/A | N/A | Withdrawn | Invenergy LLC | 134 | Energy | Long-Term Firm Transmission | N/A | N/A | 6/20/2022 | 6/1/2024 | 6/1/2025 | 6/21/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-056 5200938 | + | PJM-NIPS | N/A | N/A | Withdrawn | Invenergy LLC | 1404 | Energy | Long-Term Firm Transmission | N/A | N/A | 6/20/2022 | 6/1/2025 | 6/1/2026 | 7/6/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-057 5200939 | + | PJM-NIPS | N/A | N/A | Withdrawn | Invenergy LLC | 1404 | Energy | Long-Term Firm Transmission | N/A | N/A | 6/20/2022 | 6/1/2026 | 6/1/2027 | 7/6/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-058 5200932 | + | PJM-NIPS | N/A | N/A | Active | Invenergy LLC | 1404 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/20/2022 | 6/1/2024 | 6/1/2025 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-059 5200941 | + | PJM-CIN | N/A | N/A | Active | Invenergy LLC | 1100 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/20/2022 | 6/1/2025 | 6/1/2026 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-060 5200940 | + | PJM-NIPS | N/A | N/A | Withdrawn | Invenergy LLC | 1404 | Energy | Long-Term Firm Transmission | N/A | N/A | 6/20/2022 | 6/1/2027 | 6/1/1932 | 7/6/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-061 5200942 | + | PJM-CIN | N/A | N/A | Active | Invenergy LLC | 1100 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/20/2022 | 6/1/2026 | 6/1/2027 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-062 5200943 | + | PJM-CIN | N/A | N/A | Active | Invenergy LLC | 1100 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/20/2022 | 6/1/2027 | 6/1/1932 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-064 5201681 | + | PJM-WEC | N/A | N/A | Withdrawn | Invenergy LLC | 85 | Energy | Long-Term Firm Transmission | N/A | N/A | 6/21/2022 | 6/1/2023 | 6/1/2024 | 6/22/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-065 5201682 | + | PJM-WEC | N/A | N/A | Withdrawn | Invenergy LLC | 85 | Energy | Long-Term Firm Transmission | N/A | N/A | 6/21/2022 | 6/1/2024 | 6/1/2025 | 6/22/2022 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-068 5201755 | + | PJM-WEC | N/A | N/A | Active | 134 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/22/2022 | 6/1/2023 | 6/1/2024 | N/A | PP | No | |||||||||||||||||||||||||||
| AI1-069 5201756 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 60 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/22/2022 | 6/1/2024 | 6/1/2025 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-070 5201757 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 60 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/22/2022 | 6/1/2025 | 6/1/2026 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-071 5201758 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 60 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/22/2022 | 6/1/2026 | 6/1/2027 | N/A | PP | No | ||||||||||||||||||||||||||
| AI1-072 5201760 | + | PJM-WEC | N/A | N/A | Active | Invenergy LLC | 60 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 6/22/2022 | 6/1/2027 | 6/1/1932 | N/A | PP | No | ||||||||||||||||||||||||||
| H20_CE12 | + | IL | Adams | Withdrawn | ComEd | 700 | Energy | Generation Interconnection | Coal | Withdrawn | N/A | N/A | 1/21/2002 | N/A | N/A | 6/6/2001 | N/A | N | No | |||||||||||||||||||||||||
| H20_CE12 | - | N/A | N/A | Withdrawn | ComEd | 700 | Energy | Generation Interconnection | Coal | Withdrawn | N/A | N/A | 1/21/2002 | N/A | N/A | 6/6/2001 | N/A | N | No | |||||||||||||||||||||||||
| J06_CE16 | + | IL | Adams | Withdrawn | ComEd | 100 | Energy | Generation Interconnection | Hydro | Withdrawn | N/A | N/A | 10/31/2002 | N/A | N/A | 8/1/2005 | N/A | N | No | |||||||||||||||||||||||||
| J06_CE16 | - | N/A | N/A | Withdrawn | ComEd | 100 | Energy | Generation Interconnection | Hydro | Withdrawn | N/A | N/A | 10/31/2002 | N/A | N/A | 8/1/2005 | N/A | N | No | |||||||||||||||||||||||||
