Changes in PJM Queue between March 9th and April 6th, 2022.
Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.
Fully new queue positions appear as individual rows with all fields highlighted green.
## old_obs new_obs changes additions removals
## 8170 8254 93 90 6
## Creating HTML table for first ${limit_html} rows
| QueueNumber | chng_type | Name | CommercialName | State | County | Status | TransmissionOwner | MaximumFacilityOutput | MWEnergy | MWCapacity | MWInService | CapacityorEnergy | ProjectType | Fuel | ProjectACOrDC | RightsMW | InitialStudy | FeasibilityStudy | FeasibilityStudyStatus | SystemImpactStudy | SystemImpactStudyStatus | FacilitiesStudy | FacilitiesStudyStatus | InterimInterconnectionServiceAgreement | InterimInterconnectionServiceAgreementStatus | WholesaleMarketParticipationAgreement | ConstructionServiceAgreement | ConstructionServiceAgreementStatus | UpgradeConstructionServiceAgreement | UpgradeConstructionServiceAgreementStatus | BackfeedDate | QueueDate | LongTermFirmServiceStartDate | LongTermFirmServiceEndDate | TestEnergyDate | WithdrawalDate | WithdrawnRemarks | ProjectedInServiceDate | RevisedInServiceDate | ActualInServiceDate | SuspensionDate | AttachmentType | AlternateQueue | SlideQueue |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AA2-161 | + | Yukon-Robbins 138kV | Allegheny Energy Center LLC | PA | Allegheny | Engineering and Procurement | APS | 541 | 541 | 513 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2161_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2161_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_161_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_161_csa.pdf | Document Posted | N/A | N/A | 4/30/2015 | N/A | N/A | 6/1/2024 | 6/1/2024 | 6/1/2024 | N/A | N | No | |||||||||
| AA2-161 | - | Yukon-Robbins 138kV | Allegheny Energy Center LLC | PA | Allegheny | Suspended | APS | 541 | 541 | 513 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2161_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2161_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2161_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_161_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_161_csa.pdf | Document Posted | N/A | N/A | 4/30/2015 | N/A | N/A | 6/1/2024 | 6/1/2024 | 6/1/2024 | N/A | N | No | |||||||||
| AB2-022 | + | Elizabeth City 34.5kV | Elizabeth City Solar | NC | Camden | In Service | Dominion | 20 | 20 | 13 | 20 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2022_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2022_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2022_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2022_wmpa.pdf | Not Required | N/A | N/A | 2/4/2016 | N/A | N/A | 8/1/2021 | 6/30/2021 | 6/30/2021 | 10/18/2021 | N/A | N | No | ||||||||
| AB2-022 | - | Elizabeth City 34.5kV | Elizabeth City Solar | NC | Camden | Partially in Service - Under Construction | Dominion | 20 | 20 | 13 | 0.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2022_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2022_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2022_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2022_wmpa.pdf | Not Required | N/A | N/A | 2/4/2016 | N/A | N/A | 8/1/2021 | 6/30/2021 | 6/30/2021 | 10/18/2021 | N/A | N | No | ||||||||
| AB2-093 | + | Ormet 138kV | Hannibal Port Power Project | OH | Monroe | In Service | AEP | 485 | 485 | 485 | 485 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2093_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2093_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2093_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_093_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_093_csa.pdf | Document Posted | N/A | N/A | 12/15/2020 | 4/26/2016 | N/A | N/A | 5/22/2021 | 9/13/2021 | 9/13/2021 | 6/1/2021 | N/A | N | No | ||||||
| AB2-093 | - | Ormet 138kV | Hannibal Port Power Project | OH | Monroe | Partially in Service - Under Construction | AEP | 485 | 485 | 485 | 485 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2093_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2093_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2093_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_093_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_093_csa.pdf | Document Posted | N/A | N/A | 12/15/2020 | 4/26/2016 | N/A | N/A | 5/22/2021 | 9/13/2021 | 9/13/2021 | 6/1/2021 | N/A | N | No | ||||||
| AB2-102 | + | Cumberland 230kV | Cumberland | NJ | Cumberland | Suspended | AEC | 230 | 230 | 225 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2102_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2102_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_102_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_102_csa.pdf | Document Posted | N/A | N/A | 4/28/2016 | N/A | N/A | 12/1/2023 | 12/1/2023 | N/A | N | No | ||||||||||
| AB2-102 | - | Cumberland 230kV | Cumberland | NJ | Cumberland | Engineering and Procurement | AEC | 230 | 230 | 225 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2102_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2102_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_102_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_102_csa.pdf | Document Posted | N/A | N/A | 4/28/2016 | N/A | N/A | 12/1/2023 | 12/1/2023 | N/A | N | No | ||||||||||
