Changes in PJM Queue between April 6th and May 3rd, 2022.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

Summary of Changes

##   old_obs   new_obs   changes additions  removals 
##      8254      8457      1391       205         2

Changes

## Truncating HTML diff table to ${limit_html} rows...
## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
A10 - Glory 115 kV Colver Power PA Cambria In Service PENELEC 6 6 6 6 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/a10_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/a10_imp.pdf Document Posted Not Required Not Required N/A N/A 6/2/1997 N/A N/A 1/8/2000 1/8/2000 N/A N No
AA1-007 + Smith Gap Regional Landfill VA Roanoke Withdrawn Unknown 6 6 6 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1007_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 6/19/2014 N/A N/A 1/7/2016 Customer Milestone Not Met 6/1/2016 N/A N No
AA1-007 - Smith Gap Regional Landfill VA Roanoke Withdrawn AEP 6 6 6 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1007_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 6/19/2014 N/A N/A 1/7/2016 Customer Milestone Not Met 6/1/2016 N/A N No
AA1-013 + Hanging Rock 765kV Cornu OH Lawrence In Service Unknown 1250 10 10 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1013_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa1_013_isa.pdf Document Posted N/A Not Required N/A N/A 6/23/2014 N/A N/A 10/1/2015 10/1/2015 11/1/2015 N/A N No
AA1-013 - Hanging Rock 765kV Cornu OH Lawrence In Service AEP 1250 10 10 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1013_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa1_013_isa.pdf Document Posted N/A Not Required N/A N/A 6/23/2014 N/A N/A 10/1/2015 10/1/2015 11/1/2015 N/A N No
AA1-014 + Washington 345kV Washington Energy Facility OH Washington In Service Unknown 625 5 5 5 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1014_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa1_014_isa.pdf Document Posted N/A Not Required N/A N/A 6/23/2014 N/A N/A 10/1/2015 10/1/2015 11/1/2015 N/A N No
AA1-014 - Washington 345kV Washington Energy Facility OH Washington In Service AEP 625 5 5 5 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1014_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa1_014_isa.pdf Document Posted N/A Not Required N/A N/A 6/23/2014 N/A N/A 10/1/2015 10/1/2015 11/1/2015 N/A N No
AA1-032 + Kingsport Mill Kingsport Mill TN Sullivan In Service Unknown 50 0 45 0 Capacity Generation Interconnection Biomass https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1032_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1032_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa1_032_isa.pdf Document Posted N/A Not Required N/A N/A 7/21/2014 N/A N/A 6/1/2015 6/1/2015 5/24/2017 N/A N No
AA1-032 - Kingsport Mill Kingsport Mill TN Sullivan In Service AEP 50 0 45 0 Capacity Generation Interconnection Biomass https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1032_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1032_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa1_032_isa.pdf Document Posted N/A Not Required N/A N/A 7/21/2014 N/A N/A 6/1/2015 6/1/2015 5/24/2017 N/A N No
AA1-063 + Huntsville (Cabin Creek) 69kV IN Randolph Withdrawn Unknown 3.6 3.6 3.6 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1063_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1063_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 9/26/2014 N/A N/A 4/6/2016 Customer Initiated Withdrawal 3/31/2016 N/A N No
AA1-063 - Huntsville (Cabin Creek) 69kV IN Randolph Withdrawn AEP 3.6 3.6 3.6 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1063_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1063_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 9/26/2014 N/A N/A 4/6/2016 Customer Initiated Withdrawal 3/31/2016 N/A N No
AA1-118 + Picway 69kV OH Pickaway Withdrawn Unknown 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1118_fea.pdf Document Posted Withdrawn N/A N/A 10/31/2014 N/A N/A 5/15/2015 Customer Initiated Withdrawal 6/1/2016 N/A N No
AA1-118 - Picway 69kV OH Pickaway Withdrawn AEP 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1118_fea.pdf Document Posted Withdrawn N/A N/A 10/31/2014 N/A N/A 5/15/2015 Customer Initiated Withdrawal 6/1/2016 N/A N No
AA1-120 + Fowler-LaPorte N/A N/A Withdrawn Unknown 64 Energy Upgrade Request https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/aa1120_arr-imp.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 11/8/2017 N/A EE No
AA1-120 - Fowler-LaPorte N/A N/A Withdrawn AEP 64 Energy Upgrade Request https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/aa1120_arr-imp.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 11/8/2017 N/A EE No
AA1-121 + South Granville 12kV Denison University OH Licking Withdrawn Unknown 2 2 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1121_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1121_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/aa1121_wmpa.pdf Not Required N/A N/A 10/31/2014 N/A N/A 4/18/2017 Customer Initiated Withdrawal 1/31/2018 1/31/2018 N/A N No
AA1-121 - South Granville 12kV Denison University OH Licking Withdrawn AEP 2 2 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1121_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1121_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/aa1121_wmpa.pdf Not Required N/A N/A 10/31/2014 N/A N/A 4/18/2017 Customer Initiated Withdrawal 1/31/2018 1/31/2018 N/A N No
AA1-125 + Seaman 138kV OH Brown Withdrawn Unknown 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1125_imp.pdf Document Posted Withdrawn N/A N/A 10/31/2014 N/A N/A 7/7/2015 Customer Initiated Withdrawal 10/1/2016 N/A N No
AA1-125 - Seaman 138kV OH Brown Withdrawn AEP 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1125_imp.pdf Document Posted Withdrawn N/A N/A 10/31/2014 N/A N/A 7/7/2015 Customer Initiated Withdrawal 10/1/2016 N/A N No
AA1-128 + Glen Lyn VA Giles Withdrawn Unknown 10 10 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1128_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1128_imp.pdf Document Posted Withdrawn N/A N/A 10/31/2014 N/A N/A 7/24/2015 Customer Initiated Withdrawal 10/1/2016 N/A N No
AA1-128 - Glen Lyn VA Giles Withdrawn AEP 10 10 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1128_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1128_imp.pdf Document Posted Withdrawn N/A N/A 10/31/2014 N/A N/A 7/24/2015 Customer Initiated Withdrawal 10/1/2016 N/A N No
AA1-130 + St. Claire 13kV OH Franklin Withdrawn Unknown 5 5 3 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1130_fea.pdf Document Posted Withdrawn Not Required Withdrawn N/A Not Required N/A N/A 10/31/2014 N/A N/A 3/31/2016 Customer Milestone Not Met 11/1/2015 N/A N No
AA1-130 - St. Claire 13kV OH Franklin Withdrawn AEP 5 5 3 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1130_fea.pdf Document Posted Withdrawn Not Required Withdrawn N/A Not Required N/A N/A 10/31/2014 N/A N/A 3/31/2016 Customer Milestone Not Met 11/1/2015 N/A N No
AA2-001 + Reusens 34.5kV VA Campbell Withdrawn Unknown 12.5 12.5 2 Capacity Generation Interconnection Hydro Withdrawn N/A N/A 11/3/2014 N/A N/A 9/10/2015 Customer Milestone Not Met 12/8/2014 N/A N No
AA2-001 - Reusens 34.5kV VA Campbell Withdrawn AEP 12.5 12.5 2 Capacity Generation Interconnection Hydro Withdrawn N/A N/A 11/3/2014 N/A N/A 9/10/2015 Customer Milestone Not Met 12/8/2014 N/A N No
AA2-041 + Tidd-Collier OH Jefferson Withdrawn Unknown 225 Energy Merchant Transmission AC Withdrawn N/A N/A 2/2/2015 N/A N/A 3/16/2015 Customer Initiated Withdrawal 6/1/2016 N/A S No
AA2-041 - Tidd-Collier OH Jefferson Withdrawn AEP 225 Energy Merchant Transmission AC Withdrawn N/A N/A 2/2/2015 N/A N/A 3/16/2015 Customer Initiated Withdrawal 6/1/2016 N/A S No
AA2-048 + Allenwood-Larrabee 34kV Lakewood-Farmingdale Road Solar Farm & Storage Facility NJ Monmouth Engineering and Procurement JCPL 7 7 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2048_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/aa2048_wmpa.pdf Not Required N/A N/A 2/18/2015 N/A N/A 8/31/2022 8/31/2022 8/31/2022 N/A N No
AA2-048 - Allenwood-Larrabee 34kV Lakewood-Farmingdale Road Solar Farm & Storage Facility NJ Monmouth Engineering and Procurement JCPL 7 7 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2048_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/aa2048_wmpa.pdf Not Required N/A N/A 2/18/2015 N/A N/A 12/31/2020 8/31/2022 8/31/2022 N/A N No
AA2-060 + Branchville-Sussex #1 34kV Plains Road Battery Storage Facility NJ Sussex Under Construction JCPL 6 6 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2060_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_060_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_060_csa.pdf Document Posted N/A N/A 2/27/2015 N/A N/A 6/30/2022 6/30/2022 N/A N No
AA2-060 - Branchville-Sussex #1 34kV Plains Road Battery Storage Facility NJ Sussex Under Construction JCPL 6 6 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2060_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_060_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_060_csa.pdf Document Posted N/A N/A 2/27/2015 N/A N/A 10/31/2021 6/30/2022 6/30/2022 N/A N No
AA2-061 + Branchville-Sussex #2 34.5kV Mohawk Battery Storage Facility NJ Sussex Under Construction JCPL 8 8 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2061_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_061_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_061_csa.pdf Document Posted N/A N/A 2/27/2015 N/A N/A 6/30/2022 6/30/2022 N/A N No
AA2-061 - Branchville-Sussex #2 34.5kV Mohawk Battery Storage Facility NJ Sussex Under Construction JCPL 8 8 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2061_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_061_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_061_csa.pdf Document Posted N/A N/A 2/27/2015 N/A N/A 10/31/2021 6/30/2022 6/30/2022 N/A N No
AA2-070 + Smith Mountain 138kV Smith Mountain Hydro VA Henry In Service Unknown 649 34 34 34 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2070_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_070_isa.pdf Document Posted N/A Not Required N/A N/A 2/28/2015 N/A N/A 12/31/2018 12/31/2018 12/31/2018 N/A N No
AA2-070 - Smith Mountain 138kV Smith Mountain Hydro VA Henry In Service AEP 649 34 34 34 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2070_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_070_isa.pdf Document Posted N/A Not Required N/A N/A 2/28/2015 N/A N/A 12/31/2018 12/31/2018 12/31/2018 N/A N No
AA2-075 + Southwest Lima 345kV OH Van Wert Withdrawn Unknown 250 250 33 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2075_fea.pdf Document Posted Withdrawn N/A N/A 3/16/2015 N/A N/A 1/27/2017 Customer Initiated Withdrawal 3/14/2022 N/A N No
AA2-075 - Southwest Lima 345kV OH Van Wert Withdrawn AEP 250 250 33 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2075_fea.pdf Document Posted Withdrawn N/A N/A 3/16/2015 N/A N/A 1/27/2017 Customer Initiated Withdrawal 3/14/2022 N/A N No
AA2-076 + Linwood 230kV Phillips Island CT1, CT2, CT3 & ST4 PA Delaware In Service PECO 919 0 18 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2076_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_076_isa.pdf Document Posted N/A Not Required N/A N/A 3/27/2015 N/A N/A 4/27/2021 N/A N No This project slid to the next queue
AA2-076 - Linwood 230kV Phillips Island CT1, CT2, CT3 & ST4 PA Delaware Canceled PECO 919 0 18 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2076_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_076_isa.pdf Document Posted N/A Not Required N/A N/A 3/27/2015 N/A N/A 4/27/2021 N/A N No This project slid to the next queue
AA2-098 + George Washington (Moundsville) WV Marshall Withdrawn Unknown 565 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2098_fea.pdf Document Posted Withdrawn N/A N/A 4/20/2015 N/A N/A 5/16/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AA2-098 - George Washington (Moundsville) WV Marshall Withdrawn AEP 565 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2098_fea.pdf Document Posted Withdrawn N/A N/A 4/20/2015 N/A N/A 5/16/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AA2-106 + Bluff Point 69kV IN Jay Withdrawn Unknown 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2106_imp.pdf Document Posted N/A N/A 4/24/2015 N/A N/A 3/13/2018 12/31/2018 12/31/2018 N/A N No
AA2-106 - Bluff Point 69kV IN Jay Withdrawn AEP 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2106_imp.pdf Document Posted N/A N/A 4/24/2015 N/A N/A 3/13/2018 12/31/2018 12/31/2018 N/A N No
AA2-116 + Cook-East Elkhart 345kV Indeck Niles Energy Center MI Cass Partially in Service - Under Construction Unknown 994 994 994 160 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2116_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2116_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_116_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_116_csa.pdf Document Posted N/A N/A 6/24/2021 4/28/2015 N/A N/A 12/27/2021 3/15/2022 3/15/2022 12/27/2021 N/A N No
AA2-116 - Cook-East Elkhart 345kV Indeck Niles Energy Center MI Cass Partially in Service - Under Construction AEP 994 994 994 160 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2116_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2116_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_116_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_116_csa.pdf Document Posted N/A N/A 6/24/2021 4/28/2015 N/A N/A 12/27/2021 3/15/2022 3/15/2022 12/27/2021 N/A N No
AA2-137 + Hanging Rock 765kV - Power Block 1 Cornu OH Lawrence In Service Unknown 670 45 45 45 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2137_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2137_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_137_isa.pdf Document Posted N/A Not Required N/A N/A 4/30/2015 N/A N/A 5/1/2019 12/2/2016 N/A N No
AA2-137 - Hanging Rock 765kV - Power Block 1 Cornu OH Lawrence In Service AEP 670 45 45 45 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2137_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2137_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_137_isa.pdf Document Posted N/A Not Required N/A N/A 4/30/2015 N/A N/A 5/1/2019 12/2/2016 N/A N No
AA2-138 + Hanging Rock 765kV - Power Block 2 Cornu OH Lawrence In Service Unknown 670 45 45 45 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2138_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2138_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_138_isa.pdf Document Posted N/A Not Required N/A N/A 4/30/2015 N/A N/A 5/1/2019 5/1/2019 12/2/2016 N/A N No
AA2-138 - Hanging Rock 765kV - Power Block 2 Cornu OH Lawrence In Service AEP 670 45 45 45 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2138_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2138_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_138_isa.pdf Document Posted N/A Not Required N/A N/A 4/30/2015 N/A N/A 5/1/2019 5/1/2019 12/2/2016 N/A N No
AA2-141 + Washington 345kV Washington Energy Facility OH Washington In Service Unknown 670 45 45 45 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2141_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_141_isa.pdf Document Posted N/A Not Required N/A N/A 4/30/2015 N/A N/A 8/31/2016 8/31/2016 12/2/2016 N/A N No
AA2-141 - Washington 345kV Washington Energy Facility OH Washington In Service AEP 670 45 45 45 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2141_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_141_isa.pdf Document Posted N/A Not Required N/A N/A 4/30/2015 N/A N/A 8/31/2016 8/31/2016 12/2/2016 N/A N No
AA2-148 + Madison-Tanners Creek 138kV IN Fayette Withdrawn Unknown 175 174.2 22.75 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2148_imp.pdf Document Posted Withdrawn N/A N/A 4/30/2015 N/A N/A 4/20/2021 12/31/2017 12/31/2017 N/A N No
AA2-148 - Madison-Tanners Creek 138kV IN Fayette Withdrawn AEP 175 174.2 22.75 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2148_imp.pdf Document Posted Withdrawn N/A N/A 4/30/2015 N/A N/A 4/20/2021 12/31/2017 12/31/2017 N/A N No
AA2-151 + Delano-Scioto Trail 138kV OH Ross Withdrawn Unknown 80 80 56 Capacity Generation Interconnection Solar Withdrawn N/A N/A 4/30/2015 N/A N/A 5/18/2015 6/30/2016 N/A N No
AA2-151 - Delano-Scioto Trail 138kV OH Ross Withdrawn AEP 80 80 56 Capacity Generation Interconnection Solar Withdrawn N/A N/A 4/30/2015 N/A N/A 5/18/2015 6/30/2016 N/A N No
AA2-186 + Forest 69kV OH Hardin Withdrawn Unknown 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2186_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2186_imp.pdf Document Posted N/A N/A 4/30/2015 N/A N/A 5/11/2017 Customer Initiated Withdrawal 12/1/2016 N/A N No
AA2-186 - Forest 69kV OH Hardin Withdrawn AEP 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2186_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2186_imp.pdf Document Posted N/A N/A 4/30/2015 N/A N/A 5/11/2017 Customer Initiated Withdrawal 12/1/2016 N/A N No
AB1-004 + Solar Holler N/A N/A Withdrawn Unknown 0.4 0.4 0 Energy Generation Interconnection Solar Withdrawn N/A N/A 5/4/2015 N/A N/A 5/19/2015 10/1/2015 N/A Y No
AB1-004 - Solar Holler N/A N/A Withdrawn AEP 0.4 0.4 0 Energy Generation Interconnection Solar Withdrawn N/A N/A 5/4/2015 N/A N/A 5/19/2015 10/1/2015 N/A Y No
AB1-006 + Meadow Lake 345kV Meadow Lake Wind Farm VI IN White In Service Unknown 200 200 26 200 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1006_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1006_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1006_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_006_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_006_csa.pdf Document Posted N/A N/A 5/22/2015 N/A N/A 12/31/2018 12/31/2018 12/21/2018 N/A N No
AB1-006 - Meadow Lake 345kV Meadow Lake Wind Farm VI IN White In Service AEP 200 200 26 200 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1006_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1006_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1006_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_006_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_006_csa.pdf Document Posted N/A N/A 5/22/2015 N/A N/A 12/31/2018 12/31/2018 12/21/2018 N/A N No
AB1-032 + Lee Station Southwest 12kV OH Athens Withdrawn Unknown 3.3 3.3 1.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1032_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1032_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 7/31/2015 N/A N/A 8/1/2017 Customer Initiated Withdrawal 12/31/2016 12/31/2016 N/A N No
AB1-032 - Lee Station Southwest 12kV OH Athens Withdrawn AEP 3.3 3.3 1.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1032_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1032_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 7/31/2015 N/A N/A 8/1/2017 Customer Initiated Withdrawal 12/31/2016 12/31/2016 N/A N No
AB1-055 + Balls Gap 34.5kV Balls Gap Battery Facility WV Cabell Deactivated Unknown 2 2 0 2 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1055_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab1055_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab1055_wmpa.pdf Not Required N/A N/A 8/31/2015 N/A N/A 12/1/2016 12/1/2016 3/1/2017 N/A N No
AB1-055 - Balls Gap 34.5kV Balls Gap Battery Facility WV Cabell Deactivated AEP 2 2 0 2 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1055_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab1055_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab1055_wmpa.pdf Not Required N/A N/A 8/31/2015 N/A N/A 12/1/2016 12/1/2016 3/1/2017 N/A N No
AB1-058 + Gavin Unit #1 765kV Gavin #1 OH Gallia In Service Unknown 1331 11 11 11 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1058_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1058_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_058_isa.pdf Document Posted N/A Not Required N/A N/A 8/31/2015 N/A N/A 12/31/2017 12/31/2017 12/31/2017 N/A N No
AB1-058 - Gavin Unit #1 765kV Gavin #1 OH Gallia In Service AEP 1331 11 11 11 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1058_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1058_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_058_isa.pdf Document Posted N/A Not Required N/A N/A 8/31/2015 N/A N/A 12/31/2017 12/31/2017 12/31/2017 N/A N No
AB1-060 + Cloverdale-Jacksons Ferry 765kV N/A N/A Withdrawn Unknown Energy Merchant Transmission AC Withdrawn N/A N/A 8/31/2015 N/A N/A 9/3/2015 Customer Initiated Withdrawal 6/1/2016 N/A S No
AB1-060 - Cloverdale-Jacksons Ferry 765kV N/A N/A Withdrawn AEP Energy Merchant Transmission AC Withdrawn N/A N/A 8/31/2015 N/A N/A 9/3/2015 Customer Initiated Withdrawal 6/1/2016 N/A S No
AB1-061 + Fieldale-Thornton-Franklin 138kV & Danville-East Danville 138kV N/A N/A Withdrawn Unknown Energy Merchant Transmission AC Withdrawn N/A N/A 8/31/2015 N/A N/A 9/3/2015 Customer Initiated Withdrawal 6/1/2016 N/A S No
AB1-061 - Fieldale-Thornton-Franklin 138kV & Danville-East Danville 138kV N/A N/A Withdrawn AEP Energy Merchant Transmission AC Withdrawn N/A N/A 8/31/2015 N/A N/A 9/3/2015 Customer Initiated Withdrawal 6/1/2016 N/A S No
AB1-080 + Dumont-Olive 345kV St. Joseph’s Energy Center, LLC IN St. Joseph In Service Unknown 715 40 40 40 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1080_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1080_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_080_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_080_csa.pdf Document Posted N/A N/A 7/1/2017 9/30/2015 N/A N/A 12/28/2017 4/29/2018 4/29/2018 4/1/2018 N/A N No
AB1-080 - Dumont-Olive 345kV St. Joseph’s Energy Center, LLC IN St. Joseph In Service AEP 715 40 40 40 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1080_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1080_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_080_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_080_csa.pdf Document Posted N/A N/A 7/1/2017 9/30/2015 N/A N/A 12/28/2017 4/29/2018 4/29/2018 4/1/2018 N/A N No
AB1-087 + Sullivan 345kV #1 IN Sullivan Withdrawn Unknown 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1087_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1087_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 9/30/2015 N/A N/A 4/14/2022 6/1/2019 N/A N No
AB1-087 - Sullivan 345kV #1 IN Sullivan Active AEP 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1087_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1087_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-088 + Sullivan 345kV #2 IN Sullivan Withdrawn Unknown 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1088_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1088_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 9/30/2015 N/A N/A 4/14/2022 6/1/2019 N/A N No
AB1-088 - Sullivan 345kV #2 IN Sullivan Active AEP 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1088_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1088_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-091 + Davis Creek 345kV IL Kankakee Withdrawn ComEd 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1091_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1091_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 9/30/2015 N/A N/A 4/11/2022 6/1/2019 N/A N No
AB1-091 - Davis Creek 345kV IL Kankakee Active ComEd 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1091_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1091_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-096 + Carroll-Mt. Airy 34.5kV Union Bridge Solar Facility MD Carroll In Service APS 9.9 8.2 3.1 8.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf Document Posted N/A N/A 10/7/2015 N/A N/A 1/28/2022 2/28/2022 2/28/2022 4/21/2022 N/A N No
AB1-096 - Carroll-Mt. Airy 34.5kV Union Bridge Solar Facility MD Carroll Under Construction APS 9.9 8.2 3.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf Document Posted N/A N/A 10/7/2015 N/A N/A 1/28/2022 2/28/2022 2/28/2022 N/A N No
AB1-101 + Cloverdale-Jacksons Ferry 765kV N/A N/A Withdrawn Unknown Energy Merchant Transmission AC Not Required https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab1101_imp.pdf Document Posted N/A N/A 10/16/2015 N/A N/A 9/20/2016 6/1/2016 N/A S No
AB1-101 - Cloverdale-Jacksons Ferry 765kV N/A N/A Withdrawn AEP Energy Merchant Transmission AC Not Required https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab1101_imp.pdf Document Posted N/A N/A 10/16/2015 N/A N/A 9/20/2016 6/1/2016 N/A S No
AB1-103 + Fieldale-Thornton & Danville-E. Danville 138kV CMN N/A N/A Withdrawn Unknown Energy Merchant Transmission AC Not Required https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab1103_imp.pdf Document Posted N/A N/A 10/16/2015 N/A N/A 9/20/2016 6/1/2016 N/A S No
AB1-103 - Fieldale-Thornton & Danville-E. Danville 138kV CMN N/A N/A Withdrawn AEP Energy Merchant Transmission AC Not Required https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ab1103_imp.pdf Document Posted N/A N/A 10/16/2015 N/A N/A 9/20/2016 6/1/2016 N/A S No
AB1-109 + Mountaineer Mountaineer #1 WV Unknown Partially in Service - Under Construction Unknown 1356 36 36 36 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1109_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_109_isa.pdf Document Posted N/A Not Required N/A N/A 10/26/2015 N/A N/A 6/1/2021 6/1/2021 12/31/2018 N/A N No
AB1-109 - Mountaineer Mountaineer #1 WV Unknown Partially in Service - Under Construction AEP 1356 36 36 36 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1109_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_109_isa.pdf Document Posted N/A Not Required N/A N/A 10/26/2015 N/A N/A 6/1/2021 6/1/2021 12/31/2018 N/A N No
AB1-122 + Kendall-Tazewell & Dresden-Mole Creek Three Rivers Energy Center IL Grundy Under Construction ComEd 1160 1150 1150 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1122_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1122_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1122_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_122_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_122_csa.pdf Document Posted N/A N/A 7/1/2022 10/29/2015 N/A N/A 1/2/2023 5/30/2023 5/30/2023 N/A N No
AB1-122 - Kendall-Tazewell & Dresden-Mole Creek Three Rivers Energy Center IL Grundy Under Construction ComEd 1160 1150 1150 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1122_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1122_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1122_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_122_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_122_csa.pdf Document Posted N/A N/A 10/29/2015 N/A N/A 1/2/2023 5/30/2023 5/30/2023 N/A N No
AB1-132 + Thelma 230kV Gaston Green Acres Solar NC Northhampton Under Construction Dominion 120 120 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1132_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1132_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_132_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_132_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 2/1/2023 3/31/2023 3/31/2023 N/A N No
AB1-132 - Thelma 230kV Gaston Green Acres Solar NC Northhampton Engineering and Procurement Dominion 120 120 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1132_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1132_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_132_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_132_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 2/1/2023 3/31/2023 3/31/2023 N/A N No
AB1-136 + Picway Solar 138kV OH Franklin Withdrawn Unknown 80 80 56 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/30/2015 N/A N/A 11/17/2015 Customer Milestone Not Met 11/1/2016 N/A N No
AB1-136 - Picway Solar 138kV OH Franklin Withdrawn AEP 80 80 56 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/30/2015 N/A N/A 11/17/2015 Customer Milestone Not Met 11/1/2016 N/A N No
AB1-140 + George Washington 138kV I WV Marshall Withdrawn Unknown 575 10 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1140_fea.pdf Document Posted Withdrawn N/A N/A 10/30/2015 N/A N/A 5/16/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AB1-140 - George Washington 138kV I WV Marshall Withdrawn AEP 575 10 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1140_fea.pdf Document Posted Withdrawn N/A N/A 10/30/2015 N/A N/A 5/16/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AB1-143 + George Washington 138kV II WV Marshall Withdrawn Unknown 585 10 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1143_fea.pdf Document Posted Withdrawn N/A N/A 10/30/2015 N/A N/A 5/16/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AB1-143 - George Washington 138kV II WV Marshall Withdrawn AEP 585 10 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1143_fea.pdf Document Posted Withdrawn N/A N/A 10/30/2015 N/A N/A 5/16/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AB1-157 + George Washington 138kV III WV Marshall Withdrawn Unknown 595 10 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1157_fea.pdf Document Posted Withdrawn N/A N/A 10/30/2015 N/A N/A 5/16/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AB1-157 - George Washington 138kV III WV Marshall Withdrawn AEP 595 10 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1157_fea.pdf Document Posted Withdrawn N/A N/A 10/30/2015 N/A N/A 5/16/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AB1-158 + Thornville 34.5kV OH Perry Withdrawn Unknown 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/30/2015 N/A N/A 11/12/2015 Customer Initiated Withdrawal 10/31/2017 N/A N No
AB1-158 - Thornville 34.5kV OH Perry Withdrawn AEP 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/30/2015 N/A N/A 11/12/2015 Customer Initiated Withdrawal 10/31/2017 N/A N No
AB1-167 + South Cumberland 69kV OH Noble Withdrawn Unknown 50 50 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1167_fea.pdf Document Posted Withdrawn N/A N/A 10/30/2015 N/A N/A 11/30/2017 8/31/2017 N/A N No
AB1-167 - South Cumberland 69kV OH Noble Withdrawn AEP 50 50 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1167_fea.pdf Document Posted Withdrawn N/A N/A 10/30/2015 N/A N/A 11/30/2017 8/31/2017 N/A N No
AB1-173 + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 5/23/2022 4/1/2022 4/1/2022 N/A N No
AB1-173 - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 3/11/2022 4/1/2022 4/1/2022 N/A N No
AB1-173A + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 39.6 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 5/23/2022 4/1/2022 4/1/2022 N/A N No
AB1-173A - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 39.6 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 3/11/2022 4/1/2022 4/1/2022 N/A N No
AB1-174 + Thornville12kV Thornville 12kV OH Perry Withdrawn Unknown 10 10 6.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1174_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab1174_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab1174_wmpa.pdf Not Required N/A N/A 10/30/2015 N/A N/A 2/7/2018 12/31/2018 12/31/2018 N/A N No
AB1-174 - Thornville12kV Thornville 12kV OH Perry Withdrawn AEP 10 10 6.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1174_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab1174_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab1174_wmpa.pdf Not Required N/A N/A 10/30/2015 N/A N/A 2/7/2018 12/31/2018 12/31/2018 N/A N No
AB1-180 + Pine View 12kV Seven Islands Environmental Solutions, LLC WV Unknown In Service Unknown 3.2 3.2 2.4 3.2 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1180_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1180_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab1180_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab1180_wmpa.pdf Not Required N/A N/A 10/30/2015 N/A N/A 12/31/2016 12/31/2016 3/7/2017 N/A N No
AB1-180 - Pine View 12kV Seven Islands Environmental Solutions, LLC WV Unknown In Service AEP 3.2 3.2 2.4 3.2 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1180_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1180_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab1180_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab1180_wmpa.pdf Not Required N/A N/A 10/30/2015 N/A N/A 12/31/2016 12/31/2016 3/7/2017 N/A N No
AB2-010 + Saltville-Holston 34.5kV - Phase I Saltville-Holston 34.5kV Solar Facility VA Smyth Withdrawn Unknown 5 5 2.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2010_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2010_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2010_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2010_wmpa.pdf Not Required N/A N/A 12/1/2015 N/A N/A 2/5/2019 12/1/2017 12/1/2017 N/A N No
AB2-010 - Saltville-Holston 34.5kV - Phase I Saltville-Holston 34.5kV Solar Facility VA Smyth Withdrawn AEP 5 5 2.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2010_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2010_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2010_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2010_wmpa.pdf Not Required N/A N/A 12/1/2015 N/A N/A 2/5/2019 12/1/2017 12/1/2017 N/A N No
AB2-011 + Saltville-Holstone 34.5kV - Phase II Saltville-Holston 34.5kV Solar Facility VA Smyth Withdrawn Unknown 5 5 2.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2011_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2011_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2011_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2011_wmpa.pdf Not Required N/A N/A 12/1/2015 N/A N/A 2/5/2019 12/1/2017 12/1/2017 N/A N No
AB2-011 - Saltville-Holstone 34.5kV - Phase II Saltville-Holston 34.5kV Solar Facility VA Smyth Withdrawn AEP 5 5 2.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2011_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2011_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2011_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2011_wmpa.pdf Not Required N/A N/A 12/1/2015 N/A N/A 2/5/2019 12/1/2017 12/1/2017 N/A N No
