Changes in PJM Queue between April 6th and May 3rd, 2022.
Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.
Fully new queue positions appear as individual rows with all fields highlighted green.
## old_obs new_obs changes additions removals
## 8254 8457 1391 205 2
## Truncating HTML diff table to ${limit_html} rows...
## Creating HTML table for first ${limit_html} rows
| QueueNumber | chng_type | Name | CommercialName | State | County | Status | TransmissionOwner | MaximumFacilityOutput | MWEnergy | MWCapacity | MWInService | CapacityorEnergy | ProjectType | Fuel | ProjectACOrDC | RightsMW | InitialStudy | FeasibilityStudy | FeasibilityStudyStatus | SystemImpactStudy | SystemImpactStudyStatus | FacilitiesStudy | FacilitiesStudyStatus | InterimInterconnectionServiceAgreement | InterimInterconnectionServiceAgreementStatus | WholesaleMarketParticipationAgreement | ConstructionServiceAgreement | ConstructionServiceAgreementStatus | UpgradeConstructionServiceAgreement | UpgradeConstructionServiceAgreementStatus | BackfeedDate | QueueDate | LongTermFirmServiceStartDate | LongTermFirmServiceEndDate | TestEnergyDate | WithdrawalDate | WithdrawnRemarks | ProjectedInServiceDate | RevisedInServiceDate | ActualInServiceDate | SuspensionDate | AttachmentType | AlternateQueue | SlideQueue |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| A10 | - | Glory 115 kV | Colver Power | PA | Cambria | In Service | PENELEC | 6 | 6 | 6 | 6 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/a10_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/a10_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 6/2/1997 | N/A | N/A | 1/8/2000 | 1/8/2000 | N/A | N | No | ||||||||||||||
| AA1-007 | + | Smith Gap Regional Landfill | VA | Roanoke | Withdrawn | Unknown | 6 | 6 | 6 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1007_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1007_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Withdrawn | N/A | N/A | 6/19/2014 | N/A | N/A | 1/7/2016 | Customer Milestone Not Met | 6/1/2016 | N/A | N | No | |||||||||||||
| AA1-007 | - | Smith Gap Regional Landfill | VA | Roanoke | Withdrawn | AEP | 6 | 6 | 6 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1007_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1007_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Withdrawn | N/A | N/A | 6/19/2014 | N/A | N/A | 1/7/2016 | Customer Milestone Not Met | 6/1/2016 | N/A | N | No | |||||||||||||
| AA1-013 | + | Hanging Rock 765kV | Cornu | OH | Lawrence | In Service | Unknown | 1250 | 10 | 10 | 10 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1013_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1013_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa1_013_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/23/2014 | N/A | N/A | 10/1/2015 | 10/1/2015 | 11/1/2015 | N/A | N | No | ||||||||||
| AA1-013 | - | Hanging Rock 765kV | Cornu | OH | Lawrence | In Service | AEP | 1250 | 10 | 10 | 10 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1013_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1013_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa1_013_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/23/2014 | N/A | N/A | 10/1/2015 | 10/1/2015 | 11/1/2015 | N/A | N | No | ||||||||||
| AA1-014 | + | Washington 345kV | Washington Energy Facility | OH | Washington | In Service | Unknown | 625 | 5 | 5 | 5 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1014_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa1_014_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/23/2014 | N/A | N/A | 10/1/2015 | 10/1/2015 | 11/1/2015 | N/A | N | No | ||||||||||
| AA1-014 | - | Washington 345kV | Washington Energy Facility | OH | Washington | In Service | AEP | 625 | 5 | 5 | 5 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1014_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa1_014_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/23/2014 | N/A | N/A | 10/1/2015 | 10/1/2015 | 11/1/2015 | N/A | N | No | ||||||||||
| AA1-032 | + | Kingsport Mill | Kingsport Mill | TN | Sullivan | In Service | Unknown | 50 | 0 | 45 | 0 | Capacity | Generation Interconnection | Biomass | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1032_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1032_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa1_032_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 7/21/2014 | N/A | N/A | 6/1/2015 | 6/1/2015 | 5/24/2017 | N/A | N | No | ||||||||||
| AA1-032 | - | Kingsport Mill | Kingsport Mill | TN | Sullivan | In Service | AEP | 50 | 0 | 45 | 0 | Capacity | Generation Interconnection | Biomass | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1032_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1032_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa1_032_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 7/21/2014 | N/A | N/A | 6/1/2015 | 6/1/2015 | 5/24/2017 | N/A | N | No | ||||||||||
| AA1-063 | + | Huntsville (Cabin Creek) 69kV | IN | Randolph | Withdrawn | Unknown | 3.6 | 3.6 | 3.6 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1063_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1063_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Withdrawn | N/A | N/A | 9/26/2014 | N/A | N/A | 4/6/2016 | Customer Initiated Withdrawal | 3/31/2016 | N/A | N | No | |||||||||||||
| AA1-063 | - | Huntsville (Cabin Creek) 69kV | IN | Randolph | Withdrawn | AEP | 3.6 | 3.6 | 3.6 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1063_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1063_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Withdrawn | N/A | N/A | 9/26/2014 | N/A | N/A | 4/6/2016 | Customer Initiated Withdrawal | 3/31/2016 | N/A | N | No | |||||||||||||
| AA1-118 | + | Picway 69kV | OH | Pickaway | Withdrawn | Unknown | 20 | 20 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1118_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2014 | N/A | N/A | 5/15/2015 | Customer Initiated Withdrawal | 6/1/2016 | N/A | N | No | ||||||||||||||||||
| AA1-118 | - | Picway 69kV | OH | Pickaway | Withdrawn | AEP | 20 | 20 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1118_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2014 | N/A | N/A | 5/15/2015 | Customer Initiated Withdrawal | 6/1/2016 | N/A | N | No | ||||||||||||||||||
| AA1-120 | + | Fowler-LaPorte | N/A | N/A | Withdrawn | Unknown | 64 | Energy | Upgrade Request | https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/aa1120_arr-imp.pdf | Document Posted | N/A | N/A | 10/31/2014 | N/A | N/A | 11/8/2017 | N/A | EE | No | ||||||||||||||||||||||||
| AA1-120 | - | Fowler-LaPorte | N/A | N/A | Withdrawn | AEP | 64 | Energy | Upgrade Request | https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/aa1120_arr-imp.pdf | Document Posted | N/A | N/A | 10/31/2014 | N/A | N/A | 11/8/2017 | N/A | EE | No | ||||||||||||||||||||||||
| AA1-121 | + | South Granville 12kV | Denison University | OH | Licking | Withdrawn | Unknown | 2 | 2 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1121_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/aa1121_wmpa.pdf | Not Required | N/A | N/A | 10/31/2014 | N/A | N/A | 4/18/2017 | Customer Initiated Withdrawal | 1/31/2018 | 1/31/2018 | N/A | N | No | ||||||||||
| AA1-121 | - | South Granville 12kV | Denison University | OH | Licking | Withdrawn | AEP | 2 | 2 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1121_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/aa1121_wmpa.pdf | Not Required | N/A | N/A | 10/31/2014 | N/A | N/A | 4/18/2017 | Customer Initiated Withdrawal | 1/31/2018 | 1/31/2018 | N/A | N | No | ||||||||||
| AA1-125 | + | Seaman 138kV | OH | Brown | Withdrawn | Unknown | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1125_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1125_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2014 | N/A | N/A | 7/7/2015 | Customer Initiated Withdrawal | 10/1/2016 | N/A | N | No | ||||||||||||||||
| AA1-125 | - | Seaman 138kV | OH | Brown | Withdrawn | AEP | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1125_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1125_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2014 | N/A | N/A | 7/7/2015 | Customer Initiated Withdrawal | 10/1/2016 | N/A | N | No | ||||||||||||||||
| AA1-128 | + | Glen Lyn | VA | Giles | Withdrawn | Unknown | 10 | 10 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1128_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1128_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2014 | N/A | N/A | 7/24/2015 | Customer Initiated Withdrawal | 10/1/2016 | N/A | N | No | ||||||||||||||||
| AA1-128 | - | Glen Lyn | VA | Giles | Withdrawn | AEP | 10 | 10 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1128_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1128_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2014 | N/A | N/A | 7/24/2015 | Customer Initiated Withdrawal | 10/1/2016 | N/A | N | No | ||||||||||||||||
| AA1-130 | + | St. Claire 13kV | OH | Franklin | Withdrawn | Unknown | 5 | 5 | 3 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1130_fea.pdf | Document Posted | Withdrawn | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 10/31/2014 | N/A | N/A | 3/31/2016 | Customer Milestone Not Met | 11/1/2015 | N/A | N | No | ||||||||||||||
| AA1-130 | - | St. Claire 13kV | OH | Franklin | Withdrawn | AEP | 5 | 5 | 3 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1130_fea.pdf | Document Posted | Withdrawn | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 10/31/2014 | N/A | N/A | 3/31/2016 | Customer Milestone Not Met | 11/1/2015 | N/A | N | No | ||||||||||||||
| AA2-001 | + | Reusens 34.5kV | VA | Campbell | Withdrawn | Unknown | 12.5 | 12.5 | 2 | Capacity | Generation Interconnection | Hydro | Withdrawn | N/A | N/A | 11/3/2014 | N/A | N/A | 9/10/2015 | Customer Milestone Not Met | 12/8/2014 | N/A | N | No | ||||||||||||||||||||
| AA2-001 | - | Reusens 34.5kV | VA | Campbell | Withdrawn | AEP | 12.5 | 12.5 | 2 | Capacity | Generation Interconnection | Hydro | Withdrawn | N/A | N/A | 11/3/2014 | N/A | N/A | 9/10/2015 | Customer Milestone Not Met | 12/8/2014 | N/A | N | No | ||||||||||||||||||||
| AA2-041 | + | Tidd-Collier | OH | Jefferson | Withdrawn | Unknown | 225 | Energy | Merchant Transmission | AC | Withdrawn | N/A | N/A | 2/2/2015 | N/A | N/A | 3/16/2015 | Customer Initiated Withdrawal | 6/1/2016 | N/A | S | No | ||||||||||||||||||||||
| AA2-041 | - | Tidd-Collier | OH | Jefferson | Withdrawn | AEP | 225 | Energy | Merchant Transmission | AC | Withdrawn | N/A | N/A | 2/2/2015 | N/A | N/A | 3/16/2015 | Customer Initiated Withdrawal | 6/1/2016 | N/A | S | No | ||||||||||||||||||||||
| AA2-048 | + | Allenwood-Larrabee 34kV | Lakewood-Farmingdale Road Solar Farm & Storage Facility | NJ | Monmouth | Engineering and Procurement | JCPL | 7 | 7 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2048_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/aa2048_wmpa.pdf | Not Required | N/A | N/A | 2/18/2015 | N/A | N/A | 8/31/2022 | 8/31/2022 | 8/31/2022 | N/A | N | No | |||||||||||
| AA2-048 | - | Allenwood-Larrabee 34kV | Lakewood-Farmingdale Road Solar Farm & Storage Facility | NJ | Monmouth | Engineering and Procurement | JCPL | 7 | 7 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2048_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/aa2048_wmpa.pdf | Not Required | N/A | N/A | 2/18/2015 | N/A | N/A | 12/31/2020 | 8/31/2022 | 8/31/2022 | N/A | N | No | |||||||||||
| AA2-060 | + | Branchville-Sussex #1 34kV | Plains Road Battery Storage Facility | NJ | Sussex | Under Construction | JCPL | 6 | 6 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2060_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2060_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_060_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_060_csa.pdf | Document Posted | N/A | N/A | 2/27/2015 | N/A | N/A | 6/30/2022 | 6/30/2022 | N/A | N | No | |||||||||||
| AA2-060 | - | Branchville-Sussex #1 34kV | Plains Road Battery Storage Facility | NJ | Sussex | Under Construction | JCPL | 6 | 6 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2060_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2060_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_060_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_060_csa.pdf | Document Posted | N/A | N/A | 2/27/2015 | N/A | N/A | 10/31/2021 | 6/30/2022 | 6/30/2022 | N/A | N | No | ||||||||||
| AA2-061 | + | Branchville-Sussex #2 34.5kV | Mohawk Battery Storage Facility | NJ | Sussex | Under Construction | JCPL | 8 | 8 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2061_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_061_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_061_csa.pdf | Document Posted | N/A | N/A | 2/27/2015 | N/A | N/A | 6/30/2022 | 6/30/2022 | N/A | N | No | |||||||||||
| AA2-061 | - | Branchville-Sussex #2 34.5kV | Mohawk Battery Storage Facility | NJ | Sussex | Under Construction | JCPL | 8 | 8 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2061_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_061_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_061_csa.pdf | Document Posted | N/A | N/A | 2/27/2015 | N/A | N/A | 10/31/2021 | 6/30/2022 | 6/30/2022 | N/A | N | No | ||||||||||
| AA2-070 | + | Smith Mountain 138kV | Smith Mountain Hydro | VA | Henry | In Service | Unknown | 649 | 34 | 34 | 34 | Capacity | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2070_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2070_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_070_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 2/28/2015 | N/A | N/A | 12/31/2018 | 12/31/2018 | 12/31/2018 | N/A | N | No | ||||||||||
| AA2-070 | - | Smith Mountain 138kV | Smith Mountain Hydro | VA | Henry | In Service | AEP | 649 | 34 | 34 | 34 | Capacity | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2070_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2070_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_070_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 2/28/2015 | N/A | N/A | 12/31/2018 | 12/31/2018 | 12/31/2018 | N/A | N | No | ||||||||||
| AA2-075 | + | Southwest Lima 345kV | OH | Van Wert | Withdrawn | Unknown | 250 | 250 | 33 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2075_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 3/16/2015 | N/A | N/A | 1/27/2017 | Customer Initiated Withdrawal | 3/14/2022 | N/A | N | No | ||||||||||||||||||
| AA2-075 | - | Southwest Lima 345kV | OH | Van Wert | Withdrawn | AEP | 250 | 250 | 33 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2075_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 3/16/2015 | N/A | N/A | 1/27/2017 | Customer Initiated Withdrawal | 3/14/2022 | N/A | N | No | ||||||||||||||||||
| AA2-076 | + | Linwood 230kV | Phillips Island CT1, CT2, CT3 & ST4 | PA | Delaware | In Service | PECO | 919 | 0 | 18 | 0 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2076_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2076_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_076_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/27/2015 | N/A | N/A | 4/27/2021 | N/A | N | No | This project slid to the next queue | |||||||||||
| AA2-076 | - | Linwood 230kV | Phillips Island CT1, CT2, CT3 & ST4 | PA | Delaware | Canceled | PECO | 919 | 0 | 18 | 0 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2076_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2076_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_076_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/27/2015 | N/A | N/A | 4/27/2021 | N/A | N | No | This project slid to the next queue | |||||||||||
| AA2-098 | + | George Washington (Moundsville) | WV | Marshall | Withdrawn | Unknown | 565 | 20 | 20 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2098_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 4/20/2015 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | ||||||||||||||||||
| AA2-098 | - | George Washington (Moundsville) | WV | Marshall | Withdrawn | AEP | 565 | 20 | 20 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2098_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 4/20/2015 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | ||||||||||||||||||
| AA2-106 | + | Bluff Point 69kV | IN | Jay | Withdrawn | Unknown | 20 | 20 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2106_imp.pdf | Document Posted | N/A | N/A | 4/24/2015 | N/A | N/A | 3/13/2018 | 12/31/2018 | 12/31/2018 | N/A | N | No | |||||||||||||||||
| AA2-106 | - | Bluff Point 69kV | IN | Jay | Withdrawn | AEP | 20 | 20 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2106_imp.pdf | Document Posted | N/A | N/A | 4/24/2015 | N/A | N/A | 3/13/2018 | 12/31/2018 | 12/31/2018 | N/A | N | No | |||||||||||||||||
| AA2-116 | + | Cook-East Elkhart 345kV | Indeck Niles Energy Center | MI | Cass | Partially in Service - Under Construction | Unknown | 994 | 994 | 994 | 160 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2116_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2116_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_116_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_116_csa.pdf | Document Posted | N/A | N/A | 6/24/2021 | 4/28/2015 | N/A | N/A | 12/27/2021 | 3/15/2022 | 3/15/2022 | 12/27/2021 | N/A | N | No | ||||||
| AA2-116 | - | Cook-East Elkhart 345kV | Indeck Niles Energy Center | MI | Cass | Partially in Service - Under Construction | AEP | 994 | 994 | 994 | 160 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2116_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2116_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_116_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_116_csa.pdf | Document Posted | N/A | N/A | 6/24/2021 | 4/28/2015 | N/A | N/A | 12/27/2021 | 3/15/2022 | 3/15/2022 | 12/27/2021 | N/A | N | No | ||||||
| AA2-137 | + | Hanging Rock 765kV - Power Block 1 | Cornu | OH | Lawrence | In Service | Unknown | 670 | 45 | 45 | 45 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2137_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2137_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_137_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/30/2015 | N/A | N/A | 5/1/2019 | 12/2/2016 | N/A | N | No | |||||||||||
| AA2-137 | - | Hanging Rock 765kV - Power Block 1 | Cornu | OH | Lawrence | In Service | AEP | 670 | 45 | 45 | 45 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2137_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2137_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_137_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/30/2015 | N/A | N/A | 5/1/2019 | 12/2/2016 | N/A | N | No | |||||||||||
| AA2-138 | + | Hanging Rock 765kV - Power Block 2 | Cornu | OH | Lawrence | In Service | Unknown | 670 | 45 | 45 | 45 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2138_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2138_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_138_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/30/2015 | N/A | N/A | 5/1/2019 | 5/1/2019 | 12/2/2016 | N/A | N | No | ||||||||||
| AA2-138 | - | Hanging Rock 765kV - Power Block 2 | Cornu | OH | Lawrence | In Service | AEP | 670 | 45 | 45 | 45 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2138_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2138_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_138_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/30/2015 | N/A | N/A | 5/1/2019 | 5/1/2019 | 12/2/2016 | N/A | N | No | ||||||||||
| AA2-141 | + | Washington 345kV | Washington Energy Facility | OH | Washington | In Service | Unknown | 670 | 45 | 45 | 45 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2141_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_141_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/30/2015 | N/A | N/A | 8/31/2016 | 8/31/2016 | 12/2/2016 | N/A | N | No | ||||||||||
| AA2-141 | - | Washington 345kV | Washington Energy Facility | OH | Washington | In Service | AEP | 670 | 45 | 45 | 45 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2141_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa2_141_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/30/2015 | N/A | N/A | 8/31/2016 | 8/31/2016 | 12/2/2016 | N/A | N | No | ||||||||||
| AA2-148 | + | Madison-Tanners Creek 138kV | IN | Fayette | Withdrawn | Unknown | 175 | 174.2 | 22.75 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2148_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2148_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 4/30/2015 | N/A | N/A | 4/20/2021 | 12/31/2017 | 12/31/2017 | N/A | N | No | ||||||||||||||||
| AA2-148 | - | Madison-Tanners Creek 138kV | IN | Fayette | Withdrawn | AEP | 175 | 174.2 | 22.75 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2148_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2148_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 4/30/2015 | N/A | N/A | 4/20/2021 | 12/31/2017 | 12/31/2017 | N/A | N | No | ||||||||||||||||
| AA2-151 | + | Delano-Scioto Trail 138kV | OH | Ross | Withdrawn | Unknown | 80 | 80 | 56 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 4/30/2015 | N/A | N/A | 5/18/2015 | 6/30/2016 | N/A | N | No | |||||||||||||||||||||
| AA2-151 | - | Delano-Scioto Trail 138kV | OH | Ross | Withdrawn | AEP | 80 | 80 | 56 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 4/30/2015 | N/A | N/A | 5/18/2015 | 6/30/2016 | N/A | N | No | |||||||||||||||||||||
| AA2-186 | + | Forest 69kV | OH | Hardin | Withdrawn | Unknown | 20 | 20 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2186_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2186_imp.pdf | Document Posted | N/A | N/A | 4/30/2015 | N/A | N/A | 5/11/2017 | Customer Initiated Withdrawal | 12/1/2016 | N/A | N | No | |||||||||||||||||
| AA2-186 | - | Forest 69kV | OH | Hardin | Withdrawn | AEP | 20 | 20 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2186_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2186_imp.pdf | Document Posted | N/A | N/A | 4/30/2015 | N/A | N/A | 5/11/2017 | Customer Initiated Withdrawal | 12/1/2016 | N/A | N | No | |||||||||||||||||
| AB1-004 | + | Solar Holler | N/A | N/A | Withdrawn | Unknown | 0.4 | 0.4 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 5/4/2015 | N/A | N/A | 5/19/2015 | 10/1/2015 | N/A | Y | No | |||||||||||||||||||||
| AB1-004 | - | Solar Holler | N/A | N/A | Withdrawn | AEP | 0.4 | 0.4 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 5/4/2015 | N/A | N/A | 5/19/2015 | 10/1/2015 | N/A | Y | No | |||||||||||||||||||||
| AB1-006 | + | Meadow Lake 345kV | Meadow Lake Wind Farm VI | IN | White | In Service | Unknown | 200 | 200 | 26 | 200 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1006_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1006_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1006_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_006_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_006_csa.pdf | Document Posted | N/A | N/A | 5/22/2015 | N/A | N/A | 12/31/2018 | 12/31/2018 | 12/21/2018 | N/A | N | No | ||||||||
| AB1-006 | - | Meadow Lake 345kV | Meadow Lake Wind Farm VI | IN | White | In Service | AEP | 200 | 200 | 26 | 200 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1006_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1006_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1006_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_006_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_006_csa.pdf | Document Posted | N/A | N/A | 5/22/2015 | N/A | N/A | 12/31/2018 | 12/31/2018 | 12/21/2018 | N/A | N | No | ||||||||
| AB1-032 | + | Lee Station Southwest 12kV | OH | Athens | Withdrawn | Unknown | 3.3 | 3.3 | 1.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1032_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1032_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 7/31/2015 | N/A | N/A | 8/1/2017 | Customer Initiated Withdrawal | 12/31/2016 | 12/31/2016 | N/A | N | No | ||||||||||||
| AB1-032 | - | Lee Station Southwest 12kV | OH | Athens | Withdrawn | AEP | 3.3 | 3.3 | 1.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1032_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1032_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 7/31/2015 | N/A | N/A | 8/1/2017 | Customer Initiated Withdrawal | 12/31/2016 | 12/31/2016 | N/A | N | No | ||||||||||||
| AB1-055 | + | Balls Gap 34.5kV | Balls Gap Battery Facility | WV | Cabell | Deactivated | Unknown | 2 | 2 | 0 | 2 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1055_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1055_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1055_wmpa.pdf | Not Required | N/A | N/A | 8/31/2015 | N/A | N/A | 12/1/2016 | 12/1/2016 | 3/1/2017 | N/A | N | No | |||||||||
| AB1-055 | - | Balls Gap 34.5kV | Balls Gap Battery Facility | WV | Cabell | Deactivated | AEP | 2 | 2 | 0 | 2 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1055_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1055_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1055_wmpa.pdf | Not Required | N/A | N/A | 8/31/2015 | N/A | N/A | 12/1/2016 | 12/1/2016 | 3/1/2017 | N/A | N | No | |||||||||
| AB1-058 | + | Gavin Unit #1 765kV | Gavin #1 | OH | Gallia | In Service | Unknown | 1331 | 11 | 11 | 11 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1058_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1058_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab1_058_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 8/31/2015 | N/A | N/A | 12/31/2017 | 12/31/2017 | 12/31/2017 | N/A | N | No | ||||||||||
| AB1-058 | - | Gavin Unit #1 765kV | Gavin #1 | OH | Gallia | In Service | AEP | 1331 | 11 | 11 | 11 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1058_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1058_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab1_058_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 8/31/2015 | N/A | N/A | 12/31/2017 | 12/31/2017 | 12/31/2017 | N/A | N | No | ||||||||||
| AB1-060 | + | Cloverdale-Jacksons Ferry 765kV | N/A | N/A | Withdrawn | Unknown | Energy | Merchant Transmission | AC | Withdrawn | N/A | N/A | 8/31/2015 | N/A | N/A | 9/3/2015 | Customer Initiated Withdrawal | 6/1/2016 | N/A | S | No | |||||||||||||||||||||||
| AB1-060 | - | Cloverdale-Jacksons Ferry 765kV | N/A | N/A | Withdrawn | AEP | Energy | Merchant Transmission | AC | Withdrawn | N/A | N/A | 8/31/2015 | N/A | N/A | 9/3/2015 | Customer Initiated Withdrawal | 6/1/2016 | N/A | S | No | |||||||||||||||||||||||
| AB1-061 | + | Fieldale-Thornton-Franklin 138kV & Danville-East Danville 138kV | N/A | N/A | Withdrawn | Unknown | Energy | Merchant Transmission | AC | Withdrawn | N/A | N/A | 8/31/2015 | N/A | N/A | 9/3/2015 | Customer Initiated Withdrawal | 6/1/2016 | N/A | S | No | |||||||||||||||||||||||
| AB1-061 | - | Fieldale-Thornton-Franklin 138kV & Danville-East Danville 138kV | N/A | N/A | Withdrawn | AEP | Energy | Merchant Transmission | AC | Withdrawn | N/A | N/A | 8/31/2015 | N/A | N/A | 9/3/2015 | Customer Initiated Withdrawal | 6/1/2016 | N/A | S | No | |||||||||||||||||||||||
| AB1-080 | + | Dumont-Olive 345kV | St. Joseph’s Energy Center, LLC | IN | St. Joseph | In Service | Unknown | 715 | 40 | 40 | 40 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1080_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1080_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1080_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_080_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_080_csa.pdf | Document Posted | N/A | N/A | 7/1/2017 | 9/30/2015 | N/A | N/A | 12/28/2017 | 4/29/2018 | 4/29/2018 | 4/1/2018 | N/A | N | No | ||||||
| AB1-080 | - | Dumont-Olive 345kV | St. Joseph’s Energy Center, LLC | IN | St. Joseph | In Service | AEP | 715 | 40 | 40 | 40 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1080_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1080_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1080_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_080_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_080_csa.pdf | Document Posted | N/A | N/A | 7/1/2017 | 9/30/2015 | N/A | N/A | 12/28/2017 | 4/29/2018 | 4/29/2018 | 4/1/2018 | N/A | N | No | ||||||
| AB1-087 | + | Sullivan 345kV #1 | IN | Sullivan | Withdrawn | Unknown | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1087_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1087_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1087_fac.pdf | Document Posted | Withdrawn | N/A | Withdrawn | N/A | N/A | 9/30/2015 | N/A | N/A | 4/14/2022 | 6/1/2019 | N/A | N | No | |||||||||||||
| AB1-087 | - | Sullivan 345kV #1 | IN | Sullivan | Active | AEP | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1087_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1087_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1087_fac.pdf | Document Posted | N/A | N/A | 9/30/2015 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AB1-088 | + | Sullivan 345kV #2 | IN | Sullivan | Withdrawn | Unknown | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1088_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1088_fac.pdf | Document Posted | Withdrawn | N/A | Withdrawn | N/A | N/A | 9/30/2015 | N/A | N/A | 4/14/2022 | 6/1/2019 | N/A | N | No | |||||||||||||
| AB1-088 | - | Sullivan 345kV #2 | IN | Sullivan | Active | AEP | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1088_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1088_fac.pdf | Document Posted | N/A | N/A | 9/30/2015 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AB1-091 | + | Davis Creek 345kV | IL | Kankakee | Withdrawn | ComEd | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1091_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1091_fac.pdf | Document Posted | Withdrawn | N/A | Withdrawn | N/A | N/A | 9/30/2015 | N/A | N/A | 4/11/2022 | 6/1/2019 | N/A | N | No | |||||||||||||
| AB1-091 | - | Davis Creek 345kV | IL | Kankakee | Active | ComEd | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1091_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1091_fac.pdf | Document Posted | N/A | N/A | 9/30/2015 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AB1-096 | + | Carroll-Mt. Airy 34.5kV | Union Bridge Solar Facility | MD | Carroll | In Service | APS | 9.9 | 8.2 | 3.1 | 8.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf | Document Posted | N/A | N/A | 10/7/2015 | N/A | N/A | 1/28/2022 | 2/28/2022 | 2/28/2022 | 4/21/2022 | N/A | N | No | ||||||||
| AB1-096 | - | Carroll-Mt. Airy 34.5kV | Union Bridge Solar Facility | MD | Carroll | Under Construction | APS | 9.9 | 8.2 | 3.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf | Document Posted | N/A | N/A | 10/7/2015 | N/A | N/A | 1/28/2022 | 2/28/2022 | 2/28/2022 | N/A | N | No | ||||||||||
| AB1-101 | + | Cloverdale-Jacksons Ferry 765kV | N/A | N/A | Withdrawn | Unknown | Energy | Merchant Transmission | AC | Not Required | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab1101_imp.pdf | Document Posted | N/A | N/A | 10/16/2015 | N/A | N/A | 9/20/2016 | 6/1/2016 | N/A | S | No | ||||||||||||||||||||||
| AB1-101 | - | Cloverdale-Jacksons Ferry 765kV | N/A | N/A | Withdrawn | AEP | Energy | Merchant Transmission | AC | Not Required | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab1101_imp.pdf | Document Posted | N/A | N/A | 10/16/2015 | N/A | N/A | 9/20/2016 | 6/1/2016 | N/A | S | No | ||||||||||||||||||||||
| AB1-103 | + | Fieldale-Thornton & Danville-E. Danville 138kV | CMN | N/A | N/A | Withdrawn | Unknown | Energy | Merchant Transmission | AC | Not Required | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab1103_imp.pdf | Document Posted | N/A | N/A | 10/16/2015 | N/A | N/A | 9/20/2016 | 6/1/2016 | N/A | S | No | |||||||||||||||||||||
| AB1-103 | - | Fieldale-Thornton & Danville-E. Danville 138kV | CMN | N/A | N/A | Withdrawn | AEP | Energy | Merchant Transmission | AC | Not Required | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab1103_imp.pdf | Document Posted | N/A | N/A | 10/16/2015 | N/A | N/A | 9/20/2016 | 6/1/2016 | N/A | S | No | |||||||||||||||||||||
| AB1-109 | + | Mountaineer | Mountaineer #1 | WV | Unknown | Partially in Service - Under Construction | Unknown | 1356 | 36 | 36 | 36 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1109_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1109_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab1_109_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/26/2015 | N/A | N/A | 6/1/2021 | 6/1/2021 | 12/31/2018 | N/A | N | No | ||||||||||
| AB1-109 | - | Mountaineer | Mountaineer #1 | WV | Unknown | Partially in Service - Under Construction | AEP | 1356 | 36 | 36 | 36 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1109_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1109_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab1_109_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/26/2015 | N/A | N/A | 6/1/2021 | 6/1/2021 | 12/31/2018 | N/A | N | No | ||||||||||
| AB1-122 | + | Kendall-Tazewell & Dresden-Mole Creek | Three Rivers Energy Center | IL | Grundy | Under Construction | ComEd | 1160 | 1150 | 1150 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1122_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1122_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1122_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_122_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_122_csa.pdf | Document Posted | N/A | N/A | 7/1/2022 | 10/29/2015 | N/A | N/A | 1/2/2023 | 5/30/2023 | 5/30/2023 | N/A | N | No | ||||||||
| AB1-122 | - | Kendall-Tazewell & Dresden-Mole Creek | Three Rivers Energy Center | IL | Grundy | Under Construction | ComEd | 1160 | 1150 | 1150 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1122_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1122_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1122_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_122_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_122_csa.pdf | Document Posted | N/A | N/A | 10/29/2015 | N/A | N/A | 1/2/2023 | 5/30/2023 | 5/30/2023 | N/A | N | No | |||||||||
| AB1-132 | + | Thelma 230kV | Gaston Green Acres Solar | NC | Northhampton | Under Construction | Dominion | 120 | 120 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1132_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1132_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1132_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_132_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_132_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 2/1/2023 | 3/31/2023 | 3/31/2023 | N/A | N | No | |||||||||
| AB1-132 | - | Thelma 230kV | Gaston Green Acres Solar | NC | Northhampton | Engineering and Procurement | Dominion | 120 | 120 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1132_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1132_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1132_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_132_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_132_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 2/1/2023 | 3/31/2023 | 3/31/2023 | N/A | N | No | |||||||||
| AB1-136 | + | Picway Solar 138kV | OH | Franklin | Withdrawn | Unknown | 80 | 80 | 56 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 11/17/2015 | Customer Milestone Not Met | 11/1/2016 | N/A | N | No | ||||||||||||||||||||
| AB1-136 | - | Picway Solar 138kV | OH | Franklin | Withdrawn | AEP | 80 | 80 | 56 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 11/17/2015 | Customer Milestone Not Met | 11/1/2016 | N/A | N | No | ||||||||||||||||||||
| AB1-140 | + | George Washington 138kV I | WV | Marshall | Withdrawn | Unknown | 575 | 10 | 10 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1140_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | ||||||||||||||||||
| AB1-140 | - | George Washington 138kV I | WV | Marshall | Withdrawn | AEP | 575 | 10 | 10 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1140_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | ||||||||||||||||||
| AB1-143 | + | George Washington 138kV II | WV | Marshall | Withdrawn | Unknown | 585 | 10 | 10 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1143_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | ||||||||||||||||||
| AB1-143 | - | George Washington 138kV II | WV | Marshall | Withdrawn | AEP | 585 | 10 | 10 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1143_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | ||||||||||||||||||
| AB1-157 | + | George Washington 138kV III | WV | Marshall | Withdrawn | Unknown | 595 | 10 | 10 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1157_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | ||||||||||||||||||
| AB1-157 | - | George Washington 138kV III | WV | Marshall | Withdrawn | AEP | 595 | 10 | 10 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1157_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | ||||||||||||||||||
| AB1-158 | + | Thornville 34.5kV | OH | Perry | Withdrawn | Unknown | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 11/12/2015 | Customer Initiated Withdrawal | 10/31/2017 | N/A | N | No | ||||||||||||||||||||
| AB1-158 | - | Thornville 34.5kV | OH | Perry | Withdrawn | AEP | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 11/12/2015 | Customer Initiated Withdrawal | 10/31/2017 | N/A | N | No | ||||||||||||||||||||
| AB1-167 | + | South Cumberland 69kV | OH | Noble | Withdrawn | Unknown | 50 | 50 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1167_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 11/30/2017 | 8/31/2017 | N/A | N | No | |||||||||||||||||||
| AB1-167 | - | South Cumberland 69kV | OH | Noble | Withdrawn | AEP | 50 | 50 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1167_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/30/2015 | N/A | N/A | 11/30/2017 | 8/31/2017 | N/A | N | No | |||||||||||||||||||
| AB1-173 | + | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 19.8 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 5/23/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB1-173 | - | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 19.8 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 3/11/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB1-173A | + | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 39.6 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 5/23/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB1-173A | - | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 39.6 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 3/11/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB1-174 | + | Thornville12kV | Thornville 12kV | OH | Perry | Withdrawn | Unknown | 10 | 10 | 6.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1174_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1174_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1174_wmpa.pdf | Not Required | N/A | N/A | 10/30/2015 | N/A | N/A | 2/7/2018 | 12/31/2018 | 12/31/2018 | N/A | N | No | ||||||||||
| AB1-174 | - | Thornville12kV | Thornville 12kV | OH | Perry | Withdrawn | AEP | 10 | 10 | 6.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1174_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1174_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1174_wmpa.pdf | Not Required | N/A | N/A | 10/30/2015 | N/A | N/A | 2/7/2018 | 12/31/2018 | 12/31/2018 | N/A | N | No | ||||||||||
| AB1-180 | + | Pine View 12kV | Seven Islands Environmental Solutions, LLC | WV | Unknown | In Service | Unknown | 3.2 | 3.2 | 2.4 | 3.2 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1180_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1180_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1180_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1180_wmpa.pdf | Not Required | N/A | N/A | 10/30/2015 | N/A | N/A | 12/31/2016 | 12/31/2016 | 3/7/2017 | N/A | N | No | |||||||||
| AB1-180 | - | Pine View 12kV | Seven Islands Environmental Solutions, LLC | WV | Unknown | In Service | AEP | 3.2 | 3.2 | 2.4 | 3.2 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1180_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1180_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1180_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1180_wmpa.pdf | Not Required | N/A | N/A | 10/30/2015 | N/A | N/A | 12/31/2016 | 12/31/2016 | 3/7/2017 | N/A | N | No | |||||||||
| AB2-010 | + | Saltville-Holston 34.5kV - Phase I | Saltville-Holston 34.5kV Solar Facility | VA | Smyth | Withdrawn | Unknown | 5 | 5 | 2.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2010_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2010_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2010_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2010_wmpa.pdf | Not Required | N/A | N/A | 12/1/2015 | N/A | N/A | 2/5/2019 | 12/1/2017 | 12/1/2017 | N/A | N | No | ||||||||||
| AB2-010 | - | Saltville-Holston 34.5kV - Phase I | Saltville-Holston 34.5kV Solar Facility | VA | Smyth | Withdrawn | AEP | 5 | 5 | 2.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2010_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2010_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2010_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2010_wmpa.pdf | Not Required | N/A | N/A | 12/1/2015 | N/A | N/A | 2/5/2019 | 12/1/2017 | 12/1/2017 | N/A | N | No | ||||||||||
| AB2-011 | + | Saltville-Holstone 34.5kV - Phase II | Saltville-Holston 34.5kV Solar Facility | VA | Smyth | Withdrawn | Unknown | 5 | 5 | 2.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2011_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2011_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2011_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2011_wmpa.pdf | Not Required | N/A | N/A | 12/1/2015 | N/A | N/A | 2/5/2019 | 12/1/2017 | 12/1/2017 | N/A | N | No | ||||||||||
| AB2-011 | - | Saltville-Holstone 34.5kV - Phase II | Saltville-Holston 34.5kV Solar Facility | VA | Smyth | Withdrawn | AEP | 5 | 5 | 2.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2011_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2011_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2011_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2011_wmpa.pdf | Not Required | N/A | N/A | 12/1/2015 | N/A | N/A | 2/5/2019 | 12/1/2017 | 12/1/2017 | N/A | N | No | ||||||||||
| AB2-014 | + | Lakewood 230kV | Lakewood Cogeneration Plant | NJ | Ocean | In Service | JCPL | 280 | 0 | 8.1 | 0 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2014_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab2_014_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 12/15/2015 | N/A | N/A | 9/30/2017 | 9/30/2017 | 11/16/2016 | N/A | N | No | ||||||||||