| AC1-098 | + | Dawson-South Justice 115kV | American Beech Solar | NC | Alamance | Engineering and Procurement | Dominion | 60 | 60 | 37.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1098_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1098_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1098_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_098_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_098_csa.pdf | Document Posted | N/A | N/A | 10/21/2016 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | ||||||||||
| AC1-098 | - | Dawson-South Justice 115kV | American Beech Solar | NC | Alamance | Suspended | Dominion | 60 | 60 | 37.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1098_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1098_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1098_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_098_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_098_csa.pdf | Document Posted | N/A | N/A | 10/21/2016 | N/A | N/A | 11/1/2022 | 11/1/2022 | N/A | N | No | ||||||||||
| AC1-099 | + | Dawson-South Justice 115kV | American Beech Solar | NC | Alamance | Engineering and Procurement | Dominion | 20 | 20 | 12.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1099_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1099_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_099_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_099_csa.pdf | Document Posted | N/A | N/A | 10/21/2016 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | ||||||||||
| AC1-099 | - | Dawson-South Justice 115kV | American Beech Solar | NC | Alamance | Suspended | Dominion | 20 | 20 | 12.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1099_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1099_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_099_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_099_csa.pdf | Document Posted | N/A | N/A | 10/21/2016 | N/A | N/A | 11/1/2022 | 11/1/2022 | N/A | N | No | ||||||||||
| AC1-101 | + | Johns Creek-Excel 138kV I | KY | Pike | Active | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1101_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1101_fac.pdf | Document Posted | N/A | N/A | 10/24/2016 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-101 | - | Johns Creek-Excel 138kV I | KY | Pike | Active | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1101_imp.pdf | Document Posted | In Progress | N/A | N/A | 10/24/2016 | N/A | N/A | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AC1-102 | + | Johns Creek-Excel 138kV II | KY | Pike | Active | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1102_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1102_fac.pdf | Document Posted | N/A | N/A | 10/23/2016 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-102 | - | Johns Creek-Excel 138kV II | KY | Pike | Active | AEP | 50 | 50 | 19 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1102_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1102_imp.pdf | Document Posted | In Progress | N/A | N/A | 10/23/2016 | N/A | N/A | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AC1-120 | + | Mitchell-Mountain Run 115kV | Cricket Solar | VA | Culpeper | Engineering and Procurement | Dominion | 60 | 60 | 39.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1120_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_120_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_120_csa.pdf | Document Posted | N/A | N/A | 10/27/2016 | N/A | N/A | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||||
| AC1-120 | - | Mitchell-Mountain Run 115kV | Cricket Solar | VA | Culpeper | Suspended | Dominion | 60 | 60 | 39.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1120_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_120_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_120_csa.pdf | Document Posted | N/A | N/A | 10/27/2016 | N/A | N/A | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||||
| AC1-121 | + | Mitchell-Mountain Run 115kV | Cricket Solar | VA | Culpeper | Engineering and Procurement | Dominion | 20 | 20 | 13.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1121_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1121_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_121_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_121_csa.pdf | Document Posted | N/A | N/A | 10/27/2016 | N/A | N/A | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||||
| AC1-121 | - | Mitchell-Mountain Run 115kV | Cricket Solar | VA | Culpeper | Suspended | Dominion | 20 | 20 | 13.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1121_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1121_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_121_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_121_csa.pdf | Document Posted | N/A | N/A | 10/27/2016 | N/A | N/A | 12/1/2022 | 12/1/2022 | N/A | N | No | ||||||||||
| AC1-147 | + | Grassfield 34.5kV | VA | City of Chesapeake | Partially in Service - Under Construction | Dominion | 20 | 20 | 12.6 | 0.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1147_fea.pdf | Document Posted | Not Required | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac1147_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac1147_wmpa.pdf | Not Required | N/A | N/A | 10/31/2016 | N/A | N/A | 3/4/2022 | 12/31/2021 | 12/31/2021 | 3/25/2022 | N/A | N | Yes | ||||||||||