AB2-014 + Lakewood 230kV Lakewood Cogeneration Plant NJ Ocean In Service JCPL 280 0 8.1 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2014_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_014_isa.pdf Document Posted N/A Not Required N/A N/A 12/15/2015 N/A N/A 9/30/2017 9/30/2017 11/16/2016 N/A N No
AB2-014 - Lakewood 230kV Lakewood Cogeneration Plant NJ Ocean Partially in Service - Under Construction JCPL 280 0 8.1 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2014_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_014_isa.pdf Document Posted N/A Not Required N/A N/A 12/15/2015 N/A N/A 9/30/2017 9/30/2017 11/16/2016 N/A N No
AB2-016 + Maddox Creek 345kV OH Van Wert Withdrawn Unknown 100 100 13 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2016_imp.pdf Document Posted N/A N/A 12/28/2015 N/A N/A 3/9/2018 12/31/2019 N/A N No
AB2-016 - Maddox Creek 345kV OH Van Wert Withdrawn AEP 100 100 13 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2016_imp.pdf Document Posted N/A N/A 12/28/2015 N/A N/A 3/9/2018 12/31/2019 N/A N No
AB2-028 + Fall Creek-Desoto 345kV IN Henry Withdrawn Unknown 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2028_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2028_imp.pdf Document Posted Withdrawn N/A N/A 2/10/2016 N/A N/A 6/17/2021 10/31/2018 N/A N No
AB2-028 - Fall Creek-Desoto 345kV IN Henry Withdrawn AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2028_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2028_imp.pdf Document Posted Withdrawn N/A N/A 2/10/2016 N/A N/A 6/17/2021 10/31/2018 N/A N No
AB2-031 + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 59.6 20 13.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf Document Posted N/A N/A 2/11/2016 N/A N/A 5/23/2022 4/1/2022 4/1/2022 N/A N No
AB2-031 - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 59.6 20 13.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf Document Posted N/A N/A 2/11/2016 N/A N/A 3/11/2022 4/1/2022 4/1/2022 N/A N No
AB2-049 + Gloucester Township 12kV GEMS Landfill Solar NJ Camden In Service AEC 3 3 1.14 3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2049_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2049_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2049_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2049_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2049_wmpa.pdf Not Required N/A N/A 3/4/2016 N/A N/A 3/18/2022 6/30/2022 6/30/2022 4/14/2022 N/A N No
AB2-049 - Gloucester Township 12kV GEMS Landfill Solar NJ Camden Engineering and Procurement AEC 3 3 1.14 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2049_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2049_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2049_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab2049_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ab2049_wmpa.pdf Not Required N/A N/A 3/4/2016 N/A N/A 3/18/2022 6/30/2022 6/30/2022 N/A N No
AB2-064 + Southwest Lima 345kV OH Van Wert Withdrawn Unknown 40 40 15.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2064_fea.pdf Document Posted N/A N/A 3/30/2016 N/A N/A 9/22/2016 12/31/2018 N/A N No
AB2-064 - Southwest Lima 345kV OH Van Wert Withdrawn AEP 40 40 15.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2064_fea.pdf Document Posted N/A N/A 3/30/2016 N/A N/A 9/22/2016 12/31/2018 N/A N No
AB2-065 + Madison-Tanners Creek 138kV IN Rush Withdrawn Unknown 124.2 124.2 16 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2065_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2065_imp.pdf Document Posted N/A N/A 3/30/2016 N/A N/A 2/27/2018 12/31/2019 N/A N No
AB2-065 - Madison-Tanners Creek 138kV IN Rush Withdrawn AEP 124.2 124.2 16 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2065_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2065_imp.pdf Document Posted N/A N/A 3/30/2016 N/A N/A 2/27/2018 12/31/2019 N/A N No
AB2-067 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction Unknown 1100 1100 1100 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2067_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2067_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_067_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_067_csa.pdf Document Posted N/A N/A 9/23/2021 3/31/2016 N/A N/A 8/11/2022 12/31/2022 12/31/2022 N/A N No
AB2-067 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1100 1100 1100 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2067_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2067_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_067_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_067_csa.pdf Document Posted N/A N/A 9/23/2021 3/31/2016 N/A N/A 5/11/2022 12/31/2022 12/31/2022 N/A N No
AB2-070 + Mt. Pulaski-Brokaw Alta Farms II IL DeWitt Under Construction ComEd 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2070_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2070_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_070_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_070_csa.pdf Document Posted N/A N/A 11/1/2022 3/31/2016 N/A N/A 12/1/2022 4/16/2023 4/16/2023 N/A N No
AB2-070 - Mt. Pulaski-Brokaw Alta Farms II IL DeWitt Under Construction ComEd 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2070_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2070_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_070_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_070_csa.pdf Document Posted N/A N/A 10/10/2022 3/31/2016 N/A N/A 10/17/2022 4/16/2023 4/16/2023 N/A N No
AB2-077 + Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Under Construction Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2077_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2077_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_077_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_077_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-077 - Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2077_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2077_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_077_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_077_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-078 + Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Under Construction Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2078_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2078_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2078_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_078_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_078_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-078 - Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2078_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2078_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2078_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_078_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_078_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-079 + Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Under Construction Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_079_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-079 - Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_079_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-080 + Marysville-Flatlick 765kV OH Pickaway Withdrawn Unknown 1200 1200 1200 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2080_fea.pdf Document Posted N/A N/A 4/12/2016 N/A N/A 10/4/2016 Customer Milestone Not Met 6/1/2021 N/A N No
AB2-080 - Marysville-Flatlick 765kV OH Pickaway Withdrawn AEP 1200 1200 1200 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2080_fea.pdf Document Posted N/A N/A 4/12/2016 N/A N/A 10/4/2016 Customer Milestone Not Met 6/1/2021 N/A N No
AB2-083 + Delano 138kV OH Ross Withdrawn Unknown 40 40 27.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2083_imp.pdf Document Posted Withdrawn N/A N/A 4/14/2016 N/A N/A 3/4/2021 10/31/2017 N/A N No
AB2-083 - Delano 138kV OH Ross Withdrawn AEP 40 40 27.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2083_imp.pdf Document Posted Withdrawn N/A N/A 4/14/2016 N/A N/A 3/4/2021 10/31/2017 N/A N No
AB2-085 + Adams 138kV Stone Branch Solar OH Adams Suspended Unknown 49.9 49.9 33.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2085_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2085_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_085_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_085_csa.pdf Document Posted N/A N/A 4/18/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AB2-085 - Adams 138kV Stone Branch Solar OH Adams Engineering and Procurement AEP 49.9 49.9 33.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2085_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2085_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_085_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_085_csa.pdf Document Posted N/A N/A 4/18/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AB2-093 + Ormet 138kV Hannibal Port Power Project OH Monroe In Service Unknown 485 485 485 485 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2093_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_093_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_093_csa.pdf Document Posted N/A N/A 12/15/2020 4/26/2016 N/A N/A 5/22/2021 9/13/2021 9/13/2021 6/1/2021 N/A N No
AB2-093 - Ormet 138kV Hannibal Port Power Project OH Monroe In Service AEP 485 485 485 485 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2093_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_093_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_093_csa.pdf Document Posted N/A N/A 12/15/2020 4/26/2016 N/A N/A 5/22/2021 9/13/2021 9/13/2021 6/1/2021 N/A N No
AB2-099 + Ahoskie 34.5kV Colice Hall Solar NC Hertford Suspended Dominion 5 5 3.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2099_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2099_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_099_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_099_csa.pdf Document Posted N/A N/A 5/1/2020 4/27/2016 N/A N/A 1/31/2023 3/31/2020 3/31/2020 N/A N No
AB2-099 - Ahoskie 34.5kV Colice Hall Solar NC Hertford Suspended Dominion 5 5 3.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2099_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2099_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_099_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_099_csa.pdf Document Posted N/A N/A 5/1/2020 4/27/2016 N/A N/A 6/1/2020 3/31/2020 3/31/2020 N/A N No
AB2-101 + George Washington 138kV WV Marshall Withdrawn Unknown 626 31 31 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2101_fea.pdf Document Posted Withdrawn N/A N/A 4/27/2016 N/A N/A 5/16/2017 Customer Initiated Withdrawal 4/1/2019 N/A N No
AB2-101 - George Washington 138kV WV Marshall Withdrawn AEP 626 31 31 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2101_fea.pdf Document Posted Withdrawn N/A N/A 4/27/2016 N/A N/A 5/16/2017 Customer Initiated Withdrawal 4/1/2019 N/A N No
AB2-103 + Seaman 138kV OH Adams Withdrawn Unknown 40 40 27.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2103_imp.pdf Document Posted N/A N/A 4/28/2016 N/A N/A 3/26/2018 10/31/2017 N/A N No
AB2-103 - Seaman 138kV OH Adams Withdrawn AEP 40 40 27.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2103_imp.pdf Document Posted N/A N/A 4/28/2016 N/A N/A 3/26/2018 10/31/2017 N/A N No
AB2-109 + Reusens 34.5kV Reusens Hydro Electric Generating Plant VA City of Lynchburg In Service Unknown 12.5 12.5 4 12.5 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2109_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_109_isa.pdf Document Posted N/A Not Required N/A N/A 4/28/2016 N/A N/A 3/31/2018 3/31/2018 11/29/2017 N/A N No
AB2-109 - Reusens 34.5kV Reusens Hydro Electric Generating Plant VA City of Lynchburg In Service AEP 12.5 12.5 4 12.5 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2109_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_109_isa.pdf Document Posted N/A Not Required N/A N/A 4/28/2016 N/A N/A 3/31/2018 3/31/2018 11/29/2017 N/A N No
AB2-132 + Haumesser Road Lee-DeKalb Wind Energy Center IL Lee Engineering and Procurement ComEd 240 0 2.2 Capacity Generation Interconnection Wind; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2132_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_132_isa.pdf Document Posted N/A N/A N/A 4/29/2016 N/A N/A 9/1/2023 9/1/2023 N/A N No
AB2-132 - Haumesser Road IL Lee Active ComEd 240 0 2.2 Capacity Generation Interconnection Wind; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2132_imp.pdf Document Posted Not Required N/A N/A 4/29/2016 N/A N/A 12/15/2016 N/A N No
AB2-135 + Church-Kent 69kV Jones Farm Lane Solar MD Queen Anne’s Engineering and Procurement DPL 64 64 29.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2135_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2135_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_135_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_135_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/1/2023 12/30/2022 12/30/2022 N/A N No
AB2-135 - Church-Kent 69kV Jones Farm Lane Solar MD Queen Anne’s Engineering and Procurement DPL 64 64 29.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2135_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2135_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_135_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_135_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/30/2022 12/30/2022 N/A N No
AB2-136 + Cambridge-West Cambridge 69kV Egypt Road Solar MD Dorchester Engineering and Procurement DPL 51.1 51.1 24.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2136_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2136_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_136_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_136_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/1/2023 12/30/2022 12/30/2022 N/A N No
AB2-136 - Cambridge-West Cambridge 69kV Egypt Road Solar MD Dorchester Engineering and Procurement DPL 51.1 51.1 24.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2136_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2136_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_136_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_136_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/30/2022 12/30/2022 N/A N No
AB2-137 + St. Clair 13.2kV OH Franklin Withdrawn Unknown 4 4 1 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 4/29/2016 N/A N/A 9/30/2016 Customer Initiated Withdrawal 11/1/2017 N/A N No
AB2-137 - St. Clair 13.2kV OH Franklin Withdrawn AEP 4 4 1 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 4/29/2016 N/A N/A 9/30/2016 Customer Initiated Withdrawal 11/1/2017 N/A N No
AB2-141 + George Washington 138kV WV Marshall Withdrawn Unknown 394 394 388.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2141_imp.pdf Document Posted Withdrawn N/A N/A 4/29/2016 N/A N/A 2/27/2019 4/1/2019 N/A N No
AB2-141 - George Washington 138kV WV Marshall Withdrawn AEP 394 394 388.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2141_imp.pdf Document Posted Withdrawn N/A N/A 4/29/2016 N/A N/A 2/27/2019 4/1/2019 N/A N No
AB2-145 + Axton 138kV VA Henry Withdrawn Unknown 572 572 572 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2145_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2145_imp.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 2/23/2018 1/1/2021 N/A N No
AB2-145 - Axton 138kV VA Henry Withdrawn AEP 572 572 572 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2145_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2145_imp.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 2/23/2018 1/1/2021 N/A N No
AB2-146 + Axton 138kV VA Henry Withdrawn Unknown 382 382 382 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2146_fea.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 10/3/2016 Customer Initiated Withdrawal 1/1/2021 N/A N No
AB2-146 - Axton 138kV VA Henry Withdrawn AEP 382 382 382 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2146_fea.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 10/3/2016 Customer Initiated Withdrawal 1/1/2021 N/A N No
AB2-160 + Reams 115kV Reams Solar VA Dinwiddie Suspended Dominion 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AB2-160 - Reams 115kV Reams Solar VA Dinwiddie Engineering and Procurement Dominion 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AB2-161 + Waverly #2 DP 115kV Waverly Solar VA Sussex Engineering and Procurement Dominion 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf Document Posted N/A N/A 4/30/2016 N/A N/A 9/16/2022 9/16/2022 N/A N No
AB2-161 - Waverly #2 DP 115kV Waverly Solar VA Sussex Engineering and Procurement Dominion 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 9/16/2022 9/16/2022 N/A N No
AB2-169 + Pantago-Five Points 115kV Wilkinson Solar Energy Center NC Hyde In Service Dominion 74 74 39 74 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2169_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2169_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_169_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_169_csa.pdf Document Posted N/A N/A 10/10/2019 4/29/2016 N/A N/A 11/18/2019 6/30/2021 6/30/2021 11/20/2019 N/A N No
AB2-169 - Pantago-Five Points 115kV Wilkinson Solar Energy Center NC Hyde Partially in Service - Under Construction Dominion 74 74 39 74 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2169_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2169_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_169_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_169_csa.pdf Document Posted N/A N/A 10/10/2019 4/29/2016 N/A N/A 11/18/2019 6/30/2021 6/30/2021 11/20/2019 N/A N No
AB2-170 + East Lima-Marysville 345kV Hardin Energy Center OH Hardin In Service Unknown 150 130 49.4 130 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2170_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2170_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_170_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_170_csa.pdf Document Posted N/A N/A 8/7/2020 4/29/2016 N/A N/A 10/13/2020 6/1/2021 6/1/2021 10/13/2020 N/A N No
AB2-170 - East Lima-Marysville 345kV Hardin Energy Center OH Hardin In Service AEP 150 130 49.4 130 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2170_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2170_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_170_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_170_csa.pdf Document Posted N/A N/A 8/7/2020 4/29/2016 N/A N/A 10/13/2020 6/1/2021 6/1/2021 10/13/2020 N/A N No
AC1-001 + Delano 138kV Salt City Solar OH Ross Engineering and Procurement Unknown 49.9 49.9 33.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1001_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1001_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_001_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_001_csa.pdf Document Posted N/A N/A 5/5/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AC1-001 - Delano 138kV Salt City Solar OH Ross Engineering and Procurement AEP 49.9 49.9 33.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1001_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1001_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_001_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_001_csa.pdf Document Posted N/A N/A 5/5/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AC1-012 + Rupert 34.5kV Tri-State Solar WV Greenbrier Withdrawn Unknown 5 5 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1012_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1012_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1012_wmpa.pdf Not Required N/A N/A 6/23/2016 N/A N/A 7/30/2018 10/31/2017 10/31/2017 N/A Y No
AC1-012 - Rupert 34.5kV Tri-State Solar WV Greenbrier Withdrawn AEP 5 5 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1012_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1012_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1012_wmpa.pdf Not Required N/A N/A 6/23/2016 N/A N/A 7/30/2018 10/31/2017 10/31/2017 N/A Y No
AC1-023 + Southwest Lima-East Lima 345kV OH Allen Withdrawn Unknown 120 120 84 Capacity Generation Interconnection Solar Withdrawn N/A N/A 7/14/2016 N/A N/A 8/2/2016 Customer Milestone Not Met 12/31/2017 N/A N No
AC1-023 - Southwest Lima-East Lima 345kV OH Allen Withdrawn AEP 120 120 84 Capacity Generation Interconnection Solar Withdrawn N/A N/A 7/14/2016 N/A N/A 8/2/2016 Customer Milestone Not Met 12/31/2017 N/A N No
AC1-024 + Frazeysburg 138kV OH Muskingum Withdrawn Unknown 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1024_fea.pdf Document Posted N/A N/A 7/14/2016 N/A N/A 4/21/2017 Customer Milestone Not Met 12/1/2018 N/A N No
AC1-024 - Frazeysburg 138kV OH Muskingum Withdrawn AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1024_fea.pdf Document Posted N/A N/A 7/14/2016 N/A N/A 4/21/2017 Customer Milestone Not Met 12/1/2018 N/A N No
AC1-034 + Heartsease DP - Mayo Dunbar 115kV Edgecome Solar Energy Center NC Edgecombe Engineering and Procurement Dominion 75 75 42.75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1034_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1034_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1034_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_034_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_034_csa.pdf Document Posted N/A N/A 8/10/2016 N/A N/A 7/1/2023 5/31/2023 5/31/2023 N/A N No
AC1-034 - Heartsease DP - Mayo Dunbar 115kV Edgecome Solar Energy Center NC Edgecombe Engineering and Procurement Dominion 75 75 42.75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1034_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1034_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1034_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_034_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_034_csa.pdf Document Posted N/A N/A 8/10/2016 N/A N/A 5/31/2023 5/31/2023 N/A N No
AC1-038 + Big Sandy 1 138kV Big Sandy #1 KY Lawrence In Service Unknown 293 13 13 13 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1038_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_038_isa.pdf Document Posted N/A Not Required N/A N/A 8/30/2016 N/A N/A 10/1/2018 10/1/2018 5/30/2016 N/A N No
AC1-038 - Big Sandy 1 138kV Big Sandy #1 KY Lawrence In Service AEP 293 13 13 13 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1038_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_038_isa.pdf Document Posted N/A Not Required N/A N/A 8/30/2016 N/A N/A 10/1/2018 10/1/2018 5/30/2016 N/A N No
AC1-040 + Rockport-Duff-Coleman 345 kV IN Spencer Withdrawn Unknown 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1040_imp.pdf Document Posted Withdrawn N/A N/A 8/31/2016 N/A N/A 11/7/2018 12/31/2020 N/A N No
AC1-040 - Rockport-Duff-Coleman 345 kV IN Spencer Withdrawn AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1040_imp.pdf Document Posted Withdrawn N/A N/A 8/31/2016 N/A N/A 11/7/2018 12/31/2020 N/A N No
AC1-042 + Altavista-Mt. Airy 69kV Sycamore Solar I VA Pittsylvania Under Construction Dominion 42 42 15.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1042_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1042_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1042_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_042_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_042_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 6/30/2022 12/1/2022 12/1/2022 N/A N No
AC1-042 - Altavista-Mt. Airy 69kV Sycamore Solar I VA Pittsylvania Under Construction Dominion 42 42 15.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1042_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1042_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1042_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_042_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_042_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 4/15/2022 12/1/2022 12/1/2022 N/A N No
AC1-044 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction Unknown 1650 550 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1044_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_044_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_044_csa.pdf Document Posted N/A N/A 9/23/2021 8/31/2016 N/A N/A 8/11/2022 12/31/2022 12/31/2022 N/A N No
AC1-044 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1650 550 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1044_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_044_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_044_csa.pdf Document Posted N/A N/A 9/23/2021 8/31/2016 N/A N/A 5/11/2022 12/31/2022 12/31/2022 N/A N No
AC1-048 + Germantown 115kV Brookview Solar I PA Adams Engineering and Procurement ME 35 35 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1048_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1048_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_048_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_048_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 12/31/2023 12/31/2023 N/A N No
AC1-048 - Germantown 115kV Brookview Solar I PA Adams Engineering and Procurement ME 35 35 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1048_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1048_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_048_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_048_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 12/31/2020 12/31/2020 N/A N No
AC1-051 + Willard-S. Greenwich 69kV OH Huron Withdrawn Unknown 60 60 7.8 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1051_imp.pdf Document Posted Withdrawn https://www.pjm.com/pub/planning/project-queues/isa/ac1_051_isa2.pdf Interim Study N/A N/A N/A 8/31/2016 N/A N/A 1/12/2021 12/31/2017 N/A N No
AC1-051 - Willard-S. Greenwich 69kV OH Huron Withdrawn AEP 60 60 7.8 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1051_imp.pdf Document Posted Withdrawn https://www.pjm.com/pub/planning/project-queues/isa/ac1_051_isa2.pdf Interim Study N/A N/A N/A 8/31/2016 N/A N/A 1/12/2021 12/31/2017 N/A N No
AC1-053 + Lanesville-Brokaw IL Logan Active ComEd 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1053_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1053_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1053_fac.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 12/1/2018 N/A N No
AC1-053 - Lanesville-Brokaw IL Logan Active ComEd 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1053_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1053_imp.pdf Document Posted In Progress N/A N/A 8/31/2016 N/A N/A 12/1/2018 N/A N No
AC1-059 + Desoto-Tanners Creek 345kV IN Fayette Withdrawn Unknown 300 300 39 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1059_imp.pdf Document Posted N/A N/A 9/13/2016 N/A N/A 6/5/2018 12/15/2018 N/A N No
AC1-059 - Desoto-Tanners Creek 345kV IN Fayette Withdrawn AEP 300 300 39 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1059_imp.pdf Document Posted N/A N/A 9/13/2016 N/A N/A 6/5/2018 12/15/2018 N/A N No
AC1-068 + Atlanta 69kV I Pickaway County Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1068_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1068_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1068_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_068_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_068_csa.pdf Document Posted N/A N/A 9/26/2016 N/A N/A 12/1/2021 7/1/2025 7/1/2025 N/A N No
AC1-068 - Atlanta 69kV I Pickaway County Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1068_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1068_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1068_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_068_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_068_csa.pdf Document Posted N/A N/A 9/26/2016 N/A N/A 12/1/2021 12/31/2022 12/31/2022 N/A N No
AC1-069 + Atlanta 69kV II Pickaway County II Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1069_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1069_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1069_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_069_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_069_csa.pdf Document Posted N/A N/A 9/26/2016 N/A N/A 12/1/2021 7/1/2025 7/1/2025 N/A N No
AC1-069 - Atlanta 69kV II Pickaway County II Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1069_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1069_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1069_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_069_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_069_csa.pdf Document Posted N/A N/A 9/26/2016 N/A N/A 12/1/2021 12/31/2022 12/31/2022 N/A N No
AC1-076 + Locust Grove-Paytes 115kV Pine Glade Solar VA Orange Under Construction Dominion 62.5 62.5 23.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1076_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_076_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_076_csa.pdf Document Posted N/A N/A 10/1/2022 9/30/2016 N/A N/A 4/1/2023 3/30/2023 3/30/2023 N/A N No
AC1-076 - Locust Grove-Paytes 115kV Pine Glade Solar VA Orange Engineering and Procurement Dominion 62.5 62.5 23.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1076_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_076_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_076_csa.pdf Document Posted N/A N/A 10/1/2022 9/30/2016 N/A N/A 10/3/2022 3/30/2023 3/30/2023 N/A N No
AC1-082 + Ravenswood-Hemlock 69kV Great Bend OH Meigs Engineering and Procurement Unknown 48 48 29 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1082_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1082_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1082_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_082_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_082_csa.pdf Document Posted N/A N/A 9/30/2016 N/A N/A 12/31/2023 12/31/2023 N/A N No
AC1-082 - Ravenswood-Hemlock 69kV Great Bend OH Meigs Engineering and Procurement AEP 48 48 29 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1082_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1082_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1082_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_082_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_082_csa.pdf Document Posted N/A N/A 9/30/2016 N/A N/A 12/31/2023 12/31/2023 N/A N No
AC1-083 + Smith Mountain-Bearskin 138kV Maplewood Solar VA Pittsylvania Under Construction Unknown 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1083_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1083_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_083_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_083_csa.pdf Document Posted N/A N/A 12/15/2021 9/30/2016 N/A N/A 5/20/2022 5/20/2022 5/20/2022 N/A N No
AC1-083 - Smith Mountain-Bearskin 138kV Maplewood Solar VA Pittsylvania Under Construction AEP 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1083_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1083_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_083_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_083_csa.pdf Document Posted N/A N/A 12/15/2021 9/30/2016 N/A N/A 12/28/2021 4/1/2022 4/1/2022 N/A N No
AC1-085 + Stuart-Clinton 345kV Highland County Solar OH Highland Partially in Service - Under Construction Dayton 400 400 152 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1085_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1085_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_085_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_085_csa.pdf Document Posted N/A N/A 9/30/2016 N/A N/A 11/1/2020 12/31/2022 12/31/2022 N/A N No
AC1-085 - Stuart-Clinton 345kV Highland County Solar OH Highland Under Construction Dayton 400 400 152 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1085_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1085_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_085_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_085_csa.pdf Document Posted N/A N/A 9/30/2016 N/A N/A 11/1/2020 3/31/2022 3/31/2022 N/A N No
AC1-088 + Strawton 138kV IN Madison Withdrawn Unknown 20 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1088_imp.pdf Document Posted N/A N/A 10/12/2016 N/A N/A 5/8/2018 12/31/2017 N/A BB No
AC1-088 - Strawton 138kV IN Madison Withdrawn AEP 20 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1088_imp.pdf Document Posted N/A N/A 10/12/2016 N/A N/A 5/8/2018 12/31/2017 N/A BB No
AC1-089 + Hillsboro-Wildcat 138kV Willowbrook Solar OH Highland Engineering and Procurement Unknown 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1089_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1089_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_089_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_089_csa.pdf Document Posted N/A N/A 10/13/2016 N/A N/A 12/20/2022 12/20/2022 N/A N No
AC1-089 - Hillsboro-Wildcat 138kV Willowbrook Solar OH Highland Engineering and Procurement AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1089_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1089_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_089_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_089_csa.pdf Document Posted N/A N/A 10/13/2016 N/A N/A 12/20/2022 12/20/2022 N/A N No
AC1-096 + Marysville-Flatlick 765kV OH Pickaway Withdrawn Unknown 1277 1277 1277 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 10/20/2016 N/A N/A 2/23/2017 Customer Initiated Withdrawal 6/1/2021 N/A N No
AC1-096 - Marysville-Flatlick 765kV OH Pickaway Withdrawn AEP 1277 1277 1277 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 10/20/2016 N/A N/A 2/23/2017 Customer Initiated Withdrawal 6/1/2021 N/A N No