| AB2-014 | - | Lakewood 230kV | Lakewood Cogeneration Plant | NJ | Ocean | Partially in Service - Under Construction | JCPL | 280 | 0 | 8.1 | 0 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2014_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab2_014_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 12/15/2015 | N/A | N/A | 9/30/2017 | 9/30/2017 | 11/16/2016 | N/A | N | No | ||||||||||
| AB2-016 | + | Maddox Creek 345kV | OH | Van Wert | Withdrawn | Unknown | 100 | 100 | 13 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2016_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2016_imp.pdf | Document Posted | N/A | N/A | 12/28/2015 | N/A | N/A | 3/9/2018 | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AB2-016 | - | Maddox Creek 345kV | OH | Van Wert | Withdrawn | AEP | 100 | 100 | 13 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2016_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2016_imp.pdf | Document Posted | N/A | N/A | 12/28/2015 | N/A | N/A | 3/9/2018 | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AB2-028 | + | Fall Creek-Desoto 345kV | IN | Henry | Withdrawn | Unknown | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2028_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2028_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 2/10/2016 | N/A | N/A | 6/17/2021 | 10/31/2018 | N/A | N | No | |||||||||||||||||
| AB2-028 | - | Fall Creek-Desoto 345kV | IN | Henry | Withdrawn | AEP | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2028_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2028_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 2/10/2016 | N/A | N/A | 6/17/2021 | 10/31/2018 | N/A | N | No | |||||||||||||||||
| AB2-031 | + | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 59.6 | 20 | 13.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf | Document Posted | N/A | N/A | 2/11/2016 | N/A | N/A | 5/23/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB2-031 | - | Brink-Trego 115kV | Meherrin Solar | VA | Greensville | Under Construction | Dominion | 59.6 | 20 | 13.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf | Document Posted | N/A | N/A | 2/11/2016 | N/A | N/A | 3/11/2022 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AB2-049 | + | Gloucester Township 12kV | GEMS Landfill Solar | NJ | Camden | In Service | AEC | 3 | 3 | 1.14 | 3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2049_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2049_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2049_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2049_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2049_wmpa.pdf | Not Required | N/A | N/A | 3/4/2016 | N/A | N/A | 3/18/2022 | 6/30/2022 | 6/30/2022 | 4/14/2022 | N/A | N | No | |||||||
| AB2-049 | - | Gloucester Township 12kV | GEMS Landfill Solar | NJ | Camden | Engineering and Procurement | AEC | 3 | 3 | 1.14 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2049_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2049_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2049_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2049_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2049_wmpa.pdf | Not Required | N/A | N/A | 3/4/2016 | N/A | N/A | 3/18/2022 | 6/30/2022 | 6/30/2022 | N/A | N | No | |||||||||
| AB2-064 | + | Southwest Lima 345kV | OH | Van Wert | Withdrawn | Unknown | 40 | 40 | 15.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2064_fea.pdf | Document Posted | N/A | N/A | 3/30/2016 | N/A | N/A | 9/22/2016 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AB2-064 | - | Southwest Lima 345kV | OH | Van Wert | Withdrawn | AEP | 40 | 40 | 15.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2064_fea.pdf | Document Posted | N/A | N/A | 3/30/2016 | N/A | N/A | 9/22/2016 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AB2-065 | + | Madison-Tanners Creek 138kV | IN | Rush | Withdrawn | Unknown | 124.2 | 124.2 | 16 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2065_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2065_imp.pdf | Document Posted | N/A | N/A | 3/30/2016 | N/A | N/A | 2/27/2018 | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AB2-065 | - | Madison-Tanners Creek 138kV | IN | Rush | Withdrawn | AEP | 124.2 | 124.2 | 16 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2065_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2065_imp.pdf | Document Posted | N/A | N/A | 3/30/2016 | N/A | N/A | 2/27/2018 | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AB2-067 | + | Kammer-Vassell 765kV | Guernsey Power Station | OH | Guernsey | Under Construction | Unknown | 1100 | 1100 | 1100 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2067_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2067_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2067_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_067_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_067_csa.pdf | Document Posted | N/A | N/A | 9/23/2021 | 3/31/2016 | N/A | N/A | 8/11/2022 | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||
| AB2-067 | - | Kammer-Vassell 765kV | Guernsey Power Station | OH | Guernsey | Under Construction | AEP | 1100 | 1100 | 1100 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2067_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2067_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2067_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_067_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_067_csa.pdf | Document Posted | N/A | N/A | 9/23/2021 | 3/31/2016 | N/A | N/A | 5/11/2022 | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||
| AB2-070 | + | Mt. Pulaski-Brokaw | Alta Farms II | IL | DeWitt | Under Construction | ComEd | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2070_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2070_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2070_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_070_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_070_csa.pdf | Document Posted | N/A | N/A | 11/1/2022 | 3/31/2016 | N/A | N/A | 12/1/2022 | 4/16/2023 | 4/16/2023 | N/A | N | No | ||||||||
| AB2-070 | - | Mt. Pulaski-Brokaw | Alta Farms II | IL | DeWitt | Under Construction | ComEd | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2070_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2070_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2070_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_070_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_070_csa.pdf | Document Posted | N/A | N/A | 10/10/2022 | 3/31/2016 | N/A | N/A | 10/17/2022 | 4/16/2023 | 4/16/2023 | N/A | N | No | ||||||||
| AB2-077 | + | Buggs Island-Chase City 115kV | Otter Creek Solar Project | VA | Mecklenburg | Under Construction | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2077_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2077_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2077_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_077_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_077_csa.pdf | Document Posted | N/A | N/A | 4/11/2016 | N/A | N/A | 11/1/2023 | 12/1/2023 | 12/1/2023 | N/A | N | No | |||||||||
| AB2-077 | - | Buggs Island-Chase City 115kV | Otter Creek Solar Project | VA | Mecklenburg | Engineering and Procurement | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2077_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2077_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2077_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_077_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_077_csa.pdf | Document Posted | N/A | N/A | 4/11/2016 | N/A | N/A | 11/1/2023 | 12/1/2023 | 12/1/2023 | N/A | N | No | |||||||||
| AB2-078 | + | Buggs Island-Chase City 115kV | Otter Creek Solar Project | VA | Mecklenburg | Under Construction | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2078_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2078_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2078_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_078_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_078_csa.pdf | Document Posted | N/A | N/A | 4/11/2016 | N/A | N/A | 11/1/2023 | 12/1/2023 | 12/1/2023 | N/A | N | No | |||||||||
| AB2-078 | - | Buggs Island-Chase City 115kV | Otter Creek Solar Project | VA | Mecklenburg | Engineering and Procurement | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2078_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2078_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2078_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_078_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_078_csa.pdf | Document Posted | N/A | N/A | 4/11/2016 | N/A | N/A | 11/1/2023 | 12/1/2023 | 12/1/2023 | N/A | N | No | |||||||||
| AB2-079 | + | Buggs Island-Chase City 115kV | Otter Creek Solar Project | VA | Mecklenburg | Under Construction | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2079_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2079_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2079_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_079_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_079_csa.pdf | Document Posted | N/A | N/A | 4/11/2016 | N/A | N/A | 11/1/2023 | 12/1/2023 | 12/1/2023 | N/A | N | No | |||||||||
| AB2-079 | - | Buggs Island-Chase City 115kV | Otter Creek Solar Project | VA | Mecklenburg | Engineering and Procurement | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2079_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2079_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2079_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_079_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_079_csa.pdf | Document Posted | N/A | N/A | 4/11/2016 | N/A | N/A | 11/1/2023 | 12/1/2023 | 12/1/2023 | N/A | N | No | |||||||||
| AB2-080 | + | Marysville-Flatlick 765kV | OH | Pickaway | Withdrawn | Unknown | 1200 | 1200 | 1200 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2080_fea.pdf | Document Posted | N/A | N/A | 4/12/2016 | N/A | N/A | 10/4/2016 | Customer Milestone Not Met | 6/1/2021 | N/A | N | No | |||||||||||||||||||
| AB2-080 | - | Marysville-Flatlick 765kV | OH | Pickaway | Withdrawn | AEP | 1200 | 1200 | 1200 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2080_fea.pdf | Document Posted | N/A | N/A | 4/12/2016 | N/A | N/A | 10/4/2016 | Customer Milestone Not Met | 6/1/2021 | N/A | N | No | |||||||||||||||||||
| AB2-083 | + | Delano 138kV | OH | Ross | Withdrawn | Unknown | 40 | 40 | 27.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2083_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2083_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 4/14/2016 | N/A | N/A | 3/4/2021 | 10/31/2017 | N/A | N | No | |||||||||||||||||
| AB2-083 | - | Delano 138kV | OH | Ross | Withdrawn | AEP | 40 | 40 | 27.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2083_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2083_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 4/14/2016 | N/A | N/A | 3/4/2021 | 10/31/2017 | N/A | N | No | |||||||||||||||||
| AB2-085 | + | Adams 138kV | Stone Branch Solar | OH | Adams | Suspended | Unknown | 49.9 | 49.9 | 33.93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2085_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2085_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_085_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_085_csa.pdf | Document Posted | N/A | N/A | 4/18/2016 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AB2-085 | - | Adams 138kV | Stone Branch Solar | OH | Adams | Engineering and Procurement | AEP | 49.9 | 49.9 | 33.93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2085_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2085_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_085_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_085_csa.pdf | Document Posted | N/A | N/A | 4/18/2016 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AB2-093 | + | Ormet 138kV | Hannibal Port Power Project | OH | Monroe | In Service | Unknown | 485 | 485 | 485 | 485 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2093_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2093_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2093_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_093_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_093_csa.pdf | Document Posted | N/A | N/A | 12/15/2020 | 4/26/2016 | N/A | N/A | 5/22/2021 | 9/13/2021 | 9/13/2021 | 6/1/2021 | N/A | N | No | ||||||
| AB2-093 | - | Ormet 138kV | Hannibal Port Power Project | OH | Monroe | In Service | AEP | 485 | 485 | 485 | 485 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2093_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2093_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2093_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_093_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_093_csa.pdf | Document Posted | N/A | N/A | 12/15/2020 | 4/26/2016 | N/A | N/A | 5/22/2021 | 9/13/2021 | 9/13/2021 | 6/1/2021 | N/A | N | No | ||||||
| AB2-099 | + | Ahoskie 34.5kV | Colice Hall Solar | NC | Hertford | Suspended | Dominion | 5 | 5 | 3.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2099_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab2_099_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_099_csa.pdf | Document Posted | N/A | N/A | 5/1/2020 | 4/27/2016 | N/A | N/A | 1/31/2023 | 3/31/2020 | 3/31/2020 | N/A | N | No | |||||||||
| AB2-099 | - | Ahoskie 34.5kV | Colice Hall Solar | NC | Hertford | Suspended | Dominion | 5 | 5 | 3.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2099_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab2_099_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_099_csa.pdf | Document Posted | N/A | N/A | 5/1/2020 | 4/27/2016 | N/A | N/A | 6/1/2020 | 3/31/2020 | 3/31/2020 | N/A | N | No | |||||||||
| AB2-101 | + | George Washington 138kV | WV | Marshall | Withdrawn | Unknown | 626 | 31 | 31 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2101_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 4/27/2016 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 4/1/2019 | N/A | N | No | ||||||||||||||||||
| AB2-101 | - | George Washington 138kV | WV | Marshall | Withdrawn | AEP | 626 | 31 | 31 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2101_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 4/27/2016 | N/A | N/A | 5/16/2017 | Customer Initiated Withdrawal | 4/1/2019 | N/A | N | No | ||||||||||||||||||
| AB2-103 | + | Seaman 138kV | OH | Adams | Withdrawn | Unknown | 40 | 40 | 27.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2103_imp.pdf | Document Posted | N/A | N/A | 4/28/2016 | N/A | N/A | 3/26/2018 | 10/31/2017 | N/A | N | No | ||||||||||||||||||
| AB2-103 | - | Seaman 138kV | OH | Adams | Withdrawn | AEP | 40 | 40 | 27.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2103_imp.pdf | Document Posted | N/A | N/A | 4/28/2016 | N/A | N/A | 3/26/2018 | 10/31/2017 | N/A | N | No | ||||||||||||||||||
| AB2-109 | + | Reusens 34.5kV | Reusens Hydro Electric Generating Plant | VA | City of Lynchburg | In Service | Unknown | 12.5 | 12.5 | 4 | 12.5 | Capacity | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2109_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2109_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab2_109_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/28/2016 | N/A | N/A | 3/31/2018 | 3/31/2018 | 11/29/2017 | N/A | N | No | ||||||||||
| AB2-109 | - | Reusens 34.5kV | Reusens Hydro Electric Generating Plant | VA | City of Lynchburg | In Service | AEP | 12.5 | 12.5 | 4 | 12.5 | Capacity | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2109_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2109_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab2_109_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/28/2016 | N/A | N/A | 3/31/2018 | 3/31/2018 | 11/29/2017 | N/A | N | No | ||||||||||
| AB2-132 | + | Haumesser Road | Lee-DeKalb Wind Energy Center | IL | Lee | Engineering and Procurement | ComEd | 240 | 0 | 2.2 | Capacity | Generation Interconnection | Wind; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2132_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2132_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ab2_132_isa.pdf | Document Posted | N/A | N/A | N/A | 4/29/2016 | N/A | N/A | 9/1/2023 | 9/1/2023 | N/A | N | No | |||||||||||||
| AB2-132 | - | Haumesser Road | IL | Lee | Active | ComEd | 240 | 0 | 2.2 | Capacity | Generation Interconnection | Wind; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2132_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2132_imp.pdf | Document Posted | Not Required | N/A | N/A | 4/29/2016 | N/A | N/A | 12/15/2016 | N/A | N | No | ||||||||||||||||||
| AB2-135 | + | Church-Kent 69kV | Jones Farm Lane Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 64 | 64 | 29.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2135_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2135_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2135_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_135_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_135_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 12/1/2023 | 12/30/2022 | 12/30/2022 | N/A | N | No | |||||||||
| AB2-135 | - | Church-Kent 69kV | Jones Farm Lane Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 64 | 64 | 29.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2135_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2135_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2135_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_135_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_135_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 12/30/2022 | 12/30/2022 | N/A | N | No | ||||||||||
| AB2-136 | + | Cambridge-West Cambridge 69kV | Egypt Road Solar | MD | Dorchester | Engineering and Procurement | DPL | 51.1 | 51.1 | 24.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2136_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2136_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2136_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_136_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_136_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 12/1/2023 | 12/30/2022 | 12/30/2022 | N/A | N | No | |||||||||
| AB2-136 | - | Cambridge-West Cambridge 69kV | Egypt Road Solar | MD | Dorchester | Engineering and Procurement | DPL | 51.1 | 51.1 | 24.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2136_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2136_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2136_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_136_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_136_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 12/30/2022 | 12/30/2022 | N/A | N | No | ||||||||||
| AB2-137 | + | St. Clair 13.2kV | OH | Franklin | Withdrawn | Unknown | 4 | 4 | 1 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 4/29/2016 | N/A | N/A | 9/30/2016 | Customer Initiated Withdrawal | 11/1/2017 | N/A | N | No | ||||||||||||||||||||
| AB2-137 | - | St. Clair 13.2kV | OH | Franklin | Withdrawn | AEP | 4 | 4 | 1 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 4/29/2016 | N/A | N/A | 9/30/2016 | Customer Initiated Withdrawal | 11/1/2017 | N/A | N | No | ||||||||||||||||||||
| AB2-141 | + | George Washington 138kV | WV | Marshall | Withdrawn | Unknown | 394 | 394 | 388.6 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2141_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 4/29/2016 | N/A | N/A | 2/27/2019 | 4/1/2019 | N/A | N | No | |||||||||||||||||
| AB2-141 | - | George Washington 138kV | WV | Marshall | Withdrawn | AEP | 394 | 394 | 388.6 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2141_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 4/29/2016 | N/A | N/A | 2/27/2019 | 4/1/2019 | N/A | N | No | |||||||||||||||||
| AB2-145 | + | Axton 138kV | VA | Henry | Withdrawn | Unknown | 572 | 572 | 572 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2145_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2145_imp.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 2/23/2018 | 1/1/2021 | N/A | N | No | ||||||||||||||||||
| AB2-145 | - | Axton 138kV | VA | Henry | Withdrawn | AEP | 572 | 572 | 572 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2145_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2145_imp.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 2/23/2018 | 1/1/2021 | N/A | N | No | ||||||||||||||||||
| AB2-146 | + | Axton 138kV | VA | Henry | Withdrawn | Unknown | 382 | 382 | 382 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2146_fea.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 10/3/2016 | Customer Initiated Withdrawal | 1/1/2021 | N/A | N | No | |||||||||||||||||||
| AB2-146 | - | Axton 138kV | VA | Henry | Withdrawn | AEP | 382 | 382 | 382 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2146_fea.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 10/3/2016 | Customer Initiated Withdrawal | 1/1/2021 | N/A | N | No | |||||||||||||||||||
| AB2-160 | + | Reams 115kV | Reams Solar | VA | Dinwiddie | Suspended | Dominion | 80 | 80 | 30.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AB2-160 | - | Reams 115kV | Reams Solar | VA | Dinwiddie | Engineering and Procurement | Dominion | 80 | 80 | 30.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AB2-161 | + | Waverly #2 DP 115kV | Waverly Solar | VA | Sussex | Engineering and Procurement | Dominion | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf | Document Posted | N/A | N/A | 4/30/2016 | N/A | N/A | 9/16/2022 | 9/16/2022 | N/A | N | No | ||||||||||
| AB2-161 | - | Waverly #2 DP 115kV | Waverly Solar | VA | Sussex | Engineering and Procurement | Dominion | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 9/16/2022 | 9/16/2022 | N/A | N | No | ||||||||||
| AB2-169 | + | Pantago-Five Points 115kV | Wilkinson Solar Energy Center | NC | Hyde | In Service | Dominion | 74 | 74 | 39 | 74 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2169_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2169_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2169_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_169_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_169_csa.pdf | Document Posted | N/A | N/A | 10/10/2019 | 4/29/2016 | N/A | N/A | 11/18/2019 | 6/30/2021 | 6/30/2021 | 11/20/2019 | N/A | N | No | ||||||
| AB2-169 | - | Pantago-Five Points 115kV | Wilkinson Solar Energy Center | NC | Hyde | Partially in Service - Under Construction | Dominion | 74 | 74 | 39 | 74 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2169_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2169_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2169_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_169_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_169_csa.pdf | Document Posted | N/A | N/A | 10/10/2019 | 4/29/2016 | N/A | N/A | 11/18/2019 | 6/30/2021 | 6/30/2021 | 11/20/2019 | N/A | N | No | ||||||
| AB2-170 | + | East Lima-Marysville 345kV | Hardin Energy Center | OH | Hardin | In Service | Unknown | 150 | 130 | 49.4 | 130 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2170_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2170_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2170_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_170_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_170_csa.pdf | Document Posted | N/A | N/A | 8/7/2020 | 4/29/2016 | N/A | N/A | 10/13/2020 | 6/1/2021 | 6/1/2021 | 10/13/2020 | N/A | N | No | ||||||
| AB2-170 | - | East Lima-Marysville 345kV | Hardin Energy Center | OH | Hardin | In Service | AEP | 150 | 130 | 49.4 | 130 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2170_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2170_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2170_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_170_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_170_csa.pdf | Document Posted | N/A | N/A | 8/7/2020 | 4/29/2016 | N/A | N/A | 10/13/2020 | 6/1/2021 | 6/1/2021 | 10/13/2020 | N/A | N | No | ||||||
| AC1-001 | + | Delano 138kV | Salt City Solar | OH | Ross | Engineering and Procurement | Unknown | 49.9 | 49.9 | 33.93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1001_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1001_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1001_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_001_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_001_csa.pdf | Document Posted | N/A | N/A | 5/5/2016 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AC1-001 | - | Delano 138kV | Salt City Solar | OH | Ross | Engineering and Procurement | AEP | 49.9 | 49.9 | 33.93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1001_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1001_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1001_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_001_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_001_csa.pdf | Document Posted | N/A | N/A | 5/5/2016 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AC1-012 | + | Rupert 34.5kV | Tri-State Solar | WV | Greenbrier | Withdrawn | Unknown | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1012_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1012_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac1012_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac1012_wmpa.pdf | Not Required | N/A | N/A | 6/23/2016 | N/A | N/A | 7/30/2018 | 10/31/2017 | 10/31/2017 | N/A | Y | No | ||||||||||
| AC1-012 | - | Rupert 34.5kV | Tri-State Solar | WV | Greenbrier | Withdrawn | AEP | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1012_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1012_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac1012_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac1012_wmpa.pdf | Not Required | N/A | N/A | 6/23/2016 | N/A | N/A | 7/30/2018 | 10/31/2017 | 10/31/2017 | N/A | Y | No | ||||||||||
| AC1-023 | + | Southwest Lima-East Lima 345kV | OH | Allen | Withdrawn | Unknown | 120 | 120 | 84 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 7/14/2016 | N/A | N/A | 8/2/2016 | Customer Milestone Not Met | 12/31/2017 | N/A | N | No | ||||||||||||||||||||
| AC1-023 | - | Southwest Lima-East Lima 345kV | OH | Allen | Withdrawn | AEP | 120 | 120 | 84 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 7/14/2016 | N/A | N/A | 8/2/2016 | Customer Milestone Not Met | 12/31/2017 | N/A | N | No | ||||||||||||||||||||
| AC1-024 | + | Frazeysburg 138kV | OH | Muskingum | Withdrawn | Unknown | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1024_fea.pdf | Document Posted | N/A | N/A | 7/14/2016 | N/A | N/A | 4/21/2017 | Customer Milestone Not Met | 12/1/2018 | N/A | N | No | |||||||||||||||||||
| AC1-024 | - | Frazeysburg 138kV | OH | Muskingum | Withdrawn | AEP | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1024_fea.pdf | Document Posted | N/A | N/A | 7/14/2016 | N/A | N/A | 4/21/2017 | Customer Milestone Not Met | 12/1/2018 | N/A | N | No | |||||||||||||||||||
| AC1-034 | + | Heartsease DP - Mayo Dunbar 115kV | Edgecome Solar Energy Center | NC | Edgecombe | Engineering and Procurement | Dominion | 75 | 75 | 42.75 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1034_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1034_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1034_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_034_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_034_csa.pdf | Document Posted | N/A | N/A | 8/10/2016 | N/A | N/A | 7/1/2023 | 5/31/2023 | 5/31/2023 | N/A | N | No | |||||||||
| AC1-034 | - | Heartsease DP - Mayo Dunbar 115kV | Edgecome Solar Energy Center | NC | Edgecombe | Engineering and Procurement | Dominion | 75 | 75 | 42.75 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1034_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1034_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1034_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_034_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_034_csa.pdf | Document Posted | N/A | N/A | 8/10/2016 | N/A | N/A | 5/31/2023 | 5/31/2023 | N/A | N | No | ||||||||||
| AC1-038 | + | Big Sandy 1 138kV | Big Sandy #1 | KY | Lawrence | In Service | Unknown | 293 | 13 | 13 | 13 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1038_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1038_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_038_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 8/30/2016 | N/A | N/A | 10/1/2018 | 10/1/2018 | 5/30/2016 | N/A | N | No | ||||||||||
| AC1-038 | - | Big Sandy 1 138kV | Big Sandy #1 | KY | Lawrence | In Service | AEP | 293 | 13 | 13 | 13 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1038_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1038_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_038_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 8/30/2016 | N/A | N/A | 10/1/2018 | 10/1/2018 | 5/30/2016 | N/A | N | No | ||||||||||
| AC1-040 | + | Rockport-Duff-Coleman 345 kV | IN | Spencer | Withdrawn | Unknown | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1040_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1040_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 8/31/2016 | N/A | N/A | 11/7/2018 | 12/31/2020 | N/A | N | No | |||||||||||||||||
| AC1-040 | - | Rockport-Duff-Coleman 345 kV | IN | Spencer | Withdrawn | AEP | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1040_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1040_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 8/31/2016 | N/A | N/A | 11/7/2018 | 12/31/2020 | N/A | N | No | |||||||||||||||||
| AC1-042 | + | Altavista-Mt. Airy 69kV | Sycamore Solar I | VA | Pittsylvania | Under Construction | Dominion | 42 | 42 | 15.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1042_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1042_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1042_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_042_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_042_csa.pdf | Document Posted | N/A | N/A | 8/31/2016 | N/A | N/A | 6/30/2022 | 12/1/2022 | 12/1/2022 | N/A | N | No | |||||||||
| AC1-042 | - | Altavista-Mt. Airy 69kV | Sycamore Solar I | VA | Pittsylvania | Under Construction | Dominion | 42 | 42 | 15.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1042_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1042_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1042_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_042_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_042_csa.pdf | Document Posted | N/A | N/A | 8/31/2016 | N/A | N/A | 4/15/2022 | 12/1/2022 | 12/1/2022 | N/A | N | No | |||||||||
| AC1-044 | + | Kammer-Vassell 765kV | Guernsey Power Station | OH | Guernsey | Under Construction | Unknown | 1650 | 550 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1044_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1044_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1044_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_044_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_044_csa.pdf | Document Posted | N/A | N/A | 9/23/2021 | 8/31/2016 | N/A | N/A | 8/11/2022 | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||
| AC1-044 | - | Kammer-Vassell 765kV | Guernsey Power Station | OH | Guernsey | Under Construction | AEP | 1650 | 550 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1044_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1044_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1044_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_044_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_044_csa.pdf | Document Posted | N/A | N/A | 9/23/2021 | 8/31/2016 | N/A | N/A | 5/11/2022 | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||
| AC1-048 | + | Germantown 115kV | Brookview Solar I | PA | Adams | Engineering and Procurement | ME | 35 | 35 | 13.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1048_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1048_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_048_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_048_csa.pdf | Document Posted | N/A | N/A | 8/31/2016 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AC1-048 | - | Germantown 115kV | Brookview Solar I | PA | Adams | Engineering and Procurement | ME | 35 | 35 | 13.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1048_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1048_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_048_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_048_csa.pdf | Document Posted | N/A | N/A | 8/31/2016 | N/A | N/A | 12/31/2020 | 12/31/2020 | N/A | N | No | ||||||||||
| AC1-051 | + | Willard-S. Greenwich 69kV | OH | Huron | Withdrawn | Unknown | 60 | 60 | 7.8 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1051_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1051_imp.pdf | Document Posted | Withdrawn | https://www.pjm.com/pub/planning/project-queues/isa/ac1_051_isa2.pdf | Interim Study | N/A | N/A | N/A | 8/31/2016 | N/A | N/A | 1/12/2021 | 12/31/2017 | N/A | N | No | ||||||||||||||
| AC1-051 | - | Willard-S. Greenwich 69kV | OH | Huron | Withdrawn | AEP | 60 | 60 | 7.8 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1051_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1051_imp.pdf | Document Posted | Withdrawn | https://www.pjm.com/pub/planning/project-queues/isa/ac1_051_isa2.pdf | Interim Study | N/A | N/A | N/A | 8/31/2016 | N/A | N/A | 1/12/2021 | 12/31/2017 | N/A | N | No | ||||||||||||||
| AC1-053 | + | Lanesville-Brokaw | IL | Logan | Active | ComEd | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1053_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1053_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1053_fac.pdf | Document Posted | N/A | N/A | 8/31/2016 | N/A | N/A | 12/1/2018 | N/A | N | No | |||||||||||||||||
| AC1-053 | - | Lanesville-Brokaw | IL | Logan | Active | ComEd | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1053_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1053_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2016 | N/A | N/A | 12/1/2018 | N/A | N | No | ||||||||||||||||||
| AC1-059 | + | Desoto-Tanners Creek 345kV | IN | Fayette | Withdrawn | Unknown | 300 | 300 | 39 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1059_imp.pdf | Document Posted | N/A | N/A | 9/13/2016 | N/A | N/A | 6/5/2018 | 12/15/2018 | N/A | N | No | ||||||||||||||||||
| AC1-059 | - | Desoto-Tanners Creek 345kV | IN | Fayette | Withdrawn | AEP | 300 | 300 | 39 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1059_imp.pdf | Document Posted | N/A | N/A | 9/13/2016 | N/A | N/A | 6/5/2018 | 12/15/2018 | N/A | N | No | ||||||||||||||||||
| AC1-068 | + | Atlanta 69kV I | Pickaway County Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 34 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1068_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1068_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1068_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_068_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_068_csa.pdf | Document Posted | N/A | N/A | 9/26/2016 | N/A | N/A | 12/1/2021 | 7/1/2025 | 7/1/2025 | N/A | N | No | |||||||||
| AC1-068 | - | Atlanta 69kV I | Pickaway County Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 34 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1068_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1068_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1068_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_068_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_068_csa.pdf | Document Posted | N/A | N/A | 9/26/2016 | N/A | N/A | 12/1/2021 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC1-069 | + | Atlanta 69kV II | Pickaway County II Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 34 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1069_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1069_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1069_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_069_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_069_csa.pdf | Document Posted | N/A | N/A | 9/26/2016 | N/A | N/A | 12/1/2021 | 7/1/2025 | 7/1/2025 | N/A | N | No | |||||||||
| AC1-069 | - | Atlanta 69kV II | Pickaway County II Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 34 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1069_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1069_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1069_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_069_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_069_csa.pdf | Document Posted | N/A | N/A | 9/26/2016 | N/A | N/A | 12/1/2021 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC1-076 | + | Locust Grove-Paytes 115kV | Pine Glade Solar | VA | Orange | Under Construction | Dominion | 62.5 | 62.5 | 23.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1076_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1076_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1076_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_076_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_076_csa.pdf | Document Posted | N/A | N/A | 10/1/2022 | 9/30/2016 | N/A | N/A | 4/1/2023 | 3/30/2023 | 3/30/2023 | N/A | N | No | ||||||||
| AC1-076 | - | Locust Grove-Paytes 115kV | Pine Glade Solar | VA | Orange | Engineering and Procurement | Dominion | 62.5 | 62.5 | 23.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1076_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1076_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1076_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_076_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_076_csa.pdf | Document Posted | N/A | N/A | 10/1/2022 | 9/30/2016 | N/A | N/A | 10/3/2022 | 3/30/2023 | 3/30/2023 | N/A | N | No | ||||||||
| AC1-082 | + | Ravenswood-Hemlock 69kV | Great Bend | OH | Meigs | Engineering and Procurement | Unknown | 48 | 48 | 29 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1082_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1082_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1082_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_082_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_082_csa.pdf | Document Posted | N/A | N/A | 9/30/2016 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AC1-082 | - | Ravenswood-Hemlock 69kV | Great Bend | OH | Meigs | Engineering and Procurement | AEP | 48 | 48 | 29 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1082_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1082_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1082_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_082_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_082_csa.pdf | Document Posted | N/A | N/A | 9/30/2016 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AC1-083 | + | Smith Mountain-Bearskin 138kV | Maplewood Solar | VA | Pittsylvania | Under Construction | Unknown | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1083_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1083_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1083_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_083_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_083_csa.pdf | Document Posted | N/A | N/A | 12/15/2021 | 9/30/2016 | N/A | N/A | 5/20/2022 | 5/20/2022 | 5/20/2022 | N/A | N | No | ||||||||
| AC1-083 | - | Smith Mountain-Bearskin 138kV | Maplewood Solar | VA | Pittsylvania | Under Construction | AEP | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1083_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1083_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1083_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_083_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_083_csa.pdf | Document Posted | N/A | N/A | 12/15/2021 | 9/30/2016 | N/A | N/A | 12/28/2021 | 4/1/2022 | 4/1/2022 | N/A | N | No | ||||||||
| AC1-085 | + | Stuart-Clinton 345kV | Highland County Solar | OH | Highland | Partially in Service - Under Construction | Dayton | 400 | 400 | 152 | 9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1085_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1085_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_085_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_085_csa.pdf | Document Posted | N/A | N/A | 9/30/2016 | N/A | N/A | 11/1/2020 | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||
| AC1-085 | - | Stuart-Clinton 345kV | Highland County Solar | OH | Highland | Under Construction | Dayton | 400 | 400 | 152 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1085_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1085_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_085_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_085_csa.pdf | Document Posted | N/A | N/A | 9/30/2016 | N/A | N/A | 11/1/2020 | 3/31/2022 | 3/31/2022 | N/A | N | No | |||||||||
| AC1-088 | + | Strawton 138kV | IN | Madison | Withdrawn | Unknown | 20 | 20 | 20 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1088_imp.pdf | Document Posted | N/A | N/A | 10/12/2016 | N/A | N/A | 5/8/2018 | 12/31/2017 | N/A | BB | No | ||||||||||||||||||
| AC1-088 | - | Strawton 138kV | IN | Madison | Withdrawn | AEP | 20 | 20 | 20 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1088_imp.pdf | Document Posted | N/A | N/A | 10/12/2016 | N/A | N/A | 5/8/2018 | 12/31/2017 | N/A | BB | No | ||||||||||||||||||
| AC1-089 | + | Hillsboro-Wildcat 138kV | Willowbrook Solar | OH | Highland | Engineering and Procurement | Unknown | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1089_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1089_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1089_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_089_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_089_csa.pdf | Document Posted | N/A | N/A | 10/13/2016 | N/A | N/A | 12/20/2022 | 12/20/2022 | N/A | N | No | ||||||||||
| AC1-089 | - | Hillsboro-Wildcat 138kV | Willowbrook Solar | OH | Highland | Engineering and Procurement | AEP | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1089_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1089_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1089_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_089_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_089_csa.pdf | Document Posted | N/A | N/A | 10/13/2016 | N/A | N/A | 12/20/2022 | 12/20/2022 | N/A | N | No | ||||||||||