| P27 | + | Winchester 34.5 kV | Bethel LF | VA | Unknown | In Service | Dominion | 13 | 13 | 13 | 13 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/p27_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/p27_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/p27_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/p27_csa.pdf | Document Posted | N/A | N/A | 11/18/2005 | N/A | N/A | 1/25/2008 | 1/25/2008 | 1/25/2008 | N/A | N | No | |||||||||
| P27 | - | Winchester 34.5 kV | Bethel LF | VA | Unknown | In Service | Dominion | 13 | 13 | 13 | 13 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/p27_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/p27_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/p27_wmpa.pdf | Not Required | N/A | N/A | 11/18/2005 | N/A | N/A | 1/25/2008 | 1/25/2008 | 1/25/2008 | N/A | N | No | ||||||||||
| X2-032 | + | NJ | Atlantic | Withdrawn | JCPL | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 6/2/2011 | N/A | N/A | 9/26/2013 | Customer Milestone Not Met | N/A | N | No | |||||||||||||||||||||||||
| X2-032 | - | N/A | N/A | Withdrawn | JCPL | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 6/2/2011 | N/A | N/A | 9/26/2013 | Customer Milestone Not Met | N/A | N | No | |||||||||||||||||||||||||
| X2-072 | + | NJ | Atlantic | Withdrawn | AEC | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 7/19/2011 | N/A | N/A | 9/22/2013 | Customer Milestone Not Met | N/A | N | No | |||||||||||||||||||||||||
| X2-072 | - | N/A | N/A | Withdrawn | AEC | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 7/19/2011 | N/A | N/A | 9/22/2013 | Customer Milestone Not Met | N/A | N | No | |||||||||||||||||||||||||
| X2-079 | + | NJ | Atlantic | Withdrawn | AEC | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 7/28/2011 | N/A | N/A | 9/27/2013 | Customer Milestone Not Met | N/A | N | No | |||||||||||||||||||||||||
| X2-079 | - | N/A | N/A | Withdrawn | AEC | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 7/28/2011 | N/A | N/A | 9/27/2013 | Customer Milestone Not Met | N/A | N | No | |||||||||||||||||||||||||
| X3-042 | + | NJ | Atlantic | Withdrawn | AEC | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/2/2011 | N/A | N/A | 9/29/2011 | N/A | N | No | ||||||||||||||||||||||||||
| X3-042 | - | N/A | N/A | Withdrawn | AEC | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/2/2011 | N/A | N/A | 9/29/2011 | N/A | N | No | ||||||||||||||||||||||||||
| X3-069 | + | Hamilton | NJ | Atlantic | Withdrawn | JCPL | 4 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/19/2011 | N/A | N/A | 11/4/2011 | N/A | N | No | ||||||||||||||||||||||||
| X3-069 | - | Hamilton | N/A | N/A | Withdrawn | JCPL | 4 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/19/2011 | N/A | N/A | 11/4/2011 | N/A | N | No | ||||||||||||||||||||||||
| Y2-002 | + | PA | Adams | Withdrawn | PPL | 350 | Energy | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 5/8/2012 | N/A | N/A | 5/24/2012 | Customer Milestone Not Met | N/A | N | No | ||||||||||||||||||||||||
| Y2-002 | - | N/A | N/A | Withdrawn | PPL | 350 | Energy | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 5/8/2012 | N/A | N/A | 5/24/2012 | Customer Milestone Not Met | N/A | N | No | ||||||||||||||||||||||||
| Y2-016 | + | PA | Adams | Withdrawn | PENELEC | 68 | Energy | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 6/6/2012 | N/A | N/A | 6/12/2012 | Customer Initiated Withdrawal | N/A | N | No | ||||||||||||||||||||||||
| Y2-016 | - | N/A | N/A | Withdrawn | PENELEC | 68 | Energy | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 6/6/2012 | N/A | N/A | 6/12/2012 | Customer Initiated Withdrawal | N/A | N | No | ||||||||||||||||||||||||
| Y2-029 | + | Ringoes 12kV | NJ | Atlantic | Withdrawn | JCPL | 0.4 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 6/29/2012 | N/A | N/A | 8/16/2012 | N/A | N | No | ||||||||||||||||||||||||