AC1-098 + Dawson-South Justice 115kV American Beech Solar NC Alamance Engineering and Procurement Dominion 60 60 37.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1098_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1098_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1098_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_098_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_098_csa.pdf Document Posted N/A N/A 10/21/2016 N/A N/A 11/30/2023 11/30/2023 N/A N No
AC1-098 - Dawson-South Justice 115kV American Beech Solar NC Alamance Engineering and Procurement Dominion 60 60 37.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1098_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1098_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1098_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_098_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_098_csa.pdf Document Posted N/A N/A 10/21/2016 N/A N/A 11/30/2022 11/30/2022 N/A N No
AC1-099 + Dawson-South Justice 115kV American Beech Solar NC Alamance Engineering and Procurement Dominion 20 20 12.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1099_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1099_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1099_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_099_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_099_csa.pdf Document Posted N/A N/A 10/21/2016 N/A N/A 11/30/2023 11/30/2023 N/A N No
AC1-099 - Dawson-South Justice 115kV American Beech Solar NC Alamance Engineering and Procurement Dominion 20 20 12.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1099_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1099_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1099_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_099_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_099_csa.pdf Document Posted N/A N/A 10/21/2016 N/A N/A 11/30/2022 11/30/2022 N/A N No
AC1-100 + Ohio Central 138kV Dresden OH Muskingum In Service Unknown 678 98 43.4 98 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1100_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_100_isa.pdf Document Posted N/A Not Required N/A N/A 10/24/2016 N/A N/A 6/1/2020 6/1/2020 11/10/2017 N/A N No
AC1-100 - Ohio Central 138kV Dresden OH Muskingum In Service AEP 678 98 43.4 98 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1100_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_100_isa.pdf Document Posted N/A Not Required N/A N/A 10/24/2016 N/A N/A 6/1/2020 6/1/2020 11/10/2017 N/A N No
AC1-101 + Johns Creek-Excel 138kV I KY Pike Active Unknown 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1101_fac.pdf Document Posted N/A N/A 10/24/2016 N/A N/A 6/1/2019 N/A N No
AC1-101 - Johns Creek-Excel 138kV I KY Pike Active AEP 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1101_fac.pdf Document Posted N/A N/A 10/24/2016 N/A N/A 6/1/2019 N/A N No
AC1-102 + Johns Creek-Excel 138kV II KY Pike Active Unknown 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1102_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1102_fac.pdf Document Posted N/A N/A 10/23/2016 N/A N/A 6/1/2019 N/A N No
AC1-102 - Johns Creek-Excel 138kV II KY Pike Active AEP 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1102_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1102_fac.pdf Document Posted N/A N/A 10/23/2016 N/A N/A 6/1/2019 N/A N No
AC1-103 + Nottingham 138kV Harrison Power Plant OH Harrison Suspended Unknown 1050 1050 1026 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1103_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1103_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_103_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_103_csa.pdf Document Posted N/A N/A 10/25/2016 N/A N/A 6/11/2024 6/11/2024 N/A N No
AC1-103 - Nottingham 138kV Harrison Power Plant OH Harrison Suspended AEP 1050 1050 1026 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1103_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1103_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_103_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_103_csa.pdf Document Posted N/A N/A 10/25/2016 N/A N/A 6/11/2024 6/11/2024 N/A N No
AC1-105 + Halifax-Mt. Laurel 115kV Sunnybrook Farm Solar VA Halifax Under Construction Dominion 51 51 34.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1105_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1105_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1105_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_105_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_105_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 12/20/2022 2/9/2023 2/9/2023 N/A N No
AC1-105 - Halifax-Mt. Laurel 115kV Sunnybrook Farm Solar VA Halifax Engineering and Procurement Dominion 51 51 34.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1105_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1105_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1105_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_105_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_105_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 7/15/2022 7/15/2022 N/A N No
AC1-116 + Mount Eagle 34.5kV Rivanna Solar VA Albemarle Under Construction Dominion 12.5 12.5 4.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1116_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1116_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1116_wmpa.pdf Not Required N/A N/A 10/27/2016 N/A N/A 4/17/2023 4/17/2023 N/A N Yes
AC1-116 - Mount Eagle 34.5kV Rivanna Solar VA Albemarle Engineering and Procurement Dominion 12.5 12.5 4.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1116_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1116_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1116_wmpa.pdf Not Required N/A N/A 10/27/2016 N/A N/A 12/1/2022 12/31/2022 12/31/2022 N/A N Yes
AC1-117 + Stockton 34.5kV Leatherwood VA Henry Withdrawn Unknown 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1117_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1117_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1117_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1117_wmpa.pdf Not Required N/A N/A 10/27/2016 N/A N/A 12/31/2021 12/31/2021 N/A N Yes
AC1-117 - Stockton 34.5kV Leatherwood VA Henry Withdrawn AEP 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1117_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1117_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1117_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1117_wmpa.pdf Not Required N/A N/A 10/27/2016 N/A N/A 12/31/2021 12/31/2021 N/A N Yes
AC1-122 + Smith Mountain-Candler’s Mountain 138kV Altavista Solar VA Campbell In Service Unknown 60 60 40.7 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1122_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1122_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1122_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_122_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_122_csa.pdf Document Posted N/A N/A 9/30/2020 10/27/2016 N/A N/A 10/21/2020 6/1/2021 6/1/2021 10/21/2020 N/A N No
AC1-122 - Smith Mountain-Candler’s Mountain 138kV Altavista Solar VA Campbell In Service AEP 60 60 40.7 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1122_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1122_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1122_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_122_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_122_csa.pdf Document Posted N/A N/A 9/30/2020 10/27/2016 N/A N/A 10/21/2020 6/1/2021 6/1/2021 10/21/2020 N/A N No
AC1-123 + Smith Mountain-Candler’s Mountain 138kV Altavista Solar VA Campbell In Service Unknown 80 20 13.7 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1123_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1123_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_123_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_123_csa.pdf Document Posted N/A N/A 9/30/2020 10/27/2016 N/A N/A 10/15/2020 6/1/2021 6/1/2021 10/21/2020 N/A N No
AC1-123 - Smith Mountain-Candler’s Mountain 138kV Altavista Solar VA Campbell In Service AEP 80 20 13.7 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1123_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1123_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_123_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_123_csa.pdf Document Posted N/A N/A 9/30/2020 10/27/2016 N/A N/A 10/15/2020 6/1/2021 6/1/2021 10/21/2020 N/A N No
AC1-124 + Harryette 12kV OH Guernsey Withdrawn Unknown 1 1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1124_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1124_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 10/27/2016 N/A N/A 7/20/2017 Customer Initiated Withdrawal 10/1/2017 N/A Y No
AC1-124 - Harryette 12kV OH Guernsey Withdrawn AEP 1 1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1124_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1124_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 10/27/2016 N/A N/A 7/20/2017 Customer Initiated Withdrawal 10/1/2017 N/A Y No
AC1-125 + Harryette 12kV OH Guernsey Withdrawn Unknown 1 1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1125_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 10/27/2016 N/A N/A 7/20/2017 Customer Initiated Withdrawal 10/1/2017 N/A Y No
AC1-125 - Harryette 12kV OH Guernsey Withdrawn AEP 1 1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1125_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 10/27/2016 N/A N/A 7/20/2017 Customer Initiated Withdrawal 10/1/2017 N/A Y No
AC1-141 + Cook-East Elkhart 345kV Indeck Niles Energy Center MI Cass Partially in Service - Under Construction Unknown 1085 91 91 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1141_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_141_isa.pdf Document Posted N/A Not Required N/A N/A 6/24/2021 10/28/2016 N/A N/A 12/27/2021 3/15/2022 3/15/2022 12/27/2021 N/A N No
AC1-141 - Cook-East Elkhart 345kV Indeck Niles Energy Center MI Cass Partially in Service - Under Construction AEP 1085 91 91 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1141_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_141_isa.pdf Document Posted N/A Not Required N/A N/A 6/24/2021 10/28/2016 N/A N/A 12/27/2021 3/15/2022 3/15/2022 12/27/2021 N/A N No
AC1-144 + Hillsboro 138kV OH Highland Withdrawn Unknown 85 85 57.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1144_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1144_imp.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 6/18/2018 10/1/2019 N/A N No
AC1-144 - Hillsboro 138kV OH Highland Withdrawn AEP 85 85 57.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1144_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1144_imp.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 6/18/2018 10/1/2019 N/A N No
AC1-148 + Granger-Twin Branch 138kV IN St. Joseph Withdrawn Unknown 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1148_fea.pdf Document Posted Withdrawn N/A N/A 10/31/2016 N/A N/A 3/16/2018 11/1/2018 N/A N No
AC1-148 - Granger-Twin Branch 138kV IN St. Joseph Withdrawn AEP 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1148_fea.pdf Document Posted Withdrawn N/A N/A 10/31/2016 N/A N/A 3/16/2018 11/1/2018 N/A N No
AC1-149 + Buckskin 69kV OH Ross Withdrawn Unknown 85 85 32.3 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/22/2016 Customer Milestone Not Met 6/1/2019 N/A N No
AC1-149 - Buckskin 69kV OH Ross Withdrawn AEP 85 85 32.3 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/22/2016 Customer Milestone Not Met 6/1/2019 N/A N No
AC1-150 + Beaver 138kV OH Pike Withdrawn Unknown 200 200 76 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/22/2016 Customer Milestone Not Met 6/1/2019 N/A N No
AC1-150 - Beaver 138kV OH Pike Withdrawn AEP 200 200 76 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/22/2016 Customer Milestone Not Met 6/1/2019 N/A N No
AC1-152 + Lawrenceburg 345kV PB I Lawrenceburg Generating Plant IN Dearborn In Service Unknown 1270 50 50 50 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1152_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_152_isa.pdf Document Posted N/A Not Required N/A N/A 10/31/2016 N/A N/A 6/1/2020 6/1/2020 11/13/2019 N/A N No
AC1-152 - Lawrenceburg 345kV PB I Lawrenceburg Generating Plant IN Dearborn In Service AEP 1270 50 50 50 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1152_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_152_isa.pdf Document Posted N/A Not Required N/A N/A 10/31/2016 N/A N/A 6/1/2020 6/1/2020 11/13/2019 N/A N No
AC1-155 + Mt. Airy 34.5kV VA Wythe Withdrawn Unknown 50 50 19 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/22/2016 Customer Milestone Not Met 6/1/2019 N/A N No
AC1-155 - Mt. Airy 34.5kV VA Wythe Withdrawn AEP 50 50 19 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/22/2016 Customer Milestone Not Met 6/1/2019 N/A N No
AC1-156 + Morgan’s Cut 34.5kV VA Pulaski Withdrawn Unknown 60 60 22.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/22/2016 Customer Milestone Not Met 6/1/2019 N/A N No
AC1-156 - Morgan’s Cut 34.5kV VA Pulaski Withdrawn AEP 60 60 22.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/22/2016 Customer Milestone Not Met 6/1/2019 N/A N No
AC1-157 + Hillsboro 138kV OH Highland Withdrawn Unknown 100 100 100 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/18/2016 Customer Initiated Withdrawal 10/1/2019 N/A N No
AC1-157 - Hillsboro 138kV OH Highland Withdrawn AEP 100 100 100 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2016 N/A N/A 11/18/2016 Customer Initiated Withdrawal 10/1/2019 N/A N No
AC1-165 + Atlanta 69kV III Buckeye Plains II Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1165_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1165_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1165_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_165_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_165_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2021 7/1/2025 7/1/2025 N/A N No
AC1-165 - Atlanta 69kV III Buckeye Plains II Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1165_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1165_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1165_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_165_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_165_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2021 12/31/2022 12/31/2022 N/A N No
AC1-166 + Atlanta 69kV IV Buckeye Plains Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1166_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1166_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_166_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_166_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2021 7/1/2025 7/1/2025 N/A N No
AC1-166 - Atlanta 69kV IV Buckeye Plains Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1166_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1166_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_166_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_166_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2021 12/31/2022 12/31/2022 N/A N No
AC1-167 + Mark Center 69kV OH Defiance Active Unknown 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1167_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1167_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1167_fac.pdf Document Posted N/A N/A 11/1/2016 N/A N/A 12/1/2019 N/A N No
AC1-167 - Mark Center 69kV OH Defiance Active AEP 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1167_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1167_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1167_fac.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2019 N/A N No
AC1-171 + Powerton IL Tazewell Active ComEd 79.1 79.1 10.3 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1171_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1171_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1171_fac.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 11/15/2019 N/A N No
AC1-171 - Powerton IL Tazewell Active ComEd 79.1 79.1 10.3 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1171_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1171_imp.pdf Document Posted In Progress N/A N/A 10/31/2016 N/A N/A 11/15/2019 N/A N No
AC1-172 + Lawrenceburg 345kV PB II Lawrenceburg Generating Plant IN Dearborn Partially in Service - Under Construction Unknown 1320 50 50 4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1172_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_172_isa.pdf Document Posted N/A Not Required N/A N/A 10/31/2016 N/A N/A 6/1/2020 6/1/2020 11/13/2019 N/A N No
AC1-172 - Lawrenceburg 345kV PB II Lawrenceburg Generating Plant IN Dearborn Partially in Service - Under Construction AEP 1320 50 50 4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1172_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_172_isa.pdf Document Posted N/A Not Required N/A N/A 10/31/2016 N/A N/A 6/1/2020 6/1/2020 11/13/2019 N/A N No
AC1-173 + Logtown 138kV Timber Road IV Wind Farm (Southern Phase) OH Paulding In Service Unknown 75.9 75.9 9.9 75.9 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1173_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_173_csa.pdf Document Posted N/A N/A 2/5/2020 10/31/2016 N/A N/A 2/15/2020 3/31/2020 3/31/2020 3/27/2020 N/A N No
AC1-173 - Logtown 138kV Timber Road IV Wind Farm (Southern Phase) OH Paulding In Service AEP 75.9 75.9 9.9 75.9 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1173_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_173_csa.pdf Document Posted N/A N/A 2/5/2020 10/31/2016 N/A N/A 2/15/2020 3/31/2020 3/31/2020 3/27/2020 N/A N No
AC1-174 + Losantville 345kV Riverstart Solar Park IN Randolph In Service Unknown 100 100 38 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1174_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1174_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_174_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_174_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/24/2021 6/1/2022 6/1/2022 9/24/2021 N/A N No
AC1-174 - Losantville 345kV Riverstart Solar Park IN Randolph In Service AEP 100 100 38 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1174_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1174_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_174_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_174_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/24/2021 6/1/2022 6/1/2022 9/24/2021 N/A N No
AC1-175 + Losantville 345kV Riverstart Solar Park IN Randolph In Service Unknown 100 100 38 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1175_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1175_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1175_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_175_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_175_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/10/2021 6/1/2022 6/1/2022 9/24/2021 N/A N No
AC1-175 - Losantville 345kV Riverstart Solar Park IN Randolph In Service AEP 100 100 38 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1175_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1175_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1175_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_175_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_175_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/10/2021 6/1/2022 6/1/2022 9/24/2021 N/A N No
AC1-176 + Timber Switch 138kV OH Paulding Withdrawn Unknown 58.7 58.7 7.6 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1176_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1176_imp.pdf Document Posted Withdrawn N/A N/A 10/31/2016 N/A N/A 7/9/2020 10/31/2019 N/A N No
AC1-176 - Timber Switch 138kV OH Paulding Withdrawn AEP 58.7 58.7 7.6 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1176_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1176_imp.pdf Document Posted Withdrawn N/A N/A 10/31/2016 N/A N/A 7/9/2020 10/31/2019 N/A N No
AC1-188 + Rio-Lick 138kV OH Jackson Active Unknown 70 70 46.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1188_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1188_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/Delay email sent 11/20/19 In Progress N/A N/A 10/31/2016 N/A N/A 12/31/2017 N/A N No
AC1-188 - Rio-Lick 138kV OH Jackson Active AEP 70 70 46.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1188_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1188_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/Delay email sent 11/20/19 In Progress N/A N/A 10/31/2016 N/A N/A 12/31/2017 N/A N No
AC1-189 + Chinquapin-Everetts 230kV Pitt Solar NC Pitt Engineering and Procurement Dominion 80 80 53.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1189_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1189_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_189_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 9/1/2024 9/1/2024 9/1/2024 N/A N No
AC1-189 - Chinquapin-Everetts 230kV Pitt Solar NC Pitt Engineering and Procurement Dominion 80 80 53.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1189_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1189_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_189_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 9/1/2024 9/1/2024 N/A N No
AC1-194 + Elk 138kV OH Vinton Active Unknown 125 125 47.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1194_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ac1_194_isa2.pdf Interim Study N/A N/A N/A 10/31/2016 N/A N/A 12/31/2018 N/A N No
AC1-194 - Elk 138kV OH Vinton Active AEP 125 125 47.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1194_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ac1_194_isa2.pdf Interim Study N/A N/A N/A 10/31/2016 N/A N/A 12/31/2018 N/A N No
AC1-195 + Dunkirk-Ada 69kV OH Hardin Withdrawn Unknown 75 75 9 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1195_fea.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 5/30/2017 Customer Initiated Withdrawal 12/31/2018 N/A N No
AC1-195 - Dunkirk-Ada 69kV OH Hardin Withdrawn AEP 75 75 9 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1195_fea.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 5/30/2017 Customer Initiated Withdrawal 12/31/2018 N/A N No
AC1-208 + Cox-Whitakers 115kV Halifax County Solar NC Halifax Engineering and Procurement Dominion 80 80 55.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1208_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1208_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1208_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_208_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_208_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/15/2023 12/15/2023 N/A N No
AC1-208 - Cox-Whitakers 115kV Halifax County Solar NC Halifax Engineering and Procurement Dominion 80 80 55.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1208_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1208_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1208_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_208_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_208_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/15/2022 12/15/2022 N/A N No
AC1-210 + Madison 69kV OH Madison Withdrawn Unknown 45 45 31 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1210_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1210_imp.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 7/17/2018 6/30/2018 N/A N No
AC1-210 - Madison 69kV OH Madison Withdrawn AEP 45 45 31 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1210_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1210_imp.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 7/17/2018 6/30/2018 N/A N No
AC1-221 + Halifax-Person 230kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 29.2 29.2 14.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 6/1/2023 6/1/2023 N/A N No
AC1-221 - Halifax-Person 230kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 29.2 29.2 14.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/16/2022 12/16/2022 N/A N No
AC1-225 + Sorenson-Marysville 765kV OH Van Wert Withdrawn Unknown 300.2 300.2 39 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1225_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1225_imp.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 7/16/2018 12/31/2019 N/A N No
AC1-225 - Sorenson-Marysville 765kV OH Van Wert Withdrawn AEP 300.2 300.2 39 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1225_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1225_imp.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 7/16/2018 12/31/2019 N/A N No
AC1-226 + Wurno-Claytor 138kV VA Pulaski Withdrawn Unknown 200.1 200.1 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1226_fea.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 4/3/2017 Customer Initiated Withdrawal 12/31/2019 N/A N No
AC1-226 - Wurno-Claytor 138kV VA Pulaski Withdrawn AEP 200.1 200.1 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1226_fea.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 4/3/2017 Customer Initiated Withdrawal 12/31/2019 N/A N No
AC2-001 + OH Van Wert Withdrawn Unknown 300.2 300.2 39 Capacity Generation Interconnection Wind Withdrawn N/A N/A 11/1/2016 N/A N/A 12/6/2016 Queue Not Required 12/31/2019 N/A N No
AC2-001 - OH Van Wert Withdrawn AEP 300.2 300.2 39 Capacity Generation Interconnection Wind Withdrawn N/A N/A 11/1/2016 N/A N/A 12/6/2016 Queue Not Required 12/31/2019 N/A N No
AC2-002 + VA Pulaski Withdrawn Unknown 179.4 179.4 23 Capacity Generation Interconnection Wind Withdrawn N/A N/A 11/1/2016 N/A N/A 12/6/2016 Queue Not Required 12/31/2019 N/A N No
AC2-002 - VA Pulaski Withdrawn AEP 179.4 179.4 23 Capacity Generation Interconnection Wind Withdrawn N/A N/A 11/1/2016 N/A N/A 12/6/2016 Queue Not Required 12/31/2019 N/A N No
AC2-008 + Wildcat 12kV OH Highland Withdrawn Unknown 10 10 0 Energy Generation Interconnection Solar Withdrawn N/A N/A 11/3/2016 N/A N/A 6/5/2017 Customer Initiated Withdrawal 6/3/2019 N/A N No
AC2-008 - Wildcat 12kV OH Highland Withdrawn AEP 10 10 0 Energy Generation Interconnection Solar Withdrawn N/A N/A 11/3/2016 N/A N/A 6/5/2017 Customer Initiated Withdrawal 6/3/2019 N/A N No
AC2-012 + Grassfield-Great Bridge 115kV Chesapeake Solar VA City of Chesapeake Engineering and Procurement Dominion 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2012_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2012_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_012_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_012_csa.pdf Document Posted N/A N/A 12/19/2016 N/A N/A 4/15/2023 12/31/2022 12/31/2022 N/A N No
AC2-012 - Grassfield-Great Bridge 115kV Chesapeake Solar VA City of Chesapeake Engineering and Procurement Dominion 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2012_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2012_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_012_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_012_csa.pdf Document Posted N/A N/A 12/19/2016 N/A N/A 11/15/2022 12/31/2022 12/31/2022 N/A N No
AC2-015 + Chatfield-Howard 138kV OH Crawford Active Unknown 117 117 53.55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2015_imp.pdf Document Posted In Progress N/A N/A 12/28/2016 N/A N/A 12/31/2019 N/A N No
AC2-015 - Chatfield-Howard 138kV OH Crawford Active AEP 117 117 53.55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2015_imp.pdf Document Posted In Progress N/A N/A 12/28/2016 N/A N/A 12/31/2019 N/A N No
AC2-016 + Stemple 345kV Carroll County Energy LLC OH Carroll In Service Unknown 748 6 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2016_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_016_isa.pdf Document Posted N/A Not Required N/A N/A 1/3/2017 N/A N/A 9/1/2019 9/1/2019 2/14/2020 N/A N No
AC2-016 - Stemple 345kV Carroll County Energy LLC OH Carroll In Service AEP 748 6 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2016_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_016_isa.pdf Document Posted N/A Not Required N/A N/A 1/3/2017 N/A N/A 9/1/2019 9/1/2019 2/14/2020 N/A N No
AC2-019 + Highland 12kV OH Highland Withdrawn Unknown 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 1/19/2017 N/A N/A 7/13/2017 Customer Initiated Withdrawal 12/31/2019 N/A N No
AC2-019 - Highland 12kV OH Highland Withdrawn AEP 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 1/19/2017 N/A N/A 7/13/2017 Customer Initiated Withdrawal 12/31/2019 N/A N No
AC2-023 + Hebron 69kV Porter Mill Solar MD Wicomico Engineering and Procurement DPL 45.8 45.8 26.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2023_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2023_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_023_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_023_csa.pdf Document Posted N/A N/A 1/25/2017 N/A N/A 5/1/2026 5/1/2026 N/A N No
AC2-023 - Hebron 69kV MD Wicomico Active DPL 45.8 45.8 26.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2023_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2023_fac.pdf Document Posted N/A N/A 1/25/2017 N/A N/A 9/30/2019 N/A N No
AC2-026 + Wakefield 138kV OH Scioto Withdrawn Unknown 50 50 27.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2026_fea.pdf Document Posted N/A N/A 1/30/2017 N/A N/A 9/6/2017 Customer Milestone Not Met 6/30/2019 N/A N No
AC2-026 - Wakefield 138kV OH Scioto Withdrawn AEP 50 50 27.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2026_fea.pdf Document Posted N/A N/A 1/30/2017 N/A N/A 9/6/2017 Customer Milestone Not Met 6/30/2019 N/A N No
AC2-027 + Highland 12kV OH Highland Withdrawn Unknown 10 10 0 Energy Generation Interconnection Solar Withdrawn N/A N/A 1/30/2017 N/A N/A 7/19/2017 Customer Initiated Withdrawal 11/30/2018 N/A N No
AC2-027 - Highland 12kV OH Highland Withdrawn AEP 10 10 0 Energy Generation Interconnection Solar Withdrawn N/A N/A 1/30/2017 N/A N/A 7/19/2017 Customer Initiated Withdrawal 11/30/2018 N/A N No
AC2-028 + Highland 13.2kV OH Highland Withdrawn Unknown 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 1/31/2017 N/A N/A 4/12/2017 Customer Initiated Withdrawal 10/31/2018 N/A N No
AC2-028 - Highland 13.2kV OH Highland Withdrawn AEP 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 1/31/2017 N/A N/A 4/12/2017 Customer Initiated Withdrawal 10/31/2018 N/A N No
AC2-029 + Circleville 138kV OH Pickaway Active Unknown 70 70 26.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2029_imp.pdf Document Posted In Progress N/A N/A 1/31/2017 N/A N/A 12/31/2018 N/A N No
AC2-029 - Circleville 138kV OH Pickaway Active AEP 70 70 26.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2029_imp.pdf Document Posted In Progress N/A N/A 1/31/2017 N/A N/A 12/31/2018 N/A N No
AC2-030 + East Beaver 69kV OH Pike Withdrawn Unknown 20 20 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2030_fea.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 12/6/2017 12/31/2018 N/A N No
AC2-030 - East Beaver 69kV OH Pike Withdrawn AEP 20 20 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2030_fea.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 12/6/2017 12/31/2018 N/A N No
AC2-031 + Hillsboro 138kV OH Highland Withdrawn Unknown 100 100 67 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2031_fea.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 10/4/2017 10/1/2019 N/A N No
AC2-031 - Hillsboro 138kV OH Highland Withdrawn AEP 100 100 67 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2031_fea.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 10/4/2017 10/1/2019 N/A N No
AC2-034 + Eugene-Dequine 345kV N/A N/A Withdrawn Unknown 100 Energy Merchant Transmission Withdrawn N/A N/A 2/3/2017 N/A N/A 3/24/2017 N/A EE No
AC2-034 - Eugene-Dequine 345kV N/A N/A Withdrawn AEP 100 Energy Merchant Transmission Withdrawn N/A N/A 2/3/2017 N/A N/A 3/24/2017 N/A EE No
AC2-035 + Lick-Firebrick 69kV OH Jackson Withdrawn Unknown 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2035_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 2/25/2019 6/1/2019 N/A N No
AC2-035 - Lick-Firebrick 69kV OH Jackson Withdrawn AEP 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2035_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 2/25/2019 6/1/2019 N/A N No
AC2-036 + Ravenswood-East Bashan Switch 69kV OH Meigs Withdrawn Unknown 0 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2036_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2036_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 3/12/2019 6/1/2020 N/A N No
AC2-036 - Ravenswood-East Bashan Switch 69kV OH Meigs Withdrawn AEP 0 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2036_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2036_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 3/12/2019 6/1/2020 N/A N No
AC2-037 + Lick 69kV OH Jackson Withdrawn Unknown 20 20 12 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/3/2017 N/A N/A 5/5/2017 Customer Initiated Withdrawal 6/1/2019 N/A N No
AC2-037 - Lick 69kV OH Jackson Withdrawn AEP 20 20 12 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/3/2017 N/A N/A 5/5/2017 Customer Initiated Withdrawal 6/1/2019 N/A N No
AC2-038 + Lee 69kV OH Athens Withdrawn Unknown 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2038_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 9/27/2019 6/1/2019 N/A N No
AC2-038 - Lee 69kV OH Athens Withdrawn AEP 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2038_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 9/27/2019 6/1/2019 N/A N No
AC2-039 + Poston-Dexter 69kV OH Athens Withdrawn Unknown 43 43 29.4 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/3/2017 N/A N/A 5/5/2017 Customer Initiated Withdrawal 6/1/2019 N/A N No
AC2-039 - Poston-Dexter 69kV OH Athens Withdrawn AEP 43 43 29.4 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/3/2017 N/A N/A 5/5/2017 Customer Initiated Withdrawal 6/1/2019 N/A N No