| AC1-096 | + | Marysville-Flatlick 765kV | OH | Pickaway | Withdrawn | Unknown | 1277 | 1277 | 1277 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 10/20/2016 | N/A | N/A | 2/23/2017 | Customer Initiated Withdrawal | 6/1/2021 | N/A | N | No | ||||||||||||||||||||
| AC1-096 | - | Marysville-Flatlick 765kV | OH | Pickaway | Withdrawn | AEP | 1277 | 1277 | 1277 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 10/20/2016 | N/A | N/A | 2/23/2017 | Customer Initiated Withdrawal | 6/1/2021 | N/A | N | No | ||||||||||||||||||||
| AC1-098 | + | Dawson-South Justice 115kV | American Beech Solar | NC | Alamance | Engineering and Procurement | Dominion | 60 | 60 | 37.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1098_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1098_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1098_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_098_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_098_csa.pdf | Document Posted | N/A | N/A | 10/21/2016 | N/A | N/A | 11/30/2023 | 11/30/2023 | N/A | N | No | ||||||||||
| AC1-098 | - | Dawson-South Justice 115kV | American Beech Solar | NC | Alamance | Engineering and Procurement | Dominion | 60 | 60 | 37.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1098_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1098_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1098_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_098_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_098_csa.pdf | Document Posted | N/A | N/A | 10/21/2016 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | ||||||||||
| AC1-099 | + | Dawson-South Justice 115kV | American Beech Solar | NC | Alamance | Engineering and Procurement | Dominion | 20 | 20 | 12.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1099_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1099_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_099_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_099_csa.pdf | Document Posted | N/A | N/A | 10/21/2016 | N/A | N/A | 11/30/2023 | 11/30/2023 | N/A | N | No | ||||||||||
| AC1-099 | - | Dawson-South Justice 115kV | American Beech Solar | NC | Alamance | Engineering and Procurement | Dominion | 20 | 20 | 12.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1099_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1099_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_099_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_099_csa.pdf | Document Posted | N/A | N/A | 10/21/2016 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | ||||||||||
| AC1-100 | + | Ohio Central 138kV | Dresden | OH | Muskingum | In Service | Unknown | 678 | 98 | 43.4 | 98 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1100_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1100_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_100_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/24/2016 | N/A | N/A | 6/1/2020 | 6/1/2020 | 11/10/2017 | N/A | N | No | ||||||||||
| AC1-100 | - | Ohio Central 138kV | Dresden | OH | Muskingum | In Service | AEP | 678 | 98 | 43.4 | 98 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1100_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1100_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_100_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/24/2016 | N/A | N/A | 6/1/2020 | 6/1/2020 | 11/10/2017 | N/A | N | No | ||||||||||
| AC1-101 | + | Johns Creek-Excel 138kV I | KY | Pike | Active | Unknown | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1101_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1101_fac.pdf | Document Posted | N/A | N/A | 10/24/2016 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-101 | - | Johns Creek-Excel 138kV I | KY | Pike | Active | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1101_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1101_fac.pdf | Document Posted | N/A | N/A | 10/24/2016 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-102 | + | Johns Creek-Excel 138kV II | KY | Pike | Active | Unknown | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1102_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1102_fac.pdf | Document Posted | N/A | N/A | 10/23/2016 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-102 | - | Johns Creek-Excel 138kV II | KY | Pike | Active | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1102_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1102_fac.pdf | Document Posted | N/A | N/A | 10/23/2016 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-103 | + | Nottingham 138kV | Harrison Power Plant | OH | Harrison | Suspended | Unknown | 1050 | 1050 | 1026 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1103_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1103_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_103_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_103_csa.pdf | Document Posted | N/A | N/A | 10/25/2016 | N/A | N/A | 6/11/2024 | 6/11/2024 | N/A | N | No | ||||||||||
| AC1-103 | - | Nottingham 138kV | Harrison Power Plant | OH | Harrison | Suspended | AEP | 1050 | 1050 | 1026 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1103_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1103_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_103_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_103_csa.pdf | Document Posted | N/A | N/A | 10/25/2016 | N/A | N/A | 6/11/2024 | 6/11/2024 | N/A | N | No | ||||||||||
| AC1-105 | + | Halifax-Mt. Laurel 115kV | Sunnybrook Farm Solar | VA | Halifax | Under Construction | Dominion | 51 | 51 | 34.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1105_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1105_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1105_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_105_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_105_csa.pdf | Document Posted | N/A | N/A | 10/26/2016 | N/A | N/A | 12/20/2022 | 2/9/2023 | 2/9/2023 | N/A | N | No | |||||||||
| AC1-105 | - | Halifax-Mt. Laurel 115kV | Sunnybrook Farm Solar | VA | Halifax | Engineering and Procurement | Dominion | 51 | 51 | 34.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1105_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1105_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1105_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_105_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_105_csa.pdf | Document Posted | N/A | N/A | 10/26/2016 | N/A | N/A | 7/15/2022 | 7/15/2022 | N/A | N | No | ||||||||||
| AC1-116 | + | Mount Eagle 34.5kV | Rivanna Solar | VA | Albemarle | Under Construction | Dominion | 12.5 | 12.5 | 4.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1116_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac1116_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac1116_wmpa.pdf | Not Required | N/A | N/A | 10/27/2016 | N/A | N/A | 4/17/2023 | 4/17/2023 | N/A | N | Yes | |||||||||||
| AC1-116 | - | Mount Eagle 34.5kV | Rivanna Solar | VA | Albemarle | Engineering and Procurement | Dominion | 12.5 | 12.5 | 4.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1116_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1116_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac1116_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac1116_wmpa.pdf | Not Required | N/A | N/A | 10/27/2016 | N/A | N/A | 12/1/2022 | 12/31/2022 | 12/31/2022 | N/A | N | Yes | ||||||||||
| AC1-117 | + | Stockton 34.5kV | Leatherwood | VA | Henry | Withdrawn | Unknown | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1117_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1117_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac1117_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac1117_wmpa.pdf | Not Required | N/A | N/A | 10/27/2016 | N/A | N/A | 12/31/2021 | 12/31/2021 | N/A | N | Yes | |||||||||||
| AC1-117 | - | Stockton 34.5kV | Leatherwood | VA | Henry | Withdrawn | AEP | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1117_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1117_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac1117_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac1117_wmpa.pdf | Not Required | N/A | N/A | 10/27/2016 | N/A | N/A | 12/31/2021 | 12/31/2021 | N/A | N | Yes | |||||||||||
| AC1-122 | + | Smith Mountain-Candler’s Mountain 138kV | Altavista Solar | VA | Campbell | In Service | Unknown | 60 | 60 | 40.7 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1122_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1122_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1122_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_122_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_122_csa.pdf | Document Posted | N/A | N/A | 9/30/2020 | 10/27/2016 | N/A | N/A | 10/21/2020 | 6/1/2021 | 6/1/2021 | 10/21/2020 | N/A | N | No | ||||||
| AC1-122 | - | Smith Mountain-Candler’s Mountain 138kV | Altavista Solar | VA | Campbell | In Service | AEP | 60 | 60 | 40.7 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1122_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1122_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1122_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_122_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_122_csa.pdf | Document Posted | N/A | N/A | 9/30/2020 | 10/27/2016 | N/A | N/A | 10/21/2020 | 6/1/2021 | 6/1/2021 | 10/21/2020 | N/A | N | No | ||||||
| AC1-123 | + | Smith Mountain-Candler’s Mountain 138kV | Altavista Solar | VA | Campbell | In Service | Unknown | 80 | 20 | 13.7 | 20 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1123_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1123_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1123_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_123_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_123_csa.pdf | Document Posted | N/A | N/A | 9/30/2020 | 10/27/2016 | N/A | N/A | 10/15/2020 | 6/1/2021 | 6/1/2021 | 10/21/2020 | N/A | N | No | ||||||
| AC1-123 | - | Smith Mountain-Candler’s Mountain 138kV | Altavista Solar | VA | Campbell | In Service | AEP | 80 | 20 | 13.7 | 20 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1123_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1123_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1123_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_123_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_123_csa.pdf | Document Posted | N/A | N/A | 9/30/2020 | 10/27/2016 | N/A | N/A | 10/15/2020 | 6/1/2021 | 6/1/2021 | 10/21/2020 | N/A | N | No | ||||||
| AC1-124 | + | Harryette 12kV | OH | Guernsey | Withdrawn | Unknown | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1124_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1124_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 10/27/2016 | N/A | N/A | 7/20/2017 | Customer Initiated Withdrawal | 10/1/2017 | N/A | Y | No | |||||||||||||
| AC1-124 | - | Harryette 12kV | OH | Guernsey | Withdrawn | AEP | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1124_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1124_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 10/27/2016 | N/A | N/A | 7/20/2017 | Customer Initiated Withdrawal | 10/1/2017 | N/A | Y | No | |||||||||||||
| AC1-125 | + | Harryette 12kV | OH | Guernsey | Withdrawn | Unknown | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1125_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1125_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 10/27/2016 | N/A | N/A | 7/20/2017 | Customer Initiated Withdrawal | 10/1/2017 | N/A | Y | No | |||||||||||||
| AC1-125 | - | Harryette 12kV | OH | Guernsey | Withdrawn | AEP | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1125_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1125_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 10/27/2016 | N/A | N/A | 7/20/2017 | Customer Initiated Withdrawal | 10/1/2017 | N/A | Y | No | |||||||||||||
| AC1-141 | + | Cook-East Elkhart 345kV | Indeck Niles Energy Center | MI | Cass | Partially in Service - Under Construction | Unknown | 1085 | 91 | 91 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1141_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_141_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/24/2021 | 10/28/2016 | N/A | N/A | 12/27/2021 | 3/15/2022 | 3/15/2022 | 12/27/2021 | N/A | N | No | |||||||||
| AC1-141 | - | Cook-East Elkhart 345kV | Indeck Niles Energy Center | MI | Cass | Partially in Service - Under Construction | AEP | 1085 | 91 | 91 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1141_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_141_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/24/2021 | 10/28/2016 | N/A | N/A | 12/27/2021 | 3/15/2022 | 3/15/2022 | 12/27/2021 | N/A | N | No | |||||||||
| AC1-144 | + | Hillsboro 138kV | OH | Highland | Withdrawn | Unknown | 85 | 85 | 57.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1144_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1144_imp.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 6/18/2018 | 10/1/2019 | N/A | N | No | ||||||||||||||||||
| AC1-144 | - | Hillsboro 138kV | OH | Highland | Withdrawn | AEP | 85 | 85 | 57.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1144_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1144_imp.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 6/18/2018 | 10/1/2019 | N/A | N | No | ||||||||||||||||||
| AC1-148 | + | Granger-Twin Branch 138kV | IN | St. Joseph | Withdrawn | Unknown | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1148_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 3/16/2018 | 11/1/2018 | N/A | N | No | |||||||||||||||||||
| AC1-148 | - | Granger-Twin Branch 138kV | IN | St. Joseph | Withdrawn | AEP | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1148_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 3/16/2018 | 11/1/2018 | N/A | N | No | |||||||||||||||||||
| AC1-149 | + | Buckskin 69kV | OH | Ross | Withdrawn | Unknown | 85 | 85 | 32.3 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/22/2016 | Customer Milestone Not Met | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-149 | - | Buckskin 69kV | OH | Ross | Withdrawn | AEP | 85 | 85 | 32.3 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/22/2016 | Customer Milestone Not Met | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-150 | + | Beaver 138kV | OH | Pike | Withdrawn | Unknown | 200 | 200 | 76 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/22/2016 | Customer Milestone Not Met | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-150 | - | Beaver 138kV | OH | Pike | Withdrawn | AEP | 200 | 200 | 76 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/22/2016 | Customer Milestone Not Met | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-152 | + | Lawrenceburg 345kV PB I | Lawrenceburg Generating Plant | IN | Dearborn | In Service | Unknown | 1270 | 50 | 50 | 50 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1152_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1152_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_152_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/31/2016 | N/A | N/A | 6/1/2020 | 6/1/2020 | 11/13/2019 | N/A | N | No | ||||||||||
| AC1-152 | - | Lawrenceburg 345kV PB I | Lawrenceburg Generating Plant | IN | Dearborn | In Service | AEP | 1270 | 50 | 50 | 50 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1152_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1152_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_152_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/31/2016 | N/A | N/A | 6/1/2020 | 6/1/2020 | 11/13/2019 | N/A | N | No | ||||||||||
| AC1-155 | + | Mt. Airy 34.5kV | VA | Wythe | Withdrawn | Unknown | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/22/2016 | Customer Milestone Not Met | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-155 | - | Mt. Airy 34.5kV | VA | Wythe | Withdrawn | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/22/2016 | Customer Milestone Not Met | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-156 | + | Morgan’s Cut 34.5kV | VA | Pulaski | Withdrawn | Unknown | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/22/2016 | Customer Milestone Not Met | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-156 | - | Morgan’s Cut 34.5kV | VA | Pulaski | Withdrawn | AEP | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/22/2016 | Customer Milestone Not Met | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-157 | + | Hillsboro 138kV | OH | Highland | Withdrawn | Unknown | 100 | 100 | 100 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/18/2016 | Customer Initiated Withdrawal | 10/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-157 | - | Hillsboro 138kV | OH | Highland | Withdrawn | AEP | 100 | 100 | 100 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 11/18/2016 | Customer Initiated Withdrawal | 10/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC1-165 | + | Atlanta 69kV III | Buckeye Plains II Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1165_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1165_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1165_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_165_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_165_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2021 | 7/1/2025 | 7/1/2025 | N/A | N | No | |||||||||
| AC1-165 | - | Atlanta 69kV III | Buckeye Plains II Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1165_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1165_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1165_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_165_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_165_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2021 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC1-166 | + | Atlanta 69kV IV | Buckeye Plains Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1166_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1166_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1166_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_166_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_166_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2021 | 7/1/2025 | 7/1/2025 | N/A | N | No | |||||||||
| AC1-166 | - | Atlanta 69kV IV | Buckeye Plains Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1166_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1166_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1166_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_166_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_166_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2021 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC1-167 | + | Mark Center 69kV | OH | Defiance | Active | Unknown | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1167_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1167_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1167_fac.pdf | Document Posted | N/A | N/A | 11/1/2016 | N/A | N/A | 12/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-167 | - | Mark Center 69kV | OH | Defiance | Active | AEP | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1167_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1167_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1167_fac.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-171 | + | Powerton | IL | Tazewell | Active | ComEd | 79.1 | 79.1 | 10.3 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1171_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1171_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1171_fac.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 11/15/2019 | N/A | N | No | |||||||||||||||||
| AC1-171 | - | Powerton | IL | Tazewell | Active | ComEd | 79.1 | 79.1 | 10.3 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1171_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1171_imp.pdf | Document Posted | In Progress | N/A | N/A | 10/31/2016 | N/A | N/A | 11/15/2019 | N/A | N | No | ||||||||||||||||||
| AC1-172 | + | Lawrenceburg 345kV PB II | Lawrenceburg Generating Plant | IN | Dearborn | Partially in Service - Under Construction | Unknown | 1320 | 50 | 50 | 4 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1172_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1172_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_172_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/31/2016 | N/A | N/A | 6/1/2020 | 6/1/2020 | 11/13/2019 | N/A | N | No | ||||||||||
| AC1-172 | - | Lawrenceburg 345kV PB II | Lawrenceburg Generating Plant | IN | Dearborn | Partially in Service - Under Construction | AEP | 1320 | 50 | 50 | 4 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1172_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1172_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_172_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/31/2016 | N/A | N/A | 6/1/2020 | 6/1/2020 | 11/13/2019 | N/A | N | No | ||||||||||
| AC1-173 | + | Logtown 138kV | Timber Road IV Wind Farm (Southern Phase) | OH | Paulding | In Service | Unknown | 75.9 | 75.9 | 9.9 | 75.9 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1173_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1173_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_173_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_173_csa.pdf | Document Posted | N/A | N/A | 2/5/2020 | 10/31/2016 | N/A | N/A | 2/15/2020 | 3/31/2020 | 3/31/2020 | 3/27/2020 | N/A | N | No | |||||||
| AC1-173 | - | Logtown 138kV | Timber Road IV Wind Farm (Southern Phase) | OH | Paulding | In Service | AEP | 75.9 | 75.9 | 9.9 | 75.9 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1173_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1173_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_173_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_173_csa.pdf | Document Posted | N/A | N/A | 2/5/2020 | 10/31/2016 | N/A | N/A | 2/15/2020 | 3/31/2020 | 3/31/2020 | 3/27/2020 | N/A | N | No | |||||||
| AC1-174 | + | Losantville 345kV | Riverstart Solar Park | IN | Randolph | In Service | Unknown | 100 | 100 | 38 | 100 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1174_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1174_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_174_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_174_csa.pdf | Document Posted | N/A | N/A | 7/5/2021 | 10/31/2016 | N/A | N/A | 9/24/2021 | 6/1/2022 | 6/1/2022 | 9/24/2021 | N/A | N | No | ||||||
| AC1-174 | - | Losantville 345kV | Riverstart Solar Park | IN | Randolph | In Service | AEP | 100 | 100 | 38 | 100 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1174_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1174_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_174_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_174_csa.pdf | Document Posted | N/A | N/A | 7/5/2021 | 10/31/2016 | N/A | N/A | 9/24/2021 | 6/1/2022 | 6/1/2022 | 9/24/2021 | N/A | N | No | ||||||
| AC1-175 | + | Losantville 345kV | Riverstart Solar Park | IN | Randolph | In Service | Unknown | 100 | 100 | 38 | 100 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1175_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1175_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1175_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_175_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_175_csa.pdf | Document Posted | N/A | N/A | 7/5/2021 | 10/31/2016 | N/A | N/A | 9/10/2021 | 6/1/2022 | 6/1/2022 | 9/24/2021 | N/A | N | No | ||||||
| AC1-175 | - | Losantville 345kV | Riverstart Solar Park | IN | Randolph | In Service | AEP | 100 | 100 | 38 | 100 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1175_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1175_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1175_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_175_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_175_csa.pdf | Document Posted | N/A | N/A | 7/5/2021 | 10/31/2016 | N/A | N/A | 9/10/2021 | 6/1/2022 | 6/1/2022 | 9/24/2021 | N/A | N | No | ||||||
| AC1-176 | + | Timber Switch 138kV | OH | Paulding | Withdrawn | Unknown | 58.7 | 58.7 | 7.6 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1176_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 7/9/2020 | 10/31/2019 | N/A | N | No | |||||||||||||||||
| AC1-176 | - | Timber Switch 138kV | OH | Paulding | Withdrawn | AEP | 58.7 | 58.7 | 7.6 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1176_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 10/31/2016 | N/A | N/A | 7/9/2020 | 10/31/2019 | N/A | N | No | |||||||||||||||||
| AC1-188 | + | Rio-Lick 138kV | OH | Jackson | Active | Unknown | 70 | 70 | 46.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1188_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1188_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/Delay email sent 11/20/19 | In Progress | N/A | N/A | 10/31/2016 | N/A | N/A | 12/31/2017 | N/A | N | No | |||||||||||||||||
| AC1-188 | - | Rio-Lick 138kV | OH | Jackson | Active | AEP | 70 | 70 | 46.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1188_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1188_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/Delay email sent 11/20/19 | In Progress | N/A | N/A | 10/31/2016 | N/A | N/A | 12/31/2017 | N/A | N | No | |||||||||||||||||
| AC1-189 | + | Chinquapin-Everetts 230kV | Pitt Solar | NC | Pitt | Engineering and Procurement | Dominion | 80 | 80 | 53.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1189_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1189_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1189_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_189_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_189_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 9/1/2024 | 9/1/2024 | 9/1/2024 | N/A | N | No | |||||||||
| AC1-189 | - | Chinquapin-Everetts 230kV | Pitt Solar | NC | Pitt | Engineering and Procurement | Dominion | 80 | 80 | 53.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1189_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1189_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1189_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_189_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_189_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 9/1/2024 | 9/1/2024 | N/A | N | No | ||||||||||
| AC1-194 | + | Elk 138kV | OH | Vinton | Active | Unknown | 125 | 125 | 47.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1194_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1194_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ac1_194_isa2.pdf | Interim Study | N/A | N/A | N/A | 10/31/2016 | N/A | N/A | 12/31/2018 | N/A | N | No | |||||||||||||||
| AC1-194 | - | Elk 138kV | OH | Vinton | Active | AEP | 125 | 125 | 47.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1194_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1194_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ac1_194_isa2.pdf | Interim Study | N/A | N/A | N/A | 10/31/2016 | N/A | N/A | 12/31/2018 | N/A | N | No | |||||||||||||||
| AC1-195 | + | Dunkirk-Ada 69kV | OH | Hardin | Withdrawn | Unknown | 75 | 75 | 9 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1195_fea.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 5/30/2017 | Customer Initiated Withdrawal | 12/31/2018 | N/A | N | No | |||||||||||||||||||
| AC1-195 | - | Dunkirk-Ada 69kV | OH | Hardin | Withdrawn | AEP | 75 | 75 | 9 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1195_fea.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 5/30/2017 | Customer Initiated Withdrawal | 12/31/2018 | N/A | N | No | |||||||||||||||||||
| AC1-208 | + | Cox-Whitakers 115kV | Halifax County Solar | NC | Halifax | Engineering and Procurement | Dominion | 80 | 80 | 55.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1208_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1208_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1208_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_208_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_208_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/15/2023 | 12/15/2023 | N/A | N | No | ||||||||||
| AC1-208 | - | Cox-Whitakers 115kV | Halifax County Solar | NC | Halifax | Engineering and Procurement | Dominion | 80 | 80 | 55.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1208_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1208_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1208_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_208_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_208_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||
| AC1-210 | + | Madison 69kV | OH | Madison | Withdrawn | Unknown | 45 | 45 | 31 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1210_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1210_imp.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 7/17/2018 | 6/30/2018 | N/A | N | No | ||||||||||||||||||
| AC1-210 | - | Madison 69kV | OH | Madison | Withdrawn | AEP | 45 | 45 | 31 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1210_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1210_imp.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 7/17/2018 | 6/30/2018 | N/A | N | No | ||||||||||||||||||
| AC1-221 | + | Halifax-Person 230kV | Alton Post Office Solar | VA | Halifax | Engineering and Procurement | Dominion | 29.2 | 29.2 | 14.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 6/1/2023 | 6/1/2023 | N/A | N | No | ||||||||||
| AC1-221 | - | Halifax-Person 230kV | Alton Post Office Solar | VA | Halifax | Engineering and Procurement | Dominion | 29.2 | 29.2 | 14.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/16/2022 | 12/16/2022 | N/A | N | No | ||||||||||
| AC1-225 | + | Sorenson-Marysville 765kV | OH | Van Wert | Withdrawn | Unknown | 300.2 | 300.2 | 39 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1225_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1225_imp.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 7/16/2018 | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AC1-225 | - | Sorenson-Marysville 765kV | OH | Van Wert | Withdrawn | AEP | 300.2 | 300.2 | 39 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1225_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1225_imp.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 7/16/2018 | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AC1-226 | + | Wurno-Claytor 138kV | VA | Pulaski | Withdrawn | Unknown | 200.1 | 200.1 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1226_fea.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 4/3/2017 | Customer Initiated Withdrawal | 12/31/2019 | N/A | N | No | |||||||||||||||||||
| AC1-226 | - | Wurno-Claytor 138kV | VA | Pulaski | Withdrawn | AEP | 200.1 | 200.1 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1226_fea.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 4/3/2017 | Customer Initiated Withdrawal | 12/31/2019 | N/A | N | No | |||||||||||||||||||
| AC2-001 | + | OH | Van Wert | Withdrawn | Unknown | 300.2 | 300.2 | 39 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 11/1/2016 | N/A | N/A | 12/6/2016 | Queue Not Required | 12/31/2019 | N/A | N | No | |||||||||||||||||||||
| AC2-001 | - | OH | Van Wert | Withdrawn | AEP | 300.2 | 300.2 | 39 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 11/1/2016 | N/A | N/A | 12/6/2016 | Queue Not Required | 12/31/2019 | N/A | N | No | |||||||||||||||||||||
| AC2-002 | + | VA | Pulaski | Withdrawn | Unknown | 179.4 | 179.4 | 23 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 11/1/2016 | N/A | N/A | 12/6/2016 | Queue Not Required | 12/31/2019 | N/A | N | No | |||||||||||||||||||||
| AC2-002 | - | VA | Pulaski | Withdrawn | AEP | 179.4 | 179.4 | 23 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 11/1/2016 | N/A | N/A | 12/6/2016 | Queue Not Required | 12/31/2019 | N/A | N | No | |||||||||||||||||||||
| AC2-008 | + | Wildcat 12kV | OH | Highland | Withdrawn | Unknown | 10 | 10 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 11/3/2016 | N/A | N/A | 6/5/2017 | Customer Initiated Withdrawal | 6/3/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-008 | - | Wildcat 12kV | OH | Highland | Withdrawn | AEP | 10 | 10 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 11/3/2016 | N/A | N/A | 6/5/2017 | Customer Initiated Withdrawal | 6/3/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-012 | + | Grassfield-Great Bridge 115kV | Chesapeake Solar | VA | City of Chesapeake | Engineering and Procurement | Dominion | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2012_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2012_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2012_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_012_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_012_csa.pdf | Document Posted | N/A | N/A | 12/19/2016 | N/A | N/A | 4/15/2023 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC2-012 | - | Grassfield-Great Bridge 115kV | Chesapeake Solar | VA | City of Chesapeake | Engineering and Procurement | Dominion | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2012_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2012_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2012_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_012_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_012_csa.pdf | Document Posted | N/A | N/A | 12/19/2016 | N/A | N/A | 11/15/2022 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC2-015 | + | Chatfield-Howard 138kV | OH | Crawford | Active | Unknown | 117 | 117 | 53.55 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2015_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2015_imp.pdf | Document Posted | In Progress | N/A | N/A | 12/28/2016 | N/A | N/A | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AC2-015 | - | Chatfield-Howard 138kV | OH | Crawford | Active | AEP | 117 | 117 | 53.55 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2015_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2015_imp.pdf | Document Posted | In Progress | N/A | N/A | 12/28/2016 | N/A | N/A | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AC2-016 | + | Stemple 345kV | Carroll County Energy LLC | OH | Carroll | In Service | Unknown | 748 | 6 | 20 | 20 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2016_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2016_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_016_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 1/3/2017 | N/A | N/A | 9/1/2019 | 9/1/2019 | 2/14/2020 | N/A | N | No | ||||||||||
| AC2-016 | - | Stemple 345kV | Carroll County Energy LLC | OH | Carroll | In Service | AEP | 748 | 6 | 20 | 20 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2016_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2016_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_016_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 1/3/2017 | N/A | N/A | 9/1/2019 | 9/1/2019 | 2/14/2020 | N/A | N | No | ||||||||||
| AC2-019 | + | Highland 12kV | OH | Highland | Withdrawn | Unknown | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 1/19/2017 | N/A | N/A | 7/13/2017 | Customer Initiated Withdrawal | 12/31/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-019 | - | Highland 12kV | OH | Highland | Withdrawn | AEP | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 1/19/2017 | N/A | N/A | 7/13/2017 | Customer Initiated Withdrawal | 12/31/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-023 | + | Hebron 69kV | Porter Mill Solar | MD | Wicomico | Engineering and Procurement | DPL | 45.8 | 45.8 | 26.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2023_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2023_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_023_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_023_csa.pdf | Document Posted | N/A | N/A | 1/25/2017 | N/A | N/A | 5/1/2026 | 5/1/2026 | N/A | N | No | ||||||||||
| AC2-023 | - | Hebron 69kV | MD | Wicomico | Active | DPL | 45.8 | 45.8 | 26.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2023_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2023_fac.pdf | Document Posted | N/A | N/A | 1/25/2017 | N/A | N/A | 9/30/2019 | N/A | N | No | |||||||||||||||||
| AC2-026 | + | Wakefield 138kV | OH | Scioto | Withdrawn | Unknown | 50 | 50 | 27.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2026_fea.pdf | Document Posted | N/A | N/A | 1/30/2017 | N/A | N/A | 9/6/2017 | Customer Milestone Not Met | 6/30/2019 | N/A | N | No | |||||||||||||||||||
| AC2-026 | - | Wakefield 138kV | OH | Scioto | Withdrawn | AEP | 50 | 50 | 27.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2026_fea.pdf | Document Posted | N/A | N/A | 1/30/2017 | N/A | N/A | 9/6/2017 | Customer Milestone Not Met | 6/30/2019 | N/A | N | No | |||||||||||||||||||
| AC2-027 | + | Highland 12kV | OH | Highland | Withdrawn | Unknown | 10 | 10 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 1/30/2017 | N/A | N/A | 7/19/2017 | Customer Initiated Withdrawal | 11/30/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-027 | - | Highland 12kV | OH | Highland | Withdrawn | AEP | 10 | 10 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 1/30/2017 | N/A | N/A | 7/19/2017 | Customer Initiated Withdrawal | 11/30/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-028 | + | Highland 13.2kV | OH | Highland | Withdrawn | Unknown | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 1/31/2017 | N/A | N/A | 4/12/2017 | Customer Initiated Withdrawal | 10/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-028 | - | Highland 13.2kV | OH | Highland | Withdrawn | AEP | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 1/31/2017 | N/A | N/A | 4/12/2017 | Customer Initiated Withdrawal | 10/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-029 | + | Circleville 138kV | OH | Pickaway | Active | Unknown | 70 | 70 | 26.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2029_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2029_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2017 | N/A | N/A | 12/31/2018 | N/A | N | No | ||||||||||||||||||
| AC2-029 | - | Circleville 138kV | OH | Pickaway | Active | AEP | 70 | 70 | 26.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2029_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2029_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2017 | N/A | N/A | 12/31/2018 | N/A | N | No | ||||||||||||||||||
| AC2-030 | + | East Beaver 69kV | OH | Pike | Withdrawn | Unknown | 20 | 20 | 13.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2030_fea.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 12/6/2017 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-030 | - | East Beaver 69kV | OH | Pike | Withdrawn | AEP | 20 | 20 | 13.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2030_fea.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 12/6/2017 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-031 | + | Hillsboro 138kV | OH | Highland | Withdrawn | Unknown | 100 | 100 | 67 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2031_fea.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 10/4/2017 | 10/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-031 | - | Hillsboro 138kV | OH | Highland | Withdrawn | AEP | 100 | 100 | 67 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2031_fea.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 10/4/2017 | 10/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-034 | + | Eugene-Dequine 345kV | N/A | N/A | Withdrawn | Unknown | 100 | Energy | Merchant Transmission | Withdrawn | N/A | N/A | 2/3/2017 | N/A | N/A | 3/24/2017 | N/A | EE | No | |||||||||||||||||||||||||
| AC2-034 | - | Eugene-Dequine 345kV | N/A | N/A | Withdrawn | AEP | 100 | Energy | Merchant Transmission | Withdrawn | N/A | N/A | 2/3/2017 | N/A | N/A | 3/24/2017 | N/A | EE | No | |||||||||||||||||||||||||
| AC2-035 | + | Lick-Firebrick 69kV | OH | Jackson | Withdrawn | Unknown | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2035_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2035_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 2/25/2019 | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AC2-035 | - | Lick-Firebrick 69kV | OH | Jackson | Withdrawn | AEP | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2035_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2035_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 2/25/2019 | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AC2-036 | + | Ravenswood-East Bashan Switch 69kV | OH | Meigs | Withdrawn | Unknown | 0 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2036_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2036_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 3/12/2019 | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AC2-036 | - | Ravenswood-East Bashan Switch 69kV | OH | Meigs | Withdrawn | AEP | 0 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2036_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2036_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 3/12/2019 | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AC2-037 | + | Lick 69kV | OH | Jackson | Withdrawn | Unknown | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/3/2017 | N/A | N/A | 5/5/2017 | Customer Initiated Withdrawal | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-037 | - | Lick 69kV | OH | Jackson | Withdrawn | AEP | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/3/2017 | N/A | N/A | 5/5/2017 | Customer Initiated Withdrawal | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-038 | + | Lee 69kV | OH | Athens | Withdrawn | Unknown | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2038_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2038_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 9/27/2019 | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AC2-038 | - | Lee 69kV | OH | Athens | Withdrawn | AEP | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2038_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2038_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 9/27/2019 | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AC2-039 | + | Poston-Dexter 69kV | OH | Athens | Withdrawn | Unknown | 43 | 43 | 29.4 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/3/2017 | N/A | N/A | 5/5/2017 | Customer Initiated Withdrawal | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-039 | - | Poston-Dexter 69kV | OH | Athens | Withdrawn | AEP | 43 | 43 | 29.4 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/3/2017 | N/A | N/A | 5/5/2017 | Customer Initiated Withdrawal | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-040 | + | Hillsboro 138kV | OH | Highland | Withdrawn | Unknown | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2040_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 10/18/2017 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-040 | - | Hillsboro 138kV | OH | Highland | Withdrawn | AEP | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2040_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 10/18/2017 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-041 | + | Hillsboro 138kV | OH | Highland | Withdrawn | Unknown | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2041_fea,pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 10/18/2017 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-041 | - | Hillsboro 138kV | OH | Highland | Withdrawn | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2041_fea,pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 10/18/2017 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-042 | + | Hillsboro 138kV | OH | Highland | Withdrawn | Unknown | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2042_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 10/18/2017 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-042 | - | Hillsboro 138kV | OH | Highland | Withdrawn | AEP | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2042_imp.pdf | Document Posted | N/A | N/A | 2/3/2017 | N/A | N/A | 10/18/2017 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-043 | + | W. Millersport-S. Baltimore 138kV | OH | Fairfield | Withdrawn | Unknown | 50 | 50 | 20 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2043_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2043_imp.pdf | Document Posted | N/A | N/A | 2/6/2017 | N/A | N/A | 9/14/2018 | 12/15/2018 | N/A | N | No | ||||||||||||||||||