| AC1-147 | - | Grassfield 34.5kV | VA | City of Chesapeake | Under Construction | Dominion | 20 | 20 | 12.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1147_fea.pdf | Document Posted | Not Required | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac1147_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac1147_wmpa.pdf | Not Required | N/A | N/A | 10/31/2016 | N/A | N/A | 3/4/2022 | 12/31/2021 | 12/31/2021 | N/A | N | Yes | ||||||||||||
| AC1-164 | + | Chickahominy 230kV | Keydet Solar Center One | VA | Charles City | Partially in Service - Under Construction | Dominion | 320 | 320 | 220.8 | 100 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1164_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1164_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1164_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_164_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf | Document Posted | N/A | N/A | 11/11/2021 | 10/31/2016 | N/A | N/A | 11/22/2021 | 6/30/2023 | 6/30/2023 | 12/27/2021 | N/A | N | No | ||||||
| AC1-164 | - | Chickahominy 230kV | Keydet Solar Center One | VA | Charles City | Partially in Service - Under Construction | Dominion | 320 | 320 | 220.8 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1164_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1164_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1164_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_164_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf | Document Posted | N/A | N/A | 10/1/2021 | 10/31/2016 | N/A | N/A | 11/29/2021 | 6/30/2023 | 6/30/2023 | 12/27/2021 | N/A | N | No | ||||||
| AC1-166 | + | Atlanta 69kV IV | Buckeye Plains Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1166_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1166_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1166_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_166_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_166_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2021 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC1-166 | - | Atlanta 69kV IV | Buckeye Plains Solar | OH | Pickaway | Engineering and Procurement | Dayton | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1166_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1166_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1116_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_166_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_166_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2021 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| AC1-167 | + | Mark Center 69kV | OH | Defiance | Active | AEP | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1167_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1167_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1167_fac.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2019 | N/A | N | No | |||||||||||||||||
| AC1-167 | - | Mark Center 69kV | OH | Defiance | Active | AEP | 49.9 | 49.9 | 33.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1167_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1167_imp.pdf | Document Posted | In Progress | N/A | N/A | 10/31/2016 | N/A | N/A | 12/1/2019 | N/A | N | No | ||||||||||||||||||
| AC1-208 | + | Cox-Whitakers 115kV | Halifax County Solar | NC | Halifax | Engineering and Procurement | Dominion | 80 | 80 | 55.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1208_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1208_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1208_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_208_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_208_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||
| AC1-208 | - | Cox-Whitakers 115kV | Halifax County Solar | NC | Halifax | Suspended | Dominion | 80 | 80 | 55.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1208_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1208_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1208_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_208_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_208_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||
| AC1-216 | + | Hopewell-Surry 230kV | Spring Grove I Solar | VA | Surry | In Service | Dominion | 97.9 | 97.9 | 54.8 | 97.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1216_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1216_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1216_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_216_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_216_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 9/14/2020 | 12/1/2020 | 12/1/2020 | 10/1/2020 | N/A | N | No | |||||||
| AC1-216 | - | Hopewell-Surry 230kV | Spring Grove I Solar | VA | Surry | Partially in Service - Under Construction | Dominion | 97.9 | 97.9 | 54.8 | 97.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1216_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1216_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac1216_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac1_216_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_216_csa.pdf | Document Posted | N/A | N/A | 10/31/2016 | N/A | N/A | 9/14/2020 | 12/1/2020 | 12/1/2020 | 10/1/2020 | N/A | N | No | |||||||
| AC2-059 | + | Biers Run-Circleville 138kV | Yellowbud Solar | OH | Ross | Under Construction | AEP | 127 | 127 | 62.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_059_csa.pdf | Document Posted | N/A | N/A | 8/1/2022 | 2/16/2017 | N/A | N/A | 8/1/2022 | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||