AC2-040 + Hillsboro 138kV OH Highland Withdrawn Unknown 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2040_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 10/18/2017 6/1/2019 N/A N No
AC2-040 - Hillsboro 138kV OH Highland Withdrawn AEP 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2040_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 10/18/2017 6/1/2019 N/A N No
AC2-041 + Hillsboro 138kV OH Highland Withdrawn Unknown 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2041_fea,pdf Document Posted N/A N/A 2/3/2017 N/A N/A 10/18/2017 6/1/2019 N/A N No
AC2-041 - Hillsboro 138kV OH Highland Withdrawn AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2041_fea,pdf Document Posted N/A N/A 2/3/2017 N/A N/A 10/18/2017 6/1/2019 N/A N No
AC2-042 + Hillsboro 138kV OH Highland Withdrawn Unknown 200 200 120 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2042_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 10/18/2017 6/1/2019 N/A N No
AC2-042 - Hillsboro 138kV OH Highland Withdrawn AEP 200 200 120 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2042_imp.pdf Document Posted N/A N/A 2/3/2017 N/A N/A 10/18/2017 6/1/2019 N/A N No
AC2-043 + W. Millersport-S. Baltimore 138kV OH Fairfield Withdrawn Unknown 50 50 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2043_imp.pdf Document Posted N/A N/A 2/6/2017 N/A N/A 9/14/2018 12/15/2018 N/A N No
AC2-043 - W. Millersport-S. Baltimore 138kV OH Fairfield Withdrawn AEP 50 50 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2043_imp.pdf Document Posted N/A N/A 2/6/2017 N/A N/A 9/14/2018 12/15/2018 N/A N No
AC2-044 + Maddox Creek 345kV OH Van Wert Active Unknown 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2044_imp.pdf Document Posted In Progress N/A N/A 2/6/2017 N/A N/A 12/31/2018 N/A N No
AC2-044 - Maddox Creek 345kV OH Van Wert Active AEP 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2044_imp.pdf Document Posted In Progress N/A N/A 2/6/2017 N/A N/A 12/31/2018 N/A N No
AC2-045 + Clark 12kV Solar Power and Light, LLC OH Athens Withdrawn Unknown 10 10 3.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2045_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2045_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2045_wmpa.pdf Not Required N/A N/A 2/7/2017 N/A N/A 6/29/2020 12/31/2019 12/31/2019 N/A N No
AC2-045 - Clark 12kV Solar Power and Light, LLC OH Athens Withdrawn AEP 10 10 3.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2045_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2045_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2045_wmpa.pdf Not Required N/A N/A 2/7/2017 N/A N/A 6/29/2020 12/31/2019 12/31/2019 N/A N No
AC2-046 + EAst Beaver 138kV OH Jackson Withdrawn Unknown 63 63 39.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2046_fea.pdf Document Posted N/A N/A 2/8/2017 N/A N/A 9/26/2017 12/31/2018 N/A N No
AC2-046 - EAst Beaver 138kV OH Jackson Withdrawn AEP 63 63 39.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2046_fea.pdf Document Posted N/A N/A 2/8/2017 N/A N/A 9/26/2017 12/31/2018 N/A N No
AC2-047 + Ashley-Millbrook Park 69 kV OH Scioto Withdrawn Unknown 18.3 18.3 7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2047_fea.pdf Document Posted N/A N/A 2/8/2017 N/A N/A 10/23/2017 10/31/2018 N/A N No
AC2-047 - Ashley-Millbrook Park 69 kV OH Scioto Withdrawn AEP 18.3 18.3 7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2047_fea.pdf Document Posted N/A N/A 2/8/2017 N/A N/A 10/23/2017 10/31/2018 N/A N No
AC2-048 + Sporn 138kV OH Meigs Active Unknown 60 60 22.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2048_imp.pdf Document Posted In Progress N/A N/A 2/10/2017 N/A N/A 12/31/2018 N/A N No
AC2-048 - Sporn 138kV OH Meigs Active AEP 60 60 22.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2048_imp.pdf Document Posted In Progress N/A N/A 2/10/2017 N/A N/A 12/31/2018 N/A N No
AC2-049 + Hillsboro-Millbrook 138kV OH Highland Withdrawn Unknown 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2049_fea.pdf Document Posted N/A N/A 2/10/2017 N/A N/A 10/13/2017 6/1/2019 N/A N No
AC2-049 - Hillsboro-Millbrook 138kV OH Highland Withdrawn AEP 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2049_fea.pdf Document Posted N/A N/A 2/10/2017 N/A N/A 10/13/2017 6/1/2019 N/A N No
AC2-051 + Pickaway Solar OH Pickaway Withdrawn Unknown 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/13/2017 N/A N/A 3/24/2017 Customer Initiated Withdrawal 12/31/2018 N/A N No
AC2-051 - Pickaway Solar OH Pickaway Withdrawn AEP 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/13/2017 N/A N/A 3/24/2017 Customer Initiated Withdrawal 12/31/2018 N/A N No
AC2-053 + Germantown 115kV Brookview Solar I PA Adams Engineering and Procurement ME 55 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2053_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2053_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2053_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_053_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_053_csa.pdf Document Posted N/A N/A 2/14/2017 N/A N/A 12/31/2023 12/31/2023 N/A N No
AC2-053 - Germantown 115kV Brookview Solar I PA Adams Engineering and Procurement ME 55 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2053_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2053_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2053_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_053_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_053_csa.pdf Document Posted N/A N/A 2/14/2017 N/A N/A 12/31/2020 12/31/2020 N/A N No
AC2-054 + South Rultonham 69kV OH Muskingum Withdrawn Unknown 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/14/2017 N/A N/A 5/1/2017 Customer Initiated Withdrawal 12/31/2018 N/A N No
AC2-054 - South Rultonham 69kV OH Muskingum Withdrawn AEP 10 10 3.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/14/2017 N/A N/A 5/1/2017 Customer Initiated Withdrawal 12/31/2018 N/A N No
AC2-055 + Buckskin 69kV OH Highland Withdrawn Unknown 47.5 47.5 18.05 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2055_imp.pdf Document Posted Withdrawn N/A N/A 2/14/2017 N/A N/A 4/22/2021 7/1/2019 N/A N No
AC2-055 - Buckskin 69kV OH Highland Withdrawn AEP 47.5 47.5 18.05 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2055_imp.pdf Document Posted Withdrawn N/A N/A 2/14/2017 N/A N/A 4/22/2021 7/1/2019 N/A N No
AC2-057 + Ridgeway-Dan River 69kV VA Pittsylvania Withdrawn Unknown 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2057_fea.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 10/4/2017 12/31/2018 N/A N No
AC2-057 - Ridgeway-Dan River 69kV VA Pittsylvania Withdrawn AEP 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2057_fea.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 10/4/2017 12/31/2018 N/A N No
AC2-058 + Newcomerstown-N. Philly 69kV OH Tuscarawas Withdrawn Unknown 16.4 16.37 16.37 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/16/2017 N/A N/A 7/12/2017 Customer Initiated Withdrawal 12/31/2018 N/A N No
AC2-058 - Newcomerstown-N. Philly 69kV OH Tuscarawas Withdrawn AEP 16.4 16.37 16.37 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/16/2017 N/A N/A 7/12/2017 Customer Initiated Withdrawal 12/31/2018 N/A N No
AC2-059 + Biers Run-Circleville 138kV Yellowbud Solar OH Ross Under Construction Unknown 127 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_059_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_059_csa.pdf Document Posted N/A N/A 8/1/2022 2/16/2017 N/A N/A 8/1/2022 12/15/2022 12/15/2022 N/A N No
AC2-059 - Biers Run-Circleville 138kV Yellowbud Solar OH Ross Under Construction AEP 127 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_059_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_059_csa.pdf Document Posted N/A N/A 8/1/2022 2/16/2017 N/A N/A 8/1/2022 12/15/2022 12/15/2022 N/A N No
AC2-060 + Buckskin 69kV Ross County Solar OH Ross Engineering and Procurement Unknown 100 100 64 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2060_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2060_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_060_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_060_csa.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 6/1/2024 6/1/2024 N/A N No
AC2-060 - Buckskin 69kV OH Ross Active AEP 100 100 64 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2060_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2060_fac.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 12/31/2019 N/A N No
AC2-061 + Hillsboro-Clinton 138kV OH Ross Active Unknown 117 117 58.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2061_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2061_fac.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 12/31/2019 N/A N No
AC2-061 - Hillsboro-Clinton 138kV OH Ross Active AEP 117 117 58.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2061_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2061_fac.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 12/31/2019 N/A N No
AC2-062 + Emerald-Kenton 138kV OH Brown Withdrawn Unknown 55 55 55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2062_fea.pdf Document Posted N/A N/A 2/22/2017 N/A N/A 10/4/2017 12/31/2019 N/A N No
AC2-062 - Emerald-Kenton 138kV OH Brown Withdrawn AEP 55 55 55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2062_fea.pdf Document Posted N/A N/A 2/22/2017 N/A N/A 10/4/2017 12/31/2019 N/A N No
AC2-064 + Hillsboro-Millbrook 138kV OH Highland Withdrawn Unknown 115 115 69 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2064_fea.pdf Document Posted Withdrawn N/A N/A 2/22/2017 N/A N/A 12/9/2019 6/1/2019 N/A N No
AC2-064 - Hillsboro-Millbrook 138kV OH Highland Withdrawn AEP 115 115 69 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2064_fea.pdf Document Posted Withdrawn N/A N/A 2/22/2017 N/A N/A 12/9/2019 6/1/2019 N/A N No
AC2-080 + Olive-Reynolds 345kV IN Jasper Withdrawn Unknown 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2080_imp.pdf Document Posted Withdrawn N/A N/A 2/28/2017 N/A N/A 4/21/2021 12/31/2019 N/A N No
AC2-080 - Olive-Reynolds 345kV IN Jasper Withdrawn AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2080_imp.pdf Document Posted Withdrawn N/A N/A 2/28/2017 N/A N/A 4/21/2021 12/31/2019 N/A N No
AC2-084 + Dawson-South Justice 115kV American Beech Solar NC Halifax Engineering and Procurement Dominion 60 60 40.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2084_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_084_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_084_csa.pdf Document Posted N/A N/A 2/28/2017 N/A N/A 6/1/2024 6/1/2024 N/A N No
AC2-084 - Dawson-South Justice 115kV American Beech Solar NC Halifax Engineering and Procurement Dominion 60 60 40.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2084_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_084_isa.pdf Document Posted N/A N/A N/A 2/28/2017 N/A N/A 11/30/2022 11/30/2022 N/A N No
AC2-087 + Buckskin 69kV OH Ross Withdrawn Unknown 85 85 47.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2087_imp.pdf Document Posted N/A N/A 2/28/2017 N/A N/A 1/15/2020 5/31/2019 N/A N No
AC2-087 - Buckskin 69kV OH Ross Withdrawn AEP 85 85 47.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2087_imp.pdf Document Posted N/A N/A 2/28/2017 N/A N/A 1/15/2020 5/31/2019 N/A N No
AC2-089 + Klockner 34.5 kV Silverside Solar VA Wythe Withdrawn Unknown 18.2 18.2 8.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2089_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2089_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2089_wmpa.pdf Not Required N/A N/A 2/28/2017 N/A N/A 3/22/2019 12/31/2019 12/31/2019 N/A N No
AC2-089 - Klockner 34.5 kV Silverside Solar VA Wythe Withdrawn AEP 18.2 18.2 8.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2089_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2089_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2089_wmpa.pdf Not Required N/A N/A 2/28/2017 N/A N/A 3/22/2019 12/31/2019 12/31/2019 N/A N No
AC2-090 + Losantville 345kV IN Randolph Active Unknown 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2090_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2090_imp.pdf Document Posted In Progress N/A N/A 2/28/2017 N/A N/A Customer Milestone Not Met 11/30/2019 N/A N No
AC2-090 - Losantville 345kV IN Randolph Active AEP 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2090_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2090_imp.pdf Document Posted In Progress N/A N/A 2/28/2017 N/A N/A Customer Milestone Not Met 11/30/2019 N/A N No
AC2-091 + Modoc (Riverstart Solar IV) 138kV IN Randolph Withdrawn Unknown 100 100 38 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/28/2017 N/A N/A 3/31/2017 Customer Milestone Not Met 11/30/2019 N/A N No
AC2-091 - Modoc (Riverstart Solar IV) 138kV IN Randolph Withdrawn AEP 100 100 38 Capacity Generation Interconnection Solar Withdrawn N/A N/A 2/28/2017 N/A N/A 3/31/2017 Customer Milestone Not Met 11/30/2019 N/A N No
AC2-096 + Wurno I 34.5KV VA Pulaski Withdrawn Unknown 20 20 12 Capacity Generation Interconnection Solar Withdrawn Withdrawn N/A N/A 3/9/2017 N/A N/A 1/10/2018 6/1/2018 N/A N No
AC2-096 - Wurno I 34.5KV VA Pulaski Withdrawn AEP 20 20 12 Capacity Generation Interconnection Solar Withdrawn Withdrawn N/A N/A 3/9/2017 N/A N/A 1/10/2018 6/1/2018 N/A N No
AC2-097 + Wurno II 34.5kV VA Pulaski Withdrawn Unknown 20 20 12 Capacity Generation Interconnection Solar Withdrawn Withdrawn N/A N/A 3/9/2017 N/A N/A 1/10/2018 6/1/2018 N/A N No
AC2-097 - Wurno II 34.5kV VA Pulaski Withdrawn AEP 20 20 12 Capacity Generation Interconnection Solar Withdrawn Withdrawn N/A N/A 3/9/2017 N/A N/A 1/10/2018 6/1/2018 N/A N No
AC2-098 + Buckhorn-Lonesome Pine 138kV VA Tazewell Withdrawn Unknown 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2098_fea.pdf Document Posted N/A N/A 3/9/2017 N/A N/A 8/30/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AC2-098 - Buckhorn-Lonesome Pine 138kV VA Tazewell Withdrawn AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2098_fea.pdf Document Posted N/A N/A 3/9/2017 N/A N/A 8/30/2017 Customer Initiated Withdrawal 6/1/2018 N/A N No
AC2-104 + Marysville-Sorenson 765kv OH Van Wert Withdrawn Unknown 500.3 500.25 65.03 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2104_imp.pdf Document Posted N/A N/A 3/10/2017 N/A N/A 11/7/2019 12/31/2020 N/A N No
AC2-104 - Marysville-Sorenson 765kv OH Van Wert Withdrawn AEP 500.3 500.25 65.03 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2104_imp.pdf Document Posted N/A N/A 3/10/2017 N/A N/A 11/7/2019 12/31/2020 N/A N No
AC2-106 + Biers Run 138kV OH Ross Withdrawn Unknown 100 100 68.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2106_fea.pdf Document Posted Withdrawn N/A N/A 3/13/2017 N/A N/A 12/13/2017 10/1/2019 N/A N No
AC2-106 - Biers Run 138kV OH Ross Withdrawn AEP 100 100 68.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2106_fea.pdf Document Posted Withdrawn N/A N/A 3/13/2017 N/A N/A 12/13/2017 10/1/2019 N/A N No
AC2-111 + College Corner 138kV Angelina Solar I OH Preble Engineering and Procurement Unknown 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2111_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2111_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2111_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_111_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_111_csa.pdf Document Posted N/A N/A 3/16/2017 N/A N/A 7/1/2023 7/1/2023 N/A N No
AC2-111 - College Corner 138kV Angelina Solar I OH Preble Engineering and Procurement AEP 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2111_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2111_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2111_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_111_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_111_csa.pdf Document Posted N/A N/A 3/16/2017 N/A N/A 7/1/2023 7/1/2023 N/A N No
AC2-119 + Grandview 138kV WV Raliegh Withdrawn Unknown 25 25 17.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2119_fea.pdf Document Posted N/A N/A 3/22/2017 N/A N/A 9/6/2017 Customer Milestone Not Met 12/31/2018 N/A N No
AC2-119 - Grandview 138kV WV Raliegh Withdrawn AEP 25 25 17.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2119_fea.pdf Document Posted N/A N/A 3/22/2017 N/A N/A 9/6/2017 Customer Milestone Not Met 12/31/2018 N/A N No
AC2-120 + Ripley 69kV Ripley Solar MD Charles Engineering and Procurement SMECO 27.5 27.5 10.45 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2120_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2120_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2120_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2120_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2120_wmpa.pdf Not Required N/A N/A 3/23/2017 N/A N/A 10/1/2020 7/13/2022 7/13/2022 N/A N No
AC2-120 - Ripley 69kV Ripley Solar MD Charles Engineering and Procurement SMECO 27.5 27.5 10.45 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2120_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2120_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2120_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2120_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2120_wmpa.pdf Not Required N/A N/A 3/23/2017 N/A N/A 10/1/2020 2/28/2023 2/28/2023 N/A N No
AC2-123 + Jacksons Ferry 138kV Wythe County Solar Project VA Wythe Engineering and Procurement Unknown 75 75 44.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2123_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2123_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_123_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_123_csa.pdf Document Posted N/A N/A 3/23/2017 N/A N/A 12/1/2022 12/1/2022 N/A N No
AC2-123 - Jacksons Ferry 138kV Wythe County Solar Project VA Wythe Engineering and Procurement AEP 75 75 44.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2123_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2123_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_123_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_123_csa.pdf Document Posted N/A N/A 3/23/2017 N/A N/A 12/1/2022 12/1/2022 N/A N No
AC2-124 + Gunn Road 345kV OH Hardin Withdrawn Unknown 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2124_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2124_imp.pdf Document Posted N/A N/A 3/24/2017 N/A N/A 11/19/2018 12/15/2019 N/A N No
AC2-124 - Gunn Road 345kV OH Hardin Withdrawn AEP 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2124_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2124_imp.pdf Document Posted N/A N/A 3/24/2017 N/A N/A 11/19/2018 12/15/2019 N/A N No
AC2-140 + DC Cook Unit 2 DC Cook Generating Plant Unit No. 2 MI Berrien In Service Unknown 1220 28 38 28 Capacity Generation Interconnection Nuclear https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2140_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2140_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_140_isa.pdf Document Posted N/A Not Required N/A N/A 3/27/2017 N/A N/A 6/1/2020 6/1/2020 1/14/2017 N/A N No
AC2-140 - DC Cook Unit 2 DC Cook Generating Plant Unit No. 2 MI Berrien In Service AEP 1220 28 38 28 Capacity Generation Interconnection Nuclear https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2140_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2140_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_140_isa.pdf Document Posted N/A Not Required N/A N/A 3/27/2017 N/A N/A 6/1/2020 6/1/2020 1/14/2017 N/A N No
AC2-146 + Modoc 138kV IN Randolph Withdrawn Unknown 50 50 19 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/28/2017 N/A N/A 3/31/2017 Customer Milestone Not Met 11/30/2019 N/A N No
AC2-146 - Modoc 138kV IN Randolph Withdrawn AEP 50 50 19 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/28/2017 N/A N/A 3/31/2017 Customer Milestone Not Met 11/30/2019 N/A N No
AC2-157 + Sullivan 345 kV IN Sullivan Active Unknown 200 200 76 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2157_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2157_imp.pdf Document Posted In Progress N/A N/A 3/29/2017 N/A N/A 12/31/2020 N/A N No
AC2-157 - Sullivan 345 kV IN Sullivan Active AEP 200 200 76 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2157_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2157_imp.pdf Document Posted In Progress N/A N/A 3/29/2017 N/A N/A 12/31/2020 N/A N No
AC2-168 + Clinton 23kV Gaucho Solar PA Washington Engineering and Procurement DL 11.7 11.7 4.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2168_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2168_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2168_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2168_wmpa.pdf Not Required N/A N/A 5/31/2022 3/30/2017 N/A N/A 6/30/2022 6/30/2022 6/30/2022 N/A N Yes
AC2-168 - Clinton 23kV Gaucho Solar PA Washington Engineering and Procurement DL 11.7 11.7 4.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2168_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2168_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2168_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2168_wmpa.pdf Not Required N/A N/A 3/30/2017 N/A N/A 12/31/2020 6/1/2022 6/1/2022 N/A N Yes
AC2-172 + Big Sandy 1 138kV Big Sandy #1 KY Lawrence In Service Unknown 310 17 12 17 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2172_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_172_isa.pdf Document Posted N/A Not Required N/A N/A 3/30/2017 N/A N/A 10/1/2018 10/1/2018 5/30/2016 N/A N No
AC2-172 - Big Sandy 1 138kV Big Sandy #1 KY Lawrence In Service AEP 310 17 12 17 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2172_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_172_isa.pdf Document Posted N/A Not Required N/A N/A 3/30/2017 N/A N/A 10/1/2018 10/1/2018 5/30/2016 N/A N No
AC2-176 + Jay 138 kV Bitter Ridge Wind Farm IN Jay In Service Unknown 130 130 16.9 130 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2176_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2176_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2176_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_176_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_176_csa.pdf Document Posted N/A N/A 9/2/2020 3/31/2017 N/A N/A 9/5/2020 10/31/2020 10/31/2020 9/5/2020 N/A N No
AC2-176 - Jay 138 kV Bitter Ridge Wind Farm IN Jay In Service AEP 130 130 16.9 130 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2176_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2176_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2176_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_176_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_176_csa.pdf Document Posted N/A N/A 9/2/2020 3/31/2017 N/A N/A 9/5/2020 10/31/2020 10/31/2020 9/5/2020 N/A N No
AC2-177 + Desoto-Tanners Creek 345kV IN Henry Withdrawn Unknown 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2177_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2177_imp.pdf Document Posted Withdrawn N/A N/A 3/31/2017 N/A N/A 6/17/2021 12/31/2019 N/A N No
AC2-177 - Desoto-Tanners Creek 345kV IN Henry Withdrawn AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2177_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2177_imp.pdf Document Posted Withdrawn N/A N/A 3/31/2017 N/A N/A 6/17/2021 12/31/2019 N/A N No
AC2-179 + Natrium 138kV WV Marshall Withdrawn Unknown 57 57 48.2 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2179_fea.pdf Document Posted N/A N/A 3/31/2017 N/A N/A 7/12/2017 Customer Initiated Withdrawal 6/1/2019 N/A N No
AC2-179 - Natrium 138kV WV Marshall Withdrawn AEP 57 57 48.2 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2179_fea.pdf Document Posted N/A N/A 3/31/2017 N/A N/A 7/12/2017 Customer Initiated Withdrawal 6/1/2019 N/A N No
AC2-180 + Babcock & Wilcox 69kV VA Campbell Withdrawn Unknown 12 12 4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2180_fea.pdf Document Posted Withdrawn N/A N/A 3/31/2017 N/A N/A 11/20/2019 10/1/2018 N/A N No
AC2-180 - Babcock & Wilcox 69kV VA Campbell Withdrawn AEP 12 12 4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2180_fea.pdf Document Posted Withdrawn N/A N/A 3/31/2017 N/A N/A 11/20/2019 10/1/2018 N/A N No
AC2-181 + Payne 69kV IN Randolph Withdrawn Unknown 49.9 49.9 18.96 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/31/2017 N/A N/A 3/31/2017 Customer Milestone Not Met 11/30/2019 N/A N No
AC2-181 - Payne 69kV IN Randolph Withdrawn AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/31/2017 N/A N/A 3/31/2017 Customer Milestone Not Met 11/30/2019 N/A N No
AD1-015 + Frazeysburg 138 kV Muskingum Solar OH Muskingum Withdrawn Unknown 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_015_csa.pdf Document Posted N/A N/A 4/21/2017 N/A N/A 2/14/2022 12/31/2023 12/31/2023 N/A N No
AD1-015 - Frazeysburg 138 kV Muskingum Solar OH Muskingum Withdrawn AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_015_csa.pdf Document Posted N/A N/A 4/21/2017 N/A N/A 2/14/2022 12/31/2023 12/31/2023 N/A N No
AD1-017 + Smith Mountain-Bearskin 138 kV Maplewood Solar VA Pittsylvania Under Construction Unknown 120 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1017_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1017_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_017_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_017_csa.pdf Document Posted N/A N/A 12/17/2021 5/11/2017 N/A N/A 12/28/2021 12/1/2022 12/1/2022 N/A N No
AD1-017 - Smith Mountain-Bearskin 138 kV Maplewood Solar VA Pittsylvania Under Construction AEP 120 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1017_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1017_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_017_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_017_csa.pdf Document Posted N/A N/A 12/17/2021 5/11/2017 N/A N/A 12/28/2021 4/1/2022 4/1/2022 N/A N No
AD1-020 + Hunterstown-Lincoln 115 kV Adams Solar LLC PA Adams Engineering and Procurement ME 100 100 53.6 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1020_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1020_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1020_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_020_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_020_csa.pdf Document Posted N/A N/A 6/7/2017 N/A N/A 5/15/2021 5/15/2021 5/15/2021 N/A N No
AD1-020 - Hunterstown-Lincoln 115 kV Adams Solar LLC PA Adams Suspended ME 100 100 53.6 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1020_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1020_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1020_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_020_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_020_csa.pdf Document Posted N/A N/A 6/7/2017 N/A N/A 5/15/2021 5/15/2021 5/15/2021 N/A N No
AD1-023 + Cashie-Trowbridge 230 kV NC Bertie Withdrawn Dominion 40 40 25.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1023_imp.pdf Document Posted Withdrawn N/A N/A 6/19/2017 N/A N/A 4/21/2022 6/1/2019 N/A N No
AD1-023 - Cashie-Trowbridge 230 kV NC Bertie Active Dominion 40 40 25.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1023_imp.pdf Document Posted In Progress N/A N/A 6/19/2017 N/A N/A 6/1/2019 N/A N No
AD1-036 + Chatfield 138 kV OH Crawford Withdrawn Unknown 35 35 13.3 Capacity Generation Interconnection Solar Withdrawn N/A N/A 7/27/2017 N/A N/A 9/15/2017 12/31/2020 N/A N No
AD1-036 - Chatfield 138 kV OH Crawford Withdrawn AEP 35 35 13.3 Capacity Generation Interconnection Solar Withdrawn N/A N/A 7/27/2017 N/A N/A 9/15/2017 12/31/2020 N/A N No
AD1-043 + Makahoy 138 kV IN Madison Active Unknown 120 120 45.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1043_imp.pdf Document Posted In Progress N/A N/A 7/31/2017 N/A N/A 9/30/2020 N/A N No
AD1-043 - Makahoy 138 kV IN Madison Active AEP 120 120 45.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1043_imp.pdf Document Posted In Progress N/A N/A 7/31/2017 N/A N/A 9/30/2020 N/A N No
AD1-051 + Sporn South 138 kV WV Mason Withdrawn Unknown 30 30 18.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1051_fea.pdf Document Posted N/A N/A 8/7/2017 N/A N/A 6/4/2018 12/31/2018 N/A N No
AD1-051 - Sporn South 138 kV WV Mason Withdrawn AEP 30 30 18.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1051_fea.pdf Document Posted N/A N/A 8/7/2017 N/A N/A 6/4/2018 12/31/2018 N/A N No
AD1-058 + Halifax-Person 230 kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 75.1 45.9 36.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1058_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1058_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1058_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_058_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_058_csa.pdf Document Posted N/A N/A 8/15/2017 N/A N/A 6/1/2023 6/1/2023 N/A N No
AD1-058 - Halifax-Person 230 kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 75.1 45.9 36.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1058_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1058_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1058_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_058_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_058_csa.pdf Document Posted N/A N/A 8/15/2017 N/A N/A 12/16/2022 12/16/2022 N/A N No
AD1-070 + Fostoria Central 138 kV South Branch Solar OH Hancock Engineering and Procurement Unknown 205 205 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1070_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1070_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1070_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1070_csa.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 12/31/2025 12/31/2025 N/A N No
AD1-070 - Fostoria Central 138 kV South Branch Solar OH Hancock Engineering and Procurement AEP 205 205 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1070_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1070_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1070_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1070_csa.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 12/31/2025 12/31/2025 N/A N No
AD1-072 + Biers Run-Circleville 138 kV Yellowbud Solar OH Ross Engineering and Procurement Unknown 147 20 13.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1072_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1072_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_072_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_072_csa.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 12/15/2022 12/15/2022 N/A N No
AD1-072 - Biers Run-Circleville 138 kV Yellowbud Solar OH Ross Engineering and Procurement AEP 147 20 13.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1072_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1072_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_072_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_072_csa.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 12/15/2022 12/15/2022 N/A N No
AD1-073 + Buckskin 69 kV Ross County Solar OH Ross Engineering and Procurement Unknown 120 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1073_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1073_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_073_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_073_csa.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 6/1/2024 6/1/2024 N/A N No
AD1-073 - Buckskin 69 kV OH Ross Active AEP 120 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1073_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1073_fac.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 6/1/2020 N/A N No
AD1-085 + North Shenandoah-Stanley 34.5 kV North Shenandoah-Stanley 34.5kV VA Page Engineering and Procurement APS 20 20 12.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1085_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1085_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1085_wmpa.pdf Not Required N/A N/A 9/14/2017 N/A N/A 12/31/2022 12/31/2022 N/A N No
AD1-085 - North Shenandoah-Stanley 34.5 kV North Shenandoah-Stanley 34.5kV VA Page Engineering and Procurement APS 20 20 12.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1085_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1085_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1085_wmpa.pdf Not Required N/A N/A 9/14/2017 N/A N/A 8/29/2021 6/30/2022 6/30/2022 N/A N No
AD1-086 + E. Frankfort-Goodings Grove N/A N/A Withdrawn Unknown 23.9 Energy Merchant Transmission https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad1086_arr-imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/arr-facilities-studies/ad1086_arr-fac.pdf Document Posted N/A N/A 9/14/2017 N/A N/A 8/23/2021 6/20/2021 6/20/2021 N/A EE No
AD1-086 - E. Frankfort-Goodings Grove N/A N/A Withdrawn Unknown Energy Merchant Transmission https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad1086_arr-imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/arr-facilities-studies/ad1086_arr-fac.pdf Document Posted N/A N/A 9/14/2017 N/A N/A 8/23/2021 6/20/2021 6/20/2021 N/A EE No
AD1-087 + Clover-Sedge Hill 230 kV Foxhound Solar VA Halifax Under Construction Dominion 64.2 64.2 43.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1087_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1087_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_087_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_087_csa.pdf Document Posted N/A N/A 9/15/2017 N/A N/A 6/1/2023 5/31/2024 5/31/2024 N/A N No
AD1-087 - Clover-Sedge Hill 230 kV Foxhound Solar VA Halifax Engineering and Procurement Dominion 64.2 64.2 43.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1087_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1087_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_087_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_087_csa.pdf Document Posted N/A N/A 9/15/2017 N/A N/A 5/31/2024 5/31/2024 N/A N No