| AC2-043 | - | W. Millersport-S. Baltimore 138kV | OH | Fairfield | Withdrawn | AEP | 50 | 50 | 20 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2043_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2043_imp.pdf | Document Posted | N/A | N/A | 2/6/2017 | N/A | N/A | 9/14/2018 | 12/15/2018 | N/A | N | No | ||||||||||||||||||
| AC2-044 | + | Maddox Creek 345kV | OH | Van Wert | Active | Unknown | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2044_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2044_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/6/2017 | N/A | N/A | 12/31/2018 | N/A | N | No | ||||||||||||||||||
| AC2-044 | - | Maddox Creek 345kV | OH | Van Wert | Active | AEP | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2044_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2044_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/6/2017 | N/A | N/A | 12/31/2018 | N/A | N | No | ||||||||||||||||||
| AC2-045 | + | Clark 12kV | Solar Power and Light, LLC | OH | Athens | Withdrawn | Unknown | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2045_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2045_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2045_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2045_wmpa.pdf | Not Required | N/A | N/A | 2/7/2017 | N/A | N/A | 6/29/2020 | 12/31/2019 | 12/31/2019 | N/A | N | No | ||||||||||
| AC2-045 | - | Clark 12kV | Solar Power and Light, LLC | OH | Athens | Withdrawn | AEP | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2045_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2045_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2045_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2045_wmpa.pdf | Not Required | N/A | N/A | 2/7/2017 | N/A | N/A | 6/29/2020 | 12/31/2019 | 12/31/2019 | N/A | N | No | ||||||||||
| AC2-046 | + | EAst Beaver 138kV | OH | Jackson | Withdrawn | Unknown | 63 | 63 | 39.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2046_fea.pdf | Document Posted | N/A | N/A | 2/8/2017 | N/A | N/A | 9/26/2017 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-046 | - | EAst Beaver 138kV | OH | Jackson | Withdrawn | AEP | 63 | 63 | 39.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2046_fea.pdf | Document Posted | N/A | N/A | 2/8/2017 | N/A | N/A | 9/26/2017 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-047 | + | Ashley-Millbrook Park 69 kV | OH | Scioto | Withdrawn | Unknown | 18.3 | 18.3 | 7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2047_fea.pdf | Document Posted | N/A | N/A | 2/8/2017 | N/A | N/A | 10/23/2017 | 10/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-047 | - | Ashley-Millbrook Park 69 kV | OH | Scioto | Withdrawn | AEP | 18.3 | 18.3 | 7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2047_fea.pdf | Document Posted | N/A | N/A | 2/8/2017 | N/A | N/A | 10/23/2017 | 10/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-048 | + | Sporn 138kV | OH | Meigs | Active | Unknown | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2048_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/10/2017 | N/A | N/A | 12/31/2018 | N/A | N | No | ||||||||||||||||||
| AC2-048 | - | Sporn 138kV | OH | Meigs | Active | AEP | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2048_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/10/2017 | N/A | N/A | 12/31/2018 | N/A | N | No | ||||||||||||||||||
| AC2-049 | + | Hillsboro-Millbrook 138kV | OH | Highland | Withdrawn | Unknown | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2049_fea.pdf | Document Posted | N/A | N/A | 2/10/2017 | N/A | N/A | 10/13/2017 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-049 | - | Hillsboro-Millbrook 138kV | OH | Highland | Withdrawn | AEP | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2049_fea.pdf | Document Posted | N/A | N/A | 2/10/2017 | N/A | N/A | 10/13/2017 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-051 | + | Pickaway Solar | OH | Pickaway | Withdrawn | Unknown | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/13/2017 | N/A | N/A | 3/24/2017 | Customer Initiated Withdrawal | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-051 | - | Pickaway Solar | OH | Pickaway | Withdrawn | AEP | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/13/2017 | N/A | N/A | 3/24/2017 | Customer Initiated Withdrawal | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-053 | + | Germantown 115kV | Brookview Solar I | PA | Adams | Engineering and Procurement | ME | 55 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2053_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2053_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2053_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_053_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_053_csa.pdf | Document Posted | N/A | N/A | 2/14/2017 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AC2-053 | - | Germantown 115kV | Brookview Solar I | PA | Adams | Engineering and Procurement | ME | 55 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2053_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2053_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2053_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_053_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_053_csa.pdf | Document Posted | N/A | N/A | 2/14/2017 | N/A | N/A | 12/31/2020 | 12/31/2020 | N/A | N | No | ||||||||||
| AC2-054 | + | South Rultonham 69kV | OH | Muskingum | Withdrawn | Unknown | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/14/2017 | N/A | N/A | 5/1/2017 | Customer Initiated Withdrawal | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-054 | - | South Rultonham 69kV | OH | Muskingum | Withdrawn | AEP | 10 | 10 | 3.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/14/2017 | N/A | N/A | 5/1/2017 | Customer Initiated Withdrawal | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-055 | + | Buckskin 69kV | OH | Highland | Withdrawn | Unknown | 47.5 | 47.5 | 18.05 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2055_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 2/14/2017 | N/A | N/A | 4/22/2021 | 7/1/2019 | N/A | N | No | |||||||||||||||||
| AC2-055 | - | Buckskin 69kV | OH | Highland | Withdrawn | AEP | 47.5 | 47.5 | 18.05 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2055_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 2/14/2017 | N/A | N/A | 4/22/2021 | 7/1/2019 | N/A | N | No | |||||||||||||||||
| AC2-057 | + | Ridgeway-Dan River 69kV | VA | Pittsylvania | Withdrawn | Unknown | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2057_fea.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 10/4/2017 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-057 | - | Ridgeway-Dan River 69kV | VA | Pittsylvania | Withdrawn | AEP | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2057_fea.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 10/4/2017 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-058 | + | Newcomerstown-N. Philly 69kV | OH | Tuscarawas | Withdrawn | Unknown | 16.4 | 16.37 | 16.37 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/16/2017 | N/A | N/A | 7/12/2017 | Customer Initiated Withdrawal | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-058 | - | Newcomerstown-N. Philly 69kV | OH | Tuscarawas | Withdrawn | AEP | 16.4 | 16.37 | 16.37 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/16/2017 | N/A | N/A | 7/12/2017 | Customer Initiated Withdrawal | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-059 | + | Biers Run-Circleville 138kV | Yellowbud Solar | OH | Ross | Under Construction | Unknown | 127 | 127 | 62.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_059_csa.pdf | Document Posted | N/A | N/A | 8/1/2022 | 2/16/2017 | N/A | N/A | 8/1/2022 | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||
| AC2-059 | - | Biers Run-Circleville 138kV | Yellowbud Solar | OH | Ross | Under Construction | AEP | 127 | 127 | 62.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_059_csa.pdf | Document Posted | N/A | N/A | 8/1/2022 | 2/16/2017 | N/A | N/A | 8/1/2022 | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||
| AC2-060 | + | Buckskin 69kV | Ross County Solar | OH | Ross | Engineering and Procurement | Unknown | 100 | 100 | 64 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2060_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2060_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2060_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_060_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_060_csa.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 6/1/2024 | 6/1/2024 | N/A | N | No | ||||||||||
| AC2-060 | - | Buckskin 69kV | OH | Ross | Active | AEP | 100 | 100 | 64 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2060_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2060_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2060_fac.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-061 | + | Hillsboro-Clinton 138kV | OH | Ross | Active | Unknown | 117 | 117 | 58.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2061_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2061_fac.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-061 | - | Hillsboro-Clinton 138kV | OH | Ross | Active | AEP | 117 | 117 | 58.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2061_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2061_fac.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-062 | + | Emerald-Kenton 138kV | OH | Brown | Withdrawn | Unknown | 55 | 55 | 55 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2062_fea.pdf | Document Posted | N/A | N/A | 2/22/2017 | N/A | N/A | 10/4/2017 | 12/31/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-062 | - | Emerald-Kenton 138kV | OH | Brown | Withdrawn | AEP | 55 | 55 | 55 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2062_fea.pdf | Document Posted | N/A | N/A | 2/22/2017 | N/A | N/A | 10/4/2017 | 12/31/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-064 | + | Hillsboro-Millbrook 138kV | OH | Highland | Withdrawn | Unknown | 115 | 115 | 69 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2064_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 2/22/2017 | N/A | N/A | 12/9/2019 | 6/1/2019 | N/A | N | No | |||||||||||||||||||
| AC2-064 | - | Hillsboro-Millbrook 138kV | OH | Highland | Withdrawn | AEP | 115 | 115 | 69 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2064_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 2/22/2017 | N/A | N/A | 12/9/2019 | 6/1/2019 | N/A | N | No | |||||||||||||||||||
| AC2-080 | + | Olive-Reynolds 345kV | IN | Jasper | Withdrawn | Unknown | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2080_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2080_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 2/28/2017 | N/A | N/A | 4/21/2021 | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-080 | - | Olive-Reynolds 345kV | IN | Jasper | Withdrawn | AEP | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2080_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2080_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 2/28/2017 | N/A | N/A | 4/21/2021 | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-084 | + | Dawson-South Justice 115kV | American Beech Solar | NC | Halifax | Engineering and Procurement | Dominion | 60 | 60 | 40.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2084_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2084_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_084_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_084_csa.pdf | Document Posted | N/A | N/A | 2/28/2017 | N/A | N/A | 6/1/2024 | 6/1/2024 | N/A | N | No | |||||||||||
| AC2-084 | - | Dawson-South Justice 115kV | American Beech Solar | NC | Halifax | Engineering and Procurement | Dominion | 60 | 60 | 40.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2084_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2084_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_084_isa.pdf | Document Posted | N/A | N/A | N/A | 2/28/2017 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | |||||||||||||
| AC2-087 | + | Buckskin 69kV | OH | Ross | Withdrawn | Unknown | 85 | 85 | 47.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2087_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2087_imp.pdf | Document Posted | N/A | N/A | 2/28/2017 | N/A | N/A | 1/15/2020 | 5/31/2019 | N/A | N | No | ||||||||||||||||||
| AC2-087 | - | Buckskin 69kV | OH | Ross | Withdrawn | AEP | 85 | 85 | 47.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2087_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2087_imp.pdf | Document Posted | N/A | N/A | 2/28/2017 | N/A | N/A | 1/15/2020 | 5/31/2019 | N/A | N | No | ||||||||||||||||||
| AC2-089 | + | Klockner 34.5 kV | Silverside Solar | VA | Wythe | Withdrawn | Unknown | 18.2 | 18.2 | 8.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2089_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2089_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2089_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2089_wmpa.pdf | Not Required | N/A | N/A | 2/28/2017 | N/A | N/A | 3/22/2019 | 12/31/2019 | 12/31/2019 | N/A | N | No | ||||||||||
| AC2-089 | - | Klockner 34.5 kV | Silverside Solar | VA | Wythe | Withdrawn | AEP | 18.2 | 18.2 | 8.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2089_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2089_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2089_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2089_wmpa.pdf | Not Required | N/A | N/A | 2/28/2017 | N/A | N/A | 3/22/2019 | 12/31/2019 | 12/31/2019 | N/A | N | No | ||||||||||
| AC2-090 | + | Losantville 345kV | IN | Randolph | Active | Unknown | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2090_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2090_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2017 | N/A | N/A | Customer Milestone Not Met | 11/30/2019 | N/A | N | No | |||||||||||||||||
| AC2-090 | - | Losantville 345kV | IN | Randolph | Active | AEP | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2090_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2090_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2017 | N/A | N/A | Customer Milestone Not Met | 11/30/2019 | N/A | N | No | |||||||||||||||||
| AC2-091 | + | Modoc (Riverstart Solar IV) 138kV | IN | Randolph | Withdrawn | Unknown | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/28/2017 | N/A | N/A | 3/31/2017 | Customer Milestone Not Met | 11/30/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-091 | - | Modoc (Riverstart Solar IV) 138kV | IN | Randolph | Withdrawn | AEP | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/28/2017 | N/A | N/A | 3/31/2017 | Customer Milestone Not Met | 11/30/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-096 | + | Wurno I 34.5KV | VA | Pulaski | Withdrawn | Unknown | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | Withdrawn | Withdrawn | N/A | N/A | 3/9/2017 | N/A | N/A | 1/10/2018 | 6/1/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-096 | - | Wurno I 34.5KV | VA | Pulaski | Withdrawn | AEP | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | Withdrawn | Withdrawn | N/A | N/A | 3/9/2017 | N/A | N/A | 1/10/2018 | 6/1/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-097 | + | Wurno II 34.5kV | VA | Pulaski | Withdrawn | Unknown | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | Withdrawn | Withdrawn | N/A | N/A | 3/9/2017 | N/A | N/A | 1/10/2018 | 6/1/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-097 | - | Wurno II 34.5kV | VA | Pulaski | Withdrawn | AEP | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | Withdrawn | Withdrawn | N/A | N/A | 3/9/2017 | N/A | N/A | 1/10/2018 | 6/1/2018 | N/A | N | No | ||||||||||||||||||||
| AC2-098 | + | Buckhorn-Lonesome Pine 138kV | VA | Tazewell | Withdrawn | Unknown | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2098_fea.pdf | Document Posted | N/A | N/A | 3/9/2017 | N/A | N/A | 8/30/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | |||||||||||||||||||
| AC2-098 | - | Buckhorn-Lonesome Pine 138kV | VA | Tazewell | Withdrawn | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2098_fea.pdf | Document Posted | N/A | N/A | 3/9/2017 | N/A | N/A | 8/30/2017 | Customer Initiated Withdrawal | 6/1/2018 | N/A | N | No | |||||||||||||||||||
| AC2-104 | + | Marysville-Sorenson 765kv | OH | Van Wert | Withdrawn | Unknown | 500.3 | 500.25 | 65.03 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2104_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2104_imp.pdf | Document Posted | N/A | N/A | 3/10/2017 | N/A | N/A | 11/7/2019 | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AC2-104 | - | Marysville-Sorenson 765kv | OH | Van Wert | Withdrawn | AEP | 500.3 | 500.25 | 65.03 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2104_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2104_imp.pdf | Document Posted | N/A | N/A | 3/10/2017 | N/A | N/A | 11/7/2019 | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AC2-106 | + | Biers Run 138kV | OH | Ross | Withdrawn | Unknown | 100 | 100 | 68.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2106_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 3/13/2017 | N/A | N/A | 12/13/2017 | 10/1/2019 | N/A | N | No | |||||||||||||||||||
| AC2-106 | - | Biers Run 138kV | OH | Ross | Withdrawn | AEP | 100 | 100 | 68.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2106_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 3/13/2017 | N/A | N/A | 12/13/2017 | 10/1/2019 | N/A | N | No | |||||||||||||||||||
| AC2-111 | + | College Corner 138kV | Angelina Solar I | OH | Preble | Engineering and Procurement | Unknown | 80 | 80 | 30.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2111_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2111_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2111_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_111_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_111_csa.pdf | Document Posted | N/A | N/A | 3/16/2017 | N/A | N/A | 7/1/2023 | 7/1/2023 | N/A | N | No | ||||||||||
| AC2-111 | - | College Corner 138kV | Angelina Solar I | OH | Preble | Engineering and Procurement | AEP | 80 | 80 | 30.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2111_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2111_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2111_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_111_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_111_csa.pdf | Document Posted | N/A | N/A | 3/16/2017 | N/A | N/A | 7/1/2023 | 7/1/2023 | N/A | N | No | ||||||||||
| AC2-119 | + | Grandview 138kV | WV | Raliegh | Withdrawn | Unknown | 25 | 25 | 17.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2119_fea.pdf | Document Posted | N/A | N/A | 3/22/2017 | N/A | N/A | 9/6/2017 | Customer Milestone Not Met | 12/31/2018 | N/A | N | No | |||||||||||||||||||
| AC2-119 | - | Grandview 138kV | WV | Raliegh | Withdrawn | AEP | 25 | 25 | 17.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2119_fea.pdf | Document Posted | N/A | N/A | 3/22/2017 | N/A | N/A | 9/6/2017 | Customer Milestone Not Met | 12/31/2018 | N/A | N | No | |||||||||||||||||||
| AC2-120 | + | Ripley 69kV | Ripley Solar | MD | Charles | Engineering and Procurement | SMECO | 27.5 | 27.5 | 10.45 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2120_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2120_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2120_wmpa.pdf | Not Required | N/A | N/A | 3/23/2017 | N/A | N/A | 10/1/2020 | 7/13/2022 | 7/13/2022 | N/A | N | No | |||||||||
| AC2-120 | - | Ripley 69kV | Ripley Solar | MD | Charles | Engineering and Procurement | SMECO | 27.5 | 27.5 | 10.45 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2120_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2120_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2120_wmpa.pdf | Not Required | N/A | N/A | 3/23/2017 | N/A | N/A | 10/1/2020 | 2/28/2023 | 2/28/2023 | N/A | N | No | |||||||||
| AC2-123 | + | Jacksons Ferry 138kV | Wythe County Solar Project | VA | Wythe | Engineering and Procurement | Unknown | 75 | 75 | 44.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2123_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2123_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2123_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_123_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_123_csa.pdf | Document Posted | N/A | N/A | 3/23/2017 | N/A | N/A | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||||
| AC2-123 | - | Jacksons Ferry 138kV | Wythe County Solar Project | VA | Wythe | Engineering and Procurement | AEP | 75 | 75 | 44.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2123_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2123_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2123_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_123_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_123_csa.pdf | Document Posted | N/A | N/A | 3/23/2017 | N/A | N/A | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||||
| AC2-124 | + | Gunn Road 345kV | OH | Hardin | Withdrawn | Unknown | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2124_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2124_imp.pdf | Document Posted | N/A | N/A | 3/24/2017 | N/A | N/A | 11/19/2018 | 12/15/2019 | N/A | N | No | ||||||||||||||||||
| AC2-124 | - | Gunn Road 345kV | OH | Hardin | Withdrawn | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2124_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2124_imp.pdf | Document Posted | N/A | N/A | 3/24/2017 | N/A | N/A | 11/19/2018 | 12/15/2019 | N/A | N | No | ||||||||||||||||||
| AC2-140 | + | DC Cook Unit 2 | DC Cook Generating Plant Unit No. 2 | MI | Berrien | In Service | Unknown | 1220 | 28 | 38 | 28 | Capacity | Generation Interconnection | Nuclear | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2140_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2140_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_140_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/27/2017 | N/A | N/A | 6/1/2020 | 6/1/2020 | 1/14/2017 | N/A | N | No | ||||||||||
| AC2-140 | - | DC Cook Unit 2 | DC Cook Generating Plant Unit No. 2 | MI | Berrien | In Service | AEP | 1220 | 28 | 38 | 28 | Capacity | Generation Interconnection | Nuclear | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2140_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2140_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_140_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/27/2017 | N/A | N/A | 6/1/2020 | 6/1/2020 | 1/14/2017 | N/A | N | No | ||||||||||
| AC2-146 | + | Modoc 138kV | IN | Randolph | Withdrawn | Unknown | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/28/2017 | N/A | N/A | 3/31/2017 | Customer Milestone Not Met | 11/30/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-146 | - | Modoc 138kV | IN | Randolph | Withdrawn | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/28/2017 | N/A | N/A | 3/31/2017 | Customer Milestone Not Met | 11/30/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-157 | + | Sullivan 345 kV | IN | Sullivan | Active | Unknown | 200 | 200 | 76 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2157_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2157_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2017 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AC2-157 | - | Sullivan 345 kV | IN | Sullivan | Active | AEP | 200 | 200 | 76 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2157_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2157_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2017 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AC2-168 | + | Clinton 23kV | Gaucho Solar | PA | Washington | Engineering and Procurement | DL | 11.7 | 11.7 | 4.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2168_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2168_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2168_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2168_wmpa.pdf | Not Required | N/A | N/A | 5/31/2022 | 3/30/2017 | N/A | N/A | 6/30/2022 | 6/30/2022 | 6/30/2022 | N/A | N | Yes | |||||||||
| AC2-168 | - | Clinton 23kV | Gaucho Solar | PA | Washington | Engineering and Procurement | DL | 11.7 | 11.7 | 4.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2168_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2168_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2168_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2168_wmpa.pdf | Not Required | N/A | N/A | 3/30/2017 | N/A | N/A | 12/31/2020 | 6/1/2022 | 6/1/2022 | N/A | N | Yes | ||||||||||
| AC2-172 | + | Big Sandy 1 138kV | Big Sandy #1 | KY | Lawrence | In Service | Unknown | 310 | 17 | 12 | 17 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2172_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2172_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_172_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/30/2017 | N/A | N/A | 10/1/2018 | 10/1/2018 | 5/30/2016 | N/A | N | No | ||||||||||
| AC2-172 | - | Big Sandy 1 138kV | Big Sandy #1 | KY | Lawrence | In Service | AEP | 310 | 17 | 12 | 17 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2172_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2172_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_172_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/30/2017 | N/A | N/A | 10/1/2018 | 10/1/2018 | 5/30/2016 | N/A | N | No | ||||||||||
| AC2-176 | + | Jay 138 kV | Bitter Ridge Wind Farm | IN | Jay | In Service | Unknown | 130 | 130 | 16.9 | 130 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2176_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2176_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_176_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_176_csa.pdf | Document Posted | N/A | N/A | 9/2/2020 | 3/31/2017 | N/A | N/A | 9/5/2020 | 10/31/2020 | 10/31/2020 | 9/5/2020 | N/A | N | No | ||||||
| AC2-176 | - | Jay 138 kV | Bitter Ridge Wind Farm | IN | Jay | In Service | AEP | 130 | 130 | 16.9 | 130 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2176_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2176_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_176_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_176_csa.pdf | Document Posted | N/A | N/A | 9/2/2020 | 3/31/2017 | N/A | N/A | 9/5/2020 | 10/31/2020 | 10/31/2020 | 9/5/2020 | N/A | N | No | ||||||
| AC2-177 | + | Desoto-Tanners Creek 345kV | IN | Henry | Withdrawn | Unknown | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2177_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2177_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/31/2017 | N/A | N/A | 6/17/2021 | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-177 | - | Desoto-Tanners Creek 345kV | IN | Henry | Withdrawn | AEP | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2177_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2177_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/31/2017 | N/A | N/A | 6/17/2021 | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-179 | + | Natrium 138kV | WV | Marshall | Withdrawn | Unknown | 57 | 57 | 48.2 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2179_fea.pdf | Document Posted | N/A | N/A | 3/31/2017 | N/A | N/A | 7/12/2017 | Customer Initiated Withdrawal | 6/1/2019 | N/A | N | No | |||||||||||||||||||
| AC2-179 | - | Natrium 138kV | WV | Marshall | Withdrawn | AEP | 57 | 57 | 48.2 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2179_fea.pdf | Document Posted | N/A | N/A | 3/31/2017 | N/A | N/A | 7/12/2017 | Customer Initiated Withdrawal | 6/1/2019 | N/A | N | No | |||||||||||||||||||
| AC2-180 | + | Babcock & Wilcox 69kV | VA | Campbell | Withdrawn | Unknown | 12 | 12 | 4 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2180_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 3/31/2017 | N/A | N/A | 11/20/2019 | 10/1/2018 | N/A | N | No | |||||||||||||||||||
| AC2-180 | - | Babcock & Wilcox 69kV | VA | Campbell | Withdrawn | AEP | 12 | 12 | 4 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2180_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 3/31/2017 | N/A | N/A | 11/20/2019 | 10/1/2018 | N/A | N | No | |||||||||||||||||||
| AC2-181 | + | Payne 69kV | IN | Randolph | Withdrawn | Unknown | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2017 | N/A | N/A | 3/31/2017 | Customer Milestone Not Met | 11/30/2019 | N/A | N | No | ||||||||||||||||||||
| AC2-181 | - | Payne 69kV | IN | Randolph | Withdrawn | AEP | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2017 | N/A | N/A | 3/31/2017 | Customer Milestone Not Met | 11/30/2019 | N/A | N | No | ||||||||||||||||||||
| AD1-015 | + | Frazeysburg 138 kV | Muskingum Solar | OH | Muskingum | Withdrawn | Unknown | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_015_csa.pdf | Document Posted | N/A | N/A | 4/21/2017 | N/A | N/A | 2/14/2022 | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||
| AD1-015 | - | Frazeysburg 138 kV | Muskingum Solar | OH | Muskingum | Withdrawn | AEP | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_015_csa.pdf | Document Posted | N/A | N/A | 4/21/2017 | N/A | N/A | 2/14/2022 | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||
| AD1-017 | + | Smith Mountain-Bearskin 138 kV | Maplewood Solar | VA | Pittsylvania | Under Construction | Unknown | 120 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1017_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1017_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1017_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_017_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_017_csa.pdf | Document Posted | N/A | N/A | 12/17/2021 | 5/11/2017 | N/A | N/A | 12/28/2021 | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||
| AD1-017 | - | Smith Mountain-Bearskin 138 kV | Maplewood Solar | VA | Pittsylvania | Under Construction | AEP | 120 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1017_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1017_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1017_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_017_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_017_csa.pdf | Document Posted | N/A | N/A | 12/17/2021 | 5/11/2017 | N/A | N/A | 12/28/2021 | 4/1/2022 | 4/1/2022 | N/A | N | No | ||||||||
| AD1-020 | + | Hunterstown-Lincoln 115 kV | Adams Solar LLC | PA | Adams | Engineering and Procurement | ME | 100 | 100 | 53.6 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1020_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1020_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1020_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_020_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_020_csa.pdf | Document Posted | N/A | N/A | 6/7/2017 | N/A | N/A | 5/15/2021 | 5/15/2021 | 5/15/2021 | N/A | N | No | |||||||||
| AD1-020 | - | Hunterstown-Lincoln 115 kV | Adams Solar LLC | PA | Adams | Suspended | ME | 100 | 100 | 53.6 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1020_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1020_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1020_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_020_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_020_csa.pdf | Document Posted | N/A | N/A | 6/7/2017 | N/A | N/A | 5/15/2021 | 5/15/2021 | 5/15/2021 | N/A | N | No | |||||||||
| AD1-023 | + | Cashie-Trowbridge 230 kV | NC | Bertie | Withdrawn | Dominion | 40 | 40 | 25.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1023_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 6/19/2017 | N/A | N/A | 4/21/2022 | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AD1-023 | - | Cashie-Trowbridge 230 kV | NC | Bertie | Active | Dominion | 40 | 40 | 25.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1023_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/19/2017 | N/A | N/A | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AD1-036 | + | Chatfield 138 kV | OH | Crawford | Withdrawn | Unknown | 35 | 35 | 13.3 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 7/27/2017 | N/A | N/A | 9/15/2017 | 12/31/2020 | N/A | N | No | |||||||||||||||||||||
| AD1-036 | - | Chatfield 138 kV | OH | Crawford | Withdrawn | AEP | 35 | 35 | 13.3 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 7/27/2017 | N/A | N/A | 9/15/2017 | 12/31/2020 | N/A | N | No | |||||||||||||||||||||
| AD1-043 | + | Makahoy 138 kV | IN | Madison | Active | Unknown | 120 | 120 | 45.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1043_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1043_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/31/2017 | N/A | N/A | 9/30/2020 | N/A | N | No | ||||||||||||||||||
| AD1-043 | - | Makahoy 138 kV | IN | Madison | Active | AEP | 120 | 120 | 45.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1043_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1043_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/31/2017 | N/A | N/A | 9/30/2020 | N/A | N | No | ||||||||||||||||||
| AD1-051 | + | Sporn South 138 kV | WV | Mason | Withdrawn | Unknown | 30 | 30 | 18.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1051_fea.pdf | Document Posted | N/A | N/A | 8/7/2017 | N/A | N/A | 6/4/2018 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AD1-051 | - | Sporn South 138 kV | WV | Mason | Withdrawn | AEP | 30 | 30 | 18.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1051_fea.pdf | Document Posted | N/A | N/A | 8/7/2017 | N/A | N/A | 6/4/2018 | 12/31/2018 | N/A | N | No | ||||||||||||||||||||
| AD1-058 | + | Halifax-Person 230 kV | Alton Post Office Solar | VA | Halifax | Engineering and Procurement | Dominion | 75.1 | 45.9 | 36.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1058_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1058_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1058_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_058_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_058_csa.pdf | Document Posted | N/A | N/A | 8/15/2017 | N/A | N/A | 6/1/2023 | 6/1/2023 | N/A | N | No | ||||||||||
| AD1-058 | - | Halifax-Person 230 kV | Alton Post Office Solar | VA | Halifax | Engineering and Procurement | Dominion | 75.1 | 45.9 | 36.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1058_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1058_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1058_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_058_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_058_csa.pdf | Document Posted | N/A | N/A | 8/15/2017 | N/A | N/A | 12/16/2022 | 12/16/2022 | N/A | N | No | ||||||||||
| AD1-070 | + | Fostoria Central 138 kV | South Branch Solar | OH | Hancock | Engineering and Procurement | Unknown | 205 | 205 | 36 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1070_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1070_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1070_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1070_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1070_csa.pdf | Document Posted | N/A | N/A | 8/31/2017 | N/A | N/A | 12/31/2025 | 12/31/2025 | N/A | N | No | ||||||||||
| AD1-070 | - | Fostoria Central 138 kV | South Branch Solar | OH | Hancock | Engineering and Procurement | AEP | 205 | 205 | 36 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1070_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1070_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1070_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1070_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1070_csa.pdf | Document Posted | N/A | N/A | 8/31/2017 | N/A | N/A | 12/31/2025 | 12/31/2025 | N/A | N | No | ||||||||||
| AD1-072 | + | Biers Run-Circleville 138 kV | Yellowbud Solar | OH | Ross | Engineering and Procurement | Unknown | 147 | 20 | 13.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1072_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1072_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1072_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_072_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_072_csa.pdf | Document Posted | N/A | N/A | 8/31/2017 | N/A | N/A | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||
| AD1-072 | - | Biers Run-Circleville 138 kV | Yellowbud Solar | OH | Ross | Engineering and Procurement | AEP | 147 | 20 | 13.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1072_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1072_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1072_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_072_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_072_csa.pdf | Document Posted | N/A | N/A | 8/31/2017 | N/A | N/A | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||
| AD1-073 | + | Buckskin 69 kV | Ross County Solar | OH | Ross | Engineering and Procurement | Unknown | 120 | 20 | 13.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1073_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1073_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1073_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_073_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_073_csa.pdf | Document Posted | N/A | N/A | 8/31/2017 | N/A | N/A | 6/1/2024 | 6/1/2024 | N/A | N | No | ||||||||||
| AD1-073 | - | Buckskin 69 kV | OH | Ross | Active | AEP | 120 | 20 | 13.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1073_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1073_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1073_fac.pdf | Document Posted | N/A | N/A | 8/31/2017 | N/A | N/A | 6/1/2020 | N/A | N | No | |||||||||||||||||
| AD1-085 | + | North Shenandoah-Stanley 34.5 kV | North Shenandoah-Stanley 34.5kV | VA | Page | Engineering and Procurement | APS | 20 | 20 | 12.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1085_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad1085_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad1085_wmpa.pdf | Not Required | N/A | N/A | 9/14/2017 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||||
| AD1-085 | - | North Shenandoah-Stanley 34.5 kV | North Shenandoah-Stanley 34.5kV | VA | Page | Engineering and Procurement | APS | 20 | 20 | 12.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1085_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad1085_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad1085_wmpa.pdf | Not Required | N/A | N/A | 9/14/2017 | N/A | N/A | 8/29/2021 | 6/30/2022 | 6/30/2022 | N/A | N | No | ||||||||||
| AD1-086 | + | E. Frankfort-Goodings Grove | N/A | N/A | Withdrawn | Unknown | 23.9 | Energy | Merchant Transmission | https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad1086_arr-imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/arr-facilities-studies/ad1086_arr-fac.pdf | Document Posted | N/A | N/A | 9/14/2017 | N/A | N/A | 8/23/2021 | 6/20/2021 | 6/20/2021 | N/A | EE | No | ||||||||||||||||||||
| AD1-086 | - | E. Frankfort-Goodings Grove | N/A | N/A | Withdrawn | Unknown | Energy | Merchant Transmission | https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad1086_arr-imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/arr-facilities-studies/ad1086_arr-fac.pdf | Document Posted | N/A | N/A | 9/14/2017 | N/A | N/A | 8/23/2021 | 6/20/2021 | 6/20/2021 | N/A | EE | No | |||||||||||||||||||||
| AD1-087 | + | Clover-Sedge Hill 230 kV | Foxhound Solar | VA | Halifax | Under Construction | Dominion | 64.2 | 64.2 | 43.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1087_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1087_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1087_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_087_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_087_csa.pdf | Document Posted | N/A | N/A | 9/15/2017 | N/A | N/A | 6/1/2023 | 5/31/2024 | 5/31/2024 | N/A | N | No | |||||||||
| AD1-087 | - | Clover-Sedge Hill 230 kV | Foxhound Solar | VA | Halifax | Engineering and Procurement | Dominion | 64.2 | 64.2 | 43.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1087_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1087_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1087_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_087_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_087_csa.pdf | Document Posted | N/A | N/A | 9/15/2017 | N/A | N/A | 5/31/2024 | 5/31/2024 | N/A | N | No | ||||||||||
| AD1-090 | + | Muskingum River 345 kV Phase I | OH | Washington | Withdrawn | Unknown | 1260 | 1260 | 1180 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1090_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 9/18/2017 | N/A | N/A | 8/30/2019 | 1/1/2022 | N/A | N | No | |||||||||||||||||||
| AD1-090 | - | Muskingum River 345 kV Phase I | OH | Washington | Withdrawn | AEP | 1260 | 1260 | 1180 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1090_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 9/18/2017 | N/A | N/A | 8/30/2019 | 1/1/2022 | N/A | N | No | |||||||||||||||||||