| AC2-059 | - | Biers Run-Circleville 138kV | Yellowbud Solar | OH | Ross | Engineering and Procurement | AEP | 127 | 127 | 62.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_059_csa.pdf | Document Posted | N/A | N/A | 5/1/2022 | 2/16/2017 | N/A | N/A | 6/1/2022 | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||
| AC2-061 | + | Hillsboro-Clinton 138kV | OH | Ross | Active | AEP | 117 | 117 | 58.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2061_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2061_fac.pdf | Document Posted | N/A | N/A | 2/16/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AC2-061 | - | Hillsboro-Clinton 138kV | OH | Ross | Active | AEP | 117 | 117 | 58.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2061_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/16/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AC2-084 | + | Dawson-South Justice 115kV | American Beech Solar | NC | Halifax | Engineering and Procurement | Dominion | 60 | 60 | 40.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2084_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2084_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_084_isa.pdf | Document Posted | N/A | N/A | N/A | 2/28/2017 | N/A | N/A | 11/30/2022 | 11/30/2022 | N/A | N | No | |||||||||||||
| AC2-084 | - | Dawson-South Justice 115kV | NC | Halifax | Active | Dominion | 60 | 60 | 40.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2084_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2084_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2017 | N/A | N/A | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AD1-023 | + | Cashie-Trowbridge 230 kV | NC | Bertie | Active | Dominion | 40 | 40 | 25.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1023_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/19/2017 | N/A | N/A | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AD1-023 | - | Cashie-Trowbridge 230 kV | NC | Bertie | Active | Dominion | 40 | 40 | 25.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1023_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/19/2017 | N/A | N/A | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AD1-070 | + | Fostoria Central 138 kV | South Branch Solar | OH | Hancock | Engineering and Procurement | AEP | 205 | 205 | 36 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1070_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1070_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1070_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1070_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad1070_csa.pdf | Document Posted | N/A | N/A | 8/31/2017 | N/A | N/A | 12/31/2025 | 12/31/2025 | N/A | N | No | ||||||||||
| AD1-070 | - | Fostoria Central 138 kV | OH | Hancock | Active | AEP | 205 | 205 | 36 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1070_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1070_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1070_fac.pdf | Document Posted | N/A | N/A | 8/31/2017 | N/A | N/A | 9/30/2020 | N/A | N | No | |||||||||||||||||
| AD1-105 | + | Kings Dominion DP 115 kV | Sweet Sue Solar | VA | King William | Engineering and Procurement | Dominion | 74 | 74 | 44.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1105_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1105_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad1105_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad1105_wmpa.pdf | Not Required | N/A | N/A | 9/22/2017 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||||
| AD1-105 | - | Kings Dominion DP 115 kV | VA | King William | Active | Dominion | 74 | 74 | 44.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1105_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1105_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 9/22/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AD1-106 | + | North Waldo-Wild Creek 138 kV | OH | Marion | Active | AEP | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1106_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1106_fac.pdf | Document Posted | N/A | N/A | 9/22/2017 | N/A | N/A | 6/12/2019 | N/A | N | No | |||||||||||||||||
| AD1-106 | - | North Waldo-Wild Creek 138 kV | OH | Marion | Active | AEP | 60 | 60 | 22.8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1106_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1106_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/22/2017 | N/A | N/A | 6/12/2019 | N/A | N | No | ||||||||||||||||||
| AD1-128 | + | Modoc-Delaware 138 kV | IN | Randolph | Active | AEP | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1128_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1128_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1128_fac.pdf | Document Posted | N/A | N/A | 9/28/2017 | N/A | N/A | 10/31/2021 | N/A | N | No | |||||||||||||||||
| AD1-128 | - | Modoc-Delaware 138 kV | IN | Randolph | Active | AEP | 150 | 150 | 57 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1128_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1128_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/28/2017 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||
| AD2-014 | + | Steubenville 69 kV | OH | Jefferson | Active | AEP | 49.5 | 49.5 | 20.79 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2014_fac.pdf | Document Posted | N/A | N/A | 11/8/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | |||||||||||||||||