AD1-090 + Muskingum River 345 kV Phase I OH Washington Withdrawn Unknown 1260 1260 1180 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1090_fea.pdf Document Posted Withdrawn N/A N/A 9/18/2017 N/A N/A 8/30/2019 1/1/2022 N/A N No
AD1-090 - Muskingum River 345 kV Phase I OH Washington Withdrawn AEP 1260 1260 1180 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1090_fea.pdf Document Posted Withdrawn N/A N/A 9/18/2017 N/A N/A 8/30/2019 1/1/2022 N/A N No
AD1-091 + Muskingum River 345 kV Phase II OH Washington Withdrawn Unknown 630 630 590 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 9/18/2017 N/A N/A 11/7/2017 1/1/2022 N/A N No
AD1-091 - Muskingum River 345 kV Phase II OH Washington Withdrawn AEP 630 630 590 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 9/18/2017 N/A N/A 11/7/2017 1/1/2022 N/A N No
AD1-101 + Continental 69 kV Blue Harvest Solar Park OH Putnam Engineering and Procurement Unknown 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_101_csa.pdf Document Posted N/A N/A 9/21/2017 N/A N/A 1/31/2023 1/31/2023 N/A N No
AD1-101 - Continental 69 kV Blue Harvest Solar Park OH Putnam Engineering and Procurement AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_101_csa.pdf Document Posted N/A N/A 9/21/2017 N/A N/A 1/31/2023 1/31/2023 N/A N No
AD1-102 + Wurno-Claytor Lake 138 KV VA Pulaski Active Unknown 180 180.01 23.4 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1102_imp.pdf Document Posted In Progress N/A N/A 9/21/2017 N/A N/A 12/18/2020 N/A N No
AD1-102 - Wurno-Claytor Lake 138 KV VA Pulaski Active AEP 180 180.01 23.4 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1102_imp.pdf Document Posted In Progress N/A N/A 9/21/2017 N/A N/A 12/18/2020 N/A N No
AD1-104 + Marysville-Sorenson 765 kV II OH Van Wert Withdrawn Unknown 403.2 403.2 52.42 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1104_imp.pdf Document Posted N/A N/A 9/22/2017 N/A N/A 3/27/2020 12/17/2021 N/A N No
AD1-104 - Marysville-Sorenson 765 kV II OH Van Wert Withdrawn AEP 403.2 403.2 52.42 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1104_imp.pdf Document Posted N/A N/A 9/22/2017 N/A N/A 3/27/2020 12/17/2021 N/A N No
AD1-106 + North Waldo-Wild Creek 138 kV OH Marion Active Unknown 60 60 22.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1106_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1106_fac.pdf Document Posted N/A N/A 9/22/2017 N/A N/A 6/12/2019 N/A N No
AD1-106 - North Waldo-Wild Creek 138 kV OH Marion Active AEP 60 60 22.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1106_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1106_fac.pdf Document Posted N/A N/A 9/22/2017 N/A N/A 6/12/2019 N/A N No
AD1-119 + Payne 69 kV Timber Road Solar Park OH Paulding Engineering and Procurement Unknown 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1119_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1119_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_119_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_119_csa.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 10/1/2022 10/1/2022 N/A N No
AD1-119 - Payne 69 kV Timber Road Solar Park OH Paulding Engineering and Procurement AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1119_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1119_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_119_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_119_csa.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 10/1/2022 10/1/2022 N/A N No
AD1-124 + Lynbrook 12 kV VA Campbell Withdrawn Unknown 15 15 5.7 Capacity Generation Interconnection Solar Withdrawn Withdrawn N/A N/A 9/28/2017 N/A N/A 9/10/2019 12/31/2019 N/A N No
AD1-124 - Lynbrook 12 kV VA Campbell Withdrawn AEP 15 15 5.7 Capacity Generation Interconnection Solar Withdrawn Withdrawn N/A N/A 9/28/2017 N/A N/A 9/10/2019 12/31/2019 N/A N No
AD1-128 + Modoc-Delaware 138 kV IN Randolph Active Unknown 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1128_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1128_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1128_fac.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 10/31/2021 N/A N No
AD1-128 - Modoc-Delaware 138 kV IN Randolph Active AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1128_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1128_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1128_fac.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 10/31/2021 N/A N No
AD1-130 + Hardin Switch 345 kV Hardin Energy Center – Phase 2 OH Hardin Engineering and Procurement Unknown 170 170 115 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1130_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1130_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_130_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_130_csa.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 6/30/2023 6/30/2023 N/A N No
AD1-130 - Hardin Switch 345 kV Hardin Energy Center – Phase 2 OH Hardin Engineering and Procurement AEP 170 170 115 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1130_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1130_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_130_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_130_csa.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 6/30/2023 6/30/2023 N/A N No
AD1-135 + Clinton 23 kV II Gaucho Solar PA Washington Engineering and Procurement DL 20 8.3 3.15 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1135_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1135_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1135_wmpa.pdf Not Required N/A N/A 5/31/2022 9/29/2017 N/A N/A 6/30/2022 6/1/2022 6/1/2022 N/A N No
AD1-135 - Clinton 23 kV II Gaucho Solar PA Washington Engineering and Procurement DL 20 8.3 3.15 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1135_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1135_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1135_wmpa.pdf Not Required N/A N/A 9/29/2017 N/A N/A 12/31/2020 6/1/2022 6/1/2022 N/A N No
AD1-137 + Dequine 345 kV IN Benton Withdrawn Unknown 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1137_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1137_imp.pdf Document Posted N/A N/A 9/29/2017 N/A N/A 1/16/2020 12/18/2020 N/A N No
AD1-137 - Dequine 345 kV IN Benton Withdrawn AEP 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1137_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1137_imp.pdf Document Posted N/A N/A 9/29/2017 N/A N/A 1/16/2020 12/18/2020 N/A N No
AD1-138 + Valley 138 kV MI Van Buren Withdrawn Unknown 100 100 65.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/29/2017 N/A N/A 10/2/2017 12/1/2020 N/A N No
AD1-138 - Valley 138 kV MI Van Buren Withdrawn AEP 100 100 65.8 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/29/2017 N/A N/A 10/2/2017 12/1/2020 N/A N No
AD1-139 + Mullin-Grant Tap 138 kV IN Madison Withdrawn Unknown 100 99.9968 68.9978 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/29/2017 N/A N/A 10/2/2017 12/1/2020 N/A N No
AD1-139 - Mullin-Grant Tap 138 kV IN Madison Withdrawn AEP 100 99.9968 68.9978 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/29/2017 N/A N/A 10/2/2017 12/1/2020 N/A N No
AD1-141 + S. Lucasville-Wakefield 138 kV OH Scioto Withdrawn Unknown 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1141_imp.pdf Document Posted N/A N/A 9/29/2017 N/A N/A 3/27/2020 12/1/2019 N/A N No
AD1-141 - S. Lucasville-Wakefield 138 kV OH Scioto Withdrawn AEP 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1141_imp.pdf Document Posted N/A N/A 9/29/2017 N/A N/A 3/27/2020 12/1/2019 N/A N No
AD1-149 + Carbondale 69 kV WV Kanawha Withdrawn Unknown 19.9 19.9 8.33 Capacity Generation Interconnection Storage; Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1149_fea.pdf Document Posted N/A N/A 9/30/2017 N/A N/A 6/18/2018 6/30/2019 N/A N No
AD1-149 - Carbondale 69 kV WV Kanawha Withdrawn AEP 19.9 19.9 8.33 Capacity Generation Interconnection Storage; Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1149_fea.pdf Document Posted N/A N/A 9/30/2017 N/A N/A 6/18/2018 6/30/2019 N/A N No
AD1-152 + Clover-Sedge Hill 230 kV VA Halifax Active Dominion 80 80 48 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1152_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf Interim Study N/A N/A N/A 9/30/2017 N/A N/A 12/31/2022 12/31/2020 N/A N No
AD1-152 - Clover-Sedge Hill 230 kV VA Halifax Active Dominion 80 80 48 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf Interim Study N/A N/A N/A 9/30/2017 N/A N/A 12/31/2022 12/31/2020 N/A N No
AD1-161 + Stonewall-Long Mountain 69 kV VA Appomattox Active Unknown 55 55 30.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1161_imp.pdf Document Posted In Progress N/A N/A 9/30/2017 N/A N/A 12/31/2020 N/A N No
AD1-161 - Stonewall-Long Mountain 69 kV VA Appomattox Active AEP 55 55 30.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1161_imp.pdf Document Posted In Progress N/A N/A 9/30/2017 N/A N/A 12/31/2020 N/A N No
AD2-001 + Grangston 138 kV Big Sandy Peaker Plant WV Wayne In Service Unknown 318 18 18 18 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2001_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_001_isa.pdf Document Posted N/A Not Required N/A N/A 10/2/2017 N/A N/A 12/31/2020 12/31/2020 10/2/2020 N/A N No
AD2-001 - Grangston 138 kV Big Sandy Peaker Plant WV Wayne In Service AEP 318 18 18 18 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2001_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2001_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_001_isa.pdf Document Posted N/A Not Required N/A N/A 10/2/2017 N/A N/A 12/31/2020 12/31/2020 10/2/2020 N/A N No
AD2-005 + Nottingham 138kV Harrison Power Plant OH Harrison Suspended Unknown 1085 35 35 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2005_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2005_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2005_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_005_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_005_csa.pdf Document Posted N/A N/A 10/24/2017 N/A N/A 6/11/2024 6/11/2024 N/A N No
AD2-005 - Nottingham 138kV Harrison Power Plant OH Harrison Suspended AEP 1085 35 35 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2005_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2005_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2005_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_005_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_005_csa.pdf Document Posted N/A N/A 10/24/2017 N/A N/A 6/11/2024 6/11/2024 N/A N No
AD2-010 + Hillsboro 138 kV OH Highland Withdrawn Unknown 200 200 120 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2010_fea.pdf Document Posted N/A N/A 11/7/2017 N/A N/A 11/9/2018 6/1/2019 N/A N No
AD2-010 - Hillsboro 138 kV OH Highland Withdrawn AEP 200 200 120 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2010_fea.pdf Document Posted N/A N/A 11/7/2017 N/A N/A 11/9/2018 6/1/2019 N/A N No
AD2-011 + Hillsboro 138 kV OH Highland Withdrawn Unknown 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2011_fea.pdf Document Posted N/A N/A 11/7/2017 N/A N/A 11/9/2018 6/1/2019 N/A N No
AD2-011 - Hillsboro 138 kV OH Highland Withdrawn AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2011_fea.pdf Document Posted N/A N/A 11/7/2017 N/A N/A 11/9/2018 6/1/2019 N/A N No
AD2-012 + Hillsboro 138 kV OH Highland Withdrawn Unknown 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2012_fea.pdf Document Posted N/A N/A 11/7/2017 N/A N/A 11/9/2018 6/1/2019 N/A N No
AD2-012 - Hillsboro 138 kV OH Highland Withdrawn AEP 49 49 29.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2012_fea.pdf Document Posted N/A N/A 11/7/2017 N/A N/A 11/9/2018 6/1/2019 N/A N No
AD2-014 + Steubenville 69 kV OH Jefferson Active Unknown 49.5 49.5 20.79 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2014_fac.pdf Document Posted N/A N/A 11/8/2017 N/A N/A 12/31/2019 N/A N No
AD2-014 - Steubenville 69 kV OH Jefferson Active AEP 49.5 49.5 20.79 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2014_fac.pdf Document Posted N/A N/A 11/8/2017 N/A N/A 12/31/2019 N/A N No
AD2-015 + Dequine 345 kV IN Benton Withdrawn Unknown 500 500 65 Capacity Generation Interconnection Wind Withdrawn N/A N/A 11/13/2017 N/A N/A 1/16/2018 12/18/2020 N/A N No
AD2-015 - Dequine 345 kV IN Benton Withdrawn AEP 500 500 65 Capacity Generation Interconnection Wind Withdrawn N/A N/A 11/13/2017 N/A N/A 1/16/2018 12/18/2020 N/A N No
AD2-016 + Biers Run-Circleville 138 kV Yellowbud Solar OH Ross Engineering and Procurement Unknown 274 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2016_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2016_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_016_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_016_csa.pdf Document Posted N/A N/A 11/15/2017 N/A N/A 12/15/2022 12/15/2022 N/A N No
AD2-016 - Biers Run-Circleville 138 kV Yellowbud Solar OH Ross Engineering and Procurement AEP 274 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2016_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2016_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_016_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_016_csa.pdf Document Posted N/A N/A 11/15/2017 N/A N/A 12/15/2022 12/15/2022 N/A N No
AD2-017 + Buckskin 69 kV OH Ross Withdrawn Unknown 120 100 65.59 Capacity Generation Interconnection Solar Withdrawn N/A N/A 11/15/2017 N/A N/A 1/18/2018 12/31/2020 N/A N No
AD2-017 - Buckskin 69 kV OH Ross Withdrawn AEP 120 100 65.59 Capacity Generation Interconnection Solar Withdrawn N/A N/A 11/15/2017 N/A N/A 1/18/2018 12/31/2020 N/A N No
AD2-020 + Valley 138 kV MI Van Buren Active Unknown 100 100 61.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2020_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2020_imp.pdf Document Posted In Progress N/A N/A 11/29/2017 N/A N/A 12/1/2020 N/A N No
AD2-020 - Valley 138 kV MI Van Buren Active AEP 100 100 61.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2020_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2020_imp.pdf Document Posted In Progress N/A N/A 11/29/2017 N/A N/A 12/1/2020 N/A N No
AD2-022 + East Danville-Roxborough 230 kV VA Pittsylvania Active Unknown 96 96 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2022_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2022_imp.pdf Document Posted In Progress N/A N/A 11/30/2017 N/A N/A 6/1/2020 N/A N No
AD2-022 - East Danville-Roxborough 230 kV VA Pittsylvania Active AEP 96 96 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2022_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2022_imp.pdf Document Posted In Progress N/A N/A 11/30/2017 N/A N/A 6/1/2020 N/A N No
AD2-023 + E. Danville-Roxborough 230 kV VA Pittsylvania Active Unknown 54 54 35 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2023_imp.pdf Document Posted In Progress N/A N/A 11/30/2017 N/A N/A 6/1/2020 N/A N No
AD2-023 - E. Danville-Roxborough 230 kV VA Pittsylvania Active AEP 54 54 35 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2023_imp.pdf Document Posted In Progress N/A N/A 11/30/2017 N/A N/A 6/1/2020 N/A N No
AD2-053 + South Canton-Harmon 345kV OH Adams Withdrawn Unknown 50 Energy Merchant Transmission Withdrawn N/A N/A 2/1/2018 N/A N/A 9/19/2018 6/1/2019 N/A EE No
AD2-053 - South Canton-Harmon 345kV OH Adams Withdrawn AEP 50 Energy Merchant Transmission Withdrawn N/A N/A 2/1/2018 N/A N/A 9/19/2018 6/1/2019 N/A EE No
AD2-054 + Dumont-Stillwell 345kV IN St. Joseph Withdrawn Unknown 50 Energy Merchant Transmission Withdrawn N/A N/A 2/1/2018 N/A N/A 5/2/2019 N/A EE No
AD2-054 - Dumont-Stillwell 345kV IN St. Joseph Withdrawn AEP 50 Energy Merchant Transmission Withdrawn N/A N/A 2/1/2018 N/A N/A 5/2/2019 N/A EE No
AD2-067 + Centerburg 138kV OH Licking Active Unknown 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2067_imp.pdf Document Posted In Progress N/A N/A 2/28/2018 N/A N/A 11/1/2021 N/A N No
AD2-067 - Centerburg 138kV OH Licking Active AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2067_imp.pdf Document Posted In Progress N/A N/A 2/28/2018 N/A N/A 11/1/2021 N/A N No
AD2-071 + Strawton-Pipe Creek 138 kV IN Madison Active Unknown 100 100 67 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2071_imp.pdf Document Posted In Progress N/A N/A 3/14/2018 N/A N/A 12/1/2021 N/A N No
AD2-071 - Strawton-Pipe Creek 138 kV IN Madison Active AEP 100 100 67 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2071_imp.pdf Document Posted In Progress N/A N/A 3/14/2018 N/A N/A 12/1/2021 N/A N No
AD2-075 + Segreto 345kV MI Van Buren Active Unknown 1340 285 145 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2075_imp.pdf Document Posted In Progress N/A N/A 3/15/2018 N/A N/A 5/4/2020 N/A N No
AD2-075 - Segreto 345kV MI Van Buren Active AEP 1340 285 145 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2075_imp.pdf Document Posted In Progress N/A N/A 3/15/2018 N/A N/A 5/4/2020 N/A N No
AD2-078 + N. Haverhill 69kV OH Scioto Withdrawn Unknown 95 20 40 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2078_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2078_imp.pdf Document Posted N/A N/A 3/15/2018 N/A N/A 10/15/2020 9/1/2020 N/A N No
AD2-078 - N. Haverhill 69kV OH Scioto Withdrawn AEP 95 20 40 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2078_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2078_imp.pdf Document Posted N/A N/A 3/15/2018 N/A N/A 10/15/2020 9/1/2020 N/A N No
AD2-079 + Capitol Ave 34.5kV St. Joseph County, Indiana IN St. Joseph In Service Unknown 20 20 12 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_079_csa.pdf Document Posted N/A N/A 3/19/2018 N/A N/A 3/31/2021 3/31/2021 3/16/2021 N/A N No
AD2-079 - Capitol Ave 34.5kV St. Joseph County, Indiana IN St. Joseph In Service AEP 20 20 12 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_079_csa.pdf Document Posted N/A N/A 3/19/2018 N/A N/A 3/31/2021 3/31/2021 3/16/2021 N/A N No
AD2-080 + Dumont-Stillwell 345kV IN St. Joseph Withdrawn Unknown 309 Energy Merchant Transmission https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad2080_arr-imp.pdf Document Posted N/A N/A 3/19/2018 N/A N/A 6/25/2020 6/1/2020 N/A EE No
AD2-080 - Dumont-Stillwell 345kV IN St. Joseph Withdrawn AEP 309 Energy Merchant Transmission https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ad2080_arr-imp.pdf Document Posted N/A N/A 3/19/2018 N/A N/A 6/25/2020 6/1/2020 N/A EE No
AD2-083 + Larrabee 230kV NJ Monmouth Withdrawn JCPL 1100 Energy Merchant Transmission AC 0 https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ad2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ad2083_imp.pdf Document Posted Withdrawn N/A N/A 3/20/2018 N/A N/A 2/2/2022 N/A S No
AD2-083 - Larrabee 230kV NJ Monmouth Withdrawn JCPL Energy Merchant Transmission AC 0 https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ad2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ad2083_imp.pdf Document Posted Withdrawn N/A N/A 3/20/2018 N/A N/A 2/2/2022 N/A S No
AD2-086 + Marysville-East Lima Hardin Switch 345kV OH Hardin Active Unknown 230 230 138 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2086_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2086_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2023 12/31/2023 N/A N No
AD2-086 - Marysville-East Lima Hardin Switch 345kV OH Hardin Active AEP 230 230 138 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2086_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2086_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2023 12/31/2023 N/A N No
AD2-087 + Randolf 138kV OH Darke Withdrawn Unknown 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2087_fea.pdf Document Posted Withdrawn N/A N/A 3/20/2018 N/A N/A 12/9/2019 12/31/2020 N/A N No
AD2-087 - Randolf 138kV OH Darke Withdrawn AEP 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2087_fea.pdf Document Posted Withdrawn N/A N/A 3/20/2018 N/A N/A 12/9/2019 12/31/2020 N/A N No
AD2-091 + Hardin Tap 345kV OH Hardin Active Unknown 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2091_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2020 N/A N No
AD2-091 - Hardin Tap 345kV OH Hardin Active AEP 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2091_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2020 N/A N No
AD2-092 + Marysville 345kV OH Union Active Unknown 175 175 105 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2092_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2020 N/A N No
AD2-092 - Marysville 345kV OH Union Active AEP 175 175 105 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2092_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2020 N/A N No
AD2-093 + Marysville 345kV Cadence Solar Energy Center OH Union Engineering and Procurement Unknown 225 225 135 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2093_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_093_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_093_csa.pdf Document Posted N/A N/A 3/20/2018 N/A N/A 12/31/2024 12/31/2024 N/A N No
AD2-093 - Marysville 345kV Cadence Solar Energy Center OH Union Engineering and Procurement AEP 225 225 135 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2093_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_093_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_093_csa.pdf Document Posted N/A N/A 3/20/2018 N/A N/A 12/31/2024 12/31/2024 N/A N No
AD2-096 + Marysville 345kV OH Union Active Unknown 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2096_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2020 N/A N No
AD2-096 - Marysville 345kV OH Union Active AEP 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2096_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2020 N/A N No
AD2-105 + Leslie-Stinnett 161KV KY Leslie Withdrawn Unknown 100 100 40.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2105_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2105_imp.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 1/30/2020 12/31/2021 N/A N No
AD2-105 - Leslie-Stinnett 161KV KY Leslie Withdrawn AEP 100 100 40.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2105_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2105_imp.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 1/30/2020 12/31/2021 N/A N No
AD2-106 + Bulan 69kV KY Perry Withdrawn Unknown 80 80 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2106_imp.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 1/30/2020 12/31/2021 N/A N No
AD2-106 - Bulan 69kV KY Perry Withdrawn AEP 80 80 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2106_imp.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 1/30/2020 12/31/2021 N/A N No
AD2-107 + Chavies-Bonnyman 69kV KY Perry Withdrawn Unknown 55 55 23.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2107_imp.pdf Document Posted Withdrawn N/A N/A 3/22/2018 N/A N/A 4/16/2020 12/31/2021 N/A N No
AD2-107 - Chavies-Bonnyman 69kV KY Perry Withdrawn AEP 55 55 23.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2107_imp.pdf Document Posted Withdrawn N/A N/A 3/22/2018 N/A N/A 4/16/2020 12/31/2021 N/A N No
AD2-111 + Hunlock 69 kV PA Luzerne Withdrawn Unknown 50 6 8 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 3/22/2018 N/A N/A 3/28/2018 5/31/2022 N/A N No
AD2-111 - Hunlock 69 kV PA Luzerne Withdrawn AEP 50 6 8 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 3/22/2018 N/A N/A 3/28/2018 5/31/2022 N/A N No
AD2-113 + South Bend 500kV South Bend Generating Station PA Armstrong Partially in Service - Under Construction APS 790 70 60.6 12 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2113_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_113_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_113_csa.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 6/1/2023 6/1/2023 6/1/2023 4/27/2022 N/A N No
AD2-113 - South Bend 500kV South Bend Generating Station PA Armstrong Engineering and Procurement APS 790 70 60.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2113_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_113_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_113_csa.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 6/1/2023 6/1/2023 6/1/2023 N/A N No
AD2-123 + East Danville-Roxborough 230 kV NC Person Withdrawn Unknown 94 94 68.15 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/22/2018 N/A N/A 4/16/2018 6/1/2021 N/A N No
AD2-123 - East Danville-Roxborough 230 kV NC Person Withdrawn AEP 94 94 68.15 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/22/2018 N/A N/A 4/16/2018 6/1/2021 N/A N No
AD2-124 + East Danville-Roxborough 230 kV NC Person Withdrawn Unknown 20 20 14.54 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/22/2018 N/A N/A 4/16/2018 6/1/2021 N/A N No
AD2-124 - East Danville-Roxborough 230 kV NC Person Withdrawn AEP 20 20 14.54 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/22/2018 N/A N/A 4/16/2018 6/1/2021 N/A N No
AD2-132 + Olive-Reynolds 345kV IN Pulaski Withdrawn Unknown 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2132_fea.pdf Document Posted N/A N/A 3/23/2018 N/A N/A 1/10/2019 12/31/2020 N/A N No
AD2-132 - Olive-Reynolds 345kV IN Pulaski Withdrawn AEP 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2132_fea.pdf Document Posted N/A N/A 3/23/2018 N/A N/A 1/10/2019 12/31/2020 N/A N No
AD2-136 + Melmore Tap 138kV OH Seneca Active Unknown 360 360 46.8 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2136_imp.pdf Document Posted In Progress N/A N/A 3/23/2018 N/A N/A 10/31/2021 N/A N No
AD2-136 - Melmore Tap 138kV OH Seneca Active AEP 360 360 46.8 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2136_imp.pdf Document Posted In Progress N/A N/A 3/23/2018 N/A N/A 10/31/2021 N/A N No
AD2-138 + Olive-Reynolds #1 345kV IN Warren Withdrawn Unknown 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2138_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2138_imp.pdf Document Posted Withdrawn N/A N/A 3/23/2018 N/A N/A 4/20/2021 12/31/2020 N/A N No
AD2-138 - Olive-Reynolds #1 345kV IN Warren Withdrawn AEP 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2138_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2138_imp.pdf Document Posted Withdrawn N/A N/A 3/23/2018 N/A N/A 4/20/2021 12/31/2020 N/A N No
AD2-143 + Richland Jct-East Leipsic 138kV IN Randolph Withdrawn Unknown 150 150 26.4 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2143_fea.pdf Document Posted N/A N/A 3/23/2018 N/A N/A 1/7/2019 12/31/2020 N/A N No
AD2-143 - Richland Jct-East Leipsic 138kV IN Randolph Withdrawn AEP 150 150 26.4 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2143_fea.pdf Document Posted N/A N/A 3/23/2018 N/A N/A 1/7/2019 12/31/2020 N/A N No
AD2-144 + Marysville 345kV IN Randolph Withdrawn Unknown 150 150 26.4 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2144_fea.pdf Document Posted N/A N/A 3/23/2018 N/A N/A 1/7/2019 12/31/2020 N/A N No
AD2-144 - Marysville 345kV IN Randolph Withdrawn AEP 150 150 26.4 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2144_fea.pdf Document Posted N/A N/A 3/23/2018 N/A N/A 1/7/2019 12/31/2020 N/A N No
AD2-160 + Hickory-Moyock 230kV Oak Trail Solar NC Currituck Engineering and Procurement Dominion 50 50 32.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_160_csa.pdf Document Posted N/A N/A 3/26/2018 N/A N/A 1/3/2023 7/1/2023 7/1/2023 N/A N No
AD2-160 - Hickory-Moyock 230kV Oak Trail Solar NC Currituck Engineering and Procurement Dominion 50 50 32.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_160_csa.pdf Document Posted N/A N/A 3/26/2018 N/A N/A 12/31/2022 12/31/2022 N/A N No
AD2-162 + Biers Run-Circleville 138kV OH Pickaway Active Unknown 110 110 73.81 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2162_imp.pdf Document Posted In Progress N/A N/A 3/26/2018 N/A N/A 12/1/2021 N/A N No
AD2-162 - Biers Run-Circleville 138kV OH Pickaway Active AEP 110 110 73.81 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2162_imp.pdf Document Posted In Progress N/A N/A 3/26/2018 N/A N/A 12/1/2021 N/A N No
AD2-178 + Wurno 138kV VA Pulaski Active Unknown 120 120 72 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2178_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2178_imp.pdf Document Posted In Progress N/A N/A 3/28/2018 N/A N/A 6/1/2021 N/A N No
AD2-178 - Wurno 138kV VA Pulaski Active AEP 120 120 72 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2178_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2178_imp.pdf Document Posted In Progress N/A N/A 3/28/2018 N/A N/A 6/1/2021 N/A N No
AD2-179 + Morgans Cut-Glen Lyn 138kV VA Pulaski Active Unknown 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2179_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2179_imp.pdf Document Posted In Progress N/A N/A 3/28/2018 N/A N/A 11/1/2020 N/A N No
AD2-179 - Morgans Cut-Glen Lyn 138kV VA Pulaski Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2179_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2179_imp.pdf Document Posted In Progress N/A N/A 3/28/2018 N/A N/A 11/1/2020 N/A N No
AD2-182 + George Washington 138 kV WV Marshall Withdrawn Unknown 481.5 481.5 380 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 3/29/2018 N/A N/A 4/6/2018 4/1/2022 N/A N No
AD2-182 - George Washington 138 kV WV Marshall Withdrawn AEP 481.5 481.5 380 Capacity Generation Interconnection Natural Gas Withdrawn N/A N/A 3/29/2018 N/A N/A 4/6/2018 4/1/2022 N/A N No
AD2-189 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction Unknown 1875 225 186 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2189_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_189_csa.pdf Document Posted N/A N/A 9/23/2021 3/30/2018 N/A N/A 8/11/2022 12/31/2022 12/31/2022 N/A N No
AD2-189 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1875 225 186 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2189_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_189_csa.pdf Document Posted N/A N/A 9/23/2021 3/30/2018 N/A N/A 5/11/2022 12/31/2022 12/31/2022 N/A N No
AD2-191 + Melmore 138kV OH Seneca Withdrawn Unknown 370 170 22.1 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2191_imp.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 6/3/2020 11/2/2020 N/A N No
AD2-191 - Melmore 138kV OH Seneca Withdrawn AEP 370 170 22.1 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2191_imp.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 6/3/2020 11/2/2020 N/A N No
AD2-201A + Hickman-Riverbend 69kV VA Pulaski Withdrawn Unknown 50 50 31 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2201a_fea.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 1/22/2019 5/3/2021 N/A N No
AD2-201A - Hickman-Riverbend 69kV VA Pulaski Withdrawn AEP 50 50 31 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2201a_fea.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 1/22/2019 5/3/2021 N/A N No
AD2-202 + Clover-Sedge Hill 230kV Foxhound Solar VA Halifax Engineering and Procurement Dominion 83 18.8 12.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2202_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2202_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2202_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_202_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_202_csa.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 6/1/2023 5/31/2024 5/31/2024 N/A N No
AD2-202 - Clover-Sedge Hill 230kV Foxhound Solar VA Halifax Engineering and Procurement Dominion 83 18.8 12.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2202_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2202_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2202_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_202_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_202_csa.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 5/31/2024 5/31/2024 N/A N No
AD2-205 + Byllesby 69 kV Buck & Byllesby Hydro Project VA Carroll In Service Unknown 4 4 0 4 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2205_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2205_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_205_isa.pdf Document Posted N/A Not Required N/A N/A 4/13/2018 N/A N/A 12/31/2018 12/31/2018 1/31/2019 N/A N No
AD2-205 - Byllesby 69 kV Buck & Byllesby Hydro Project VA Carroll In Service AEP 4 4 0 4 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2205_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2205_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_205_isa.pdf Document Posted N/A Not Required N/A N/A 4/13/2018 N/A N/A 12/31/2018 12/31/2018 1/31/2019 N/A N No
AD2-216 + Axton 138 kV VA Henry Withdrawn Unknown 68 68 43.9 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/30/2018 N/A N/A 4/3/2018 3/31/2020 N/A N No
AD2-216 - Axton 138 kV VA Henry Withdrawn AEP 68 68 43.9 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/30/2018 N/A N/A 4/3/2018 3/31/2020 N/A N No
AE1-008 + College Corner 138 kV OH Preble Withdrawn Unknown 100 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1008_fea.pdf Document Posted N/A N/A 4/23/2018 N/A N/A 8/1/2019 7/1/2019 N/A N No
AE1-008 - College Corner 138 kV OH Preble Withdrawn AEP 100 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1008_fea.pdf Document Posted N/A N/A 4/23/2018 N/A N/A 8/1/2019 7/1/2019 N/A N No
AE1-017 + Peak Creek-Draper 34.5 kV VA Pulaski Withdrawn Unknown 20 20 11 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1017_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 5/14/2018 N/A N/A 7/15/2020 6/1/2020 N/A N No
AE1-017 - Peak Creek-Draper 34.5 kV VA Pulaski Withdrawn AEP 20 20 11 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1017_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1017_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 5/14/2018 N/A N/A 7/15/2020 6/1/2020 N/A N No