| AD1-091 | + | Muskingum River 345 kV Phase II | OH | Washington | Withdrawn | Unknown | 630 | 630 | 590 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 9/18/2017 | N/A | N/A | 11/7/2017 | 1/1/2022 | N/A | N | No | |||||||||||||||||||||
| AD1-091 | - | Muskingum River 345 kV Phase II | OH | Washington | Withdrawn | AEP | 630 | 630 | 590 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 9/18/2017 | N/A | N/A | 11/7/2017 | 1/1/2022 | N/A | N | No | |||||||||||||||||||||
| AD1-101 | + | Continental 69 kV | Blue Harvest Solar Park | OH | Putnam | Engineering and Procurement | Unknown | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_101_csa.pdf | Document Posted | N/A | N/A | 9/21/2017 | N/A | N/A | 1/31/2023 | 1/31/2023 | N/A | N | No | ||||||||||
| AD1-101 | - | Continental 69 kV | Blue Harvest Solar Park | OH | Putnam | Engineering and Procurement | AEP | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_101_csa.pdf | Document Posted | N/A | N/A | 9/21/2017 | N/A | N/A | 1/31/2023 | 1/31/2023 | N/A | N | No | ||||||||||
| AD1-102 | + | Wurno-Claytor Lake 138 KV | VA | Pulaski | Active | Unknown | 180 | 180.01 | 23.4 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1102_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/21/2017 | N/A | N/A | 12/18/2020 | N/A | N | No | ||||||||||||||||||
| AD1-102 | - | Wurno-Claytor Lake 138 KV | VA | Pulaski | Active | AEP | 180 | 180.01 | 23.4 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1102_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/21/2017 | N/A | N/A | 12/18/2020 | N/A | N | No | ||||||||||||||||||
| AD1-104 | + | Marysville-Sorenson 765 kV II | OH | Van Wert | Withdrawn | Unknown | 403.2 | 403.2 | 52.42 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1104_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1104_imp.pdf | Document Posted | N/A | N/A | 9/22/2017 | N/A | N/A | 3/27/2020 | 12/17/2021 | N/A | N | No | ||||||||||||||||||
| AD1-104 | - | Marysville-Sorenson 765 kV II | OH | Van Wert | Withdrawn | AEP | 403.2 | 403.2 | 52.42 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1104_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1104_imp.pdf | Document Posted | N/A | N/A | 9/22/2017 | N/A | N/A | 3/27/2020 | 12/17/2021 | N/A | N | No | ||||||||||||||||||
| AD1-106 | + | North Waldo-Wild Creek 138 kV | OH | Marion | Active | Unknown | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1106_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1106_fac.pdf | Document Posted | N/A | N/A | 9/22/2017 | N/A | N/A | 6/12/2019 | N/A | N | No | |||||||||||||||||
| AD1-106 | - | North Waldo-Wild Creek 138 kV | OH | Marion | Active | AEP | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1106_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1106_fac.pdf | Document Posted | N/A | N/A | 9/22/2017 | N/A | N/A | 6/12/2019 | N/A | N | No | |||||||||||||||||
| AD1-119 | + | Payne 69 kV | Timber Road Solar Park | OH | Paulding | Engineering and Procurement | Unknown | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1119_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1119_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1119_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_119_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_119_csa.pdf | Document Posted | N/A | N/A | 9/28/2017 | N/A | N/A | 10/1/2022 | 10/1/2022 | N/A | N | No | ||||||||||
| AD1-119 | - | Payne 69 kV | Timber Road Solar Park | OH | Paulding | Engineering and Procurement | AEP | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1119_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1119_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1119_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_119_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_119_csa.pdf | Document Posted | N/A | N/A | 9/28/2017 | N/A | N/A | 10/1/2022 | 10/1/2022 | N/A | N | No | ||||||||||
| AD1-124 | + | Lynbrook 12 kV | VA | Campbell | Withdrawn | Unknown | 15 | 15 | 5.7 | Capacity | Generation Interconnection | Solar | Withdrawn | Withdrawn | N/A | N/A | 9/28/2017 | N/A | N/A | 9/10/2019 | 12/31/2019 | N/A | N | No | ||||||||||||||||||||
| AD1-124 | - | Lynbrook 12 kV | VA | Campbell | Withdrawn | AEP | 15 | 15 | 5.7 | Capacity | Generation Interconnection | Solar | Withdrawn | Withdrawn | N/A | N/A | 9/28/2017 | N/A | N/A | 9/10/2019 | 12/31/2019 | N/A | N | No | ||||||||||||||||||||
| AD1-128 | + | Modoc-Delaware 138 kV | IN | Randolph | Active | Unknown | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1128_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1128_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1128_fac.pdf | Document Posted | N/A | N/A | 9/28/2017 | N/A | N/A | 10/31/2021 | N/A | N | No | |||||||||||||||||
| AD1-128 | - | Modoc-Delaware 138 kV | IN | Randolph | Active | AEP | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1128_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1128_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1128_fac.pdf | Document Posted | N/A | N/A | 9/28/2017 | N/A | N/A | 10/31/2021 | N/A | N | No | |||||||||||||||||
| AD1-130 | + | Hardin Switch 345 kV | Hardin Energy Center – Phase 2 | OH | Hardin | Engineering and Procurement | Unknown | 170 | 170 | 115 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1130_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1130_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1130_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_130_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_130_csa.pdf | Document Posted | N/A | N/A | 9/28/2017 | N/A | N/A | 6/30/2023 | 6/30/2023 | N/A | N | No | ||||||||||
| AD1-130 | - | Hardin Switch 345 kV | Hardin Energy Center – Phase 2 | OH | Hardin | Engineering and Procurement | AEP | 170 | 170 | 115 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1130_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1130_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1130_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_130_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1_130_csa.pdf | Document Posted | N/A | N/A | 9/28/2017 | N/A | N/A | 6/30/2023 | 6/30/2023 | N/A | N | No | ||||||||||
| AD1-135 | + | Clinton 23 kV II | Gaucho Solar | PA | Washington | Engineering and Procurement | DL | 20 | 8.3 | 3.15 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1135_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1135_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad1135_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad1135_wmpa.pdf | Not Required | N/A | N/A | 5/31/2022 | 9/29/2017 | N/A | N/A | 6/30/2022 | 6/1/2022 | 6/1/2022 | N/A | N | No | |||||||||
| AD1-135 | - | Clinton 23 kV II | Gaucho Solar | PA | Washington | Engineering and Procurement | DL | 20 | 8.3 | 3.15 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1135_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1135_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad1135_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad1135_wmpa.pdf | Not Required | N/A | N/A | 9/29/2017 | N/A | N/A | 12/31/2020 | 6/1/2022 | 6/1/2022 | N/A | N | No | ||||||||||
| AD1-137 | + | Dequine 345 kV | IN | Benton | Withdrawn | Unknown | 500 | 500 | 65 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1137_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1137_imp.pdf | Document Posted | N/A | N/A | 9/29/2017 | N/A | N/A | 1/16/2020 | 12/18/2020 | N/A | N | No | ||||||||||||||||||
| AD1-137 | - | Dequine 345 kV | IN | Benton | Withdrawn | AEP | 500 | 500 | 65 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1137_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1137_imp.pdf | Document Posted | N/A | N/A | 9/29/2017 | N/A | N/A | 1/16/2020 | 12/18/2020 | N/A | N | No | ||||||||||||||||||
| AD1-138 | + | Valley 138 kV | MI | Van Buren | Withdrawn | Unknown | 100 | 100 | 65.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/29/2017 | N/A | N/A | 10/2/2017 | 12/1/2020 | N/A | N | No | |||||||||||||||||||||
| AD1-138 | - | Valley 138 kV | MI | Van Buren | Withdrawn | AEP | 100 | 100 | 65.8 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/29/2017 | N/A | N/A | 10/2/2017 | 12/1/2020 | N/A | N | No | |||||||||||||||||||||
| AD1-139 | + | Mullin-Grant Tap 138 kV | IN | Madison | Withdrawn | Unknown | 100 | 99.9968 | 68.9978 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/29/2017 | N/A | N/A | 10/2/2017 | 12/1/2020 | N/A | N | No | |||||||||||||||||||||
| AD1-139 | - | Mullin-Grant Tap 138 kV | IN | Madison | Withdrawn | AEP | 100 | 99.9968 | 68.9978 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/29/2017 | N/A | N/A | 10/2/2017 | 12/1/2020 | N/A | N | No | |||||||||||||||||||||
| AD1-141 | + | S. Lucasville-Wakefield 138 kV | OH | Scioto | Withdrawn | Unknown | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1141_imp.pdf | Document Posted | N/A | N/A | 9/29/2017 | N/A | N/A | 3/27/2020 | 12/1/2019 | N/A | N | No | ||||||||||||||||||
| AD1-141 | - | S. Lucasville-Wakefield 138 kV | OH | Scioto | Withdrawn | AEP | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1141_imp.pdf | Document Posted | N/A | N/A | 9/29/2017 | N/A | N/A | 3/27/2020 | 12/1/2019 | N/A | N | No | ||||||||||||||||||
| AD1-149 | + | Carbondale 69 kV | WV | Kanawha | Withdrawn | Unknown | 19.9 | 19.9 | 8.33 | Capacity | Generation Interconnection | Storage; Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1149_fea.pdf | Document Posted | N/A | N/A | 9/30/2017 | N/A | N/A | 6/18/2018 | 6/30/2019 | N/A | N | No | ||||||||||||||||||||
| AD1-149 | - | Carbondale 69 kV | WV | Kanawha | Withdrawn | AEP | 19.9 | 19.9 | 8.33 | Capacity | Generation Interconnection | Storage; Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1149_fea.pdf | Document Posted | N/A | N/A | 9/30/2017 | N/A | N/A | 6/18/2018 | 6/30/2019 | N/A | N | No | ||||||||||||||||||||
| AD1-152 | + | Clover-Sedge Hill 230 kV | VA | Halifax | Active | Dominion | 80 | 80 | 48 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1152_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/30/2017 | N/A | N/A | 12/31/2022 | 12/31/2020 | N/A | N | No | |||||||||||||
| AD1-152 | - | Clover-Sedge Hill 230 kV | VA | Halifax | Active | Dominion | 80 | 80 | 48 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/30/2017 | N/A | N/A | 12/31/2022 | 12/31/2020 | N/A | N | No | ||||||||||||||
| AD1-161 | + | Stonewall-Long Mountain 69 kV | VA | Appomattox | Active | Unknown | 55 | 55 | 30.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1161_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2017 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AD1-161 | - | Stonewall-Long Mountain 69 kV | VA | Appomattox | Active | AEP | 55 | 55 | 30.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1161_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2017 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AD2-001 | + | Grangston 138 kV | Big Sandy Peaker Plant | WV | Wayne | In Service | Unknown | 318 | 18 | 18 | 18 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2001_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2001_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_001_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/2/2017 | N/A | N/A | 12/31/2020 | 12/31/2020 | 10/2/2020 | N/A | N | No | ||||||||||
| AD2-001 | - | Grangston 138 kV | Big Sandy Peaker Plant | WV | Wayne | In Service | AEP | 318 | 18 | 18 | 18 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2001_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2001_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_001_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/2/2017 | N/A | N/A | 12/31/2020 | 12/31/2020 | 10/2/2020 | N/A | N | No | ||||||||||
| AD2-005 | + | Nottingham 138kV | Harrison Power Plant | OH | Harrison | Suspended | Unknown | 1085 | 35 | 35 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2005_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2005_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2005_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_005_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_005_csa.pdf | Document Posted | N/A | N/A | 10/24/2017 | N/A | N/A | 6/11/2024 | 6/11/2024 | N/A | N | No | ||||||||||
| AD2-005 | - | Nottingham 138kV | Harrison Power Plant | OH | Harrison | Suspended | AEP | 1085 | 35 | 35 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2005_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2005_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2005_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_005_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_005_csa.pdf | Document Posted | N/A | N/A | 10/24/2017 | N/A | N/A | 6/11/2024 | 6/11/2024 | N/A | N | No | ||||||||||
| AD2-010 | + | Hillsboro 138 kV | OH | Highland | Withdrawn | Unknown | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2010_fea.pdf | Document Posted | N/A | N/A | 11/7/2017 | N/A | N/A | 11/9/2018 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AD2-010 | - | Hillsboro 138 kV | OH | Highland | Withdrawn | AEP | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2010_fea.pdf | Document Posted | N/A | N/A | 11/7/2017 | N/A | N/A | 11/9/2018 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AD2-011 | + | Hillsboro 138 kV | OH | Highland | Withdrawn | Unknown | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2011_fea.pdf | Document Posted | N/A | N/A | 11/7/2017 | N/A | N/A | 11/9/2018 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AD2-011 | - | Hillsboro 138 kV | OH | Highland | Withdrawn | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2011_fea.pdf | Document Posted | N/A | N/A | 11/7/2017 | N/A | N/A | 11/9/2018 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AD2-012 | + | Hillsboro 138 kV | OH | Highland | Withdrawn | Unknown | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2012_fea.pdf | Document Posted | N/A | N/A | 11/7/2017 | N/A | N/A | 11/9/2018 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AD2-012 | - | Hillsboro 138 kV | OH | Highland | Withdrawn | AEP | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2012_fea.pdf | Document Posted | N/A | N/A | 11/7/2017 | N/A | N/A | 11/9/2018 | 6/1/2019 | N/A | N | No | ||||||||||||||||||||
| AD2-014 | + | Steubenville 69 kV | OH | Jefferson | Active | Unknown | 49.5 | 49.5 | 20.79 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2014_fac.pdf | Document Posted | N/A | N/A | 11/8/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AD2-014 | - | Steubenville 69 kV | OH | Jefferson | Active | AEP | 49.5 | 49.5 | 20.79 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2014_fac.pdf | Document Posted | N/A | N/A | 11/8/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AD2-015 | + | Dequine 345 kV | IN | Benton | Withdrawn | Unknown | 500 | 500 | 65 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 11/13/2017 | N/A | N/A | 1/16/2018 | 12/18/2020 | N/A | N | No | |||||||||||||||||||||
| AD2-015 | - | Dequine 345 kV | IN | Benton | Withdrawn | AEP | 500 | 500 | 65 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 11/13/2017 | N/A | N/A | 1/16/2018 | 12/18/2020 | N/A | N | No | |||||||||||||||||||||
| AD2-016 | + | Biers Run-Circleville 138 kV | Yellowbud Solar | OH | Ross | Engineering and Procurement | Unknown | 274 | 127 | 62.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2016_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2016_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2016_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_016_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_016_csa.pdf | Document Posted | N/A | N/A | 11/15/2017 | N/A | N/A | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||
| AD2-016 | - | Biers Run-Circleville 138 kV | Yellowbud Solar | OH | Ross | Engineering and Procurement | AEP | 274 | 127 | 62.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2016_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2016_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2016_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_016_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_016_csa.pdf | Document Posted | N/A | N/A | 11/15/2017 | N/A | N/A | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||
| AD2-017 | + | Buckskin 69 kV | OH | Ross | Withdrawn | Unknown | 120 | 100 | 65.59 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 11/15/2017 | N/A | N/A | 1/18/2018 | 12/31/2020 | N/A | N | No | |||||||||||||||||||||
| AD2-017 | - | Buckskin 69 kV | OH | Ross | Withdrawn | AEP | 120 | 100 | 65.59 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 11/15/2017 | N/A | N/A | 1/18/2018 | 12/31/2020 | N/A | N | No | |||||||||||||||||||||
| AD2-020 | + | Valley 138 kV | MI | Van Buren | Active | Unknown | 100 | 100 | 61.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2020_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2020_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/29/2017 | N/A | N/A | 12/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-020 | - | Valley 138 kV | MI | Van Buren | Active | AEP | 100 | 100 | 61.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2020_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2020_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/29/2017 | N/A | N/A | 12/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-022 | + | East Danville-Roxborough 230 kV | VA | Pittsylvania | Active | Unknown | 96 | 96 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2022_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2022_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/30/2017 | N/A | N/A | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-022 | - | East Danville-Roxborough 230 kV | VA | Pittsylvania | Active | AEP | 96 | 96 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2022_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2022_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/30/2017 | N/A | N/A | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-023 | + | E. Danville-Roxborough 230 kV | VA | Pittsylvania | Active | Unknown | 54 | 54 | 35 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2023_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/30/2017 | N/A | N/A | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-023 | - | E. Danville-Roxborough 230 kV | VA | Pittsylvania | Active | AEP | 54 | 54 | 35 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2023_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/30/2017 | N/A | N/A | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-053 | + | South Canton-Harmon 345kV | OH | Adams | Withdrawn | Unknown | 50 | Energy | Merchant Transmission | Withdrawn | N/A | N/A | 2/1/2018 | N/A | N/A | 9/19/2018 | 6/1/2019 | N/A | EE | No | ||||||||||||||||||||||||
| AD2-053 | - | South Canton-Harmon 345kV | OH | Adams | Withdrawn | AEP | 50 | Energy | Merchant Transmission | Withdrawn | N/A | N/A | 2/1/2018 | N/A | N/A | 9/19/2018 | 6/1/2019 | N/A | EE | No | ||||||||||||||||||||||||
| AD2-054 | + | Dumont-Stillwell 345kV | IN | St. Joseph | Withdrawn | Unknown | 50 | Energy | Merchant Transmission | Withdrawn | N/A | N/A | 2/1/2018 | N/A | N/A | 5/2/2019 | N/A | EE | No | |||||||||||||||||||||||||
| AD2-054 | - | Dumont-Stillwell 345kV | IN | St. Joseph | Withdrawn | AEP | 50 | Energy | Merchant Transmission | Withdrawn | N/A | N/A | 2/1/2018 | N/A | N/A | 5/2/2019 | N/A | EE | No | |||||||||||||||||||||||||
| AD2-067 | + | Centerburg 138kV | OH | Licking | Active | Unknown | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2067_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2067_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2018 | N/A | N/A | 11/1/2021 | N/A | N | No | ||||||||||||||||||
| AD2-067 | - | Centerburg 138kV | OH | Licking | Active | AEP | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2067_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2067_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2018 | N/A | N/A | 11/1/2021 | N/A | N | No | ||||||||||||||||||
| AD2-071 | + | Strawton-Pipe Creek 138 kV | IN | Madison | Active | Unknown | 100 | 100 | 67 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2071_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2071_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/14/2018 | N/A | N/A | 12/1/2021 | N/A | N | No | ||||||||||||||||||
| AD2-071 | - | Strawton-Pipe Creek 138 kV | IN | Madison | Active | AEP | 100 | 100 | 67 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2071_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2071_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/14/2018 | N/A | N/A | 12/1/2021 | N/A | N | No | ||||||||||||||||||
| AD2-075 | + | Segreto 345kV | MI | Van Buren | Active | Unknown | 1340 | 285 | 145 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2075_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2075_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2018 | N/A | N/A | 5/4/2020 | N/A | N | No | ||||||||||||||||||
| AD2-075 | - | Segreto 345kV | MI | Van Buren | Active | AEP | 1340 | 285 | 145 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2075_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2075_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2018 | N/A | N/A | 5/4/2020 | N/A | N | No | ||||||||||||||||||
| AD2-078 | + | N. Haverhill 69kV | OH | Scioto | Withdrawn | Unknown | 95 | 20 | 40 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2078_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2078_imp.pdf | Document Posted | N/A | N/A | 3/15/2018 | N/A | N/A | 10/15/2020 | 9/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-078 | - | N. Haverhill 69kV | OH | Scioto | Withdrawn | AEP | 95 | 20 | 40 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2078_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2078_imp.pdf | Document Posted | N/A | N/A | 3/15/2018 | N/A | N/A | 10/15/2020 | 9/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-079 | + | Capitol Ave 34.5kV | St. Joseph County, Indiana | IN | St. Joseph | In Service | Unknown | 20 | 20 | 12 | 20 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2079_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2079_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2079_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_079_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_079_csa.pdf | Document Posted | N/A | N/A | 3/19/2018 | N/A | N/A | 3/31/2021 | 3/31/2021 | 3/16/2021 | N/A | N | No | ||||||||
| AD2-079 | - | Capitol Ave 34.5kV | St. Joseph County, Indiana | IN | St. Joseph | In Service | AEP | 20 | 20 | 12 | 20 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2079_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2079_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2079_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_079_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_079_csa.pdf | Document Posted | N/A | N/A | 3/19/2018 | N/A | N/A | 3/31/2021 | 3/31/2021 | 3/16/2021 | N/A | N | No | ||||||||
| AD2-080 | + | Dumont-Stillwell 345kV | IN | St. Joseph | Withdrawn | Unknown | 309 | Energy | Merchant Transmission | https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad2080_arr-imp.pdf | Document Posted | N/A | N/A | 3/19/2018 | N/A | N/A | 6/25/2020 | 6/1/2020 | N/A | EE | No | |||||||||||||||||||||||
| AD2-080 | - | Dumont-Stillwell 345kV | IN | St. Joseph | Withdrawn | AEP | 309 | Energy | Merchant Transmission | https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad2080_arr-imp.pdf | Document Posted | N/A | N/A | 3/19/2018 | N/A | N/A | 6/25/2020 | 6/1/2020 | N/A | EE | No | |||||||||||||||||||||||
| AD2-083 | + | Larrabee 230kV | NJ | Monmouth | Withdrawn | JCPL | 1100 | Energy | Merchant Transmission | AC | 0 | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ad2083_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ad2083_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/20/2018 | N/A | N/A | 2/2/2022 | N/A | S | No | |||||||||||||||||||
| AD2-083 | - | Larrabee 230kV | NJ | Monmouth | Withdrawn | JCPL | Energy | Merchant Transmission | AC | 0 | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ad2083_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ad2083_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/20/2018 | N/A | N/A | 2/2/2022 | N/A | S | No | ||||||||||||||||||||
| AD2-086 | + | Marysville-East Lima Hardin Switch 345kV | OH | Hardin | Active | Unknown | 230 | 230 | 138 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2086_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2086_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||||||||||
| AD2-086 | - | Marysville-East Lima Hardin Switch 345kV | OH | Hardin | Active | AEP | 230 | 230 | 138 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2086_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2086_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||||||||||
| AD2-087 | + | Randolf 138kV | OH | Darke | Withdrawn | Unknown | 200 | 200 | 35.2 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2087_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 3/20/2018 | N/A | N/A | 12/9/2019 | 12/31/2020 | N/A | N | No | |||||||||||||||||||
| AD2-087 | - | Randolf 138kV | OH | Darke | Withdrawn | AEP | 200 | 200 | 35.2 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2087_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 3/20/2018 | N/A | N/A | 12/9/2019 | 12/31/2020 | N/A | N | No | |||||||||||||||||||
| AD2-091 | + | Hardin Tap 345kV | OH | Hardin | Active | Unknown | 50 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2091_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AD2-091 | - | Hardin Tap 345kV | OH | Hardin | Active | AEP | 50 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2091_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AD2-092 | + | Marysville 345kV | OH | Union | Active | Unknown | 175 | 175 | 105 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2092_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2092_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AD2-092 | - | Marysville 345kV | OH | Union | Active | AEP | 175 | 175 | 105 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2092_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2092_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AD2-093 | + | Marysville 345kV | Cadence Solar Energy Center | OH | Union | Engineering and Procurement | Unknown | 225 | 225 | 135 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2093_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2093_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2093_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_093_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_093_csa.pdf | Document Posted | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | ||||||||||
| AD2-093 | - | Marysville 345kV | Cadence Solar Energy Center | OH | Union | Engineering and Procurement | AEP | 225 | 225 | 135 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2093_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2093_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2093_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_093_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_093_csa.pdf | Document Posted | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | ||||||||||
| AD2-096 | + | Marysville 345kV | OH | Union | Active | Unknown | 50 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2096_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2096_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AD2-096 | - | Marysville 345kV | OH | Union | Active | AEP | 50 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2096_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2096_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2018 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AD2-105 | + | Leslie-Stinnett 161KV | KY | Leslie | Withdrawn | Unknown | 100 | 100 | 40.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2105_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2105_imp.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 1/30/2020 | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AD2-105 | - | Leslie-Stinnett 161KV | KY | Leslie | Withdrawn | AEP | 100 | 100 | 40.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2105_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2105_imp.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 1/30/2020 | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AD2-106 | + | Bulan 69kV | KY | Perry | Withdrawn | Unknown | 80 | 80 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2106_imp.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 1/30/2020 | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AD2-106 | - | Bulan 69kV | KY | Perry | Withdrawn | AEP | 80 | 80 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2106_imp.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 1/30/2020 | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AD2-107 | + | Chavies-Bonnyman 69kV | KY | Perry | Withdrawn | Unknown | 55 | 55 | 23.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2107_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2107_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/22/2018 | N/A | N/A | 4/16/2020 | 12/31/2021 | N/A | N | No | |||||||||||||||||
| AD2-107 | - | Chavies-Bonnyman 69kV | KY | Perry | Withdrawn | AEP | 55 | 55 | 23.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2107_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2107_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/22/2018 | N/A | N/A | 4/16/2020 | 12/31/2021 | N/A | N | No | |||||||||||||||||
| AD2-111 | + | Hunlock 69 kV | PA | Luzerne | Withdrawn | Unknown | 50 | 6 | 8 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 3/22/2018 | N/A | N/A | 3/28/2018 | 5/31/2022 | N/A | N | No | |||||||||||||||||||||
| AD2-111 | - | Hunlock 69 kV | PA | Luzerne | Withdrawn | AEP | 50 | 6 | 8 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 3/22/2018 | N/A | N/A | 3/28/2018 | 5/31/2022 | N/A | N | No | |||||||||||||||||||||
| AD2-113 | + | South Bend 500kV | South Bend Generating Station | PA | Armstrong | Partially in Service - Under Construction | APS | 790 | 70 | 60.6 | 12 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2113_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2113_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_113_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_113_csa.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 6/1/2023 | 6/1/2023 | 6/1/2023 | 4/27/2022 | N/A | N | No | ||||||||
| AD2-113 | - | South Bend 500kV | South Bend Generating Station | PA | Armstrong | Engineering and Procurement | APS | 790 | 70 | 60.6 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2113_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2113_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_113_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_113_csa.pdf | Document Posted | N/A | N/A | 3/22/2018 | N/A | N/A | 6/1/2023 | 6/1/2023 | 6/1/2023 | N/A | N | No | ||||||||||
| AD2-123 | + | East Danville-Roxborough 230 kV | NC | Person | Withdrawn | Unknown | 94 | 94 | 68.15 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/22/2018 | N/A | N/A | 4/16/2018 | 6/1/2021 | N/A | N | No | |||||||||||||||||||||
| AD2-123 | - | East Danville-Roxborough 230 kV | NC | Person | Withdrawn | AEP | 94 | 94 | 68.15 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/22/2018 | N/A | N/A | 4/16/2018 | 6/1/2021 | N/A | N | No | |||||||||||||||||||||
| AD2-124 | + | East Danville-Roxborough 230 kV | NC | Person | Withdrawn | Unknown | 20 | 20 | 14.54 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/22/2018 | N/A | N/A | 4/16/2018 | 6/1/2021 | N/A | N | No | |||||||||||||||||||||
| AD2-124 | - | East Danville-Roxborough 230 kV | NC | Person | Withdrawn | AEP | 20 | 20 | 14.54 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/22/2018 | N/A | N/A | 4/16/2018 | 6/1/2021 | N/A | N | No | |||||||||||||||||||||
| AD2-132 | + | Olive-Reynolds 345kV | IN | Pulaski | Withdrawn | Unknown | 200 | 200 | 35.2 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2132_fea.pdf | Document Posted | N/A | N/A | 3/23/2018 | N/A | N/A | 1/10/2019 | 12/31/2020 | N/A | N | No | ||||||||||||||||||||
| AD2-132 | - | Olive-Reynolds 345kV | IN | Pulaski | Withdrawn | AEP | 200 | 200 | 35.2 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2132_fea.pdf | Document Posted | N/A | N/A | 3/23/2018 | N/A | N/A | 1/10/2019 | 12/31/2020 | N/A | N | No | ||||||||||||||||||||
| AD2-136 | + | Melmore Tap 138kV | OH | Seneca | Active | Unknown | 360 | 360 | 46.8 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2136_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2136_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/23/2018 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AD2-136 | - | Melmore Tap 138kV | OH | Seneca | Active | AEP | 360 | 360 | 46.8 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2136_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2136_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/23/2018 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AD2-138 | + | Olive-Reynolds #1 345kV | IN | Warren | Withdrawn | Unknown | 200 | 200 | 35.2 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2138_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2138_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/23/2018 | N/A | N/A | 4/20/2021 | 12/31/2020 | N/A | N | No | |||||||||||||||||
| AD2-138 | - | Olive-Reynolds #1 345kV | IN | Warren | Withdrawn | AEP | 200 | 200 | 35.2 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2138_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2138_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/23/2018 | N/A | N/A | 4/20/2021 | 12/31/2020 | N/A | N | No | |||||||||||||||||
| AD2-143 | + | Richland Jct-East Leipsic 138kV | IN | Randolph | Withdrawn | Unknown | 150 | 150 | 26.4 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2143_fea.pdf | Document Posted | N/A | N/A | 3/23/2018 | N/A | N/A | 1/7/2019 | 12/31/2020 | N/A | N | No | ||||||||||||||||||||
| AD2-143 | - | Richland Jct-East Leipsic 138kV | IN | Randolph | Withdrawn | AEP | 150 | 150 | 26.4 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2143_fea.pdf | Document Posted | N/A | N/A | 3/23/2018 | N/A | N/A | 1/7/2019 | 12/31/2020 | N/A | N | No | ||||||||||||||||||||
| AD2-144 | + | Marysville 345kV | IN | Randolph | Withdrawn | Unknown | 150 | 150 | 26.4 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2144_fea.pdf | Document Posted | N/A | N/A | 3/23/2018 | N/A | N/A | 1/7/2019 | 12/31/2020 | N/A | N | No | ||||||||||||||||||||
| AD2-144 | - | Marysville 345kV | IN | Randolph | Withdrawn | AEP | 150 | 150 | 26.4 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2144_fea.pdf | Document Posted | N/A | N/A | 3/23/2018 | N/A | N/A | 1/7/2019 | 12/31/2020 | N/A | N | No | ||||||||||||||||||||
| AD2-160 | + | Hickory-Moyock 230kV | Oak Trail Solar | NC | Currituck | Engineering and Procurement | Dominion | 50 | 50 | 32.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2160_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2160_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2160_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_160_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_160_csa.pdf | Document Posted | N/A | N/A | 3/26/2018 | N/A | N/A | 1/3/2023 | 7/1/2023 | 7/1/2023 | N/A | N | No | |||||||||
| AD2-160 | - | Hickory-Moyock 230kV | Oak Trail Solar | NC | Currituck | Engineering and Procurement | Dominion | 50 | 50 | 32.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2160_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2160_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2160_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_160_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_160_csa.pdf | Document Posted | N/A | N/A | 3/26/2018 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AD2-162 | + | Biers Run-Circleville 138kV | OH | Pickaway | Active | Unknown | 110 | 110 | 73.81 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2162_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2162_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/26/2018 | N/A | N/A | 12/1/2021 | N/A | N | No | ||||||||||||||||||
| AD2-162 | - | Biers Run-Circleville 138kV | OH | Pickaway | Active | AEP | 110 | 110 | 73.81 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2162_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2162_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/26/2018 | N/A | N/A | 12/1/2021 | N/A | N | No | ||||||||||||||||||
| AD2-178 | + | Wurno 138kV | VA | Pulaski | Active | Unknown | 120 | 120 | 72 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2178_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2178_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/28/2018 | N/A | N/A | 6/1/2021 | N/A | N | No | ||||||||||||||||||
| AD2-178 | - | Wurno 138kV | VA | Pulaski | Active | AEP | 120 | 120 | 72 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2178_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2178_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/28/2018 | N/A | N/A | 6/1/2021 | N/A | N | No | ||||||||||||||||||
| AD2-179 | + | Morgans Cut-Glen Lyn 138kV | VA | Pulaski | Active | Unknown | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2179_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2179_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/28/2018 | N/A | N/A | 11/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-179 | - | Morgans Cut-Glen Lyn 138kV | VA | Pulaski | Active | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2179_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2179_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/28/2018 | N/A | N/A | 11/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-182 | + | George Washington 138 kV | WV | Marshall | Withdrawn | Unknown | 481.5 | 481.5 | 380 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 3/29/2018 | N/A | N/A | 4/6/2018 | 4/1/2022 | N/A | N | No | |||||||||||||||||||||
| AD2-182 | - | George Washington 138 kV | WV | Marshall | Withdrawn | AEP | 481.5 | 481.5 | 380 | Capacity | Generation Interconnection | Natural Gas | Withdrawn | N/A | N/A | 3/29/2018 | N/A | N/A | 4/6/2018 | 4/1/2022 | N/A | N | No | |||||||||||||||||||||
| AD2-189 | + | Kammer-Vassell 765kV | Guernsey Power Station | OH | Guernsey | Under Construction | Unknown | 1875 | 225 | 186 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2189_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2189_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_189_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_189_csa.pdf | Document Posted | N/A | N/A | 9/23/2021 | 3/30/2018 | N/A | N/A | 8/11/2022 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AD2-189 | - | Kammer-Vassell 765kV | Guernsey Power Station | OH | Guernsey | Under Construction | AEP | 1875 | 225 | 186 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2189_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2189_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_189_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_189_csa.pdf | Document Posted | N/A | N/A | 9/23/2021 | 3/30/2018 | N/A | N/A | 5/11/2022 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AD2-191 | + | Melmore 138kV | OH | Seneca | Withdrawn | Unknown | 370 | 170 | 22.1 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2191_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2191_imp.pdf | Document Posted | N/A | N/A | 3/30/2018 | N/A | N/A | 6/3/2020 | 11/2/2020 | N/A | N | No | ||||||||||||||||||
| AD2-191 | - | Melmore 138kV | OH | Seneca | Withdrawn | AEP | 370 | 170 | 22.1 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2191_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2191_imp.pdf | Document Posted | N/A | N/A | 3/30/2018 | N/A | N/A | 6/3/2020 | 11/2/2020 | N/A | N | No | ||||||||||||||||||
| AD2-201A | + | Hickman-Riverbend 69kV | VA | Pulaski | Withdrawn | Unknown | 50 | 50 | 31 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2201a_fea.pdf | Document Posted | N/A | N/A | 3/30/2018 | N/A | N/A | 1/22/2019 | 5/3/2021 | N/A | N | No | ||||||||||||||||||||
| AD2-201A | - | Hickman-Riverbend 69kV | VA | Pulaski | Withdrawn | AEP | 50 | 50 | 31 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2201a_fea.pdf | Document Posted | N/A | N/A | 3/30/2018 | N/A | N/A | 1/22/2019 | 5/3/2021 | N/A | N | No | ||||||||||||||||||||
| AD2-202 | + | Clover-Sedge Hill 230kV | Foxhound Solar | VA | Halifax | Engineering and Procurement | Dominion | 83 | 18.8 | 12.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2202_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2202_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2202_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_202_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_202_csa.pdf | Document Posted | N/A | N/A | 3/30/2018 | N/A | N/A | 6/1/2023 | 5/31/2024 | 5/31/2024 | N/A | N | No | |||||||||
| AD2-202 | - | Clover-Sedge Hill 230kV | Foxhound Solar | VA | Halifax | Engineering and Procurement | Dominion | 83 | 18.8 | 12.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2202_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2202_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2202_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_202_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_202_csa.pdf | Document Posted | N/A | N/A | 3/30/2018 | N/A | N/A | 5/31/2024 | 5/31/2024 | N/A | N | No | ||||||||||
| AD2-205 | + | Byllesby 69 kV | Buck & Byllesby Hydro Project | VA | Carroll | In Service | Unknown | 4 | 4 | 0 | 4 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2205_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2205_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_205_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/13/2018 | N/A | N/A | 12/31/2018 | 12/31/2018 | 1/31/2019 | N/A | N | No | ||||||||||
| AD2-205 | - | Byllesby 69 kV | Buck & Byllesby Hydro Project | VA | Carroll | In Service | AEP | 4 | 4 | 0 | 4 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2205_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2205_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ad2_205_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 4/13/2018 | N/A | N/A | 12/31/2018 | 12/31/2018 | 1/31/2019 | N/A | N | No | ||||||||||