| AD2-014 | - | Steubenville 69 kV | OH | Jefferson | Active | AEP | 49.5 | 49.5 | 20.79 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2014_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2014_imp.pdf | Document Posted | In Progress | N/A | N/A | 11/8/2017 | N/A | N/A | 12/31/2019 | N/A | N | No | ||||||||||||||||||
| AD2-074 | + | Garner DP-Lancaster 115 kV | Waller Solar I | VA | Lancaster | Engineering and Procurement | Dominion | 86 | 86 | 32.68 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2074_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2074_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2074_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad2_074_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ad2_074_csa.pdf | Document Posted | N/A | N/A | 3/14/2018 | N/A | N/A | 5/31/2024 | 5/31/2024 | N/A | N | No | ||||||||||
| AD2-074 | - | Garner DP-Lancaster 115 kV | VA | Lancaster | Active | Dominion | 86 | 86 | 32.68 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2074_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2074_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2074_fac.pdf | Document Posted | N/A | N/A | 3/14/2018 | N/A | N/A | 11/30/2021 | N/A | N | No | |||||||||||||||||
| AD2-131 | + | Kincaid-Pana 345kV | IL | Christian | Active | ComEd | 50 | 50 | 8.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2131_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2131_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/23/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AD2-131 | - | Kincaid-Pana 345kV | IL | Christian | Active | ComEd | 50 | 50 | 8.3 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2131_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2131_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/23/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-020 | + | Oyster Creek 230 kV | NJ | Ocean | Active | JCPL | 816 | 816 | 229.3 | Capacity | Generation Interconnection | Offshore Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1020_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1020_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1020_fac.pdf | Document Posted | N/A | N/A | 5/22/2018 | N/A | N/A | 6/1/2023 | N/A | N | No | This project slid to the next queue | ||||||||||||||||
| AE1-020 | - | Oyster Creek 230 kV | NJ | Ocean | Active | JCPL | 816 | 816 | 229.3 | Capacity | Generation Interconnection | Offshore Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1020_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1020_imp.pdf | Document Posted | In Progress | N/A | N/A | 5/22/2018 | N/A | N/A | 6/1/2023 | N/A | N | No | This project slid to the next queue | |||||||||||||||||
| AE1-062 | + | Silver Lake 69 kV | NJ | Camden | Withdrawn | AEC | 20 | 20 | 10 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1062_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1062_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1062_fac.pdf | Document Posted | Withdrawn | N/A | Withdrawn | N/A | N/A | 7/30/2018 | N/A | N/A | 3/22/2022 | 10/30/2020 | N/A | N | No | |||||||||||||
| AE1-062 | - | Silver Lake 69 kV | NJ | Camden | Active | AEC | 20 | 20 | 10 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1062_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1062_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1062_fac.pdf | Document Posted | N/A | N/A | 7/30/2018 | N/A | N/A | 10/30/2020 | N/A | N | No | |||||||||||||||||
| AE1-098 | + | Endless Caverns 34.5 kV | Endless Caverns Solar | VA | Rockingham | Engineering and Procurement | Dominion | 15.7 | 15.7 | 10.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1098_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1098_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1098_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1098_wmpa.pdf | Not Required | N/A | N/A | 8/31/2018 | N/A | N/A | 1/1/2023 | 4/25/2022 | 4/25/2022 | N/A | N | No | ||||||||||
| AE1-098 | - | Endless Caverns 34.5 kV | Endless Caverns Solar | VA | Rockingham | Engineering and Procurement | Dominion | 15.7 | 15.7 | 10.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1098_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1098_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1098_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1098_wmpa.pdf | Not Required | N/A | N/A | 8/31/2018 | N/A | N/A | 4/1/2022 | 4/25/2022 | 4/25/2022 | N/A | N | No | ||||||||||
| AE1-099 | + | Endless Caverns 34.kV | Endless Caverns Solar | VA | Rockingham | Engineering and Procurement | Dominion | 15.7 | 15.7 | 10.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1099_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1099_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1099_wmpa.pdf | Not Required | N/A | N/A | 8/31/2018 | N/A | N/A | 1/1/2023 | 4/25/2022 | 4/25/2022 | N/A | N | No | ||||||||||
| AE1-099 | - | Endless Caverns 34.kV | Endless Caverns Solar | VA | Rockingham | Engineering and Procurement | Dominion | 15.7 | 15.7 | 10.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1099_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1099_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1099_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1099_wmpa.pdf | Not Required | N/A | N/A | 8/31/2018 | N/A | N/A | 4/22/2022 | 4/25/2022 | 4/25/2022 | N/A | N | No | ||||||||||