AE1-018 + Peak Creek-Memoria Drive 12 kV Pulaski Community Solar VA Pulaski Withdrawn Unknown 5 5 2.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1018_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1018_imp.pdf Document Posted Not Required Not Required N/A N/A 5/14/2018 N/A N/A 2/21/2020 6/1/2020 N/A N No
AE1-018 - Peak Creek-Memoria Drive 12 kV Pulaski Community Solar VA Pulaski Withdrawn AEP 5 5 2.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1018_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1018_imp.pdf Document Posted Not Required Not Required N/A N/A 5/14/2018 N/A N/A 2/21/2020 6/1/2020 N/A N No
AE1-021 + Gavin #2 765 kV Gavin Unit No. 2 OH Gallia In Service Unknown 1367 11 11 11 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1021_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1021_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_021_isa.pdf Document Posted N/A Not Required N/A N/A 5/24/2018 N/A N/A 6/1/2021 6/1/2021 6/19/2021 N/A N No
AE1-021 - Gavin #2 765 kV Gavin Unit No. 2 OH Gallia In Service AEP 1367 11 11 11 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1021_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1021_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_021_isa.pdf Document Posted N/A Not Required N/A N/A 5/24/2018 N/A N/A 6/1/2021 6/1/2021 6/19/2021 N/A N No
AE1-039 + West Street (Orchard Hills) 12.47 kV Orchard Hills Sanitary Landfill MI Berrien In Service Unknown 4 0.8 0.8 0.8 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1039_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1039_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_039_isa.pdf Document Posted N/A Not Required N/A N/A 6/22/2018 N/A N/A 9/30/2020 9/30/2020 10/1/2019 N/A N No
AE1-039 - West Street (Orchard Hills) 12.47 kV Orchard Hills Sanitary Landfill MI Berrien In Service AEP 4 0.8 0.8 0.8 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1039_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1039_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_039_isa.pdf Document Posted N/A Not Required N/A N/A 6/22/2018 N/A N/A 9/30/2020 9/30/2020 10/1/2019 N/A N No
AE1-040 + Greenfield 69 kV Fayette Solar OH Fayette Engineering and Procurement Unknown 48 48 31.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1040_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1040_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_040_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_040_csa.pdf Document Posted N/A N/A 6/25/2018 N/A N/A 5/31/2024 5/31/2024 N/A N No
AE1-040 - Greenfield 69 kV OH Fayette Active Dayton 48 48 31.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1040_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1040_fac.pdf Document Posted N/A N/A 6/25/2018 N/A N/A 7/1/2022 7/1/2022 N/A N No
AE1-044 + Morrisville 230 kV Fitch Solar VA Fauquier Suspended Dominion 200 200 111.7933 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1044_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_044_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_044_csa.pdf Document Posted N/A N/A 7/5/2018 N/A N/A 12/30/2025 12/30/2025 N/A N No
AE1-044 - Morrisville 230 kV Fitch Solar VA Fauquier Engineering and Procurement Dominion 200 200 111.7933 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1044_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_044_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_044_csa.pdf Document Posted N/A N/A 7/5/2018 N/A N/A 12/30/2025 12/30/2025 N/A N No
AE1-050 + Gavin Unit 1 765 kV Gavin Unit No. 1 OH Gallia Engineering and Procurement Unknown 1349 18 18 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1050_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_050_isa.pdf Document Posted N/A Not Required N/A N/A 7/20/2018 N/A N/A 6/9/2024 6/9/2024 N/A N No
AE1-050 - Gavin Unit 1 765 kV Gavin Unit No. 1 OH Gallia Engineering and Procurement AEP 1349 18 18 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1050_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_050_isa.pdf Document Posted N/A Not Required N/A N/A 7/20/2018 N/A N/A 6/9/2024 6/9/2024 N/A N No
AE1-056 + Red House-South Creek 115 kV VA Appomattox Active Dominion 60 60 38.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1056_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1056_imp.pdf Document Posted In Progress N/A N/A 7/25/2018 N/A N/A 12/15/2020 N/A N No
AE1-056 - Red House-South Creek 115 kV VA Appomattox Active Dominion 60 60 38.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1056_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1056_imp.pdf Document Posted In Progress N/A N/A 7/25/2018 N/A N/A 12/15/2020 N/A N No
AE1-064 + Rockcastle 138 kV VA Bedford Active Unknown 102.1 102.1 67.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1064_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1064_imp.pdf Document Posted In Progress N/A N/A 7/31/2018 N/A N/A 5/3/2021 N/A N No
AE1-064 - Rockcastle 138 kV VA Bedford Active AEP 102.1 102.1 67.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1064_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1064_imp.pdf Document Posted In Progress N/A N/A 7/31/2018 N/A N/A 5/3/2021 N/A N No
AE1-089 + Elderberry-Dumont 345 kV IN St. Joseph Withdrawn Unknown 310 310 130.65 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1089_imp.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 1/30/2020 12/31/2021 N/A N No
AE1-089 - Elderberry-Dumont 345 kV IN St. Joseph Withdrawn AEP 310 310 130.65 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1089_imp.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 1/30/2020 12/31/2021 N/A N No
AE1-090 + Hardin Switch 345 kV OH Hardin Active Unknown 50 50 21.56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1090_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1090_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/31/2021 N/A N No
AE1-090 - Hardin Switch 345 kV OH Hardin Active AEP 50 50 21.56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1090_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1090_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/31/2021 N/A N No
AE1-091 + West Newton-Lynn 138 kV OH Hardin Active Unknown 110 110 46.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1091_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/31/2021 N/A N No
AE1-091 - West Newton-Lynn 138 kV OH Hardin Active AEP 110 110 46.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1091_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/31/2021 N/A N No
AE1-093 + Elk 138 kV OH Vinton Active Unknown 42 42 42 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1093_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/31/2021 N/A N No
AE1-093 - Elk 138 kV OH Vinton Active AEP 42 42 42 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1093_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/31/2021 N/A N No
AE1-098 + Endless Caverns 34.5 kV Endless Caverns Solar VA Rockingham Under Construction Dominion 15.7 15.7 10.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1098_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1098_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1098_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1098_wmpa.pdf Not Required N/A N/A 8/31/2018 N/A N/A 1/1/2023 4/25/2022 4/25/2022 N/A N No
AE1-098 - Endless Caverns 34.5 kV Endless Caverns Solar VA Rockingham Engineering and Procurement Dominion 15.7 15.7 10.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1098_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1098_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1098_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1098_wmpa.pdf Not Required N/A N/A 8/31/2018 N/A N/A 1/1/2023 4/25/2022 4/25/2022 N/A N No
AE1-099 + Endless Caverns 34.kV Endless Caverns Solar VA Rockingham Under Construction Dominion 15.7 15.7 10.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1099_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1099_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1099_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1099_wmpa.pdf Not Required N/A N/A 8/31/2018 N/A N/A 1/1/2023 4/25/2022 4/25/2022 N/A N No
AE1-099 - Endless Caverns 34.kV Endless Caverns Solar VA Rockingham Engineering and Procurement Dominion 15.7 15.7 10.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1099_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1099_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1099_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1099_wmpa.pdf Not Required N/A N/A 8/31/2018 N/A N/A 1/1/2023 4/25/2022 4/25/2022 N/A N No
AE1-100 + Axton 138 kV Caden Energix Axton VA Henry Engineering and Procurement Unknown 66 66 41.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1100_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1100_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_100_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_100_csa.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 12/31/2023 12/31/2023 N/A N No
AE1-100 - Axton 138 kV Caden Energix Axton VA Henry Engineering and Procurement AEP 66 66 41.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1100_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1100_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_100_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_100_csa.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 12/31/2023 12/31/2023 N/A N No
AE1-102 + Maddox Creek 345 kV OH Van Wert Active Unknown 26 26 15.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1102_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/31/2021 N/A N No
AE1-102 - Maddox Creek 345 kV OH Van Wert Active AEP 26 26 15.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1102_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 12/31/2021 N/A N No
AE1-108 + Bremo-Scottsville 138 kV VA Buckingham Active Unknown 149.5 149.5 89.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1108_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1108_imp.pdf Document Posted In Progress N/A N/A 9/12/2018 N/A N/A 8/31/2021 N/A N No
AE1-108 - Bremo-Scottsville 138 kV VA Buckingham Active AEP 149.5 149.5 89.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1108_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1108_imp.pdf Document Posted In Progress N/A N/A 9/12/2018 N/A N/A 8/31/2021 N/A N No
AE1-115 + Churchtown 69 kV NJ Salem Withdrawn AEC 20 20 10 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1115_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1115_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 9/14/2018 N/A N/A 4/29/2022 6/1/2021 N/A N No
AE1-115 - Churchtown 69 kV NJ Salem Active AEC 20 20 10 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1115_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1115_fac.pdf Document Posted N/A N/A 9/14/2018 N/A N/A 6/1/2021 N/A N No
AE1-121 + Axton 138 kV VA Pittsylvania Withdrawn Unknown 529.5 529.5 483 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1121_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1121_imp.pdf Document Posted Withdrawn N/A N/A 9/18/2018 N/A N/A 1/8/2021 6/1/2022 N/A N No
AE1-121 - Axton 138 kV VA Pittsylvania Withdrawn AEP 529.5 529.5 483 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1121_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1121_imp.pdf Document Posted Withdrawn N/A N/A 9/18/2018 N/A N/A 1/8/2021 6/1/2022 N/A N No
AE1-122 + Axton 138 kV VA Pittsylvania Withdrawn Unknown 529.5 529.5 483 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1122_fea.pdf Document Posted N/A N/A 9/18/2018 N/A N/A 7/18/2019 6/1/2023 N/A N No
AE1-122 - Axton 138 kV VA Pittsylvania Withdrawn AEP 529.5 529.5 483 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1122_fea.pdf Document Posted N/A N/A 9/18/2018 N/A N/A 7/18/2019 6/1/2023 N/A N No
AE1-130 + Meads Store 138 kV VA Bedford Withdrawn Unknown 83 83 55.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1130_imp.pdf Document Posted Withdrawn N/A N/A 9/11/2018 N/A N/A 8/6/2021 11/30/2020 N/A N No
AE1-130 - Meads Store 138 kV VA Bedford Withdrawn AEP 83 83 55.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1130_imp.pdf Document Posted Withdrawn N/A N/A 9/11/2018 N/A N/A 8/6/2021 11/30/2020 N/A N No
AE1-137 + Bluff Point-Randolph IN Randolph Withdrawn Unknown 100 100 38 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/24/2018 N/A N/A 10/3/2018 10/31/2021 N/A N No
AE1-137 - Bluff Point-Randolph IN Randolph Withdrawn AEP 100 100 38 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/24/2018 N/A N/A 10/3/2018 10/31/2021 N/A N No
AE1-145 + Wallops Island 69 kV VA Accomack Withdrawn ODEC 20 20 20 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1145_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1145_imp.pdf Document Posted Withdrawn N/A N/A 9/24/2018 N/A N/A 4/20/2022 12/1/2020 N/A N No
AE1-145 - Wallops Island 69 kV VA Accomack Active ODEC 20 20 20 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1145_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1145_imp.pdf Document Posted N/A N/A 9/24/2018 N/A N/A 12/1/2020 N/A N No
AE1-146 + Ebersole #2-Fostoria Central 138 kV OH Hancock Active Unknown 120 120 81.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1146_imp.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 5/1/2020 N/A N No
AE1-146 - Ebersole #2-Fostoria Central 138 kV OH Hancock Active AEP 120 120 81.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1146_imp.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 5/1/2020 N/A N No
AE1-170 + Kenzie Creek-Colby 138 kV MI Cass Active Unknown 150 150 63 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1170_imp.pdf Document Posted In Progress N/A N/A 9/25/2018 N/A N/A 12/31/2022 N/A N No
AE1-170 - Kenzie Creek-Colby 138 kV MI Cass Active AEP 150 150 63 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1170_imp.pdf Document Posted In Progress N/A N/A 9/25/2018 N/A N/A 12/31/2022 N/A N No
AE1-171 + Reynolds-Olive 345 kV IN White Withdrawn Unknown 280 280 118 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/25/2018 N/A N/A 10/1/2018 12/31/2022 N/A N No
AE1-171 - Reynolds-Olive 345 kV IN White Withdrawn AEP 280 280 118 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/25/2018 N/A N/A 10/1/2018 12/31/2022 N/A N No
AE1-176 + Roanoke-Vinton 12 kV (Niagara Hydro) Niagara Power Plant Dam VA Roanoke In Service Unknown 2.4 2.4 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1176_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1176_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_176_isa.pdf Document Posted N/A Not Required N/A N/A 9/25/2018 N/A N/A 6/1/2020 6/1/2020 5/23/2020 N/A N No
AE1-176 - Roanoke-Vinton 12 kV (Niagara Hydro) Niagara Power Plant Dam VA Roanoke In Service AEP 2.4 2.4 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1176_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1176_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_176_isa.pdf Document Posted N/A Not Required N/A N/A 9/25/2018 N/A N/A 6/1/2020 6/1/2020 5/23/2020 N/A N No
AE1-178 + Wolf Hills 138 kV Wolf Hills Energy Plant VA Washington In Service Unknown 294 19 19 19 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1178_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1178_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_178_isa.pdf Document Posted N/A Not Required N/A N/A 9/25/2018 N/A N/A 12/21/2021 12/21/2021 5/25/2021 N/A N No
AE1-178 - Wolf Hills 138 kV Wolf Hills Energy Plant VA Washington In Service AEP 294 19 19 19 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1178_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1178_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_178_isa.pdf Document Posted N/A Not Required N/A N/A 9/25/2018 N/A N/A 12/21/2021 12/21/2021 5/25/2021 N/A N No
AE1-189 + Penville-Adams 138 kV IN Jay Withdrawn Unknown 245 245 103 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/26/2018 N/A N/A 10/1/2018 12/31/2022 N/A N No
AE1-189 - Penville-Adams 138 kV IN Jay Withdrawn AEP 245 245 103 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/26/2018 N/A N/A 10/1/2018 12/31/2022 N/A N No
AE1-197 + Reynolds 345 kV IN White Withdrawn Unknown 500 500 65 Capacity Generation Interconnection Wind Withdrawn N/A N/A 9/26/2018 N/A N/A 10/1/2018 9/1/2021 N/A N No
AE1-197 - Reynolds 345 kV IN White Withdrawn AEP 500 500 65 Capacity Generation Interconnection Wind Withdrawn N/A N/A 9/26/2018 N/A N/A 10/1/2018 9/1/2021 N/A N No
AE1-200 + College Corner-Randolph 138 kV IN Randolph Withdrawn Unknown 235 235 99 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/26/2018 N/A N/A 10/1/2018 12/31/2022 N/A N No
AE1-200 - College Corner-Randolph 138 kV IN Randolph Withdrawn AEP 235 235 99 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/26/2018 N/A N/A 10/1/2018 12/31/2022 N/A N No
AE1-207 + Mississinewa-Gaston 138 kV IN Grant Active Unknown 160 160 67.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1207_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1207_imp.pdf Document Posted In Progress N/A N/A 9/27/2018 N/A N/A 12/31/2022 N/A N No
AE1-207 - Mississinewa-Gaston 138 kV IN Grant Active AEP 160 160 67.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1207_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1207_imp.pdf Document Posted In Progress N/A N/A 9/27/2018 N/A N/A 12/31/2022 N/A N No
AE1-208 + Delaware-Van Buren 138 kV IN Delaware Active Unknown 130 130 55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1208_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1208_imp.pdf Document Posted In Progress N/A N/A 9/27/2018 N/A N/A 12/31/2022 N/A N No
AE1-208 - Delaware-Van Buren 138 kV IN Delaware Active AEP 130 130 55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1208_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1208_imp.pdf Document Posted In Progress N/A N/A 9/27/2018 N/A N/A 12/31/2022 N/A N No
AE1-209 + Desoto 345 kV IN Randolph Active Unknown 100 100 13 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1209_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1209_imp.pdf Document Posted In Progress N/A N/A 9/27/2018 N/A N/A 10/31/2021 N/A N No
AE1-209 - Desoto 345 kV IN Randolph Active AEP 100 100 13 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1209_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1209_imp.pdf Document Posted In Progress N/A N/A 9/27/2018 N/A N/A 10/31/2021 N/A N No
AE1-210 + Desoto 345 kV IN Randolph Active Unknown 100 100 13 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1210_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1210_imp.pdf Document Posted In Progress N/A N/A 9/27/2018 N/A N/A 10/31/2021 N/A N No
AE1-210 - Desoto 345 kV IN Randolph Active AEP 100 100 13 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1210_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1210_imp.pdf Document Posted In Progress N/A N/A 9/27/2018 N/A N/A 10/31/2021 N/A N No
AE1-211 + Reynolds 345 kV IN Jasper Withdrawn Unknown 302.4 302.4 40 Capacity Generation Interconnection Wind Withdrawn N/A N/A 9/27/2018 N/A N/A 10/1/2018 10/31/2020 N/A N No
AE1-211 - Reynolds 345 kV IN Jasper Withdrawn AEP 302.4 302.4 40 Capacity Generation Interconnection Wind Withdrawn N/A N/A 9/27/2018 N/A N/A 10/1/2018 10/31/2020 N/A N No
AE1-212 + Grandview-Clifftop 138 kV Raleigh Solar Project WV Raliegh Engineering and Procurement Unknown 90 90 53.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1212_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1212_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1212_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_212_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1212_csa.pdf Document Posted N/A N/A 9/7/2018 N/A N/A 8/1/2024 8/1/2024 N/A N No
AE1-212 - Grandview-Clifftop 138 kV WV Raliegh Active AEP 90 90 53.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1212_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1212_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1212_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/csa/ae1212_csa.pdf Document Posted N/A N/A 9/7/2018 N/A N/A 9/30/2021 N/A N No
AE1-214 + Rockport 765 kV IN Spencer Withdrawn Unknown 800 800 625 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 9/27/2018 N/A N/A 10/2/2018 12/1/2023 N/A N No
AE1-214 - Rockport 765 kV IN Spencer Withdrawn AEP 800 800 625 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 9/27/2018 N/A N/A 10/2/2018 12/1/2023 N/A N No
AE1-215 + Reynolds 345 kV IN White Withdrawn Unknown 500 500 395 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 9/27/2018 N/A N/A 10/1/2018 12/1/2023 N/A N No
AE1-215 - Reynolds 345 kV IN White Withdrawn AEP 500 500 395 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 9/27/2018 N/A N/A 10/1/2018 12/1/2023 N/A N No
AE1-216 + Reynolds 345 kV IN White Withdrawn Unknown 500 500 395 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 9/27/2018 N/A N/A 10/2/2018 12/1/2023 N/A N No
AE1-216 - Reynolds 345 kV IN White Withdrawn AEP 500 500 395 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 9/27/2018 N/A N/A 10/2/2018 12/1/2023 N/A N No
AE1-217 + Gaston 138kV IN Delaware Withdrawn Unknown 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1217_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1217_imp.pdf Document Posted N/A N/A 9/27/2018 N/A N/A 1/30/2020 12/31/2022 N/A N No
AE1-217 - Gaston 138kV IN Delaware Withdrawn AEP 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1217_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1217_imp.pdf Document Posted N/A N/A 9/27/2018 N/A N/A 1/30/2020 12/31/2022 N/A N No
AE1-218 + Glassboro 12 kV Glassboro LF Solar NJ Gloucester Engineering and Procurement AEC 2 2 0.82 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1218_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1218_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1218_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1218_wmpa.pdf Not Required N/A N/A 9/27/2018 N/A N/A 12/31/2023 7/17/2022 7/17/2022 N/A N No
AE1-218 - Glassboro 12 kV Glassboro LF Solar NJ Gloucester Engineering and Procurement AEC 2 2 0.82 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1218_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1218_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1218_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1218_wmpa.pdf Not Required N/A N/A 9/27/2018 N/A N/A 7/17/2022 7/17/2022 N/A N No
AE1-220 + Coleen-Clifford 138 kV VA Nelson Withdrawn Unknown 100 100 66.7 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/24/2018 N/A N/A 6/17/2019 6/1/2022 N/A N No
AE1-220 - Coleen-Clifford 138 kV VA Nelson Withdrawn AEP 100 100 66.7 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/24/2018 N/A N/A 6/17/2019 6/1/2022 N/A N No
AE1-226 + Face Rock-Kinzer #13 69 kV Holtwood Solar PA Lancaster Engineering and Procurement PPL 19.8 19.8 9.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1226_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1226_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1226_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_226_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_226_csa.pdf Document Posted N/A N/A 9/28/2018 N/A N/A 4/7/2023 4/1/2022 4/1/2022 N/A N No
AE1-226 - Face Rock-Kinzer #13 69 kV Holtwood Solar PA Lancaster Engineering and Procurement PPL 19.8 19.8 9.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1226_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1226_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1226_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_226_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_226_csa.pdf Document Posted N/A N/A 9/28/2018 N/A N/A 4/1/2022 4/1/2022 N/A N No
AE1-227 + Cumberland 69 kV OH Guernsey Active Unknown 49.5 49.5 30.69 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1227_imp.pdf Document Posted In Progress N/A N/A 9/28/2018 N/A N/A 9/30/2021 N/A N No
AE1-227 - Cumberland 69 kV OH Guernsey Active AEP 49.5 49.5 30.69 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1227_imp.pdf Document Posted In Progress N/A N/A 9/28/2018 N/A N/A 9/30/2021 N/A N No
AE1-229 + Deepwater-Upper Pittsgrove 138 kV Pilesgrove Solar Project NJ Salem Engineering and Procurement AEC 149.3 149.3 89 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1229_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1229_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1229_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_229_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_229_csa.pdf Document Posted N/A N/A 9/17/2018 N/A N/A 12/31/2026 12/31/2026 N/A N No
AE1-229 - Deepwater-Upper Pittsgrove 138 kV NJ Salem Active AEC 149.3 149.3 89 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1229_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1229_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1229_fac.pdf Document Posted N/A N/A 9/17/2018 N/A N/A 9/30/2021 N/A N No
AE1-237 + Andover (Maysville) 69kV I Welcome Solar II PA Crawford Engineering and Procurement ATSI 19.9 19.9 13.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1237_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1237_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1237_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_237_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_237_csa.pdf Document Posted N/A N/A 9/28/2018 N/A N/A 12/31/2023 12/31/2023 N/A N No
AE1-237 - Andover (Maysville) 69kV I PA Crawford Active ATSI 19.9 19.9 13.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1237_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1237_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1237_fac.pdf Document Posted N/A N/A 9/28/2018 N/A N/A 6/1/2020 N/A N No
AE1-243 + Warren Glen Storage 34.5 kV Warren Glen Storage NJ Warren Engineering and Procurement JCPL 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1243_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1243_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1243_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_243_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_243_csa.pdf Document Posted N/A N/A 9/28/2018 N/A N/A 10/31/2023 10/31/2023 N/A N No
AE1-243 - Warren Glen Storage 34.5 kV NJ Warren Active JCPL 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1243_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1243_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1243_fac.pdf Document Posted N/A N/A 9/28/2018 N/A N/A 12/1/2019 N/A N No
AE1-245 + Haviland 138 kV OH Paulding Active Unknown 150 150 19.5 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1245_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1245_imp.pdf Document Posted In Progress N/A N/A 9/18/2018 N/A N/A 6/30/2021 N/A N No
AE1-245 - Haviland 138 kV OH Paulding Active AEP 150 150 19.5 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1245_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1245_imp.pdf Document Posted In Progress N/A N/A 9/18/2018 N/A N/A 6/30/2021 N/A N No
AE1-250 + Smith Mountain-E. Danville 138 kV VA Pittsylvania Active Unknown 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1250_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1250_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 9/30/2021 N/A N No
AE1-250 - Smith Mountain-E. Danville 138 kV VA Pittsylvania Active AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1250_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1250_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 9/30/2021 N/A N No
AE2-006 + Twittys Creek 34.5 kV Twittys Creek Solar VA Charlotte Partially in Service - Under Construction Dominion 13.8 0 2.9 0 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2006_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2006_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2006_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2006_wmpa.pdf Not Required N/A N/A 10/8/2018 N/A N/A 12/8/2020 12/31/2020 12/31/2020 12/8/2020 N/A N No
AE2-006 - Twittys Creek 34.5 kV Twittys Creek Solar VA Charlotte Partially in Service - Under Construction Dominion 13.8 0 2.9 0 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2006_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2006_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2006_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2006_wmpa.pdf Not Required N/A N/A 10/8/2018 N/A N/A 12/31/2020 12/31/2020 12/8/2020 N/A N No
AE2-008 + Elderberry-Dumont 345 kV IN St. Joseph Withdrawn Unknown 390 80 80 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2008_fea.pdf Document Posted Withdrawn N/A N/A 10/15/2018 N/A N/A 1/30/2020 12/31/2022 N/A N No
AE2-008 - Elderberry-Dumont 345 kV IN St. Joseph Withdrawn AEP 390 80 80 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2008_fea.pdf Document Posted Withdrawn N/A N/A 10/15/2018 N/A N/A 1/30/2020 12/31/2022 N/A N No
AE2-045 + Olive-Reynolds 345 kV IN Lake Active Unknown 200 200 84.28 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2045_imp.pdf Document Posted In Progress N/A N/A 1/29/2019 N/A N/A 12/31/2022 N/A N No
AE2-045 - Olive-Reynolds 345 kV IN Lake Active AEP 200 200 84.28 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2045_imp.pdf Document Posted In Progress N/A N/A 1/29/2019 N/A N/A 12/31/2022 N/A N No
AE2-046 + Harwood-East Hazelton 69 kV McAdoo Energy Center PA Schuylkill Engineering and Procurement PPL 50 50 24 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2046_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2046_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2046_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_046_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_046_csa.pdf Document Posted N/A N/A 1/30/2019 N/A N/A 8/1/2023 8/1/2023 N/A N No
AE2-046 - Harwood-East Hazelton 69 kV PA Schuylkill Active PPL 50 50 24 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2046_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2046_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2046_fac.pdf Document Posted N/A N/A 1/30/2019 N/A N/A 12/31/2020 N/A N No
AE2-047 + Ridgeway-Solite 69 kV VA Henry Active Unknown 50 50 32.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2047_imp.pdf Document Posted In Progress N/A N/A 1/31/2019 N/A N/A 12/15/2021 N/A N No
AE2-047 - Ridgeway-Solite 69 kV VA Henry Active AEP 50 50 32.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2047_imp.pdf Document Posted In Progress N/A N/A 1/31/2019 N/A N/A 12/15/2021 N/A N No
AE2-048 + Muskingum-W. Millersport 345 kV OH Fairfield Active Unknown 220 220 147.7 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2048_imp.pdf Document Posted In Progress N/A N/A 1/31/2019 N/A N/A 6/1/2022 N/A N No
AE2-048 - Muskingum-W. Millersport 345 kV OH Fairfield Active AEP 220 220 147.7 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2048_imp.pdf Document Posted In Progress N/A N/A 1/31/2019 N/A N/A 6/1/2022 N/A N No
AE2-054 + Warfordsburg 34 kV Blairs Valley PA Franklin Engineering and Procurement APS 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2054_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2054_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2054_wmpa.pdf Not Required N/A N/A 1/31/2019 N/A N/A 9/30/2023 9/30/2023 N/A N No
AE2-054 - Warfordsburg 34 kV Blairs Valley PA Franklin Engineering and Procurement APS 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2054_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2054_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2054_wmpa.pdf Not Required N/A N/A 1/31/2019 N/A N/A 3/31/2021 3/31/2021 3/31/2021 N/A N No
AE2-072 + East Leipsic-Richland 138 kV OH Putnam Active Unknown 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2072_imp.pdf Document Posted In Progress N/A N/A 2/14/2019 N/A N/A 12/31/2021 N/A N No
AE2-072 - East Leipsic-Richland 138 kV OH Putnam Active AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2072_imp.pdf Document Posted In Progress N/A N/A 2/14/2019 N/A N/A 12/31/2021 N/A N No
AE2-073 + Centerburg 138kV OH Licking Active Unknown 200 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2073_imp.pdf Document Posted In Progress N/A N/A 2/15/2019 N/A N/A 11/1/2021 N/A N No
AE2-073 - Centerburg 138kV OH Licking Active AEP 200 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2073_imp.pdf Document Posted In Progress N/A N/A 2/15/2019 N/A N/A 11/1/2021 N/A N No
AE2-089 + Pennville-Adams 138 kV IN Jay Active Unknown 155 155 93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2089_imp.pdf Document Posted In Progress N/A N/A 2/22/2019 N/A N/A 12/31/2022 N/A N No
AE2-089 - Pennville-Adams 138 kV IN Jay Active AEP 155 155 93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2089_imp.pdf Document Posted In Progress N/A N/A 2/22/2019 N/A N/A 12/31/2022 N/A N No
AE2-090 + Randolph-Hodgin 138 kV IN Randolph Withdrawn Unknown 144 144 86.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2090_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2090_imp.pdf Document Posted N/A N/A 2/22/2019 N/A N/A 10/15/2020 12/31/2022 N/A N No
AE2-090 - Randolph-Hodgin 138 kV IN Randolph Withdrawn AEP 144 144 86.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2090_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2090_imp.pdf Document Posted N/A N/A 2/22/2019 N/A N/A 10/15/2020 12/31/2022 N/A N No
AE2-091 + Newport 69 kV NJ Cumberland Withdrawn AEC 35 35 23 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2091_imp.pdf Document Posted N/A N/A 1/24/2019 N/A N/A 3/31/2020 6/30/2022 N/A N No
AE2-091 - Newport 69 kV NJ Cumberland Withdrawn Unknown 35 35 23 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2091_imp.pdf Document Posted N/A N/A 1/24/2019 N/A N/A 3/31/2020 6/30/2022 N/A N No
AE2-130 + Rockport 765 kV IN Spencer Active Unknown 800 800 480 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2130_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 12/1/2022 N/A N No
AE2-130 - Rockport 765 kV IN Spencer Active AEP 800 800 480 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2130_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 12/1/2022 N/A N No