| AD2-216 | + | Axton 138 kV | VA | Henry | Withdrawn | Unknown | 68 | 68 | 43.9 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/30/2018 | N/A | N/A | 4/3/2018 | 3/31/2020 | N/A | N | No | |||||||||||||||||||||
| AD2-216 | - | Axton 138 kV | VA | Henry | Withdrawn | AEP | 68 | 68 | 43.9 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/30/2018 | N/A | N/A | 4/3/2018 | 3/31/2020 | N/A | N | No | |||||||||||||||||||||
| AE1-008 | + | College Corner 138 kV | OH | Preble | Withdrawn | Unknown | 100 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1008_fea.pdf | Document Posted | N/A | N/A | 4/23/2018 | N/A | N/A | 8/1/2019 | 7/1/2019 | N/A | N | No | ||||||||||||||||||||
| AE1-008 | - | College Corner 138 kV | OH | Preble | Withdrawn | AEP | 100 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1008_fea.pdf | Document Posted | N/A | N/A | 4/23/2018 | N/A | N/A | 8/1/2019 | 7/1/2019 | N/A | N | No | ||||||||||||||||||||
| AE1-017 | + | Peak Creek-Draper 34.5 kV | VA | Pulaski | Withdrawn | Unknown | 20 | 20 | 11 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1017_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1017_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 5/14/2018 | N/A | N/A | 7/15/2020 | 6/1/2020 | N/A | N | No | ||||||||||||||
| AE1-017 | - | Peak Creek-Draper 34.5 kV | VA | Pulaski | Withdrawn | AEP | 20 | 20 | 11 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1017_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1017_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Not Required | N/A | N/A | 5/14/2018 | N/A | N/A | 7/15/2020 | 6/1/2020 | N/A | N | No | ||||||||||||||
| AE1-018 | + | Peak Creek-Memoria Drive 12 kV | Pulaski Community Solar | VA | Pulaski | Withdrawn | Unknown | 5 | 5 | 2.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1018_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1018_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 5/14/2018 | N/A | N/A | 2/21/2020 | 6/1/2020 | N/A | N | No | |||||||||||||||
| AE1-018 | - | Peak Creek-Memoria Drive 12 kV | Pulaski Community Solar | VA | Pulaski | Withdrawn | AEP | 5 | 5 | 2.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1018_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1018_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 5/14/2018 | N/A | N/A | 2/21/2020 | 6/1/2020 | N/A | N | No | |||||||||||||||
| AE1-021 | + | Gavin #2 765 kV | Gavin Unit No. 2 | OH | Gallia | In Service | Unknown | 1367 | 11 | 11 | 11 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1021_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1021_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_021_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 5/24/2018 | N/A | N/A | 6/1/2021 | 6/1/2021 | 6/19/2021 | N/A | N | No | ||||||||||
| AE1-021 | - | Gavin #2 765 kV | Gavin Unit No. 2 | OH | Gallia | In Service | AEP | 1367 | 11 | 11 | 11 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1021_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1021_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_021_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 5/24/2018 | N/A | N/A | 6/1/2021 | 6/1/2021 | 6/19/2021 | N/A | N | No | ||||||||||
| AE1-039 | + | West Street (Orchard Hills) 12.47 kV | Orchard Hills Sanitary Landfill | MI | Berrien | In Service | Unknown | 4 | 0.8 | 0.8 | 0.8 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1039_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1039_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_039_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/22/2018 | N/A | N/A | 9/30/2020 | 9/30/2020 | 10/1/2019 | N/A | N | No | ||||||||||
| AE1-039 | - | West Street (Orchard Hills) 12.47 kV | Orchard Hills Sanitary Landfill | MI | Berrien | In Service | AEP | 4 | 0.8 | 0.8 | 0.8 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1039_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1039_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_039_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 6/22/2018 | N/A | N/A | 9/30/2020 | 9/30/2020 | 10/1/2019 | N/A | N | No | ||||||||||
| AE1-040 | + | Greenfield 69 kV | Fayette Solar | OH | Fayette | Engineering and Procurement | Unknown | 48 | 48 | 31.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1040_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1040_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1040_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_040_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_040_csa.pdf | Document Posted | N/A | N/A | 6/25/2018 | N/A | N/A | 5/31/2024 | 5/31/2024 | N/A | N | No | ||||||||||
| AE1-040 | - | Greenfield 69 kV | OH | Fayette | Active | Dayton | 48 | 48 | 31.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1040_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1040_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1040_fac.pdf | Document Posted | N/A | N/A | 6/25/2018 | N/A | N/A | 7/1/2022 | 7/1/2022 | N/A | N | No | ||||||||||||||||
| AE1-044 | + | Morrisville 230 kV | Fitch Solar | VA | Fauquier | Suspended | Dominion | 200 | 200 | 111.7933 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1044_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1044_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1044_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_044_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_044_csa.pdf | Document Posted | N/A | N/A | 7/5/2018 | N/A | N/A | 12/30/2025 | 12/30/2025 | N/A | N | No | ||||||||||
| AE1-044 | - | Morrisville 230 kV | Fitch Solar | VA | Fauquier | Engineering and Procurement | Dominion | 200 | 200 | 111.7933 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1044_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1044_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1044_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_044_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_044_csa.pdf | Document Posted | N/A | N/A | 7/5/2018 | N/A | N/A | 12/30/2025 | 12/30/2025 | N/A | N | No | ||||||||||
| AE1-050 | + | Gavin Unit 1 765 kV | Gavin Unit No. 1 | OH | Gallia | Engineering and Procurement | Unknown | 1349 | 18 | 18 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1050_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1050_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_050_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 7/20/2018 | N/A | N/A | 6/9/2024 | 6/9/2024 | N/A | N | No | ||||||||||||
| AE1-050 | - | Gavin Unit 1 765 kV | Gavin Unit No. 1 | OH | Gallia | Engineering and Procurement | AEP | 1349 | 18 | 18 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1050_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1050_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_050_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 7/20/2018 | N/A | N/A | 6/9/2024 | 6/9/2024 | N/A | N | No | ||||||||||||
| AE1-056 | + | Red House-South Creek 115 kV | VA | Appomattox | Active | Dominion | 60 | 60 | 38.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1056_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1056_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/25/2018 | N/A | N/A | 12/15/2020 | N/A | N | No | ||||||||||||||||||
| AE1-056 | - | Red House-South Creek 115 kV | VA | Appomattox | Active | Dominion | 60 | 60 | 38.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1056_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1056_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/25/2018 | N/A | N/A | 12/15/2020 | N/A | N | No | ||||||||||||||||||
| AE1-064 | + | Rockcastle 138 kV | VA | Bedford | Active | Unknown | 102.1 | 102.1 | 67.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1064_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1064_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/31/2018 | N/A | N/A | 5/3/2021 | N/A | N | No | ||||||||||||||||||
| AE1-064 | - | Rockcastle 138 kV | VA | Bedford | Active | AEP | 102.1 | 102.1 | 67.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1064_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1064_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/31/2018 | N/A | N/A | 5/3/2021 | N/A | N | No | ||||||||||||||||||
| AE1-089 | + | Elderberry-Dumont 345 kV | IN | St. Joseph | Withdrawn | Unknown | 310 | 310 | 130.65 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1089_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1089_imp.pdf | Document Posted | N/A | N/A | 8/31/2018 | N/A | N/A | 1/30/2020 | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-089 | - | Elderberry-Dumont 345 kV | IN | St. Joseph | Withdrawn | AEP | 310 | 310 | 130.65 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1089_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1089_imp.pdf | Document Posted | N/A | N/A | 8/31/2018 | N/A | N/A | 1/30/2020 | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-090 | + | Hardin Switch 345 kV | OH | Hardin | Active | Unknown | 50 | 50 | 21.56 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1090_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1090_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-090 | - | Hardin Switch 345 kV | OH | Hardin | Active | AEP | 50 | 50 | 21.56 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1090_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1090_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-091 | + | West Newton-Lynn 138 kV | OH | Hardin | Active | Unknown | 110 | 110 | 46.93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1091_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-091 | - | West Newton-Lynn 138 kV | OH | Hardin | Active | AEP | 110 | 110 | 46.93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1091_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-093 | + | Elk 138 kV | OH | Vinton | Active | Unknown | 42 | 42 | 42 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1093_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1093_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-093 | - | Elk 138 kV | OH | Vinton | Active | AEP | 42 | 42 | 42 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1093_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1093_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-098 | + | Endless Caverns 34.5 kV | Endless Caverns Solar | VA | Rockingham | Under Construction | Dominion | 15.7 | 15.7 | 10.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1098_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1098_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1098_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1098_wmpa.pdf | Not Required | N/A | N/A | 8/31/2018 | N/A | N/A | 1/1/2023 | 4/25/2022 | 4/25/2022 | N/A | N | No | ||||||||||
| AE1-098 | - | Endless Caverns 34.5 kV | Endless Caverns Solar | VA | Rockingham | Engineering and Procurement | Dominion | 15.7 | 15.7 | 10.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1098_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1098_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1098_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1098_wmpa.pdf | Not Required | N/A | N/A | 8/31/2018 | N/A | N/A | 1/1/2023 | 4/25/2022 | 4/25/2022 | N/A | N | No | ||||||||||
| AE1-099 | + | Endless Caverns 34.kV | Endless Caverns Solar | VA | Rockingham | Under Construction | Dominion | 15.7 | 15.7 | 10.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1099_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1099_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1099_wmpa.pdf | Not Required | N/A | N/A | 8/31/2018 | N/A | N/A | 1/1/2023 | 4/25/2022 | 4/25/2022 | N/A | N | No | ||||||||||
| AE1-099 | - | Endless Caverns 34.kV | Endless Caverns Solar | VA | Rockingham | Engineering and Procurement | Dominion | 15.7 | 15.7 | 10.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1099_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1099_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1099_wmpa.pdf | Not Required | N/A | N/A | 8/31/2018 | N/A | N/A | 1/1/2023 | 4/25/2022 | 4/25/2022 | N/A | N | No | ||||||||||
| AE1-100 | + | Axton 138 kV | Caden Energix Axton | VA | Henry | Engineering and Procurement | Unknown | 66 | 66 | 41.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1100_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1100_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1100_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_100_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_100_csa.pdf | Document Posted | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AE1-100 | - | Axton 138 kV | Caden Energix Axton | VA | Henry | Engineering and Procurement | AEP | 66 | 66 | 41.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1100_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1100_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1100_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_100_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_100_csa.pdf | Document Posted | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AE1-102 | + | Maddox Creek 345 kV | OH | Van Wert | Active | Unknown | 26 | 26 | 15.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1102_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-102 | - | Maddox Creek 345 kV | OH | Van Wert | Active | AEP | 26 | 26 | 15.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1102_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-108 | + | Bremo-Scottsville 138 kV | VA | Buckingham | Active | Unknown | 149.5 | 149.5 | 89.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1108_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1108_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/12/2018 | N/A | N/A | 8/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-108 | - | Bremo-Scottsville 138 kV | VA | Buckingham | Active | AEP | 149.5 | 149.5 | 89.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1108_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1108_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/12/2018 | N/A | N/A | 8/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-115 | + | Churchtown 69 kV | NJ | Salem | Withdrawn | AEC | 20 | 20 | 10 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1115_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1115_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1115_fac.pdf | Document Posted | Withdrawn | N/A | Withdrawn | N/A | N/A | 9/14/2018 | N/A | N/A | 4/29/2022 | 6/1/2021 | N/A | N | No | |||||||||||||
| AE1-115 | - | Churchtown 69 kV | NJ | Salem | Active | AEC | 20 | 20 | 10 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1115_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1115_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1115_fac.pdf | Document Posted | N/A | N/A | 9/14/2018 | N/A | N/A | 6/1/2021 | N/A | N | No | |||||||||||||||||
| AE1-121 | + | Axton 138 kV | VA | Pittsylvania | Withdrawn | Unknown | 529.5 | 529.5 | 483 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1121_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/18/2018 | N/A | N/A | 1/8/2021 | 6/1/2022 | N/A | N | No | |||||||||||||||||
| AE1-121 | - | Axton 138 kV | VA | Pittsylvania | Withdrawn | AEP | 529.5 | 529.5 | 483 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1121_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/18/2018 | N/A | N/A | 1/8/2021 | 6/1/2022 | N/A | N | No | |||||||||||||||||
| AE1-122 | + | Axton 138 kV | VA | Pittsylvania | Withdrawn | Unknown | 529.5 | 529.5 | 483 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1122_fea.pdf | Document Posted | N/A | N/A | 9/18/2018 | N/A | N/A | 7/18/2019 | 6/1/2023 | N/A | N | No | ||||||||||||||||||||
| AE1-122 | - | Axton 138 kV | VA | Pittsylvania | Withdrawn | AEP | 529.5 | 529.5 | 483 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1122_fea.pdf | Document Posted | N/A | N/A | 9/18/2018 | N/A | N/A | 7/18/2019 | 6/1/2023 | N/A | N | No | ||||||||||||||||||||
| AE1-130 | + | Meads Store 138 kV | VA | Bedford | Withdrawn | Unknown | 83 | 83 | 55.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1130_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1130_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/11/2018 | N/A | N/A | 8/6/2021 | 11/30/2020 | N/A | N | No | |||||||||||||||||
| AE1-130 | - | Meads Store 138 kV | VA | Bedford | Withdrawn | AEP | 83 | 83 | 55.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1130_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1130_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/11/2018 | N/A | N/A | 8/6/2021 | 11/30/2020 | N/A | N | No | |||||||||||||||||
| AE1-137 | + | Bluff Point-Randolph | IN | Randolph | Withdrawn | Unknown | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/24/2018 | N/A | N/A | 10/3/2018 | 10/31/2021 | N/A | N | No | |||||||||||||||||||||
| AE1-137 | - | Bluff Point-Randolph | IN | Randolph | Withdrawn | AEP | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/24/2018 | N/A | N/A | 10/3/2018 | 10/31/2021 | N/A | N | No | |||||||||||||||||||||
| AE1-145 | + | Wallops Island 69 kV | VA | Accomack | Withdrawn | ODEC | 20 | 20 | 20 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1145_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1145_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/24/2018 | N/A | N/A | 4/20/2022 | 12/1/2020 | N/A | N | No | |||||||||||||||||
| AE1-145 | - | Wallops Island 69 kV | VA | Accomack | Active | ODEC | 20 | 20 | 20 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1145_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1145_imp.pdf | Document Posted | N/A | N/A | 9/24/2018 | N/A | N/A | 12/1/2020 | N/A | N | No | |||||||||||||||||||
| AE1-146 | + | Ebersole #2-Fostoria Central 138 kV | OH | Hancock | Active | Unknown | 120 | 120 | 81.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1146_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1146_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/24/2018 | N/A | N/A | 5/1/2020 | N/A | N | No | ||||||||||||||||||
| AE1-146 | - | Ebersole #2-Fostoria Central 138 kV | OH | Hancock | Active | AEP | 120 | 120 | 81.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1146_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1146_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/24/2018 | N/A | N/A | 5/1/2020 | N/A | N | No | ||||||||||||||||||
| AE1-170 | + | Kenzie Creek-Colby 138 kV | MI | Cass | Active | Unknown | 150 | 150 | 63 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1170_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1170_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/25/2018 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE1-170 | - | Kenzie Creek-Colby 138 kV | MI | Cass | Active | AEP | 150 | 150 | 63 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1170_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1170_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/25/2018 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE1-171 | + | Reynolds-Olive 345 kV | IN | White | Withdrawn | Unknown | 280 | 280 | 118 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/25/2018 | N/A | N/A | 10/1/2018 | 12/31/2022 | N/A | N | No | |||||||||||||||||||||
| AE1-171 | - | Reynolds-Olive 345 kV | IN | White | Withdrawn | AEP | 280 | 280 | 118 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/25/2018 | N/A | N/A | 10/1/2018 | 12/31/2022 | N/A | N | No | |||||||||||||||||||||
| AE1-176 | + | Roanoke-Vinton 12 kV (Niagara Hydro) | Niagara Power Plant Dam | VA | Roanoke | In Service | Unknown | 2.4 | 2.4 | Capacity | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1176_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_176_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 9/25/2018 | N/A | N/A | 6/1/2020 | 6/1/2020 | 5/23/2020 | N/A | N | No | ||||||||||||
| AE1-176 | - | Roanoke-Vinton 12 kV (Niagara Hydro) | Niagara Power Plant Dam | VA | Roanoke | In Service | AEP | 2.4 | 2.4 | Capacity | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1176_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_176_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 9/25/2018 | N/A | N/A | 6/1/2020 | 6/1/2020 | 5/23/2020 | N/A | N | No | ||||||||||||
| AE1-178 | + | Wolf Hills 138 kV | Wolf Hills Energy Plant | VA | Washington | In Service | Unknown | 294 | 19 | 19 | 19 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1178_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1178_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_178_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 9/25/2018 | N/A | N/A | 12/21/2021 | 12/21/2021 | 5/25/2021 | N/A | N | No | ||||||||||
| AE1-178 | - | Wolf Hills 138 kV | Wolf Hills Energy Plant | VA | Washington | In Service | AEP | 294 | 19 | 19 | 19 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1178_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1178_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae1_178_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 9/25/2018 | N/A | N/A | 12/21/2021 | 12/21/2021 | 5/25/2021 | N/A | N | No | ||||||||||
| AE1-189 | + | Penville-Adams 138 kV | IN | Jay | Withdrawn | Unknown | 245 | 245 | 103 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/26/2018 | N/A | N/A | 10/1/2018 | 12/31/2022 | N/A | N | No | |||||||||||||||||||||
| AE1-189 | - | Penville-Adams 138 kV | IN | Jay | Withdrawn | AEP | 245 | 245 | 103 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/26/2018 | N/A | N/A | 10/1/2018 | 12/31/2022 | N/A | N | No | |||||||||||||||||||||
| AE1-197 | + | Reynolds 345 kV | IN | White | Withdrawn | Unknown | 500 | 500 | 65 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 9/26/2018 | N/A | N/A | 10/1/2018 | 9/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE1-197 | - | Reynolds 345 kV | IN | White | Withdrawn | AEP | 500 | 500 | 65 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 9/26/2018 | N/A | N/A | 10/1/2018 | 9/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE1-200 | + | College Corner-Randolph 138 kV | IN | Randolph | Withdrawn | Unknown | 235 | 235 | 99 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/26/2018 | N/A | N/A | 10/1/2018 | 12/31/2022 | N/A | N | No | |||||||||||||||||||||
| AE1-200 | - | College Corner-Randolph 138 kV | IN | Randolph | Withdrawn | AEP | 235 | 235 | 99 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/26/2018 | N/A | N/A | 10/1/2018 | 12/31/2022 | N/A | N | No | |||||||||||||||||||||
| AE1-207 | + | Mississinewa-Gaston 138 kV | IN | Grant | Active | Unknown | 160 | 160 | 67.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1207_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1207_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2018 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE1-207 | - | Mississinewa-Gaston 138 kV | IN | Grant | Active | AEP | 160 | 160 | 67.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1207_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1207_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2018 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE1-208 | + | Delaware-Van Buren 138 kV | IN | Delaware | Active | Unknown | 130 | 130 | 55 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1208_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1208_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2018 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE1-208 | - | Delaware-Van Buren 138 kV | IN | Delaware | Active | AEP | 130 | 130 | 55 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1208_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1208_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2018 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE1-209 | + | Desoto 345 kV | IN | Randolph | Active | Unknown | 100 | 100 | 13 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1209_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1209_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2018 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-209 | - | Desoto 345 kV | IN | Randolph | Active | AEP | 100 | 100 | 13 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1209_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1209_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2018 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-210 | + | Desoto 345 kV | IN | Randolph | Active | Unknown | 100 | 100 | 13 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1210_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1210_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2018 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-210 | - | Desoto 345 kV | IN | Randolph | Active | AEP | 100 | 100 | 13 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1210_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1210_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2018 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-211 | + | Reynolds 345 kV | IN | Jasper | Withdrawn | Unknown | 302.4 | 302.4 | 40 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 9/27/2018 | N/A | N/A | 10/1/2018 | 10/31/2020 | N/A | N | No | |||||||||||||||||||||
| AE1-211 | - | Reynolds 345 kV | IN | Jasper | Withdrawn | AEP | 302.4 | 302.4 | 40 | Capacity | Generation Interconnection | Wind | Withdrawn | N/A | N/A | 9/27/2018 | N/A | N/A | 10/1/2018 | 10/31/2020 | N/A | N | No | |||||||||||||||||||||
| AE1-212 | + | Grandview-Clifftop 138 kV | Raleigh Solar Project | WV | Raliegh | Engineering and Procurement | Unknown | 90 | 90 | 53.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1212_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1212_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1212_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_212_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1212_csa.pdf | Document Posted | N/A | N/A | 9/7/2018 | N/A | N/A | 8/1/2024 | 8/1/2024 | N/A | N | No | ||||||||||
| AE1-212 | - | Grandview-Clifftop 138 kV | WV | Raliegh | Active | AEP | 90 | 90 | 53.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1212_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1212_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1212_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/csa/ae1212_csa.pdf | Document Posted | N/A | N/A | 9/7/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | |||||||||||||||
| AE1-214 | + | Rockport 765 kV | IN | Spencer | Withdrawn | Unknown | 800 | 800 | 625 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 9/27/2018 | N/A | N/A | 10/2/2018 | 12/1/2023 | N/A | N | No | |||||||||||||||||||||
| AE1-214 | - | Rockport 765 kV | IN | Spencer | Withdrawn | AEP | 800 | 800 | 625 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 9/27/2018 | N/A | N/A | 10/2/2018 | 12/1/2023 | N/A | N | No | |||||||||||||||||||||
| AE1-215 | + | Reynolds 345 kV | IN | White | Withdrawn | Unknown | 500 | 500 | 395 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 9/27/2018 | N/A | N/A | 10/1/2018 | 12/1/2023 | N/A | N | No | |||||||||||||||||||||
| AE1-215 | - | Reynolds 345 kV | IN | White | Withdrawn | AEP | 500 | 500 | 395 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 9/27/2018 | N/A | N/A | 10/1/2018 | 12/1/2023 | N/A | N | No | |||||||||||||||||||||
| AE1-216 | + | Reynolds 345 kV | IN | White | Withdrawn | Unknown | 500 | 500 | 395 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 9/27/2018 | N/A | N/A | 10/2/2018 | 12/1/2023 | N/A | N | No | |||||||||||||||||||||
| AE1-216 | - | Reynolds 345 kV | IN | White | Withdrawn | AEP | 500 | 500 | 395 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 9/27/2018 | N/A | N/A | 10/2/2018 | 12/1/2023 | N/A | N | No | |||||||||||||||||||||
| AE1-217 | + | Gaston 138kV | IN | Delaware | Withdrawn | Unknown | 200 | 200 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1217_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1217_imp.pdf | Document Posted | N/A | N/A | 9/27/2018 | N/A | N/A | 1/30/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE1-217 | - | Gaston 138kV | IN | Delaware | Withdrawn | AEP | 200 | 200 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1217_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1217_imp.pdf | Document Posted | N/A | N/A | 9/27/2018 | N/A | N/A | 1/30/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE1-218 | + | Glassboro 12 kV | Glassboro LF Solar | NJ | Gloucester | Engineering and Procurement | AEC | 2 | 2 | 0.82 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1218_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1218_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1218_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1218_wmpa.pdf | Not Required | N/A | N/A | 9/27/2018 | N/A | N/A | 12/31/2023 | 7/17/2022 | 7/17/2022 | N/A | N | No | ||||||||||
| AE1-218 | - | Glassboro 12 kV | Glassboro LF Solar | NJ | Gloucester | Engineering and Procurement | AEC | 2 | 2 | 0.82 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1218_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1218_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1218_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1218_wmpa.pdf | Not Required | N/A | N/A | 9/27/2018 | N/A | N/A | 7/17/2022 | 7/17/2022 | N/A | N | No | |||||||||||
| AE1-220 | + | Coleen-Clifford 138 kV | VA | Nelson | Withdrawn | Unknown | 100 | 100 | 66.7 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/24/2018 | N/A | N/A | 6/17/2019 | 6/1/2022 | N/A | N | No | |||||||||||||||||||||
| AE1-220 | - | Coleen-Clifford 138 kV | VA | Nelson | Withdrawn | AEP | 100 | 100 | 66.7 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/24/2018 | N/A | N/A | 6/17/2019 | 6/1/2022 | N/A | N | No | |||||||||||||||||||||
| AE1-226 | + | Face Rock-Kinzer #13 69 kV | Holtwood Solar | PA | Lancaster | Engineering and Procurement | PPL | 19.8 | 19.8 | 9.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1226_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1226_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1226_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_226_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_226_csa.pdf | Document Posted | N/A | N/A | 9/28/2018 | N/A | N/A | 4/7/2023 | 4/1/2022 | 4/1/2022 | N/A | N | No | |||||||||
| AE1-226 | - | Face Rock-Kinzer #13 69 kV | Holtwood Solar | PA | Lancaster | Engineering and Procurement | PPL | 19.8 | 19.8 | 9.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1226_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1226_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1226_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_226_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_226_csa.pdf | Document Posted | N/A | N/A | 9/28/2018 | N/A | N/A | 4/1/2022 | 4/1/2022 | N/A | N | No | ||||||||||
| AE1-227 | + | Cumberland 69 kV | OH | Guernsey | Active | Unknown | 49.5 | 49.5 | 30.69 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1227_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1227_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/28/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | ||||||||||||||||||
| AE1-227 | - | Cumberland 69 kV | OH | Guernsey | Active | AEP | 49.5 | 49.5 | 30.69 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1227_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1227_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/28/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | ||||||||||||||||||
| AE1-229 | + | Deepwater-Upper Pittsgrove 138 kV | Pilesgrove Solar Project | NJ | Salem | Engineering and Procurement | AEC | 149.3 | 149.3 | 89 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1229_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1229_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1229_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_229_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_229_csa.pdf | Document Posted | N/A | N/A | 9/17/2018 | N/A | N/A | 12/31/2026 | 12/31/2026 | N/A | N | No | ||||||||||
| AE1-229 | - | Deepwater-Upper Pittsgrove 138 kV | NJ | Salem | Active | AEC | 149.3 | 149.3 | 89 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1229_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1229_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1229_fac.pdf | Document Posted | N/A | N/A | 9/17/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | |||||||||||||||||
| AE1-237 | + | Andover (Maysville) 69kV I | Welcome Solar II | PA | Crawford | Engineering and Procurement | ATSI | 19.9 | 19.9 | 13.5 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1237_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1237_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1237_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_237_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_237_csa.pdf | Document Posted | N/A | N/A | 9/28/2018 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AE1-237 | - | Andover (Maysville) 69kV I | PA | Crawford | Active | ATSI | 19.9 | 19.9 | 13.5 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1237_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1237_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1237_fac.pdf | Document Posted | N/A | N/A | 9/28/2018 | N/A | N/A | 6/1/2020 | N/A | N | No | |||||||||||||||||
| AE1-243 | + | Warren Glen Storage 34.5 kV | Warren Glen Storage | NJ | Warren | Engineering and Procurement | JCPL | 20 | 20 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1243_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1243_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1243_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_243_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_243_csa.pdf | Document Posted | N/A | N/A | 9/28/2018 | N/A | N/A | 10/31/2023 | 10/31/2023 | N/A | N | No | ||||||||||
| AE1-243 | - | Warren Glen Storage 34.5 kV | NJ | Warren | Active | JCPL | 20 | 20 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1243_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1243_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1243_fac.pdf | Document Posted | N/A | N/A | 9/28/2018 | N/A | N/A | 12/1/2019 | N/A | N | No | |||||||||||||||||
| AE1-245 | + | Haviland 138 kV | OH | Paulding | Active | Unknown | 150 | 150 | 19.5 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1245_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1245_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/18/2018 | N/A | N/A | 6/30/2021 | N/A | N | No | ||||||||||||||||||
| AE1-245 | - | Haviland 138 kV | OH | Paulding | Active | AEP | 150 | 150 | 19.5 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1245_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1245_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/18/2018 | N/A | N/A | 6/30/2021 | N/A | N | No | ||||||||||||||||||
| AE1-250 | + | Smith Mountain-E. Danville 138 kV | VA | Pittsylvania | Active | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1250_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1250_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | ||||||||||||||||||
| AE1-250 | - | Smith Mountain-E. Danville 138 kV | VA | Pittsylvania | Active | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1250_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1250_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | ||||||||||||||||||
| AE2-006 | + | Twittys Creek 34.5 kV | Twittys Creek Solar | VA | Charlotte | Partially in Service - Under Construction | Dominion | 13.8 | 0 | 2.9 | 0 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2006_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2006_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2006_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2006_wmpa.pdf | Not Required | N/A | N/A | 10/8/2018 | N/A | N/A | 12/8/2020 | 12/31/2020 | 12/31/2020 | 12/8/2020 | N/A | N | No | ||||||||
| AE2-006 | - | Twittys Creek 34.5 kV | Twittys Creek Solar | VA | Charlotte | Partially in Service - Under Construction | Dominion | 13.8 | 0 | 2.9 | 0 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2006_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2006_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2006_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2006_wmpa.pdf | Not Required | N/A | N/A | 10/8/2018 | N/A | N/A | 12/31/2020 | 12/31/2020 | 12/8/2020 | N/A | N | No | |||||||||
| AE2-008 | + | Elderberry-Dumont 345 kV | IN | St. Joseph | Withdrawn | Unknown | 390 | 80 | 80 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2008_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/15/2018 | N/A | N/A | 1/30/2020 | 12/31/2022 | N/A | N | No | |||||||||||||||||||
| AE2-008 | - | Elderberry-Dumont 345 kV | IN | St. Joseph | Withdrawn | AEP | 390 | 80 | 80 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2008_fea.pdf | Document Posted | Withdrawn | N/A | N/A | 10/15/2018 | N/A | N/A | 1/30/2020 | 12/31/2022 | N/A | N | No | |||||||||||||||||||
| AE2-045 | + | Olive-Reynolds 345 kV | IN | Lake | Active | Unknown | 200 | 200 | 84.28 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2045_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2045_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/29/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-045 | - | Olive-Reynolds 345 kV | IN | Lake | Active | AEP | 200 | 200 | 84.28 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2045_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2045_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/29/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-046 | + | Harwood-East Hazelton 69 kV | McAdoo Energy Center | PA | Schuylkill | Engineering and Procurement | PPL | 50 | 50 | 24 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2046_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2046_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2046_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_046_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_046_csa.pdf | Document Posted | N/A | N/A | 1/30/2019 | N/A | N/A | 8/1/2023 | 8/1/2023 | N/A | N | No | ||||||||||
| AE2-046 | - | Harwood-East Hazelton 69 kV | PA | Schuylkill | Active | PPL | 50 | 50 | 24 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2046_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2046_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2046_fac.pdf | Document Posted | N/A | N/A | 1/30/2019 | N/A | N/A | 12/31/2020 | N/A | N | No | |||||||||||||||||
| AE2-047 | + | Ridgeway-Solite 69 kV | VA | Henry | Active | Unknown | 50 | 50 | 32.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2047_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2047_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2019 | N/A | N/A | 12/15/2021 | N/A | N | No | ||||||||||||||||||
| AE2-047 | - | Ridgeway-Solite 69 kV | VA | Henry | Active | AEP | 50 | 50 | 32.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2047_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2047_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2019 | N/A | N/A | 12/15/2021 | N/A | N | No | ||||||||||||||||||
| AE2-048 | + | Muskingum-W. Millersport 345 kV | OH | Fairfield | Active | Unknown | 220 | 220 | 147.7 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2048_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-048 | - | Muskingum-W. Millersport 345 kV | OH | Fairfield | Active | AEP | 220 | 220 | 147.7 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2048_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-054 | + | Warfordsburg 34 kV | Blairs Valley | PA | Franklin | Engineering and Procurement | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2054_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2054_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2054_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2054_wmpa.pdf | Not Required | N/A | N/A | 1/31/2019 | N/A | N/A | 9/30/2023 | 9/30/2023 | N/A | N | No | |||||||||||
| AE2-054 | - | Warfordsburg 34 kV | Blairs Valley | PA | Franklin | Engineering and Procurement | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2054_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2054_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2054_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2054_wmpa.pdf | Not Required | N/A | N/A | 1/31/2019 | N/A | N/A | 3/31/2021 | 3/31/2021 | 3/31/2021 | N/A | N | No | ||||||||||
| AE2-072 | + | East Leipsic-Richland 138 kV | OH | Putnam | Active | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2072_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2072_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/14/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-072 | - | East Leipsic-Richland 138 kV | OH | Putnam | Active | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2072_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2072_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/14/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-073 | + | Centerburg 138kV | OH | Licking | Active | Unknown | 200 | 50 | 21 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2073_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2073_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/15/2019 | N/A | N/A | 11/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-073 | - | Centerburg 138kV | OH | Licking | Active | AEP | 200 | 50 | 21 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2073_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2073_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/15/2019 | N/A | N/A | 11/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-089 | + | Pennville-Adams 138 kV | IN | Jay | Active | Unknown | 155 | 155 | 93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2089_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2089_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/22/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-089 | - | Pennville-Adams 138 kV | IN | Jay | Active | AEP | 155 | 155 | 93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2089_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2089_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/22/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-090 | + | Randolph-Hodgin 138 kV | IN | Randolph | Withdrawn | Unknown | 144 | 144 | 86.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2090_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2090_imp.pdf | Document Posted | N/A | N/A | 2/22/2019 | N/A | N/A | 10/15/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-090 | - | Randolph-Hodgin 138 kV | IN | Randolph | Withdrawn | AEP | 144 | 144 | 86.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2090_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2090_imp.pdf | Document Posted | N/A | N/A | 2/22/2019 | N/A | N/A | 10/15/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-091 | + | Newport 69 kV | NJ | Cumberland | Withdrawn | AEC | 35 | 35 | 23 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2091_imp.pdf | Document Posted | N/A | N/A | 1/24/2019 | N/A | N/A | 3/31/2020 | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AE2-091 | - | Newport 69 kV | NJ | Cumberland | Withdrawn | Unknown | 35 | 35 | 23 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2091_imp.pdf | Document Posted | N/A | N/A | 1/24/2019 | N/A | N/A | 3/31/2020 | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AE2-130 | + | Rockport 765 kV | IN | Spencer | Active | Unknown | 800 | 800 | 480 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2130_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2130_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-130 | - | Rockport 765 kV | IN | Spencer | Active | AEP | 800 | 800 | 480 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2130_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2130_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-134 | + | Locust Grove-Paytes 115 kV | Pine Glade Solar | VA | Orange | Under Construction | Dominion | 62.5 | 0 | 16.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2134_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2134_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_134_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_134_csa.pdf | Document Posted | N/A | N/A | 3/4/2019 | N/A | N/A | 4/1/2023 | 3/30/2023 | 3/30/2023 | N/A | N | No | ||||||||||