| AE1-138 | + | Hamilton 115 kV | PA | Adams | Withdrawn | ME | 22 | 22 | 13.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1138_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1138_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/24/2018 | N/A | N/A | 3/30/2022 | N/A | N | No | ||||||||||||||||||
| AE1-138 | - | Hamilton 115 kV | PA | Adams | Active | ME | 22 | 22 | 13.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1138_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1138_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/24/2018 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AE1-139 | + | Hunterstown 115 kV | PA | Adams | Withdrawn | ME | 65 | 65 | 39 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1139_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1139_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/24/2018 | N/A | N/A | 3/29/2022 | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||||||||
| AE1-139 | - | Hunterstown 115 kV | PA | Adams | Active | ME | 65 | 65 | 39 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1139_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1139_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/24/2018 | N/A | N/A | 12/15/2022 | 12/15/2022 | N/A | N | No | |||||||||||||||||
| AE1-145 | + | Wallops Island 69 kV | VA | Accomack | Active | ODEC | 20 | 20 | 20 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1145_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1145_imp.pdf | Document Posted | N/A | N/A | 9/24/2018 | N/A | N/A | 12/1/2020 | N/A | N | No | |||||||||||||||||||
| AE1-145 | - | Wallops Island 69 kV | VA | Accomack | Active | ODEC | 20 | 20 | 20 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1145_fea.pdf | Document Posted | In Progress | N/A | N/A | 9/24/2018 | N/A | N/A | 12/1/2020 | N/A | N | No | ||||||||||||||||||||
| AE1-147 | + | Bellefonte 46 kV | Nittany Solar | PA | Centre | Withdrawn | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1147_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1147_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1147_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1147_wmpa.pdf | Not Required | N/A | N/A | 9/24/2018 | N/A | N/A | 12/15/2022 | 3/12/2022 | 12/15/2022 | 12/15/2022 | N/A | N | No | |||||||||
| AE1-147 | - | Bellefonte 46 kV | Nittany Solar | PA | Centre | Engineering and Procurement | APS | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1147_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1147_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae1147_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae1147_wmpa.pdf | Not Required | N/A | N/A | 9/24/2018 | N/A | N/A | 12/15/2022 | 12/15/2022 | 12/15/2022 | N/A | N | No | ||||||||||
| AE1-155 | + | Garner-Northern Neck 115 kV | Bookers Mill Solar | VA | City of Richmond | Engineering and Procurement | Dominion | 127 | 127 | 76.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1155_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1155_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1155_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_155_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_155_csa.pdf | Document Posted | N/A | N/A | 9/24/2018 | N/A | N/A | 12/31/2023 | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||
| AE1-155 | - | Garner-Northern Neck 115 kV | VA | City of Richmond | Active | Dominion | 127 | 127 | 76.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1155_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1155_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1155_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_155_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/24/2018 | N/A | N/A | 12/31/2023 | 10/23/2020 | N/A | N | No | |||||||||||||
| AE1-212 | + | Grandview-Clifftop 138 kV | WV | Raliegh | Active | AEP | 90 | 90 | 53.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1212_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1212_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1212_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/csa/ae1212_csa.pdf | Document Posted | N/A | N/A | 9/7/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | |||||||||||||||
| AE1-212 | - | Grandview-Clifftop 138 kV | WV | Raliegh | Active | AEP | 90 | 90 | 53.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1212_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1212_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1212_fac.pdf | Document Posted | N/A | N/A | 9/7/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | |||||||||||||||||
| AE1-240 | + | Carlls Corner-Sherman Avenue 69 kV | NJ | Cumberland | Active | AEC | 49.7 | 49.7 | 29 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1240_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1240_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1240_fac.pdf | Document Posted | N/A | N/A | 9/28/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | |||||||||||||||||
| AE1-240 | - | Carlls Corner-Sherman Avenue 69 kV | NJ | Cumberland | Active | AEC | 49.7 | 49.7 | 29 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1240_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1240_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/28/2018 | N/A | N/A | 9/30/2021 | N/A | N | No | ||||||||||||||||||
| AE2-059 | + | Derry Tap-Derry Bus 69 kV | PA | Northumberland | Engineering and Procurement | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_059_csa.pdf | Document Posted | N/A | N/A | 2/1/2019 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||||