| Y2-029 | - | Ringoes 12kV | N/A | N/A | Withdrawn | JCPL | 0.4 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 6/29/2012 | N/A | N/A | 8/16/2012 | N/A | N | No | ||||||||||||||||||||||||
| Y3-081 | + | OH | Adams | Withdrawn | ATSI | 0.1 | Energy | Generation Interconnection | Methane | Withdrawn | N/A | N/A | 4/19/2013 | N/A | N/A | 4/25/2013 | N/A | N | No | |||||||||||||||||||||||||
| Y3-081 | - | N/A | N/A | Withdrawn | ATSI | 0.1 | Energy | Generation Interconnection | Methane | Withdrawn | N/A | N/A | 4/19/2013 | N/A | N/A | 4/25/2013 | N/A | N | No | |||||||||||||||||||||||||
| Y3-103 | + | Valley-Raccoon 138kV | Pennsylvania Chemicals Generating Facility | PA | Beaver | In Service | DL | 205 | 205 | 97 | 205 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/y3103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/y3103_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/y3103_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/y3_103_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/y3_103_csa.pdf | Document Posted | N/A | N/A | 11/12/2019 | 4/30/2013 | N/A | N/A | 6/1/2021 | 11/30/2021 | 11/30/2021 | 6/22/2021 | N/A | N | No | ||||||
| Y3-103 | - | Valley-Raccoon 138kV | Pennsylvania Chemicals Generating Facility | PA | Beaver | Partially in Service - Under Construction | DL | 205 | 205 | 97 | 105 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/y3103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/y3103_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/y3103_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/y3_103_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/y3_103_csa.pdf | Document Posted | N/A | N/A | 11/12/2019 | 4/30/2013 | N/A | N/A | 6/1/2021 | 11/30/2021 | 11/30/2021 | 6/22/2021 | N/A | N | No | ||||||
| Y3-114 | + | PA | Adams | Withdrawn | PENELEC | 19.9 | Energy | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 4/30/2013 | N/A | N/A | 4/30/2013 | Customer Initiated Withdrawal | N/A | N | No | ||||||||||||||||||||||||
| Y3-114 | - | N/A | N/A | Withdrawn | PENELEC | 19.9 | Energy | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 4/30/2013 | N/A | N/A | 4/30/2013 | Customer Initiated Withdrawal | N/A | N | No | ||||||||||||||||||||||||
| Z2-086 | + | IL | Adams | Withdrawn | ComEd | 200 | Energy | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 4/29/2014 | N/A | N/A | 5/21/2014 | Customer Milestone Not Met | N/A | N | No | ||||||||||||||||||||||||
| Z2-086 | - | N/A | N/A | Withdrawn | ComEd | 200 | Energy | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 4/29/2014 | N/A | N/A | 5/21/2014 | Customer Milestone Not Met | N/A | N | No | ||||||||||||||||||||||||
| Z2-107 | + | East Carbondale-Lackawanna 69kV | Waymart Battery Energy Storage System | PA | Wayne | Engineering and Procurement | PPL | 10 | 10 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/z2107_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/z2107_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/z2107_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/z2_107_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/z2_107_csa.pdf | Document Posted | N/A | N/A | 4/30/2014 | N/A | N/A | 12/15/2023 | 12/15/2020 | 12/15/2020 | N/A | N | No | |||||||||
| Z2-107 | - | East Carbondale-Lackawanna 69kV | Waymart Battery Energy Storage System | PA | Wayne | Suspended | PPL | 10 | 10 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/z2107_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/z2107_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/z2107_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/z2_107_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/z2_107_csa.pdf | Document Posted | N/A | N/A | 4/30/2014 | N/A | N/A | 12/15/2023 | 12/15/2020 | 12/15/2020 | N/A | N | No |