| AE2-134 | - | Locust Grove-Paytes 115 kV | Pine Glade Solar | VA | Orange | Engineering and Procurement | Dominion | 62.5 | 0 | 16.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2134_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2134_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_134_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_134_csa.pdf | Document Posted | N/A | N/A | 10/1/2022 | 3/4/2019 | N/A | N/A | 10/3/2022 | 3/30/2022 | 3/30/2022 | N/A | N | No | |||||||||
| AE2-136 | + | Muskingum River-W. Millersport 345 kV | OH | Fairfield | Active | Unknown | 114 | 114 | 83.2 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2136_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2136_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/6/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-136 | - | Muskingum River-W. Millersport 345 kV | OH | Fairfield | Active | AEP | 114 | 114 | 83.2 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2136_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2136_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/6/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-140 | + | Axton-Danville 138 kV | VA | Henry | Active | Unknown | 201.1 | 201.1 | 120.66 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2140_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2140_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/11/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-140 | - | Axton-Danville 138 kV | VA | Henry | Active | AEP | 201.1 | 201.1 | 120.66 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2140_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2140_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/11/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-148 | + | Beatty-Greene 345 kV | OH | Madison | Active | Unknown | 577 | 577 | 397.3 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2148_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2148_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ae2_148_isa2.pdf | Interim Study | N/A | Not Required | N/A | N/A | 2/20/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||
| AE2-148 | - | Beatty-Greene 345 kV | OH | Madison | Active | AEP | 577 | 577 | 397.3 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2148_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2148_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ae2_148_isa2.pdf | Interim Study | N/A | Not Required | N/A | N/A | 2/20/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||
| AE2-149 | + | Biers Run-Bixby 345 kV | OH | Pickaway | Active | Unknown | 400 | 400 | 291.4 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2149_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2149_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/14/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-149 | - | Biers Run-Bixby 345 kV | OH | Pickaway | Active | AEP | 400 | 400 | 291.4 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2149_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2149_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/14/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-154 | + | Meadow Lake 345 kV (MLV VIII) | IN | White | Active | Unknown | 250 | 250 | 32.5 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2154_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2154_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/14/2019 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-154 | - | Meadow Lake 345 kV (MLV VIII) | IN | White | Active | AEP | 250 | 250 | 32.5 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2154_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2154_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/14/2019 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-158 | + | Kanawha River 138 kV | WV | Fayette | Withdrawn | Unknown | 48 | Energy | Merchant Transmission | Hydro | AC | 48 NFTIR | Withdrawn | N/A | N/A | 3/15/2019 | N/A | N/A | 4/1/2019 | 10/1/2021 | N/A | S | No | |||||||||||||||||||||
| AE2-158 | - | Kanawha River 138 kV | WV | Fayette | Withdrawn | AEP | 48 | Energy | Merchant Transmission | Hydro | AC | 48 NFTIR | Withdrawn | N/A | N/A | 3/15/2019 | N/A | N/A | 4/1/2019 | 10/1/2021 | N/A | S | No | |||||||||||||||||||||
| AE2-159 | + | Kanawha River 138 kV | WV | Fayette | Withdrawn | Unknown | 48 | 48 | 0 | Energy | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2159_fea.pdf | Document Posted | N/A | N/A | 3/15/2019 | N/A | N/A | 11/21/2019 | 10/1/2021 | N/A | N | No | ||||||||||||||||||||
| AE2-159 | - | Kanawha River 138 kV | WV | Fayette | Withdrawn | AEP | 48 | 48 | 0 | Energy | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2159_fea.pdf | Document Posted | N/A | N/A | 3/15/2019 | N/A | N/A | 11/21/2019 | 10/1/2021 | N/A | N | No | ||||||||||||||||||||
| AE2-160 | + | Kanawha River 138 kV | WV | Fayette | Active | Unknown | 51 | 51 | 30 | Capacity | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2160_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2160_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2019 | N/A | N/A | 10/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-160 | - | Kanawha River 138 kV | WV | Fayette | Active | AEP | 51 | 51 | 30 | Capacity | Generation Interconnection | Hydro | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2160_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2160_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2019 | N/A | N/A | 10/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-166 | + | Stockton 138 kV | VA | Henry | Active | Unknown | 90 | 90 | 54 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2166_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2166_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-166 | - | Stockton 138 kV | VA | Henry | Active | AEP | 90 | 90 | 54 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2166_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2166_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-169 | + | Delaware-Van Buren 138 kV | IN | Delaware | Active | Unknown | 163 | 33 | 33 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2169_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2169_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-169 | - | Delaware-Van Buren 138 kV | IN | Delaware | Active | AEP | 163 | 33 | 33 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2169_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2169_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-170 | + | Gaston-Desoto 138 kV | IN | Delaware | Withdrawn | Unknown | 250 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2170_fea.pdf | Document Posted | N/A | N/A | 3/15/2019 | N/A | N/A | 1/30/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||||
| AE2-170 | - | Gaston-Desoto 138 kV | IN | Delaware | Withdrawn | AEP | 250 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2170_fea.pdf | Document Posted | N/A | N/A | 3/15/2019 | N/A | N/A | 1/30/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||||
| AE2-171 | + | Makahoy 138 kV | IN | Madison | Withdrawn | Unknown | 150 | 30 | 30 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2171_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2171_imp.pdf | Document Posted | N/A | N/A | 3/15/2019 | N/A | N/A | 3/24/2021 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-171 | - | Makahoy 138 kV | IN | Madison | Withdrawn | AEP | 150 | 30 | 30 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2171_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2171_imp.pdf | Document Posted | N/A | N/A | 3/15/2019 | N/A | N/A | 3/24/2021 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-172 | + | Mississinewa-Gaston 138 kV | IN | Grant | Active | Unknown | 40 | 40 | 40 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2172_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2172_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-172 | - | Mississinewa-Gaston 138 kV | IN | Grant | Active | AEP | 40 | 40 | 40 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2172_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2172_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/15/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-174 | + | Fremont Center-Tiffin Center 138 kV circuit #1 | OH | Seneca | Active | Unknown | 198 | 198 | 34.85 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2174_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/18/2019 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-174 | - | Fremont Center-Tiffin Center 138 kV circuit #1 | OH | Seneca | Active | AEP | 198 | 198 | 34.85 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2174_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/18/2019 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-195 | + | East Canton-Robertsville 69 kV | OH | Stark | Active | Unknown | 19.7 | 19.7 | 9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2195_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2195_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/18/2019 | N/A | N/A | 10/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-195 | - | East Canton-Robertsville 69 kV | OH | Stark | Active | AEP | 19.7 | 19.7 | 9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2195_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2195_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/18/2019 | N/A | N/A | 10/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-196 | + | Mt. Airy-Wythe 138 kV | VA | Wythe | Withdrawn | Unknown | 94.6 | 94.6 | 56 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2196_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2196_imp.pdf | Document Posted | N/A | N/A | 3/19/2019 | N/A | N/A | 3/27/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-196 | - | Mt. Airy-Wythe 138 kV | VA | Wythe | Withdrawn | AEP | 94.6 | 94.6 | 56 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2196_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2196_imp.pdf | Document Posted | N/A | N/A | 3/19/2019 | N/A | N/A | 3/27/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-204 | + | Bolivar 34.5 kV | OH | Stark | Active | Unknown | 19.3 | 19.3 | 9.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2204_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2204_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/19/2019 | N/A | N/A | 5/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-204 | - | Bolivar 34.5 kV | OH | Stark | Active | AEP | 19.3 | 19.3 | 9.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2204_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2204_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/19/2019 | N/A | N/A | 5/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-208 | + | Chavies-Bonnyman 69 kV | KY | Perry | Withdrawn | Unknown | 80 | 25 | 25 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2208_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2208_imp.pdf | Document Posted | N/A | N/A | 3/20/2019 | N/A | N/A | 3/27/2020 | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-208 | - | Chavies-Bonnyman 69 kV | KY | Perry | Withdrawn | AEP | 80 | 25 | 25 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2208_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2208_imp.pdf | Document Posted | N/A | N/A | 3/20/2019 | N/A | N/A | 3/27/2020 | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-211 | + | Jackson-Three Mile Island 230 kV | Dover Solar | PA | York | Engineering and Procurement | ME | 75 | 55 | 31.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2211_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2211_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2211_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_211_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_211_csa.pdf | Document Posted | N/A | N/A | 3/20/2019 | N/A | N/A | 11/1/2024 | 11/1/2024 | N/A | N | No | ||||||||||
| AE2-211 | - | Jackson-Three Mile Island 230 kV | PA | York | Active | ME | 55 | 55 | 23.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2211_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2211_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2211_fac.pdf | Document Posted | N/A | N/A | 3/20/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | |||||||||||||||||
| AE2-214 | + | Cole 345 kV | OH | Franklin | Active | Unknown | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2214_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2214_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/21/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-214 | - | Cole 345 kV | OH | Franklin | Active | AEP | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2214_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2214_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/21/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-216 | + | Hardin Switch 345 kV | OH | Hardin | Active | Unknown | 55 | 55 | 55 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2216_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2216_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/21/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-216 | - | Hardin Switch 345 kV | OH | Hardin | Active | AEP | 55 | 55 | 55 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2216_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2216_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/21/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-219 | + | Bluff Point-Randolph 138 kV | IN | Randolph | Active | Unknown | 100 | 100 | 42 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2219_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2219_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/21/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-219 | - | Bluff Point-Randolph 138 kV | IN | Randolph | Active | AEP | 100 | 100 | 42 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2219_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2219_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/21/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-220 | + | Losantville 345 kV | IN | Randolph | Active | Unknown | 125 | 125 | 52.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2220_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2220_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/21/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-220 | - | Losantville 345 kV | IN | Randolph | Active | AEP | 125 | 125 | 52.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2220_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2220_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/21/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-224 | + | Bearrock-Johnstown 230 kV | CPV Maple Hill Solar | PA | Cambria | Engineering and Procurement | PENELEC | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2224_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2224_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2224_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_224_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_224_csa.pdf | Document Posted | N/A | N/A | 3/22/2019 | N/A | N/A | 5/5/2024 | 5/5/2024 | N/A | N | No | ||||||||||
| AE2-224 | - | Bearrock-Johnstown 230 kV | PA | Cambria | Active | PENELEC | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2224_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2224_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2224_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_224_isa2.pdf | Interim Study | N/A | N/A | N/A | 3/22/2019 | N/A | N/A | 9/1/2021 | N/A | N | No | ||||||||||||||
| AE2-227 | + | Iron Bridge 34 kV | Bradley Ridge Solar | VA | Chesterfield | Engineering and Procurement | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2227_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2227_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2227_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2227_wmpa.pdf | Not Required | N/A | N/A | 3/22/2019 | N/A | N/A | 11/30/2023 | 11/30/2023 | N/A | N | No | |||||||||||
| AE2-227 | - | Iron Bridge 34 kV | Bradley Ridge Solar | VA | Chesterfield | Engineering and Procurement | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2227_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2227_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2227_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2227_wmpa.pdf | Not Required | N/A | N/A | 3/22/2019 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | |||||||||||
| AE2-228 | + | Tyler 34 kv | Bradley BridgeSolar | VA | Chesterfield | Engineering and Procurement | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2228_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2228_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2228_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2228_wmpa.pdf | Not Required | N/A | N/A | 3/22/2019 | N/A | N/A | 11/30/2023 | 11/30/2023 | N/A | N | No | |||||||||||
| AE2-228 | - | Tyler 34 kv | Bradley BridgeSolar | VA | Chesterfield | Engineering and Procurement | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2228_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2228_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2228_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2228_wmpa.pdf | Not Required | N/A | N/A | 3/22/2019 | N/A | N/A | 10/31/2022 | 10/31/2022 | N/A | N | No | |||||||||||
| AE2-234 | + | Liberty Center-Buckeye Tap 69 kV | IN | Huntington | Active | Unknown | 35 | 35 | 24.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2234_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2234_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2019 | N/A | N/A | 7/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-234 | - | Liberty Center-Buckeye Tap 69 kV | IN | Huntington | Active | AEP | 35 | 35 | 24.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2234_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2234_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2019 | N/A | N/A | 7/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-236 | + | Columbia-Northeast 138 kV | IN | Whitley | Active | Unknown | 55 | 55 | 38.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2236_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2236_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2019 | N/A | N/A | 7/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-236 | - | Columbia-Northeast 138 kV | IN | Whitley | Active | AEP | 55 | 55 | 38.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2236_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2236_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2019 | N/A | N/A | 7/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-239 | + | Tanners Creek-East Bend & Miami Fort-Terminal 345 kV | N/A | N/A | Withdrawn | Unknown | 100 | Energy | Merchant Transmission | AC | 0 | Withdrawn | N/A | N/A | 3/22/2019 | N/A | N/A | 4/1/2019 | 3/1/2023 | N/A | S | No | ||||||||||||||||||||||
| AE2-239 | - | Tanners Creek-East Bend & Miami Fort-Terminal 345 kV | N/A | N/A | Withdrawn | AEP | 100 | Energy | Merchant Transmission | AC | 0 | Withdrawn | N/A | N/A | 3/22/2019 | N/A | N/A | 4/1/2019 | 3/1/2023 | N/A | S | No | ||||||||||||||||||||||
| AE2-240 | + | Olive-Reynolds 1 & 2 345 kV | IN | Starke | Withdrawn | Unknown | 3170 | Energy | Merchant Transmission | AC | 0 | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ae2240_fea.pdf | Document Posted | N/A | N/A | 3/22/2019 | N/A | N/A | 2/19/2021 | 6/1/2019 | N/A | S | No | |||||||||||||||||||||
| AE2-240 | - | Olive-Reynolds 1 & 2 345 kV | IN | Starke | Withdrawn | AEP | 3170 | Energy | Merchant Transmission | AC | 0 | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ae2240_fea.pdf | Document Posted | N/A | N/A | 3/22/2019 | N/A | N/A | 2/19/2021 | 6/1/2019 | N/A | S | No | |||||||||||||||||||||
| AE2-245 | + | Stockton 34.5 kV | VA | Henry | Withdrawn | Unknown | 20 | 0 | 5.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2245_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2245_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/25/2019 | N/A | N/A | 10/23/2020 | 12/30/2020 | N/A | N | No | |||||||||||||||||
| AE2-245 | - | Stockton 34.5 kV | VA | Henry | Withdrawn | AEP | 20 | 0 | 5.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2245_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2245_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/25/2019 | N/A | N/A | 10/23/2020 | 12/30/2020 | N/A | N | No | |||||||||||||||||
| AE2-253 | + | Hickory-Moyock 230 kV | Oak Trail Solar | NC | Currituck | Engineering and Procurement | Dominion | 100 | 50 | 34.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2253_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2253_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2253_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_253_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_253_csa.pdf | Document Posted | N/A | N/A | 3/25/2019 | N/A | N/A | 1/3/2023 | 7/1/2023 | 7/1/2023 | N/A | N | No | |||||||||
| AE2-253 | - | Hickory-Moyock 230 kV | Oak Trail Solar | NC | Currituck | Engineering and Procurement | Dominion | 100 | 50 | 34.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2253_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2253_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2253_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_253_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_253_csa.pdf | Document Posted | N/A | N/A | 3/25/2019 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AE2-265 | + | Corey 138 kV | MI | St. Joseph | Withdrawn | Unknown | 150 | 150 | 47.78 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 3/28/2019 | N/A | N/A | 4/1/2019 | 9/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-265 | - | Corey 138 kV | MI | St. Joseph | Withdrawn | AEP | 150 | 150 | 47.78 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 3/28/2019 | N/A | N/A | 4/1/2019 | 9/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-266 | + | Corey 138kV | MI | St. Joseph | Withdrawn | Unknown | 198.9 | 198.9 | 64.19 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 3/28/2019 | N/A | N/A | 4/1/2019 | 9/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-266 | - | Corey 138kV | MI | St. Joseph | Withdrawn | AEP | 198.9 | 198.9 | 64.19 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 3/28/2019 | N/A | N/A | 4/1/2019 | 9/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-276 | + | Sullivan 345kV | IN | Sullivan | Active | Unknown | 50 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2276_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2276_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/28/2019 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AE2-276 | - | Sullivan 345kV | IN | Sullivan | Active | AEP | 50 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2276_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2276_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/28/2019 | N/A | N/A | 12/31/2020 | N/A | N | No | ||||||||||||||||||
| AE2-280 | + | Claytor Lake-Edgemont 138 kV | VA | Montgomery | Active | Unknown | 126.7 | 126.65 | 75.99 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2280_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2280_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-280 | - | Claytor Lake-Edgemont 138 kV | VA | Montgomery | Active | AEP | 126.7 | 126.65 | 75.99 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2280_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2280_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-284 | + | Kenzie Creek-Colby 138 kV | MI | Cass | Withdrawn | Unknown | 225 | 75 | 75 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2284_fea.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 1/30/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||||
| AE2-284 | - | Kenzie Creek-Colby 138 kV | MI | Cass | Withdrawn | AEP | 225 | 75 | 75 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2284_fea.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 1/30/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||||
| AE2-290 | + | Nottingham 138 kV | Nottingham Solar | OH | Harrison | Engineering and Procurement | Unknown | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2290_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2290_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2290_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_290_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_290_csa.pdf | Document Posted | N/A | N/A | 9/15/2023 | 3/29/2019 | N/A | N/A | 9/15/2023 | 12/15/2023 | 12/15/2023 | N/A | N | No | ||||||||
| AE2-290 | - | Nottingham 138 kV | Nottingham Solar | OH | Harrison | Engineering and Procurement | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2290_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2290_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2290_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_290_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_290_csa.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 6/1/2021 | 12/15/2023 | N/A | N | No | ||||||||||
| AE2-297 | + | Madison-Tanners Creek 138 kV | Bellflower Solar 1 | IN | Henry | Engineering and Procurement | Unknown | 152.5 | 152.5 | 91.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2297_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2297_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2297_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_297_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_297_csa.pdf | Document Posted | N/A | N/A | 4/22/2021 | 3/22/2019 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | |||||||||
| AE2-297 | - | Madison-Tanners Creek 138 kV | Bellflower Solar 1 | IN | Henry | Engineering and Procurement | AEP | 152.5 | 152.5 | 91.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2297_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2297_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2297_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_297_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_297_csa.pdf | Document Posted | N/A | N/A | 4/22/2021 | 3/22/2019 | N/A | N/A | 12/31/2024 | 12/31/2024 | N/A | N | No | |||||||||
| AE2-298 | + | Haviland-Cavett Switch 69 kV | OH | Van Wert | Active | Unknown | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2298_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2298_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-298 | - | Haviland-Cavett Switch 69 kV | OH | Van Wert | Active | AEP | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2298_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2298_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE2-300 | + | OH | Licking | Withdrawn | Unknown | 200 | 200 | 200 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/29/2019 | N/A | N/A | 4/1/2019 | 9/22/2022 | N/A | N | No | ||||||||||||||||||||||
| AE2-300 | - | OH | Licking | Withdrawn | AEP | 200 | 200 | 200 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/29/2019 | N/A | N/A | 4/1/2019 | 9/22/2022 | N/A | N | No | ||||||||||||||||||||||
| AE2-302 | + | East Beaver-Lick 138 kV | OH | Jackson | Active | Unknown | 49.9 | 49.9 | 29.94 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2302_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2302_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2019 | N/A | N/A | 7/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-302 | - | East Beaver-Lick 138 kV | OH | Jackson | Active | AEP | 49.9 | 49.9 | 29.94 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2302_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2302_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2019 | N/A | N/A | 7/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-306 | + | Gunn Road 345 kV | OH | Hardin | Active | Unknown | 30 | 30 | 18 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2306_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2306_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2306_fac.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 8/1/2021 | N/A | N | No | |||||||||||||||||
| AE2-306 | - | Gunn Road 345 kV | OH | Hardin | Active | AEP | 30 | 30 | 18 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2306_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2306_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2306_fac.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 8/1/2021 | N/A | N | No | |||||||||||||||||
| AE2-315 | + | Yankee Tap 69 kV | Yankee 1-7 | OH | Montgomery | Engineering and Procurement | Dayton | 124 | 23.5 | 23.5 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2315_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2315_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2315_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_315_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_315_csa.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | ||||||||||
| AE2-315 | - | Yankee Tap 69 kV | OH | Montgomery | Active | Dayton | 124 | 23.5 | 23.5 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2315_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2315_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2315_fac.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 6/1/2020 | N/A | N | No | |||||||||||||||||
| AE2-319 | + | Atlanta 69kV I | Mustang County Solar Project | OH | Pickaway | Engineering and Procurement | Unknown | 100 | 100 | 66.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2319_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2319_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2319_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_319_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_319_csa.pdf | Document Posted | N/A | N/A | 3/31/2019 | N/A | N/A | 10/1/2025 | 10/1/2025 | N/A | N | No | ||||||||||
| AE2-319 | - | Atlanta 69kV I | OH | Pickaway | Active | Dayton | 100 | 100 | 66.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2319_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2319_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2319_fac.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | |||||||||||||||||
| AE2-322 | + | Mark Center 69 kV | OH | Defiance | Active | Unknown | 60 | 60 | 40.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2322_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2322_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-322 | - | Mark Center 69 kV | OH | Defiance | Active | AEP | 60 | 60 | 40.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2322_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2322_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-323 | + | Twin Branch-Guardian 138 kV | IN | Elkhart | Active | Unknown | 100 | 100 | 67.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2323_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2323_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-323 | - | Twin Branch-Guardian 138 kV | IN | Elkhart | Active | AEP | 100 | 100 | 67.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2323_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2323_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-325 | + | Valley 138 kV | MI | Van Buren | Active | Unknown | 152.2 | 52.2 | 31.32 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2325_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2325_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-325 | - | Valley 138 kV | MI | Van Buren | Active | AEP | 152.2 | 52.2 | 31.32 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2325_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2325_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-326 | + | Jacksons Ferry 138 kV | VA | Wythe | Active | Unknown | 127.2 | 52.2 | 31.32 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2326_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2326_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-326 | - | Jacksons Ferry 138 kV | VA | Wythe | Active | AEP | 127.2 | 52.2 | 31.32 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2326_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2326_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/30/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-327 | + | Biers Run-Circleville 138 kV | OH | Pickaway | Withdrawn | Unknown | 162.2 | 52.2 | 31.32 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2327_fea.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 3/6/2020 | 12/1/2021 | N/A | N | No | ||||||||||||||||||||
| AE2-327 | - | Biers Run-Circleville 138 kV | OH | Pickaway | Withdrawn | AEP | 162.2 | 52.2 | 31.32 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2327_fea.pdf | Document Posted | N/A | N/A | 3/30/2019 | N/A | N/A | 3/6/2020 | 12/1/2021 | N/A | N | No | ||||||||||||||||||||
| AE2-331 | + | Mark Center 69 kV | OH | Defiance | Withdrawn | Unknown | 34.8 | 34.8 | 139.2 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/31/2019 | N/A | N/A | 4/29/2019 | 12/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-331 | - | Mark Center 69 kV | OH | Defiance | Withdrawn | AEP | 34.8 | 34.8 | 139.2 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/31/2019 | N/A | N/A | 4/29/2019 | 12/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-332 | + | Twin Branch-Guardian 138 kV | IN | Elkhart | Withdrawn | Unknown | 52.2 | 52.2 | 208.8 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/31/2019 | N/A | N/A | 4/29/2019 | 12/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-332 | - | Twin Branch-Guardian 138 kV | IN | Elkhart | Withdrawn | AEP | 52.2 | 52.2 | 208.8 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/31/2019 | N/A | N/A | 4/29/2019 | 12/1/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-333 | + | Bedington 138 kV | MD | Frederick | Active | APS | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2333_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2333_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2333_fac.pdf | Document Posted | N/A | N/A | 3/31/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | |||||||||||||||||
| AE2-333 | - | Bedington 138 kV | MD | Frederick | Active | APS | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2333_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2333_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||
| AE2-346 | + | Ahoskie 34.5 kV | Colice Hall Solar | NC | Hertford | Engineering and Procurement | Dominion | 17 | 12 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2346_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2346_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_346_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_346_csa.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 1/31/2023 | 1/31/2023 | N/A | N | No | |||||||||||
| AE2-346 | - | Ahoskie 34.5 kV | NC | Hertford | Active | Dominion | 17 | 12 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2346_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2346_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2019 | N/A | N/A | 12/30/2019 | N/A | N | No | ||||||||||||||||||
| AF1-029 | + | Haviland-Cavett Switch 69 kV | OH | Van Wert | Active | Unknown | 75 | 25 | 15 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1029_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1029_imp.pdf | Document Posted | In Progress | N/A | N/A | 5/14/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AF1-029 | - | Haviland-Cavett Switch 69 kV | OH | Van Wert | Active | AEP | 75 | 25 | 15 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1029_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1029_imp.pdf | Document Posted | In Progress | N/A | N/A | 5/14/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AF1-046 | + | Twin Branch-Guardian 138 kV | IN | Elkhart | Active | Unknown | 152.2 | 52.2 | 31.32 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1046_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1046_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/28/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-046 | - | Twin Branch-Guardian 138 kV | IN | Elkhart | Active | AEP | 152.2 | 52.2 | 31.32 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1046_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1046_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/28/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-047 | + | Mark Center 69 kV | OH | Defiance | Active | Unknown | 94.8 | 34.8 | 20.88 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1047_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1047_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/28/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-047 | - | Mark Center 69 kV | OH | Defiance | Active | AEP | 94.8 | 34.8 | 20.88 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1047_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1047_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/28/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-049 | + | Berry Hill 138 kV | VA | Pittsylvania | Active | Unknown | 125 | 125 | 75 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1049_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1049_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/12/2019 | N/A | N/A | 11/25/2022 | N/A | N | No | ||||||||||||||||||
| AF1-049 | - | Berry Hill 138 kV | VA | Pittsylvania | Active | AEP | 125 | 125 | 75 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1049_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1049_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/12/2019 | N/A | N/A | 11/25/2022 | N/A | N | No | ||||||||||||||||||
| AF1-051 | + | Gavin 765 kV | OH | Gallia | Active | Unknown | 1360 | 11 | 11 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1051_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1051_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/12/2019 | N/A | N/A | 5/1/2024 | N/A | N | No | ||||||||||||||||||
| AF1-051 | - | Gavin 765 kV | OH | Gallia | Active | AEP | 1360 | 11 | 11 | Capacity | Generation Interconnection | Coal | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1051_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1051_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/12/2019 | N/A | N/A | 5/1/2024 | N/A | N | No | ||||||||||||||||||
| AF1-057 | + | Jackson-Three Mile Island 230 kV II | Dover Solar | PA | York | Engineering and Procurement | ME | 75 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1057_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1057_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1057_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/af1_057_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/af1_057_csa.pdf | Document Posted | N/A | N/A | 7/31/2019 | N/A | N/A | 11/1/2024 | 11/1/2024 | N/A | N | No | ||||||||||
| AF1-057 | - | Jackson-Three Mile Island 230 kV II | PA | York | Active | ME | 75 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1057_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1057_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1057_fac.pdf | Document Posted | N/A | N/A | 7/31/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | |||||||||||||||||
| AF1-062 | + | Jug Street 138 kV | OH | Licking | Active | Unknown | 200 | 200 | 80 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1062_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1062_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/31/2019 | N/A | N/A | 8/22/2022 | N/A | N | No | ||||||||||||||||||
| AF1-062 | - | Jug Street 138 kV | OH | Licking | Active | AEP | 200 | 200 | 80 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1062_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1062_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/31/2019 | N/A | N/A | 8/22/2022 | N/A | N | No | ||||||||||||||||||
| AF1-063 | + | Lockwood Road 138 kV | OH | Defiance | Active | Unknown | 30 | 30 | 19.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1063_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1063_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_063_isa2.pdf | Interim Study | N/A | N/A | N/A | 7/31/2019 | N/A | N/A | 3/31/2022 | N/A | N | No | |||||||||||||||
| AF1-063 | - | Lockwood Road 138 kV | OH | Defiance | Active | AEP | 30 | 30 | 19.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1063_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1063_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_063_isa2.pdf | Interim Study | N/A | N/A | N/A | 7/31/2019 | N/A | N/A | 3/31/2022 | N/A | N | No | |||||||||||||||
| AF1-071 | + | College Corner 138 kV | OH | Preble | Active | Unknown | 98 | 18 | 6.84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1071_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1071_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/13/2019 | N/A | N/A | 7/1/2019 | N/A | N | No | ||||||||||||||||||
| AF1-071 | - | College Corner 138 kV | OH | Preble | Active | AEP | 98 | 18 | 6.84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1071_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1071_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/13/2019 | N/A | N/A | 7/1/2019 | N/A | N | No | ||||||||||||||||||