| AE2-059 | - | Derry Tap-Derry Bus 69 kV | PA | Northumberland | Active | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_059_csa.pdf | Document Posted | N/A | N/A | 2/1/2019 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||||
| AE2-112 | + | Carville 138 kV II | Concho Solar I | MD | Queen Anne’s | Engineering and Procurement | DPL | 66 | 17 | 6.46 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2112_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2112_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_112_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_112_csa.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 6/3/2024 | 6/3/2024 | N/A | N | No | |||||||||||
| AE2-112 | - | Carville 138 kV II | MD | Queen Anne’s | Active | DPL | 66 | 17 | 6.46 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2112_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2112_imp.pdf | Document Posted | Not Required | N/A | N/A | 2/28/2019 | N/A | N/A | 11/30/2021 | N/A | N | No | ||||||||||||||||||
| AE2-114 | + | Midland 23 kV I | BE-PINE 1 Cain Road | PA | Beaver | Under Construction | DL | 17.1 | 17.1 | 10.26 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2114_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2114_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2114_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2114_wmpa.pdf | Not Required | N/A | N/A | 3/1/2022 | 2/28/2019 | N/A | N/A | 4/1/2022 | 7/31/2022 | 7/31/2022 | N/A | N | No | |||||||||
| AE2-114 | - | Midland 23 kV I | BE-PINE 1 Cain Road | PA | Beaver | Engineering and Procurement | DL | 17.1 | 17.1 | 10.26 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2114_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2114_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2114_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2114_wmpa.pdf | Not Required | N/A | N/A | 3/1/2022 | 2/28/2019 | N/A | N/A | 4/1/2022 | 4/30/2022 | 4/30/2022 | N/A | N | No | |||||||||
| AE2-115 | + | Midland 23 kV II | BE-PINE 2 Dam Road | PA | Beaver | Engineering and Procurement | DL | 17.1 | 17.1 | 10.26 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2115_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2115_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2115_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2115_wmpa.pdf | Not Required | N/A | N/A | 3/1/2022 | 2/28/2019 | N/A | N/A | 4/1/2022 | 7/31/2022 | 7/31/2022 | N/A | N | No | |||||||||
| AE2-115 | - | Midland 23 kV II | BE-PINE 2 Dam Road | PA | Beaver | Engineering and Procurement | DL | 17.1 | 17.1 | 10.26 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2115_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2115_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2115_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2115_wmpa.pdf | Not Required | N/A | N/A | 3/1/2022 | 2/28/2019 | N/A | N/A | 3/1/2022 | 4/30/2022 | 4/30/2022 | N/A | N | No | |||||||||
| AE2-121 | + | Milesburg-Tanney Junction 46 kV | PA | Centre | Active | APS | 10.6 | 10.64 | 6.384 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2121_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2121_fac.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 9/1/2021 | N/A | N | No | |||||||||||||||||
| AE2-121 | - | Milesburg-Tanney Junction 46 kV | PA | Centre | Active | APS | 10.6 | 10.64 | 6.384 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2121_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2121_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/28/2019 | N/A | N/A | 9/1/2021 | N/A | N | No | ||||||||||||||||||
| AE2-126 | + | Dubois-Curwensville 34.5 kV | UN-Viaduct | PA | Clearfield | Engineering and Procurement | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2126_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2126_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_126_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_126_csa.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 6/1/2022 | 11/30/2022 | 11/30/2022 | N/A | N | No | ||||||||||
| AE2-126 | - | Dubois-Curwensville 34.5 kV | UN-Viaduct | PA | Clearfield | Engineering and Procurement | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2126_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2126_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_126_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_126_csa.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 6/1/2022 | 6/30/2022 | 6/30/2022 | N/A | N | No | ||||||||||
| AE2-152 | + | Loretto-Wilton & Braidwood-Davis Creek | IL | Kankakee | Active | ComEd | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2152_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2152_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/4/2019 | N/A | N/A | 9/30/2020 | N/A | N | No | ||||||||||||||||||
| AE2-152 | - | Loretto-Wilton & Braidwood-Davis Creek | IL | Kankakee | Active | ComEd | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2152_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2152_imp.pdf | Document Posted | N/A | N/A | 3/4/2019 | N/A | N/A | 9/30/2020 | N/A | N | No | |||||||||||||||||||
| AE2-193 | + | Shenango 138 kV | PA | Mercer | Withdrawn | ATSI | 120 | 120 | 50.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2193_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2193_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 3/18/2019 | N/A | N/A | 3/29/2022 | 12/31/2022 | N/A | N | No | |||||||||||||||||