AE2-134 + Locust Grove-Paytes 115 kV Pine Glade Solar VA Orange Under Construction Dominion 62.5 0 16.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2134_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_134_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_134_csa.pdf Document Posted N/A N/A 3/4/2019 N/A N/A 4/1/2023 3/30/2023 3/30/2023 N/A N No
AE2-134 - Locust Grove-Paytes 115 kV Pine Glade Solar VA Orange Engineering and Procurement Dominion 62.5 0 16.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2134_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_134_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_134_csa.pdf Document Posted N/A N/A 10/1/2022 3/4/2019 N/A N/A 10/3/2022 3/30/2022 3/30/2022 N/A N No
AE2-136 + Muskingum River-W. Millersport 345 kV OH Fairfield Active Unknown 114 114 83.2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2136_imp.pdf Document Posted In Progress N/A N/A 3/6/2019 N/A N/A 6/1/2022 N/A N No
AE2-136 - Muskingum River-W. Millersport 345 kV OH Fairfield Active AEP 114 114 83.2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2136_imp.pdf Document Posted In Progress N/A N/A 3/6/2019 N/A N/A 6/1/2022 N/A N No
AE2-140 + Axton-Danville 138 kV VA Henry Active Unknown 201.1 201.1 120.66 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2140_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2140_imp.pdf Document Posted In Progress N/A N/A 3/11/2019 N/A N/A 5/31/2022 N/A N No
AE2-140 - Axton-Danville 138 kV VA Henry Active AEP 201.1 201.1 120.66 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2140_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2140_imp.pdf Document Posted In Progress N/A N/A 3/11/2019 N/A N/A 5/31/2022 N/A N No
AE2-148 + Beatty-Greene 345 kV OH Madison Active Unknown 577 577 397.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2148_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_148_isa2.pdf Interim Study N/A Not Required N/A N/A 2/20/2019 N/A N/A 6/1/2022 N/A N No
AE2-148 - Beatty-Greene 345 kV OH Madison Active AEP 577 577 397.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2148_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_148_isa2.pdf Interim Study N/A Not Required N/A N/A 2/20/2019 N/A N/A 6/1/2022 N/A N No
AE2-149 + Biers Run-Bixby 345 kV OH Pickaway Active Unknown 400 400 291.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2149_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2149_imp.pdf Document Posted In Progress N/A N/A 3/14/2019 N/A N/A 6/1/2022 N/A N No
AE2-149 - Biers Run-Bixby 345 kV OH Pickaway Active AEP 400 400 291.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2149_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2149_imp.pdf Document Posted In Progress N/A N/A 3/14/2019 N/A N/A 6/1/2022 N/A N No
AE2-154 + Meadow Lake 345 kV (MLV VIII) IN White Active Unknown 250 250 32.5 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2154_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2154_imp.pdf Document Posted In Progress N/A N/A 3/14/2019 N/A N/A 10/31/2021 N/A N No
AE2-154 - Meadow Lake 345 kV (MLV VIII) IN White Active AEP 250 250 32.5 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2154_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2154_imp.pdf Document Posted In Progress N/A N/A 3/14/2019 N/A N/A 10/31/2021 N/A N No
AE2-158 + Kanawha River 138 kV WV Fayette Withdrawn Unknown 48 Energy Merchant Transmission Hydro AC 48 NFTIR Withdrawn N/A N/A 3/15/2019 N/A N/A 4/1/2019 10/1/2021 N/A S No
AE2-158 - Kanawha River 138 kV WV Fayette Withdrawn AEP 48 Energy Merchant Transmission Hydro AC 48 NFTIR Withdrawn N/A N/A 3/15/2019 N/A N/A 4/1/2019 10/1/2021 N/A S No
AE2-159 + Kanawha River 138 kV WV Fayette Withdrawn Unknown 48 48 0 Energy Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2159_fea.pdf Document Posted N/A N/A 3/15/2019 N/A N/A 11/21/2019 10/1/2021 N/A N No
AE2-159 - Kanawha River 138 kV WV Fayette Withdrawn AEP 48 48 0 Energy Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2159_fea.pdf Document Posted N/A N/A 3/15/2019 N/A N/A 11/21/2019 10/1/2021 N/A N No
AE2-160 + Kanawha River 138 kV WV Fayette Active Unknown 51 51 30 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2160_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 10/1/2021 N/A N No
AE2-160 - Kanawha River 138 kV WV Fayette Active AEP 51 51 30 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2160_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 10/1/2021 N/A N No
AE2-166 + Stockton 138 kV VA Henry Active Unknown 90 90 54 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2166_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 12/31/2022 N/A N No
AE2-166 - Stockton 138 kV VA Henry Active AEP 90 90 54 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2166_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 12/31/2022 N/A N No
AE2-169 + Delaware-Van Buren 138 kV IN Delaware Active Unknown 163 33 33 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2169_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 12/31/2022 N/A N No
AE2-169 - Delaware-Van Buren 138 kV IN Delaware Active AEP 163 33 33 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2169_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 12/31/2022 N/A N No
AE2-170 + Gaston-Desoto 138 kV IN Delaware Withdrawn Unknown 250 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2170_fea.pdf Document Posted N/A N/A 3/15/2019 N/A N/A 1/30/2020 12/31/2022 N/A N No
AE2-170 - Gaston-Desoto 138 kV IN Delaware Withdrawn AEP 250 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2170_fea.pdf Document Posted N/A N/A 3/15/2019 N/A N/A 1/30/2020 12/31/2022 N/A N No
AE2-171 + Makahoy 138 kV IN Madison Withdrawn Unknown 150 30 30 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2171_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2171_imp.pdf Document Posted N/A N/A 3/15/2019 N/A N/A 3/24/2021 12/31/2022 N/A N No
AE2-171 - Makahoy 138 kV IN Madison Withdrawn AEP 150 30 30 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2171_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2171_imp.pdf Document Posted N/A N/A 3/15/2019 N/A N/A 3/24/2021 12/31/2022 N/A N No
AE2-172 + Mississinewa-Gaston 138 kV IN Grant Active Unknown 40 40 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2172_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 12/31/2022 N/A N No
AE2-172 - Mississinewa-Gaston 138 kV IN Grant Active AEP 40 40 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2172_imp.pdf Document Posted In Progress N/A N/A 3/15/2019 N/A N/A 12/31/2022 N/A N No
AE2-174 + Fremont Center-Tiffin Center 138 kV circuit #1 OH Seneca Active Unknown 198 198 34.85 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2174_imp.pdf Document Posted In Progress N/A N/A 3/18/2019 N/A N/A 10/31/2021 N/A N No
AE2-174 - Fremont Center-Tiffin Center 138 kV circuit #1 OH Seneca Active AEP 198 198 34.85 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2174_imp.pdf Document Posted In Progress N/A N/A 3/18/2019 N/A N/A 10/31/2021 N/A N No
AE2-195 + East Canton-Robertsville 69 kV OH Stark Active Unknown 19.7 19.7 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2195_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2195_imp.pdf Document Posted In Progress N/A N/A 3/18/2019 N/A N/A 10/1/2021 N/A N No
AE2-195 - East Canton-Robertsville 69 kV OH Stark Active AEP 19.7 19.7 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2195_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2195_imp.pdf Document Posted In Progress N/A N/A 3/18/2019 N/A N/A 10/1/2021 N/A N No
AE2-196 + Mt. Airy-Wythe 138 kV VA Wythe Withdrawn Unknown 94.6 94.6 56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2196_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2196_imp.pdf Document Posted N/A N/A 3/19/2019 N/A N/A 3/27/2020 12/31/2022 N/A N No
AE2-196 - Mt. Airy-Wythe 138 kV VA Wythe Withdrawn AEP 94.6 94.6 56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2196_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2196_imp.pdf Document Posted N/A N/A 3/19/2019 N/A N/A 3/27/2020 12/31/2022 N/A N No
AE2-204 + Bolivar 34.5 kV OH Stark Active Unknown 19.3 19.3 9.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2204_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2204_imp.pdf Document Posted In Progress N/A N/A 3/19/2019 N/A N/A 5/1/2021 N/A N No
AE2-204 - Bolivar 34.5 kV OH Stark Active AEP 19.3 19.3 9.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2204_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2204_imp.pdf Document Posted In Progress N/A N/A 3/19/2019 N/A N/A 5/1/2021 N/A N No
AE2-208 + Chavies-Bonnyman 69 kV KY Perry Withdrawn Unknown 80 25 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2208_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2208_imp.pdf Document Posted N/A N/A 3/20/2019 N/A N/A 3/27/2020 12/31/2021 N/A N No
AE2-208 - Chavies-Bonnyman 69 kV KY Perry Withdrawn AEP 80 25 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2208_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2208_imp.pdf Document Posted N/A N/A 3/20/2019 N/A N/A 3/27/2020 12/31/2021 N/A N No
AE2-211 + Jackson-Three Mile Island 230 kV Dover Solar PA York Engineering and Procurement ME 75 55 31.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2211_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2211_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2211_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_211_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_211_csa.pdf Document Posted N/A N/A 3/20/2019 N/A N/A 11/1/2024 11/1/2024 N/A N No
AE2-211 - Jackson-Three Mile Island 230 kV PA York Active ME 55 55 23.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2211_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2211_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2211_fac.pdf Document Posted N/A N/A 3/20/2019 N/A N/A 6/30/2022 N/A N No
AE2-214 + Cole 345 kV OH Franklin Active Unknown 200 200 120 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2214_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2214_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-214 - Cole 345 kV OH Franklin Active AEP 200 200 120 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2214_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2214_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-216 + Hardin Switch 345 kV OH Hardin Active Unknown 55 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2216_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2216_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 12/31/2022 N/A N No
AE2-216 - Hardin Switch 345 kV OH Hardin Active AEP 55 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2216_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2216_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 12/31/2022 N/A N No
AE2-219 + Bluff Point-Randolph 138 kV IN Randolph Active Unknown 100 100 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2219_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2219_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 10/31/2022 N/A N No
AE2-219 - Bluff Point-Randolph 138 kV IN Randolph Active AEP 100 100 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2219_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2219_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 10/31/2022 N/A N No
AE2-220 + Losantville 345 kV IN Randolph Active Unknown 125 125 52.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2220_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2220_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 10/31/2022 N/A N No
AE2-220 - Losantville 345 kV IN Randolph Active AEP 125 125 52.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2220_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2220_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 10/31/2022 N/A N No
AE2-224 + Bearrock-Johnstown 230 kV CPV Maple Hill Solar PA Cambria Engineering and Procurement PENELEC 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2224_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2224_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2224_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_224_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_224_csa.pdf Document Posted N/A N/A 3/22/2019 N/A N/A 5/5/2024 5/5/2024 N/A N No
AE2-224 - Bearrock-Johnstown 230 kV PA Cambria Active PENELEC 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2224_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2224_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2224_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_224_isa2.pdf Interim Study N/A N/A N/A 3/22/2019 N/A N/A 9/1/2021 N/A N No
AE2-227 + Iron Bridge 34 kV Bradley Ridge Solar VA Chesterfield Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2227_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2227_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2227_wmpa.pdf Not Required N/A N/A 3/22/2019 N/A N/A 11/30/2023 11/30/2023 N/A N No
AE2-227 - Iron Bridge 34 kV Bradley Ridge Solar VA Chesterfield Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2227_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2227_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2227_wmpa.pdf Not Required N/A N/A 3/22/2019 N/A N/A 11/30/2022 11/30/2022 N/A N No
AE2-228 + Tyler 34 kv Bradley BridgeSolar VA Chesterfield Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2228_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2228_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2228_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2228_wmpa.pdf Not Required N/A N/A 3/22/2019 N/A N/A 11/30/2023 11/30/2023 N/A N No
AE2-228 - Tyler 34 kv Bradley BridgeSolar VA Chesterfield Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2228_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2228_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2228_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2228_wmpa.pdf Not Required N/A N/A 3/22/2019 N/A N/A 10/31/2022 10/31/2022 N/A N No
AE2-234 + Liberty Center-Buckeye Tap 69 kV IN Huntington Active Unknown 35 35 24.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2234_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2234_imp.pdf Document Posted In Progress N/A N/A 3/22/2019 N/A N/A 7/31/2021 N/A N No
AE2-234 - Liberty Center-Buckeye Tap 69 kV IN Huntington Active AEP 35 35 24.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2234_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2234_imp.pdf Document Posted In Progress N/A N/A 3/22/2019 N/A N/A 7/31/2021 N/A N No
AE2-236 + Columbia-Northeast 138 kV IN Whitley Active Unknown 55 55 38.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2236_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2236_imp.pdf Document Posted In Progress N/A N/A 3/22/2019 N/A N/A 7/31/2021 N/A N No
AE2-236 - Columbia-Northeast 138 kV IN Whitley Active AEP 55 55 38.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2236_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2236_imp.pdf Document Posted In Progress N/A N/A 3/22/2019 N/A N/A 7/31/2021 N/A N No
AE2-239 + Tanners Creek-East Bend & Miami Fort-Terminal 345 kV N/A N/A Withdrawn Unknown 100 Energy Merchant Transmission AC 0 Withdrawn N/A N/A 3/22/2019 N/A N/A 4/1/2019 3/1/2023 N/A S No
AE2-239 - Tanners Creek-East Bend & Miami Fort-Terminal 345 kV N/A N/A Withdrawn AEP 100 Energy Merchant Transmission AC 0 Withdrawn N/A N/A 3/22/2019 N/A N/A 4/1/2019 3/1/2023 N/A S No
AE2-240 + Olive-Reynolds 1 & 2 345 kV IN Starke Withdrawn Unknown 3170 Energy Merchant Transmission AC 0 https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ae2240_fea.pdf Document Posted N/A N/A 3/22/2019 N/A N/A 2/19/2021 6/1/2019 N/A S No
AE2-240 - Olive-Reynolds 1 & 2 345 kV IN Starke Withdrawn AEP 3170 Energy Merchant Transmission AC 0 https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ae2240_fea.pdf Document Posted N/A N/A 3/22/2019 N/A N/A 2/19/2021 6/1/2019 N/A S No
AE2-245 + Stockton 34.5 kV VA Henry Withdrawn Unknown 20 0 5.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2245_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2245_imp.pdf Document Posted Withdrawn N/A N/A 3/25/2019 N/A N/A 10/23/2020 12/30/2020 N/A N No
AE2-245 - Stockton 34.5 kV VA Henry Withdrawn AEP 20 0 5.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2245_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2245_imp.pdf Document Posted Withdrawn N/A N/A 3/25/2019 N/A N/A 10/23/2020 12/30/2020 N/A N No
AE2-253 + Hickory-Moyock 230 kV Oak Trail Solar NC Currituck Engineering and Procurement Dominion 100 50 34.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2253_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2253_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2253_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_253_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_253_csa.pdf Document Posted N/A N/A 3/25/2019 N/A N/A 1/3/2023 7/1/2023 7/1/2023 N/A N No
AE2-253 - Hickory-Moyock 230 kV Oak Trail Solar NC Currituck Engineering and Procurement Dominion 100 50 34.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2253_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2253_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2253_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_253_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_253_csa.pdf Document Posted N/A N/A 3/25/2019 N/A N/A 12/31/2022 12/31/2022 N/A N No
AE2-265 + Corey 138 kV MI St. Joseph Withdrawn Unknown 150 150 47.78 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 3/28/2019 N/A N/A 4/1/2019 9/1/2021 N/A N No
AE2-265 - Corey 138 kV MI St. Joseph Withdrawn AEP 150 150 47.78 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 3/28/2019 N/A N/A 4/1/2019 9/1/2021 N/A N No
AE2-266 + Corey 138kV MI St. Joseph Withdrawn Unknown 198.9 198.9 64.19 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 3/28/2019 N/A N/A 4/1/2019 9/1/2021 N/A N No
AE2-266 - Corey 138kV MI St. Joseph Withdrawn AEP 198.9 198.9 64.19 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 3/28/2019 N/A N/A 4/1/2019 9/1/2021 N/A N No
AE2-276 + Sullivan 345kV IN Sullivan Active Unknown 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2276_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2276_imp.pdf Document Posted In Progress N/A N/A 3/28/2019 N/A N/A 12/31/2020 N/A N No
AE2-276 - Sullivan 345kV IN Sullivan Active AEP 50 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2276_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2276_imp.pdf Document Posted In Progress N/A N/A 3/28/2019 N/A N/A 12/31/2020 N/A N No
AE2-280 + Claytor Lake-Edgemont 138 kV VA Montgomery Active Unknown 126.7 126.65 75.99 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2280_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2280_imp.pdf Document Posted In Progress N/A N/A 3/29/2019 N/A N/A 12/31/2022 N/A N No
AE2-280 - Claytor Lake-Edgemont 138 kV VA Montgomery Active AEP 126.7 126.65 75.99 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2280_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2280_imp.pdf Document Posted In Progress N/A N/A 3/29/2019 N/A N/A 12/31/2022 N/A N No
AE2-284 + Kenzie Creek-Colby 138 kV MI Cass Withdrawn Unknown 225 75 75 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2284_fea.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 1/30/2020 12/31/2022 N/A N No
AE2-284 - Kenzie Creek-Colby 138 kV MI Cass Withdrawn AEP 225 75 75 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2284_fea.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 1/30/2020 12/31/2022 N/A N No
AE2-290 + Nottingham 138 kV Nottingham Solar OH Harrison Engineering and Procurement Unknown 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2290_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2290_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2290_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_290_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_290_csa.pdf Document Posted N/A N/A 9/15/2023 3/29/2019 N/A N/A 9/15/2023 12/15/2023 12/15/2023 N/A N No
AE2-290 - Nottingham 138 kV Nottingham Solar OH Harrison Engineering and Procurement AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2290_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2290_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2290_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_290_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_290_csa.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 6/1/2021 12/15/2023 N/A N No
AE2-297 + Madison-Tanners Creek 138 kV Bellflower Solar 1 IN Henry Engineering and Procurement Unknown 152.5 152.5 91.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2297_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2297_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2297_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_297_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_297_csa.pdf Document Posted N/A N/A 4/22/2021 3/22/2019 N/A N/A 12/31/2024 12/31/2024 N/A N No
AE2-297 - Madison-Tanners Creek 138 kV Bellflower Solar 1 IN Henry Engineering and Procurement AEP 152.5 152.5 91.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2297_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2297_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2297_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_297_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_297_csa.pdf Document Posted N/A N/A 4/22/2021 3/22/2019 N/A N/A 12/31/2024 12/31/2024 N/A N No
AE2-298 + Haviland-Cavett Switch 69 kV OH Van Wert Active Unknown 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2298_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2298_imp.pdf Document Posted In Progress N/A N/A 3/22/2019 N/A N/A 12/31/2021 N/A N No
AE2-298 - Haviland-Cavett Switch 69 kV OH Van Wert Active AEP 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2298_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2298_imp.pdf Document Posted In Progress N/A N/A 3/22/2019 N/A N/A 12/31/2021 N/A N No
AE2-300 + OH Licking Withdrawn Unknown 200 200 200 Capacity Generation Interconnection Storage Withdrawn N/A N/A 3/29/2019 N/A N/A 4/1/2019 9/22/2022 N/A N No
AE2-300 - OH Licking Withdrawn AEP 200 200 200 Capacity Generation Interconnection Storage Withdrawn N/A N/A 3/29/2019 N/A N/A 4/1/2019 9/22/2022 N/A N No
AE2-302 + East Beaver-Lick 138 kV OH Jackson Active Unknown 49.9 49.9 29.94 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2302_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2302_imp.pdf Document Posted In Progress N/A N/A 3/29/2019 N/A N/A 7/1/2022 N/A N No
AE2-302 - East Beaver-Lick 138 kV OH Jackson Active AEP 49.9 49.9 29.94 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2302_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2302_imp.pdf Document Posted In Progress N/A N/A 3/29/2019 N/A N/A 7/1/2022 N/A N No
AE2-306 + Gunn Road 345 kV OH Hardin Active Unknown 30 30 18 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2306_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2306_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2306_fac.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 8/1/2021 N/A N No
AE2-306 - Gunn Road 345 kV OH Hardin Active AEP 30 30 18 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2306_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2306_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2306_fac.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 8/1/2021 N/A N No
AE2-315 + Yankee Tap 69 kV Yankee 1-7 OH Montgomery Engineering and Procurement Dayton 124 23.5 23.5 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2315_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2315_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2315_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_315_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_315_csa.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 11/30/2022 11/30/2022 N/A N No
AE2-315 - Yankee Tap 69 kV OH Montgomery Active Dayton 124 23.5 23.5 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2315_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2315_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2315_fac.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 6/1/2020 N/A N No
AE2-319 + Atlanta 69kV I Mustang County Solar Project OH Pickaway Engineering and Procurement Unknown 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2319_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2319_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2319_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_319_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_319_csa.pdf Document Posted N/A N/A 3/31/2019 N/A N/A 10/1/2025 10/1/2025 N/A N No
AE2-319 - Atlanta 69kV I OH Pickaway Active Dayton 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2319_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2319_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2319_fac.pdf Document Posted N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-322 + Mark Center 69 kV OH Defiance Active Unknown 60 60 40.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2322_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2322_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2021 N/A N No
AE2-322 - Mark Center 69 kV OH Defiance Active AEP 60 60 40.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2322_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2322_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2021 N/A N No
AE2-323 + Twin Branch-Guardian 138 kV IN Elkhart Active Unknown 100 100 67.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2323_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2323_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2021 N/A N No
AE2-323 - Twin Branch-Guardian 138 kV IN Elkhart Active AEP 100 100 67.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2323_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2323_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2021 N/A N No
AE2-325 + Valley 138 kV MI Van Buren Active Unknown 152.2 52.2 31.32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2325_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2325_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-325 - Valley 138 kV MI Van Buren Active AEP 152.2 52.2 31.32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2325_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2325_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-326 + Jacksons Ferry 138 kV VA Wythe Active Unknown 127.2 52.2 31.32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2326_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2326_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-326 - Jacksons Ferry 138 kV VA Wythe Active AEP 127.2 52.2 31.32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2326_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2326_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-327 + Biers Run-Circleville 138 kV OH Pickaway Withdrawn Unknown 162.2 52.2 31.32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2327_fea.pdf Document Posted N/A N/A 3/30/2019 N/A N/A 3/6/2020 12/1/2021 N/A N No
AE2-327 - Biers Run-Circleville 138 kV OH Pickaway Withdrawn AEP 162.2 52.2 31.32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2327_fea.pdf Document Posted N/A N/A 3/30/2019 N/A N/A 3/6/2020 12/1/2021 N/A N No
AE2-331 + Mark Center 69 kV OH Defiance Withdrawn Unknown 34.8 34.8 139.2 Capacity Generation Interconnection Storage Withdrawn N/A N/A 3/31/2019 N/A N/A 4/29/2019 12/1/2021 N/A N No
AE2-331 - Mark Center 69 kV OH Defiance Withdrawn AEP 34.8 34.8 139.2 Capacity Generation Interconnection Storage Withdrawn N/A N/A 3/31/2019 N/A N/A 4/29/2019 12/1/2021 N/A N No
AE2-332 + Twin Branch-Guardian 138 kV IN Elkhart Withdrawn Unknown 52.2 52.2 208.8 Capacity Generation Interconnection Storage Withdrawn N/A N/A 3/31/2019 N/A N/A 4/29/2019 12/1/2021 N/A N No
AE2-332 - Twin Branch-Guardian 138 kV IN Elkhart Withdrawn AEP 52.2 52.2 208.8 Capacity Generation Interconnection Storage Withdrawn N/A N/A 3/31/2019 N/A N/A 4/29/2019 12/1/2021 N/A N No
AE2-333 + Bedington 138 kV MD Frederick Active APS 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2333_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2333_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2333_fac.pdf Document Posted N/A N/A 3/31/2019 N/A N/A 12/1/2022 N/A N No
AE2-333 - Bedington 138 kV MD Frederick Active APS 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2333_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2333_imp.pdf Document Posted In Progress N/A N/A 3/31/2019 N/A N/A 12/1/2022 N/A N No
AE2-346 + Ahoskie 34.5 kV Colice Hall Solar NC Hertford Engineering and Procurement Dominion 17 12 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2346_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2346_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_346_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_346_csa.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 1/31/2023 1/31/2023 N/A N No
AE2-346 - Ahoskie 34.5 kV NC Hertford Active Dominion 17 12 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2346_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2346_imp.pdf Document Posted In Progress N/A N/A 3/29/2019 N/A N/A 12/30/2019 N/A N No
AF1-029 + Haviland-Cavett Switch 69 kV OH Van Wert Active Unknown 75 25 15 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1029_imp.pdf Document Posted In Progress N/A N/A 5/14/2019 N/A N/A 12/31/2021 N/A N No
AF1-029 - Haviland-Cavett Switch 69 kV OH Van Wert Active AEP 75 25 15 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1029_imp.pdf Document Posted In Progress N/A N/A 5/14/2019 N/A N/A 12/31/2021 N/A N No
AF1-046 + Twin Branch-Guardian 138 kV IN Elkhart Active Unknown 152.2 52.2 31.32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1046_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1046_imp.pdf Document Posted In Progress N/A N/A 6/28/2019 N/A N/A 12/1/2023 N/A N No
AF1-046 - Twin Branch-Guardian 138 kV IN Elkhart Active AEP 152.2 52.2 31.32 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1046_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1046_imp.pdf Document Posted In Progress N/A N/A 6/28/2019 N/A N/A 12/1/2023 N/A N No
AF1-047 + Mark Center 69 kV OH Defiance Active Unknown 94.8 34.8 20.88 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1047_imp.pdf Document Posted In Progress N/A N/A 6/28/2019 N/A N/A 12/1/2023 N/A N No
AF1-047 - Mark Center 69 kV OH Defiance Active AEP 94.8 34.8 20.88 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1047_imp.pdf Document Posted In Progress N/A N/A 6/28/2019 N/A N/A 12/1/2023 N/A N No
AF1-049 + Berry Hill 138 kV VA Pittsylvania Active Unknown 125 125 75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1049_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1049_imp.pdf Document Posted In Progress N/A N/A 7/12/2019 N/A N/A 11/25/2022 N/A N No
AF1-049 - Berry Hill 138 kV VA Pittsylvania Active AEP 125 125 75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1049_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1049_imp.pdf Document Posted In Progress N/A N/A 7/12/2019 N/A N/A 11/25/2022 N/A N No
AF1-051 + Gavin 765 kV OH Gallia Active Unknown 1360 11 11 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/af1051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1051_imp.pdf Document Posted In Progress N/A N/A 7/12/2019 N/A N/A 5/1/2024 N/A N No
AF1-051 - Gavin 765 kV OH Gallia Active AEP 1360 11 11 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/af1051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1051_imp.pdf Document Posted In Progress N/A N/A 7/12/2019 N/A N/A 5/1/2024 N/A N No
AF1-057 + Jackson-Three Mile Island 230 kV II Dover Solar PA York Engineering and Procurement ME 75 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1057_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1057_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1057_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/af1_057_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/af1_057_csa.pdf Document Posted N/A N/A 7/31/2019 N/A N/A 11/1/2024 11/1/2024 N/A N No
AF1-057 - Jackson-Three Mile Island 230 kV II PA York Active ME 75 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1057_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1057_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1057_fac.pdf Document Posted N/A N/A 7/31/2019 N/A N/A 6/30/2022 N/A N No
AF1-062 + Jug Street 138 kV OH Licking Active Unknown 200 200 80 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1062_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1062_imp.pdf Document Posted In Progress N/A N/A 7/31/2019 N/A N/A 8/22/2022 N/A N No
AF1-062 - Jug Street 138 kV OH Licking Active AEP 200 200 80 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1062_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1062_imp.pdf Document Posted In Progress N/A N/A 7/31/2019 N/A N/A 8/22/2022 N/A N No
AF1-063 + Lockwood Road 138 kV OH Defiance Active Unknown 30 30 19.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1063_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1063_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_063_isa2.pdf Interim Study N/A N/A N/A 7/31/2019 N/A N/A 3/31/2022 N/A N No
AF1-063 - Lockwood Road 138 kV OH Defiance Active AEP 30 30 19.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1063_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1063_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_063_isa2.pdf Interim Study N/A N/A N/A 7/31/2019 N/A N/A 3/31/2022 N/A N No
AF1-071 + College Corner 138 kV OH Preble Active Unknown 98 18 6.84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1071_imp.pdf Document Posted In Progress N/A N/A 8/13/2019 N/A N/A 7/1/2019 N/A N No