| AF1-076 | + | Southwest Lima 138 kV | OH | Allen | Active | Unknown | 100 | 100 | 61.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1076_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1076_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/22/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AF1-076 | - | Southwest Lima 138 kV | OH | Allen | Active | AEP | 100 | 100 | 61.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1076_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1076_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/22/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AF1-077 | + | Southwest Lima 138 kV | OH | Allen | Active | Unknown | 200 | 100 | 61.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1077_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1077_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/22/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AF1-077 | - | Southwest Lima 138 kV | OH | Allen | Active | AEP | 200 | 100 | 61.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1077_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1077_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/22/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AF1-080 | + | Deer Creek-Fisher Body-Mullin 138 kV | IN | Madison | Withdrawn | Unknown | 220 | 20 | 20 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1080_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1080_imp.pdf | Document Posted | N/A | N/A | 8/28/2019 | N/A | N/A | 9/29/2020 | 9/15/2021 | N/A | N | No | ||||||||||||||||||
| AF1-080 | - | Deer Creek-Fisher Body-Mullin 138 kV | IN | Madison | Withdrawn | AEP | 220 | 20 | 20 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1080_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1080_imp.pdf | Document Posted | N/A | N/A | 8/28/2019 | N/A | N/A | 9/29/2020 | 9/15/2021 | N/A | N | No | ||||||||||||||||||
| AF1-084 | + | East Hartford-Murch 69 kV | MI | Van Buren | Active | Unknown | 85 | 85 | 54.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1084_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1084_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 10/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-084 | - | East Hartford-Murch 69 kV | MI | Van Buren | Active | AEP | 85 | 85 | 54.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1084_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1084_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 10/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-085 | + | Southwest Lima-West Moulton 138 kV | OH | Auglaize | Active | Unknown | 77 | 77 | 32.34 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1085_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 11/30/2022 | N/A | N | No | ||||||||||||||||||
| AF1-085 | - | Southwest Lima-West Moulton 138 kV | OH | Auglaize | Active | AEP | 77 | 77 | 32.34 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1085_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 11/30/2022 | N/A | N | No | ||||||||||||||||||
| AF1-088 | + | Sullivan 345 kV | IN | Sullivan | Active | Unknown | 1000 | 1000 | 1000 | Capacity | Merchant Transmission | DC | 1000 F/1000 NFTIR/1000 F/1000 NFTWR | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1088_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 12/31/2025 | N/A | S | No | |||||||||||||||||
| AF1-088 | - | Sullivan 345 kV | IN | Sullivan | Active | AEP | 1000 | 1000 | 1000 | Capacity | Merchant Transmission | DC | 1000 F/1000 NFTIR/1000 F/1000 NFTWR | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1088_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 12/31/2025 | N/A | S | No | |||||||||||||||||
| AF1-091 | + | Butler-S Hicksville 138 kV | IN | DeKalb | Active | Unknown | 180 | 180 | 138.4 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1091_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-091 | - | Butler-S Hicksville 138 kV | IN | DeKalb | Active | AEP | 180 | 180 | 138.4 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1091_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-092 | + | Huntington Jct. 138 kV | IN | Huntington | Active | Unknown | 150 | 150 | 115 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1092_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1092_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-092 | - | Huntington Jct. 138 kV | IN | Huntington | Active | AEP | 150 | 150 | 115 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1092_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1092_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-113 | + | Gristmill 345 kV | OH | Auglaize | Active | Unknown | 180 | 180 | 137.3 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1113_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1113_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/11/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-113 | - | Gristmill 345 kV | OH | Auglaize | Active | AEP | 180 | 180 | 137.3 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1113_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1113_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/11/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-117 | + | Atlanta-Stuart 345 kV | OH | Ross | Active | Unknown | 200 | 200 | 152.9 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1117_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1117_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/13/2019 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-117 | - | Atlanta-Stuart 345 kV | OH | Ross | Active | AEP | 200 | 200 | 152.9 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1117_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1117_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/13/2019 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-118 | + | Sorenson-Desoto 345 kV | IN | Wells | Active | Unknown | 350 | 350 | 268.9 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1118_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1118_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/13/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-118 | - | Sorenson-Desoto 345 kV | IN | Wells | Active | AEP | 350 | 350 | 268.9 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1118_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1118_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/13/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-119 | + | Keystone-Desoto 345 kV | IN | Blackford | Active | Unknown | 200 | 200 | 140 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1119_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1119_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/13/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-119 | - | Keystone-Desoto 345 kV | IN | Blackford | Active | AEP | 200 | 200 | 140 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1119_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1119_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/13/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-130 | + | Inez 138 kV | KY | Martin | Active | Unknown | 200 | 200 | 133.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1130_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1130_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_130_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/18/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | |||||||||||||||
| AF1-130 | - | Inez 138 kV | KY | Martin | Active | AEP | 200 | 200 | 133.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1130_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1130_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_130_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/18/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | |||||||||||||||
| AF1-141 | + | Varner 138 kV | IN | DeKalb | Active | Unknown | 96 | 96 | 62.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1141_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_141_isa2.pdf | Interim Study | N/A | N/A | N/A | 8/30/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | |||||||||||||||
| AF1-141 | - | Varner 138 kV | IN | DeKalb | Active | AEP | 96 | 96 | 62.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1141_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_141_isa2.pdf | Interim Study | N/A | N/A | N/A | 8/30/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | |||||||||||||||
| AF1-144 | + | Hayden 345 kV | OH | Franklin | Active | Unknown | 100 | 100 | 66.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1144_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1144_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/18/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-144 | - | Hayden 345 kV | OH | Franklin | Active | AEP | 100 | 100 | 66.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1144_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1144_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/18/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||||||||
| AF1-148 | + | Sorenson-Desoto 345 kV | IN | Wells | Active | Unknown | 159 | 159 | 95.4 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1148_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1148_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/19/2019 | N/A | N/A | 4/30/2023 | N/A | N | No | ||||||||||||||||||
| AF1-148 | - | Sorenson-Desoto 345 kV | IN | Wells | Active | AEP | 159 | 159 | 95.4 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1148_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1148_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/19/2019 | N/A | N/A | 4/30/2023 | N/A | N | No | ||||||||||||||||||
| AF1-158 | + | Edison-Gravel Pit 138 kV | IN | St. Joseph | Active | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1158_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1158_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_158_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/20/2019 | N/A | N/A | 4/30/2023 | N/A | N | No | |||||||||||||||
| AF1-158 | - | Edison-Gravel Pit 138 kV | IN | St. Joseph | Active | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1158_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1158_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/20/2019 | N/A | N/A | 4/30/2023 | N/A | N | No | ||||||||||||||||||
| AF1-161 | + | Valley 138 kV | MI | Van Buren | Active | Unknown | 50 | 50 | 25 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1161_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/20/2019 | N/A | N/A | 3/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-161 | - | Valley 138 kV | MI | Van Buren | Active | AEP | 50 | 50 | 25 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1161_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/20/2019 | N/A | N/A | 3/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-162 | + | Inez 138 kV | KY | Martin | Active | Unknown | 300 | 100 | 60 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1162_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1162_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_162_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/20/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | |||||||||||||||
| AF1-162 | - | Inez 138 kV | KY | Martin | Active | AEP | 300 | 100 | 60 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1162_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1162_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_162_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/20/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | |||||||||||||||
| AF1-164 | + | Southwest Lima 345 kV | OH | Allen | Active | Unknown | 300 | 300 | 195 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1164_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1164_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_164_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/20/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | |||||||||||||||
| AF1-164 | - | Southwest Lima 345 kV | OH | Allen | Active | AEP | 300 | 300 | 195 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1164_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1164_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_164_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/20/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | |||||||||||||||
| AF1-175 | + | Donald C Cook-Jackson Road 345 kV | IN | St. Joseph | Withdrawn | Unknown | 152 | 152 | 91.2 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1175_fea.pdf | Document Posted | N/A | N/A | 9/24/2019 | N/A | N/A | 4/16/2020 | 4/30/2023 | N/A | N | No | ||||||||||||||||||||
| AF1-175 | - | Donald C Cook-Jackson Road 345 kV | IN | St. Joseph | Withdrawn | AEP | 152 | 152 | 91.2 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1175_fea.pdf | Document Posted | N/A | N/A | 9/24/2019 | N/A | N/A | 4/16/2020 | 4/30/2023 | N/A | N | No | ||||||||||||||||||||
| AF1-176 | + | Corey 138 kV | MI | St. Joseph | Active | Unknown | 300 | 300 | 155.684 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1176_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/24/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-176 | - | Corey 138 kV | MI | St. Joseph | Active | AEP | 300 | 300 | 155.684 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1176_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/24/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-202 | + | Keystone-Desoto 345 kV | IN | Blackford | Active | Unknown | 200 | 200 | 34 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1202_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1202_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_202_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/25/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | |||||||||||||||
| AF1-202 | - | Keystone-Desoto 345 kV | IN | Blackford | Active | AEP | 200 | 200 | 34 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1202_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1202_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/25/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-204 | + | Eugene 345 kV | IN | Vermillion | Active | Unknown | 255 | 255 | 63.75 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1204_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1204_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/25/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-204 | - | Eugene 345 kV | IN | Vermillion | Active | AEP | 255 | 255 | 63.75 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1204_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1204_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/25/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-205 | + | Napoleon Muni 138 kV | OH | Henry | Active | Unknown | 40 | 40 | 24 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1205_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1205_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/26/2019 | N/A | N/A | 11/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-205 | - | Napoleon Muni 138 kV | OH | Henry | Active | ATSI | 40 | 40 | 24 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1205_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1205_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/26/2019 | N/A | N/A | 11/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-207 | + | Reynolds–Olive #1 345 kV | IN | White | Active | Unknown | 180 | 180 | 34 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1207_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1207_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/26/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-207 | - | Reynolds–Olive #1 345 kV | IN | White | Active | AEP | 180 | 180 | 34 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1207_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1207_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/26/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-215 | + | Reynolds-Olive 345 kV | IN | Starke | Active | Unknown | 300 | 300 | 180 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1215_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1215_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_215_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/26/2019 | N/A | N/A | 5/31/2021 | N/A | N | No | |||||||||||||||
| AF1-215 | - | Reynolds-Olive 345 kV | IN | Starke | Active | AEP | 300 | 300 | 180 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1215_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1215_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_215_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/26/2019 | N/A | N/A | 5/31/2021 | N/A | N | No | |||||||||||||||
| AF1-221 | + | College Corner-Drewersburg 138 kV | IN | Franklin | Active | Unknown | 180 | 180 | 138.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1221_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1221_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-221 | - | College Corner-Drewersburg 138 kV | IN | Franklin | Active | AEP | 180 | 180 | 138.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1221_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1221_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF1-223 | + | Keystone-Desoto 345 kV | IN | Blackford | Active | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1223_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1223_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-223 | - | Keystone-Desoto 345 kV | IN | Blackford | Active | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1223_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1223_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-227 | + | Marysville – Gunn Road 345 kV | OH | Union | Active | Unknown | 325 | 325 | 195 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1227_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1227_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_227_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/27/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | |||||||||||||||
| AF1-227 | - | Marysville – Gunn Road 345 kV | OH | Union | Active | AEP | 325 | 325 | 195 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1227_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1227_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af1_227_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/27/2019 | N/A | N/A | 5/31/2022 | N/A | N | No | |||||||||||||||
| AF1-228 | + | Beatty-Greene 345 kV | OH | Madison | Active | Unknown | 155 | 155 | 93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1228_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1228_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-228 | - | Beatty-Greene 345 kV | OH | Madison | Active | AEP | 155 | 155 | 93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1228_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1228_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-229 | + | Galion-South Berwick 345 kV | OH | Wyandot | Active | Unknown | 120 | 120 | 72 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1229_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1229_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-229 | - | Galion-South Berwick 345 kV | OH | Wyandot | Active | AEP | 120 | 120 | 72 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1229_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1229_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/27/2019 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-268 | + | Desoto-Jay 138 kV | IN | Delaware | Active | Unknown | 83 | 83 | 57.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1268_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1268_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 1/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-268 | - | Desoto-Jay 138 kV | IN | Delaware | Active | AEP | 83 | 83 | 57.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1268_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1268_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 1/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-275 | + | Cole 345 kV | OH | Franklin | Active | Unknown | 250 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1275_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1275_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-275 | - | Cole 345 kV | OH | Franklin | Active | AEP | 250 | 50 | 50 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1275_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1275_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-285 | + | Gunn Road 345 kV | OH | Hardin | Active | Unknown | 130 | 100 | 56 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1285_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1285_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1285_fac.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 8/1/2021 | N/A | N | No | |||||||||||||||||
| AF1-285 | - | Gunn Road 345 kV | OH | Hardin | Active | AEP | 130 | 100 | 56 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1285_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1285_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1285_fac.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 8/1/2021 | N/A | N | No | |||||||||||||||||
| AF1-298 | + | Desoto 345 kV | IN | Delaware | Withdrawn | Unknown | 200 | 200 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1298_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 3/6/2020 | 10/31/2023 | N/A | N | No | ||||||||||||||||||||
| AF1-298 | - | Desoto 345 kV | IN | Delaware | Withdrawn | AEP | 200 | 200 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1298_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 3/6/2020 | 10/31/2023 | N/A | N | No | ||||||||||||||||||||
| AF1-308 | + | Waverly 138 kV | OH | Pike | Withdrawn | Unknown | 60 | 60 | 36 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1308_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 3/6/2020 | 12/31/2023 | N/A | N | No | ||||||||||||||||||||
| AF1-308 | - | Waverly 138 kV | OH | Pike | Withdrawn | AEP | 60 | 60 | 36 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1308_fea.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 3/6/2020 | 12/31/2023 | N/A | N | No | ||||||||||||||||||||
| AF1-312 | + | Dan River-Ridgeway 138 kV | NC | Rockingham | Withdrawn | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 9/30/2019 | N/A | N/A | 10/28/2019 | 12/31/2023 | N/A | N | No | |||||||||||||||||||||
| AF1-312 | - | Dan River-Ridgeway 138 kV | NC | Rockingham | Withdrawn | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 9/30/2019 | N/A | N/A | 10/28/2019 | 12/31/2023 | N/A | N | No | |||||||||||||||||||||
| AF1-313 | + | Wes Del-Royerton 138 kV | IN | Delaware | Withdrawn | Unknown | 40 | 40 | 24 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1313_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1313_imp.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 10/9/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-313 | - | Wes Del-Royerton 138 kV | IN | Delaware | Withdrawn | AEP | 40 | 40 | 24 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1313_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1313_imp.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 10/9/2020 | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AF1-322 | + | Meadow Lake 345 kV | IN | White | Active | Unknown | 200 | 200 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1322_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1322_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/23/2019 | N/A | N/A | 8/15/2022 | N/A | N | No | ||||||||||||||||||
| AF1-322 | - | Meadow Lake 345 kV | IN | White | Active | AEP | 200 | 200 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1322_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1322_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/23/2019 | N/A | N/A | 8/15/2022 | N/A | N | No | ||||||||||||||||||
| AF1-323 | + | Scottsville-Colleen 138 kV | VA | Albemarle | Active | Unknown | 55 | 55 | 33 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1323_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1323_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 12/12/2022 | N/A | N | No | ||||||||||||||||||
| AF1-323 | - | Scottsville-Colleen 138 kV | VA | Albemarle | Active | AEP | 55 | 55 | 33 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1323_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1323_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 12/12/2022 | N/A | N | No | ||||||||||||||||||
| AF2-008 | + | Sullivan 345 kV | IN | Sullivan | Active | Unknown | 2000 | 1000 | 500 | Capacity | Merchant Transmission | DC | 500 FTIR/1000 NFTIR | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af2008_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af2008_imp.pdf | Document Posted | N/A | N/A | 10/3/2019 | N/A | N/A | 12/31/2025 | N/A | S | No | ||||||||||||||||||
| AF2-008 | - | Sullivan 345 kV | IN | Sullivan | Active | AEP | 2000 | 1000 | 500 | Capacity | Merchant Transmission | DC | 500 FTIR/1000 NFTIR | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af2008_fea.pdf | Document Posted | In Progress | N/A | N/A | 10/3/2019 | N/A | N/A | 12/31/2025 | N/A | S | No | |||||||||||||||||||
| AF2-014 | + | Maddox Creek 345 kV | OH | Van Wert | Active | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2014_imp.pdf | Document Posted | In Progress | N/A | N/A | 10/18/2019 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-014 | - | Maddox Creek 345 kV | OH | Van Wert | Active | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2014_imp.pdf | Document Posted | In Progress | N/A | N/A | 10/18/2019 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-015 | + | Essex-McCarter 230 kV | N/A | N/A | Withdrawn | PSEG | 50 | Energy | Merchant Transmission | Not Required | Withdrawn | N/A | N/A | 10/23/2019 | N/A | N/A | 7/28/2021 | 10/23/2019 | N/A | EE | No | |||||||||||||||||||||||
| AF2-015 | - | Essex-McCarter 230 kV | N/A | N/A | Withdrawn | PSEG | Energy | Merchant Transmission | Not Required | Withdrawn | N/A | N/A | 10/23/2019 | N/A | N/A | 7/28/2021 | 10/23/2019 | N/A | EE | No | ||||||||||||||||||||||||
| AF2-017 | + | John’s Creek 34 kV | KY | Pike | Withdrawn | Unknown | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2019 | N/A | N/A | 3/6/2020 | 12/31/2021 | N/A | N | No | |||||||||||||||||||||
| AF2-017 | - | John’s Creek 34 kV | KY | Pike | Withdrawn | AEP | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 10/31/2019 | N/A | N/A | 3/6/2020 | 12/31/2021 | N/A | N | No | |||||||||||||||||||||
| AF2-018 | + | Inez 138 kV | KY | Martin | Active | Unknown | 200 | 200 | 133.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2018_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2018_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/1/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||||||||
| AF2-018 | - | Inez 138 kV | KY | Martin | Active | AEP | 200 | 200 | 133.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2018_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2018_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/1/2019 | N/A | N/A | 12/1/2023 | N/A | N | No | ||||||||||||||||||
| AF2-048 | + | Rio-Lick 138 kV | OH | Jackson | Active | Unknown | 140 | 70 | 46.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2048_imp.pdf | Document Posted | In Progress | N/A | N/A | 12/19/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AF2-048 | - | Rio-Lick 138 kV | OH | Jackson | Active | AEP | 140 | 70 | 46.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2048_imp.pdf | Document Posted | In Progress | N/A | N/A | 12/19/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AF2-059 | + | Southwest Lima-West Moulton 138 kV | OH | Auglaize | Active | Unknown | 97 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2059_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/24/2020 | N/A | N/A | 11/30/2022 | N/A | N | No | ||||||||||||||||||
| AF2-059 | - | Southwest Lima-West Moulton 138 kV | OH | Auglaize | Active | AEP | 97 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2059_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/24/2020 | N/A | N/A | 11/30/2022 | N/A | N | No | ||||||||||||||||||
| AF2-068 | + | Jay 138 kV | IN | Blackford | Active | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2068_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2068_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/30/2020 | N/A | N/A | 10/3/2022 | N/A | N | No | ||||||||||||||||||
| AF2-068 | - | Jay 138 kV | IN | Blackford | Active | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2068_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2068_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/30/2020 | N/A | N/A | 10/3/2022 | N/A | N | No | ||||||||||||||||||
| AF2-078 | + | Reynolds-Olive #1 345 kV | IN | White | Active | Unknown | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2078_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2078_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AF2-078 | - | Reynolds-Olive #1 345 kV | IN | White | Active | AEP | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2078_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2078_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 10/31/2022 | N/A | N | No | ||||||||||||||||||
| AF2-083 | + | Kenzie Creek-Stone Lake 69 kV | MI | Cass | Active | Unknown | 150 | 150 | 100 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2083_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2083_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 10/21/2022 | N/A | N | No | ||||||||||||||||||
| AF2-083 | - | Kenzie Creek-Stone Lake 69 kV | MI | Cass | Active | AEP | 150 | 150 | 100 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2083_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2083_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 10/21/2022 | N/A | N | No | ||||||||||||||||||
| AF2-094 | + | Huntington Jct. 138 kV | IN | Huntington | Active | Unknown | 190 | 40 | 26.4 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2094_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2094_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/12/2020 | N/A | N/A | 2/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-094 | - | Huntington Jct. 138 kV | IN | Huntington | Active | AEP | 190 | 40 | 26.4 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2094_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2094_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/12/2020 | N/A | N/A | 2/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-103 | + | Haviland 138 kV | Northwest Ohio Wind | OH | Paulding | Partially in Service - Under Construction | Unknown | 103.2 | 3.15 | 1.32 | 2 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2103_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/af2_103_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/17/2020 | N/A | N/A | 2/1/2021 | 2/1/2021 | 6/1/2021 | N/A | N | No | ||||||||||
| AF2-103 | - | Haviland 138 kV | Northwest Ohio Wind | OH | Paulding | Partially in Service - Under Construction | AEP | 103.2 | 3.15 | 1.32 | 2 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2103_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/af2_103_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/17/2020 | N/A | N/A | 2/1/2021 | 2/1/2021 | 6/1/2021 | N/A | N | No | ||||||||||
| AF2-105 | + | Morgans Cut-Glen Lyn #2 138 kV | VA | Pulaski | Active | Unknown | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2105_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2105_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 3/28/2022 | N/A | N | No | ||||||||||||||||||
| AF2-105 | - | Morgans Cut-Glen Lyn #2 138 kV | VA | Pulaski | Active | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2105_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2105_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 3/28/2022 | N/A | N | No | ||||||||||||||||||
| AF2-106 | + | Hazel Hollow-Glen Lyn #1 138 kV | VA | Pulaski | Active | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2106_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 3/28/2022 | N/A | N | No | ||||||||||||||||||
| AF2-106 | - | Hazel Hollow-Glen Lyn #1 138 kV | VA | Pulaski | Active | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2106_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/31/2020 | N/A | N/A | 3/28/2022 | N/A | N | No | ||||||||||||||||||
| AF2-107 | + | Clifford 138 kV | VA | Amherst | Active | Unknown | 50 | 50 | 32.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2107_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2107_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/24/2020 | N/A | N/A | 2/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-107 | - | Clifford 138 kV | VA | Amherst | Active | AEP | 50 | 50 | 32.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2107_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2107_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/24/2020 | N/A | N/A | 2/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-122 | + | Kirk 138 kV | OH | Licking | Active | Unknown | 107.7 | 107.7 | 64.62 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2122_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2122_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af2_122_isa2.pdf | Interim Study | N/A | N/A | N/A | 2/28/2020 | N/A | N/A | 10/3/2022 | N/A | N | No | |||||||||||||||
| AF2-122 | - | Kirk 138 kV | OH | Licking | Active | AEP | 107.7 | 107.7 | 64.62 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2122_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2122_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af2_122_isa2.pdf | Interim Study | N/A | N/A | N/A | 2/28/2020 | N/A | N/A | 10/3/2022 | N/A | N | No | |||||||||||||||
| AF2-125 | + | Varner 138 kV | IN | DeKalb | Active | Unknown | 150 | 54 | 35.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2125_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2125_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2020 | N/A | N/A | 4/3/2023 | N/A | N | No | ||||||||||||||||||
| AF2-125 | - | Varner 138 kV | IN | DeKalb | Active | AEP | 150 | 54 | 35.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2125_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2125_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2020 | N/A | N/A | 4/3/2023 | N/A | N | No | ||||||||||||||||||
| AF2-127 | + | Lockwood Road 138 kV | OH | Defiance | Active | Unknown | 68 | 38 | 24.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2127_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2127_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af2_127_isa2.pdf | Interim Study | N/A | N/A | N/A | 2/28/2020 | N/A | N/A | 3/31/2022 | N/A | N | No | |||||||||||||||
| AF2-127 | - | Lockwood Road 138 kV | OH | Defiance | Active | AEP | 68 | 38 | 24.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2127_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2127_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/af2_127_isa2.pdf | Interim Study | N/A | N/A | N/A | 2/28/2020 | N/A | N/A | 3/31/2022 | N/A | N | No | |||||||||||||||
| AF2-132 | + | Reynolds-Olive #1 345 kV | IN | Pulaski | Active | Unknown | 300 | 300 | 180 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2132_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2132_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/4/2020 | N/A | N/A | 5/31/2021 | N/A | N | No | ||||||||||||||||||
| AF2-132 | - | Reynolds-Olive #1 345 kV | IN | Pulaski | Active | AEP | 300 | 300 | 180 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2132_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2132_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/4/2020 | N/A | N/A | 5/31/2021 | N/A | N | No | ||||||||||||||||||
| AF2-133 | + | Reynolds-Olive #2 345 kV | IN | Pulaski | Active | Unknown | 300 | 300 | 180 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2133_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2133_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/4/2020 | N/A | N/A | 5/31/2021 | N/A | N | No | ||||||||||||||||||
| AF2-133 | - | Reynolds-Olive #2 345 kV | IN | Pulaski | Active | AEP | 300 | 300 | 180 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2133_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2133_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/4/2020 | N/A | N/A | 5/31/2021 | N/A | N | No | ||||||||||||||||||
| AF2-134 | + | Reynolds-Olive #2 345 kV | IN | Starke | Active | Unknown | 400 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2134_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2134_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/4/2020 | N/A | N/A | 5/31/2021 | N/A | N | No | ||||||||||||||||||
| AF2-134 | - | Reynolds-Olive #2 345 kV | IN | Starke | Active | AEP | 400 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2134_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2134_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/4/2020 | N/A | N/A | 5/31/2021 | N/A | N | No | ||||||||||||||||||
| AF2-137 | + | Marysville-Sorenson 765 kV | OH | Logan | Active | Unknown | 500 | 500 | 210 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2137_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2137_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/6/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-137 | - | Marysville-Sorenson 765 kV | OH | Logan | Active | AEP | 500 | 500 | 210 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2137_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2137_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/6/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-149 | + | Sharp Road 69 kV | OH | Knox | Active | Unknown | 80 | 80 | 32 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2149_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2149_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/12/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-149 | - | Sharp Road 69 kV | OH | Knox | Active | AEP | 80 | 80 | 32 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2149_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2149_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/12/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-162 | + | Keystone-Desoto 345 kV | IN | Blackford | Active | Unknown | 245 | 45 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2162_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2162_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/16/2020 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AF2-162 | - | Keystone-Desoto 345 kV | IN | Blackford | Active | AEP | 245 | 45 | 30 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2162_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2162_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/16/2020 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||
| AF2-173 | + | Desoto 345 kV | IN | Delaware | Active | Unknown | 200 | 200 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2173_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2173_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/19/2020 | N/A | N/A | 10/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-173 | - | Desoto 345 kV | IN | Delaware | Active | AEP | 200 | 200 | 84 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2173_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2173_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/19/2020 | N/A | N/A | 10/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-177 | + | Sorenson-DeSoto #2 345 kV | IN | Blackford | Active | Unknown | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2177_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2177_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2020 | N/A | N/A | 10/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-177 | - | Sorenson-DeSoto #2 345 kV | IN | Blackford | Active | AEP | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2177_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2177_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2020 | N/A | N/A | 10/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-186 | + | South Cecil 69 kV | OH | Paulding | Active | Unknown | 45 | 45 | 18.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2186_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2186_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-186 | - | South Cecil 69 kV | OH | Paulding | Active | AEP | 45 | 45 | 18.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2186_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2186_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-188 | + | Reynolds-Meadow Lake #1 345 kV | IN | White | Active | Unknown | 112 | 112 | 67.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2188_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2188_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2020 | N/A | N/A | 6/30/2023 | N/A | N | No | ||||||||||||||||||
| AF2-188 | - | Reynolds-Meadow Lake #1 345 kV | IN | White | Active | AEP | 112 | 112 | 67.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2188_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2188_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/22/2020 | N/A | N/A | 6/30/2023 | N/A | N | No | ||||||||||||||||||
| AF2-189 | + | Greentown 138 kV | IN | Howard | Withdrawn | Unknown | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2189_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2189_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/22/2020 | N/A | N/A | 9/17/2021 | 6/30/2023 | N/A | N | No | |||||||||||||||||
| AF2-189 | - | Greentown 138 kV | IN | Howard | Withdrawn | AEP | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2189_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2189_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/22/2020 | N/A | N/A | 9/17/2021 | 6/30/2023 | N/A | N | No | |||||||||||||||||
| AF2-190 | + | Olive-Reynolds #2 345 kV | IN | Pulaski | Withdrawn | Unknown | 260 | 260 | 156 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2190_fea.pdf | Document Posted | N/A | N/A | 3/22/2020 | N/A | N/A | 9/10/2020 | 6/30/2023 | N/A | N | No | ||||||||||||||||||||
| AF2-190 | - | Olive-Reynolds #2 345 kV | IN | Pulaski | Withdrawn | AEP | 260 | 260 | 156 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2190_fea.pdf | Document Posted | N/A | N/A | 3/22/2020 | N/A | N/A | 9/10/2020 | 6/30/2023 | N/A | N | No |