AF1-071 - College Corner 138 kV OH Preble Active AEP 98 18 6.84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1071_imp.pdf Document Posted In Progress N/A N/A 8/13/2019 N/A N/A 7/1/2019 N/A N No
AF1-076 + Southwest Lima 138 kV OH Allen Active Unknown 100 100 61.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1076_imp.pdf Document Posted In Progress N/A N/A 8/22/2019 N/A N/A 12/31/2021 N/A N No
AF1-076 - Southwest Lima 138 kV OH Allen Active AEP 100 100 61.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1076_imp.pdf Document Posted In Progress N/A N/A 8/22/2019 N/A N/A 12/31/2021 N/A N No
AF1-077 + Southwest Lima 138 kV OH Allen Active Unknown 200 100 61.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1077_imp.pdf Document Posted In Progress N/A N/A 8/22/2019 N/A N/A 12/31/2021 N/A N No
AF1-077 - Southwest Lima 138 kV OH Allen Active AEP 200 100 61.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1077_imp.pdf Document Posted In Progress N/A N/A 8/22/2019 N/A N/A 12/31/2021 N/A N No
AF1-080 + Deer Creek-Fisher Body-Mullin 138 kV IN Madison Withdrawn Unknown 220 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1080_imp.pdf Document Posted N/A N/A 8/28/2019 N/A N/A 9/29/2020 9/15/2021 N/A N No
AF1-080 - Deer Creek-Fisher Body-Mullin 138 kV IN Madison Withdrawn AEP 220 20 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1080_imp.pdf Document Posted N/A N/A 8/28/2019 N/A N/A 9/29/2020 9/15/2021 N/A N No
AF1-084 + East Hartford-Murch 69 kV MI Van Buren Active Unknown 85 85 54.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1084_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 10/1/2022 N/A N No
AF1-084 - East Hartford-Murch 69 kV MI Van Buren Active AEP 85 85 54.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1084_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 10/1/2022 N/A N No
AF1-085 + Southwest Lima-West Moulton 138 kV OH Auglaize Active Unknown 77 77 32.34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1085_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 11/30/2022 N/A N No
AF1-085 - Southwest Lima-West Moulton 138 kV OH Auglaize Active AEP 77 77 32.34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1085_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 11/30/2022 N/A N No
AF1-088 + Sullivan 345 kV IN Sullivan Active Unknown 1000 1000 1000 Capacity Merchant Transmission DC 1000 F/1000 NFTIR/1000 F/1000 NFTWR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1088_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 12/31/2025 N/A S No
AF1-088 - Sullivan 345 kV IN Sullivan Active AEP 1000 1000 1000 Capacity Merchant Transmission DC 1000 F/1000 NFTIR/1000 F/1000 NFTWR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1088_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 12/31/2025 N/A S No
AF1-091 + Butler-S Hicksville 138 kV IN DeKalb Active Unknown 180 180 138.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1091_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 6/1/2023 N/A N No
AF1-091 - Butler-S Hicksville 138 kV IN DeKalb Active AEP 180 180 138.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1091_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 6/1/2023 N/A N No
AF1-092 + Huntington Jct. 138 kV IN Huntington Active Unknown 150 150 115 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1092_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 6/1/2022 N/A N No
AF1-092 - Huntington Jct. 138 kV IN Huntington Active AEP 150 150 115 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1092_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 6/1/2022 N/A N No
AF1-113 + Gristmill 345 kV OH Auglaize Active Unknown 180 180 137.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1113_imp.pdf Document Posted In Progress N/A N/A 9/11/2019 N/A N/A 6/1/2022 N/A N No
AF1-113 - Gristmill 345 kV OH Auglaize Active AEP 180 180 137.3 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1113_imp.pdf Document Posted In Progress N/A N/A 9/11/2019 N/A N/A 6/1/2022 N/A N No
AF1-117 + Atlanta-Stuart 345 kV OH Ross Active Unknown 200 200 152.9 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1117_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1117_imp.pdf Document Posted In Progress N/A N/A 9/13/2019 N/A N/A 6/1/2023 N/A N No
AF1-117 - Atlanta-Stuart 345 kV OH Ross Active AEP 200 200 152.9 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1117_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1117_imp.pdf Document Posted In Progress N/A N/A 9/13/2019 N/A N/A 6/1/2023 N/A N No
AF1-118 + Sorenson-Desoto 345 kV IN Wells Active Unknown 350 350 268.9 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1118_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1118_imp.pdf Document Posted In Progress N/A N/A 9/13/2019 N/A N/A 6/1/2022 N/A N No
AF1-118 - Sorenson-Desoto 345 kV IN Wells Active AEP 350 350 268.9 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1118_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1118_imp.pdf Document Posted In Progress N/A N/A 9/13/2019 N/A N/A 6/1/2022 N/A N No
AF1-119 + Keystone-Desoto 345 kV IN Blackford Active Unknown 200 200 140 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1119_imp.pdf Document Posted In Progress N/A N/A 9/13/2019 N/A N/A 6/1/2022 N/A N No
AF1-119 - Keystone-Desoto 345 kV IN Blackford Active AEP 200 200 140 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1119_imp.pdf Document Posted In Progress N/A N/A 9/13/2019 N/A N/A 6/1/2022 N/A N No
AF1-130 + Inez 138 kV KY Martin Active Unknown 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1130_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_130_isa2.pdf Interim Study N/A N/A N/A 9/18/2019 N/A N/A 12/1/2023 N/A N No
AF1-130 - Inez 138 kV KY Martin Active AEP 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1130_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_130_isa2.pdf Interim Study N/A N/A N/A 9/18/2019 N/A N/A 12/1/2023 N/A N No
AF1-141 + Varner 138 kV IN DeKalb Active Unknown 96 96 62.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1141_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_141_isa2.pdf Interim Study N/A N/A N/A 8/30/2019 N/A N/A 5/31/2022 N/A N No
AF1-141 - Varner 138 kV IN DeKalb Active AEP 96 96 62.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1141_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_141_isa2.pdf Interim Study N/A N/A N/A 8/30/2019 N/A N/A 5/31/2022 N/A N No
AF1-144 + Hayden 345 kV OH Franklin Active Unknown 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1144_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1144_imp.pdf Document Posted In Progress N/A N/A 9/18/2019 N/A N/A 12/1/2023 N/A N No
AF1-144 - Hayden 345 kV OH Franklin Active AEP 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1144_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1144_imp.pdf Document Posted In Progress N/A N/A 9/18/2019 N/A N/A 12/1/2023 N/A N No
AF1-148 + Sorenson-Desoto 345 kV IN Wells Active Unknown 159 159 95.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1148_imp.pdf Document Posted In Progress N/A N/A 9/19/2019 N/A N/A 4/30/2023 N/A N No
AF1-148 - Sorenson-Desoto 345 kV IN Wells Active AEP 159 159 95.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1148_imp.pdf Document Posted In Progress N/A N/A 9/19/2019 N/A N/A 4/30/2023 N/A N No
AF1-158 + Edison-Gravel Pit 138 kV IN St. Joseph Active Unknown 150 150 90 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1158_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_158_isa2.pdf Interim Study N/A N/A N/A 9/20/2019 N/A N/A 4/30/2023 N/A N No
AF1-158 - Edison-Gravel Pit 138 kV IN St. Joseph Active AEP 150 150 90 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1158_imp.pdf Document Posted In Progress N/A N/A 9/20/2019 N/A N/A 4/30/2023 N/A N No
AF1-161 + Valley 138 kV MI Van Buren Active Unknown 50 50 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1161_imp.pdf Document Posted In Progress N/A N/A 9/20/2019 N/A N/A 3/1/2022 N/A N No
AF1-161 - Valley 138 kV MI Van Buren Active AEP 50 50 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1161_imp.pdf Document Posted In Progress N/A N/A 9/20/2019 N/A N/A 3/1/2022 N/A N No
AF1-162 + Inez 138 kV KY Martin Active Unknown 300 100 60 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1162_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_162_isa2.pdf Interim Study N/A N/A N/A 9/20/2019 N/A N/A 12/1/2023 N/A N No
AF1-162 - Inez 138 kV KY Martin Active AEP 300 100 60 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1162_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_162_isa2.pdf Interim Study N/A N/A N/A 9/20/2019 N/A N/A 12/1/2023 N/A N No
AF1-164 + Southwest Lima 345 kV OH Allen Active Unknown 300 300 195 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1164_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1164_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_164_isa2.pdf Interim Study N/A N/A N/A 9/20/2019 N/A N/A 6/30/2022 N/A N No
AF1-164 - Southwest Lima 345 kV OH Allen Active AEP 300 300 195 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1164_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1164_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_164_isa2.pdf Interim Study N/A N/A N/A 9/20/2019 N/A N/A 6/30/2022 N/A N No
AF1-175 + Donald C Cook-Jackson Road 345 kV IN St. Joseph Withdrawn Unknown 152 152 91.2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1175_fea.pdf Document Posted N/A N/A 9/24/2019 N/A N/A 4/16/2020 4/30/2023 N/A N No
AF1-175 - Donald C Cook-Jackson Road 345 kV IN St. Joseph Withdrawn AEP 152 152 91.2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1175_fea.pdf Document Posted N/A N/A 9/24/2019 N/A N/A 4/16/2020 4/30/2023 N/A N No
AF1-176 + Corey 138 kV MI St. Joseph Active Unknown 300 300 155.684 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1176_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1176_imp.pdf Document Posted In Progress N/A N/A 9/24/2019 N/A N/A 10/31/2022 N/A N No
AF1-176 - Corey 138 kV MI St. Joseph Active AEP 300 300 155.684 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1176_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1176_imp.pdf Document Posted In Progress N/A N/A 9/24/2019 N/A N/A 10/31/2022 N/A N No
AF1-202 + Keystone-Desoto 345 kV IN Blackford Active Unknown 200 200 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1202_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1202_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_202_isa2.pdf Interim Study N/A N/A N/A 9/25/2019 N/A N/A 12/31/2022 N/A N No
AF1-202 - Keystone-Desoto 345 kV IN Blackford Active AEP 200 200 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1202_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1202_imp.pdf Document Posted In Progress N/A N/A 9/25/2019 N/A N/A 12/31/2022 N/A N No
AF1-204 + Eugene 345 kV IN Vermillion Active Unknown 255 255 63.75 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1204_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1204_imp.pdf Document Posted In Progress N/A N/A 9/25/2019 N/A N/A 12/31/2022 N/A N No
AF1-204 - Eugene 345 kV IN Vermillion Active AEP 255 255 63.75 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1204_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1204_imp.pdf Document Posted In Progress N/A N/A 9/25/2019 N/A N/A 12/31/2022 N/A N No
AF1-205 + Napoleon Muni 138 kV OH Henry Active Unknown 40 40 24 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1205_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1205_imp.pdf Document Posted In Progress N/A N/A 9/26/2019 N/A N/A 11/1/2022 N/A N No
AF1-205 - Napoleon Muni 138 kV OH Henry Active ATSI 40 40 24 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1205_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1205_imp.pdf Document Posted In Progress N/A N/A 9/26/2019 N/A N/A 11/1/2022 N/A N No
AF1-207 + Reynolds–Olive #1 345 kV IN White Active Unknown 180 180 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1207_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1207_imp.pdf Document Posted In Progress N/A N/A 9/26/2019 N/A N/A 12/31/2022 N/A N No
AF1-207 - Reynolds–Olive #1 345 kV IN White Active AEP 180 180 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1207_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1207_imp.pdf Document Posted In Progress N/A N/A 9/26/2019 N/A N/A 12/31/2022 N/A N No
AF1-215 + Reynolds-Olive 345 kV IN Starke Active Unknown 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1215_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1215_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_215_isa2.pdf Interim Study N/A N/A N/A 9/26/2019 N/A N/A 5/31/2021 N/A N No
AF1-215 - Reynolds-Olive 345 kV IN Starke Active AEP 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1215_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1215_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_215_isa2.pdf Interim Study N/A N/A N/A 9/26/2019 N/A N/A 5/31/2021 N/A N No
AF1-221 + College Corner-Drewersburg 138 kV IN Franklin Active Unknown 180 180 138.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1221_imp.pdf Document Posted In Progress N/A N/A 9/27/2019 N/A N/A 6/1/2022 N/A N No
AF1-221 - College Corner-Drewersburg 138 kV IN Franklin Active AEP 180 180 138.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1221_imp.pdf Document Posted In Progress N/A N/A 9/27/2019 N/A N/A 6/1/2022 N/A N No
AF1-223 + Keystone-Desoto 345 kV IN Blackford Active Unknown 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1223_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1223_imp.pdf Document Posted In Progress N/A N/A 9/27/2019 N/A N/A 12/31/2022 N/A N No
AF1-223 - Keystone-Desoto 345 kV IN Blackford Active AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1223_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1223_imp.pdf Document Posted In Progress N/A N/A 9/27/2019 N/A N/A 12/31/2022 N/A N No
AF1-227 + Marysville – Gunn Road 345 kV OH Union Active Unknown 325 325 195 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1227_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_227_isa2.pdf Interim Study N/A N/A N/A 9/27/2019 N/A N/A 5/31/2022 N/A N No
AF1-227 - Marysville – Gunn Road 345 kV OH Union Active AEP 325 325 195 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1227_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1227_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_227_isa2.pdf Interim Study N/A N/A N/A 9/27/2019 N/A N/A 5/31/2022 N/A N No
AF1-228 + Beatty-Greene 345 kV OH Madison Active Unknown 155 155 93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1228_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1228_imp.pdf Document Posted In Progress N/A N/A 9/27/2019 N/A N/A 10/31/2022 N/A N No
AF1-228 - Beatty-Greene 345 kV OH Madison Active AEP 155 155 93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1228_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1228_imp.pdf Document Posted In Progress N/A N/A 9/27/2019 N/A N/A 10/31/2022 N/A N No
AF1-229 + Galion-South Berwick 345 kV OH Wyandot Active Unknown 120 120 72 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1229_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1229_imp.pdf Document Posted In Progress N/A N/A 9/27/2019 N/A N/A 10/31/2022 N/A N No
AF1-229 - Galion-South Berwick 345 kV OH Wyandot Active AEP 120 120 72 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1229_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1229_imp.pdf Document Posted In Progress N/A N/A 9/27/2019 N/A N/A 10/31/2022 N/A N No
AF1-268 + Desoto-Jay 138 kV IN Delaware Active Unknown 83 83 57.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1268_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1268_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 1/31/2022 N/A N No
AF1-268 - Desoto-Jay 138 kV IN Delaware Active AEP 83 83 57.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1268_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1268_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 1/31/2022 N/A N No
AF1-275 + Cole 345 kV OH Franklin Active Unknown 250 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1275_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1275_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/31/2022 N/A N No
AF1-275 - Cole 345 kV OH Franklin Active AEP 250 50 50 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1275_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1275_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/31/2022 N/A N No
AF1-285 + Gunn Road 345 kV OH Hardin Active Unknown 130 100 56 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1285_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1285_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1285_fac.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 8/1/2021 N/A N No
AF1-285 - Gunn Road 345 kV OH Hardin Active AEP 130 100 56 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1285_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1285_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1285_fac.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 8/1/2021 N/A N No
AF1-298 + Desoto 345 kV IN Delaware Withdrawn Unknown 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1298_fea.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 3/6/2020 10/31/2023 N/A N No
AF1-298 - Desoto 345 kV IN Delaware Withdrawn AEP 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1298_fea.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 3/6/2020 10/31/2023 N/A N No
AF1-308 + Waverly 138 kV OH Pike Withdrawn Unknown 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1308_fea.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 3/6/2020 12/31/2023 N/A N No
AF1-308 - Waverly 138 kV OH Pike Withdrawn AEP 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1308_fea.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 3/6/2020 12/31/2023 N/A N No
AF1-312 + Dan River-Ridgeway 138 kV NC Rockingham Withdrawn Unknown 150 150 90 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 9/30/2019 N/A N/A 10/28/2019 12/31/2023 N/A N No
AF1-312 - Dan River-Ridgeway 138 kV NC Rockingham Withdrawn AEP 150 150 90 Capacity Generation Interconnection Solar; Storage Withdrawn N/A N/A 9/30/2019 N/A N/A 10/28/2019 12/31/2023 N/A N No
AF1-313 + Wes Del-Royerton 138 kV IN Delaware Withdrawn Unknown 40 40 24 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1313_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1313_imp.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 10/9/2020 12/31/2022 N/A N No
AF1-313 - Wes Del-Royerton 138 kV IN Delaware Withdrawn AEP 40 40 24 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1313_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1313_imp.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 10/9/2020 12/31/2022 N/A N No
AF1-322 + Meadow Lake 345 kV IN White Active Unknown 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1322_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1322_imp.pdf Document Posted In Progress N/A N/A 9/23/2019 N/A N/A 8/15/2022 N/A N No
AF1-322 - Meadow Lake 345 kV IN White Active AEP 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1322_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1322_imp.pdf Document Posted In Progress N/A N/A 9/23/2019 N/A N/A 8/15/2022 N/A N No
AF1-323 + Scottsville-Colleen 138 kV VA Albemarle Active Unknown 55 55 33 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1323_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1323_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/12/2022 N/A N No
AF1-323 - Scottsville-Colleen 138 kV VA Albemarle Active AEP 55 55 33 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1323_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1323_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/12/2022 N/A N No
AF2-008 + Sullivan 345 kV IN Sullivan Active Unknown 2000 1000 500 Capacity Merchant Transmission DC 500 FTIR/1000 NFTIR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af2008_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af2008_imp.pdf Document Posted N/A N/A 10/3/2019 N/A N/A 12/31/2025 N/A S No
AF2-008 - Sullivan 345 kV IN Sullivan Active AEP 2000 1000 500 Capacity Merchant Transmission DC 500 FTIR/1000 NFTIR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af2008_fea.pdf Document Posted In Progress N/A N/A 10/3/2019 N/A N/A 12/31/2025 N/A S No
AF2-014 + Maddox Creek 345 kV OH Van Wert Active Unknown 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2014_imp.pdf Document Posted In Progress N/A N/A 10/18/2019 N/A N/A 12/31/2023 N/A N No
AF2-014 - Maddox Creek 345 kV OH Van Wert Active AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2014_imp.pdf Document Posted In Progress N/A N/A 10/18/2019 N/A N/A 12/31/2023 N/A N No
AF2-015 + Essex-McCarter 230 kV N/A N/A Withdrawn PSEG 50 Energy Merchant Transmission Not Required Withdrawn N/A N/A 10/23/2019 N/A N/A 7/28/2021 10/23/2019 N/A EE No
AF2-015 - Essex-McCarter 230 kV N/A N/A Withdrawn PSEG Energy Merchant Transmission Not Required Withdrawn N/A N/A 10/23/2019 N/A N/A 7/28/2021 10/23/2019 N/A EE No
AF2-017 + John’s Creek 34 kV KY Pike Withdrawn Unknown 20 20 8.4 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2019 N/A N/A 3/6/2020 12/31/2021 N/A N No
AF2-017 - John’s Creek 34 kV KY Pike Withdrawn AEP 20 20 8.4 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/31/2019 N/A N/A 3/6/2020 12/31/2021 N/A N No
AF2-018 + Inez 138 kV KY Martin Active Unknown 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2018_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2018_imp.pdf Document Posted In Progress N/A N/A 11/1/2019 N/A N/A 12/1/2023 N/A N No
AF2-018 - Inez 138 kV KY Martin Active AEP 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2018_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2018_imp.pdf Document Posted In Progress N/A N/A 11/1/2019 N/A N/A 12/1/2023 N/A N No
AF2-048 + Rio-Lick 138 kV OH Jackson Active Unknown 140 70 46.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2048_imp.pdf Document Posted In Progress N/A N/A 12/19/2019 N/A N/A 12/31/2021 N/A N No
AF2-048 - Rio-Lick 138 kV OH Jackson Active AEP 140 70 46.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2048_imp.pdf Document Posted In Progress N/A N/A 12/19/2019 N/A N/A 12/31/2021 N/A N No
AF2-059 + Southwest Lima-West Moulton 138 kV OH Auglaize Active Unknown 97 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2059_imp.pdf Document Posted In Progress N/A N/A 1/24/2020 N/A N/A 11/30/2022 N/A N No
AF2-059 - Southwest Lima-West Moulton 138 kV OH Auglaize Active AEP 97 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2059_imp.pdf Document Posted In Progress N/A N/A 1/24/2020 N/A N/A 11/30/2022 N/A N No
AF2-068 + Jay 138 kV IN Blackford Active Unknown 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2068_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2068_imp.pdf Document Posted In Progress N/A N/A 1/30/2020 N/A N/A 10/3/2022 N/A N No
AF2-068 - Jay 138 kV IN Blackford Active AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2068_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2068_imp.pdf Document Posted In Progress N/A N/A 1/30/2020 N/A N/A 10/3/2022 N/A N No
AF2-078 + Reynolds-Olive #1 345 kV IN White Active Unknown 200 200 120 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2078_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2078_imp.pdf Document Posted In Progress N/A N/A 1/31/2020 N/A N/A 10/31/2022 N/A N No
AF2-078 - Reynolds-Olive #1 345 kV IN White Active AEP 200 200 120 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2078_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2078_imp.pdf Document Posted In Progress N/A N/A 1/31/2020 N/A N/A 10/31/2022 N/A N No
AF2-083 + Kenzie Creek-Stone Lake 69 kV MI Cass Active Unknown 150 150 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2083_imp.pdf Document Posted In Progress N/A N/A 1/31/2020 N/A N/A 10/21/2022 N/A N No
AF2-083 - Kenzie Creek-Stone Lake 69 kV MI Cass Active AEP 150 150 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2083_imp.pdf Document Posted In Progress N/A N/A 1/31/2020 N/A N/A 10/21/2022 N/A N No
AF2-094 + Huntington Jct. 138 kV IN Huntington Active Unknown 190 40 26.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2094_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2094_imp.pdf Document Posted In Progress N/A N/A 2/12/2020 N/A N/A 2/1/2022 N/A N No
AF2-094 - Huntington Jct. 138 kV IN Huntington Active AEP 190 40 26.4 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2094_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2094_imp.pdf Document Posted In Progress N/A N/A 2/12/2020 N/A N/A 2/1/2022 N/A N No
AF2-103 + Haviland 138 kV Northwest Ohio Wind OH Paulding Partially in Service - Under Construction Unknown 103.2 3.15 1.32 2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2103_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af2_103_isa.pdf Document Posted N/A Not Required N/A N/A 3/17/2020 N/A N/A 2/1/2021 2/1/2021 6/1/2021 N/A N No
AF2-103 - Haviland 138 kV Northwest Ohio Wind OH Paulding Partially in Service - Under Construction AEP 103.2 3.15 1.32 2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2103_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af2_103_isa.pdf Document Posted N/A Not Required N/A N/A 3/17/2020 N/A N/A 2/1/2021 2/1/2021 6/1/2021 N/A N No
AF2-105 + Morgans Cut-Glen Lyn #2 138 kV VA Pulaski Active Unknown 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2105_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2105_imp.pdf Document Posted In Progress N/A N/A 1/31/2020 N/A N/A 3/28/2022 N/A N No
AF2-105 - Morgans Cut-Glen Lyn #2 138 kV VA Pulaski Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2105_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2105_imp.pdf Document Posted In Progress N/A N/A 1/31/2020 N/A N/A 3/28/2022 N/A N No
AF2-106 + Hazel Hollow-Glen Lyn #1 138 kV VA Pulaski Active Unknown 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2106_imp.pdf Document Posted In Progress N/A N/A 1/31/2020 N/A N/A 3/28/2022 N/A N No
AF2-106 - Hazel Hollow-Glen Lyn #1 138 kV VA Pulaski Active AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2106_imp.pdf Document Posted In Progress N/A N/A 1/31/2020 N/A N/A 3/28/2022 N/A N No
AF2-107 + Clifford 138 kV VA Amherst Active Unknown 50 50 32.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2107_imp.pdf Document Posted In Progress N/A N/A 2/24/2020 N/A N/A 2/1/2022 N/A N No
AF2-107 - Clifford 138 kV VA Amherst Active AEP 50 50 32.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2107_imp.pdf Document Posted In Progress N/A N/A 2/24/2020 N/A N/A 2/1/2022 N/A N No
AF2-122 + Kirk 138 kV OH Licking Active Unknown 107.7 107.7 64.62 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2122_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2122_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af2_122_isa2.pdf Interim Study N/A N/A N/A 2/28/2020 N/A N/A 10/3/2022 N/A N No
AF2-122 - Kirk 138 kV OH Licking Active AEP 107.7 107.7 64.62 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2122_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2122_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af2_122_isa2.pdf Interim Study N/A N/A N/A 2/28/2020 N/A N/A 10/3/2022 N/A N No
AF2-125 + Varner 138 kV IN DeKalb Active Unknown 150 54 35.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2125_imp.pdf Document Posted In Progress N/A N/A 2/28/2020 N/A N/A 4/3/2023 N/A N No
AF2-125 - Varner 138 kV IN DeKalb Active AEP 150 54 35.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2125_imp.pdf Document Posted In Progress N/A N/A 2/28/2020 N/A N/A 4/3/2023 N/A N No
AF2-127 + Lockwood Road 138 kV OH Defiance Active Unknown 68 38 24.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2127_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2127_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af2_127_isa2.pdf Interim Study N/A N/A N/A 2/28/2020 N/A N/A 3/31/2022 N/A N No
AF2-127 - Lockwood Road 138 kV OH Defiance Active AEP 68 38 24.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2127_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2127_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af2_127_isa2.pdf Interim Study N/A N/A N/A 2/28/2020 N/A N/A 3/31/2022 N/A N No
AF2-132 + Reynolds-Olive #1 345 kV IN Pulaski Active Unknown 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2132_imp.pdf Document Posted In Progress N/A N/A 3/4/2020 N/A N/A 5/31/2021 N/A N No
AF2-132 - Reynolds-Olive #1 345 kV IN Pulaski Active AEP 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2132_imp.pdf Document Posted In Progress N/A N/A 3/4/2020 N/A N/A 5/31/2021 N/A N No
AF2-133 + Reynolds-Olive #2 345 kV IN Pulaski Active Unknown 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2133_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2133_imp.pdf Document Posted In Progress N/A N/A 3/4/2020 N/A N/A 5/31/2021 N/A N No
AF2-133 - Reynolds-Olive #2 345 kV IN Pulaski Active AEP 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2133_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2133_imp.pdf Document Posted In Progress N/A N/A 3/4/2020 N/A N/A 5/31/2021 N/A N No
AF2-134 + Reynolds-Olive #2 345 kV IN Starke Active Unknown 400 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2134_imp.pdf Document Posted In Progress N/A N/A 3/4/2020 N/A N/A 5/31/2021 N/A N No
AF2-134 - Reynolds-Olive #2 345 kV IN Starke Active AEP 400 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2134_imp.pdf Document Posted In Progress N/A N/A 3/4/2020 N/A N/A 5/31/2021 N/A N No
AF2-137 + Marysville-Sorenson 765 kV OH Logan Active Unknown 500 500 210 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2137_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2137_imp.pdf Document Posted In Progress N/A N/A 3/6/2020 N/A N/A 12/31/2023 N/A N No
AF2-137 - Marysville-Sorenson 765 kV OH Logan Active AEP 500 500 210 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2137_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2137_imp.pdf Document Posted In Progress N/A N/A 3/6/2020 N/A N/A 12/31/2023 N/A N No
AF2-149 + Sharp Road 69 kV OH Knox Active Unknown 80 80 32 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2149_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2149_imp.pdf Document Posted In Progress N/A N/A 3/12/2020 N/A N/A 12/31/2023 N/A N No
AF2-149 - Sharp Road 69 kV OH Knox Active AEP 80 80 32 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2149_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2149_imp.pdf Document Posted In Progress N/A N/A 3/12/2020 N/A N/A 12/31/2023 N/A N No
AF2-162 + Keystone-Desoto 345 kV IN Blackford Active Unknown 245 45 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2162_imp.pdf Document Posted In Progress N/A N/A 3/16/2020 N/A N/A 6/1/2023 N/A N No
AF2-162 - Keystone-Desoto 345 kV IN Blackford Active AEP 245 45 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2162_imp.pdf Document Posted In Progress N/A N/A 3/16/2020 N/A N/A 6/1/2023 N/A N No
AF2-173 + Desoto 345 kV IN Delaware Active Unknown 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2173_imp.pdf Document Posted In Progress N/A N/A 3/19/2020 N/A N/A 10/31/2023 N/A N No
AF2-173 - Desoto 345 kV IN Delaware Active AEP 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2173_imp.pdf Document Posted In Progress N/A N/A 3/19/2020 N/A N/A 10/31/2023 N/A N No
AF2-177 + Sorenson-DeSoto #2 345 kV IN Blackford Active Unknown 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af2177_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2177_imp.pdf Document Posted In Progress N/A N/A 3/20/2020 N/A N/A 10/31/2023 N/A N No
AF2-177 - Sorenson-DeSoto #2 345 kV IN Blackford Active AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af2177_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2177_imp.pdf Document Posted In Progress N/A N/A 3/20/2020 N/A N/A 10/31/2023 N/A N No
AF2-186 + South Cecil 69 kV OH Paulding Active Unknown 45 45 18.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2186_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2186_imp.pdf Document Posted In Progress N/A N/A 3/20/2020 N/A N/A 12/31/2023 N/A N No
AF2-186 - South Cecil 69 kV OH Paulding Active AEP 45 45 18.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2186_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2186_imp.pdf Document Posted In Progress N/A N/A 3/20/2020 N/A N/A 12/31/2023 N/A N No
AF2-188 + Reynolds-Meadow Lake #1 345 kV IN White Active Unknown 112 112 67.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2188_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2188_imp.pdf Document Posted In Progress N/A N/A 3/22/2020 N/A N/A 6/30/2023 N/A N No
AF2-188 - Reynolds-Meadow Lake #1 345 kV IN White Active AEP 112 112 67.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2188_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2188_imp.pdf Document Posted In Progress N/A N/A 3/22/2020 N/A N/A 6/30/2023 N/A N No
AF2-189 + Greentown 138 kV IN Howard Withdrawn Unknown 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2189_imp.pdf Document Posted Withdrawn N/A N/A 3/22/2020 N/A N/A 9/17/2021 6/30/2023 N/A N No
AF2-189 - Greentown 138 kV IN Howard Withdrawn AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2189_imp.pdf Document Posted Withdrawn N/A N/A 3/22/2020 N/A N/A 9/17/2021 6/30/2023 N/A N No
AF2-190 + Olive-Reynolds #2 345 kV IN Pulaski Withdrawn Unknown 260 260 156 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2190_fea.pdf Document Posted N/A N/A 3/22/2020 N/A N/A 9/10/2020 6/30/2023 N/A N No
AF2-190 - Olive-Reynolds #2 345 kV IN Pulaski Withdrawn AEP 260 260 156 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2190_fea.pdf Document Posted N/A N/A 3/22/2020 N/A N/A 9/10/2020 6/30/2023 N/A N No