| AE2-193 | - | Shenango 138 kV | PA | Mercer | Active | ATSI | 120 | 120 | 50.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2193_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2193_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/18/2019 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||
| AE2-217 | + | East Springfield-London 138 kV | Sloopy Solar Energy Center | OH | Clark | Engineering and Procurement | ATSI | 180 | 180 | 108 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2217_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2217_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2217_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_217_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_217_csa.pdf | Document Posted | N/A | N/A | 3/21/2019 | N/A | N/A | 9/30/2025 | 9/30/2025 | N/A | N | No | ||||||||||
| AE2-217 | - | East Springfield-London 138 kV | OH | Clark | Active | ATSI | 180 | 180 | 108 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2217_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2217_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2217_fac.pdf | Document Posted | N/A | N/A | 3/21/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | |||||||||||||||||
| AE2-224 | + | Bearrock-Johnstown 230 kV | PA | Cambria | Active | PENELEC | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2224_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2224_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2224_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_224_isa2.pdf | Interim Study | N/A | N/A | N/A | 3/22/2019 | N/A | N/A | 9/1/2021 | N/A | N | No | ||||||||||||||
| AE2-224 | - | Bearrock-Johnstown 230 kV | PA | Cambria | Active | PENELEC | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2224_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2224_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ae2_224_isa2.pdf | Interim Study | N/A | N/A | N/A | 3/22/2019 | N/A | N/A | 9/1/2021 | N/A | N | No | |||||||||||||||
| AE2-277 | + | McDowell 138 kV | PA | Mercer | Withdrawn | ATSI | 38.2 | 38.2 | 16 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2277_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2277_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2277_fac.pdf | Document Posted | Withdrawn | N/A | Withdrawn | N/A | N/A | 3/28/2019 | N/A | N/A | 3/30/2022 | N/A | N | No | ||||||||||||||
| AE2-277 | - | McDowell 138 kV | PA | Mercer | Active | ATSI | 38.2 | 38.2 | 16 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2277_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2277_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2277_fac.pdf | Document Posted | N/A | N/A | 3/28/2019 | N/A | N/A | 12/31/2021 | N/A | N | No | |||||||||||||||||
| AE2-315 | + | Yankee Tap 69 kV | OH | Montgomery | Active | Dayton | 124 | 23.5 | 23.5 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2315_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2315_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2315_fac.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 6/1/2020 | N/A | N | No | |||||||||||||||||
| AE2-315 | - | Yankee Tap 69 kV | OH | Montgomery | Active | Dayton | 124 | 23.5 | 23.5 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2315_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2315_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/29/2019 | N/A | N/A | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AE2-334 | + | Clayton-Williamstown 69 kV | NJ | Gloucester | Active | AEC | 44 | 44 | 26.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2334_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2334_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2334_fac.pdf | Document Posted | N/A | N/A | 3/31/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | |||||||||||||||||
| AE2-334 | - | Clayton-Williamstown 69 kV | NJ | Gloucester | Active | AEC | 44 | 44 | 26.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2334_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2334_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AF1-036 | + | Carville 138 kV III | Concho Solar I | MD | Queen Anne’s | Engineering and Procurement | DPL | 86 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1036_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1036_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/af1_036_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/af1_036_csa.pdf | Document Posted | N/A | N/A | 5/24/2019 | N/A | N/A | 6/3/2024 | 6/3/2024 | N/A | N | No | |||||||||||
| AF1-036 | - | Carville 138 kV III | MD | Queen Anne’s | Active | DPL | 86 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1036_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1036_imp.pdf | Document Posted | Not Required | N/A | N/A | 5/24/2019 | N/A | N/A | 11/30/2021 | N/A | N | No | ||||||||||||||||||
| AF1-042 | + | Garner DP-Lancaster 115 kV | Waller Solar I | VA | Lancaster | Engineering and Procurement | Dominion | 131 | 45 | 17.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1042_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1042_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1042_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/af1_042_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/af1_042_csa.pdf | Document Posted | N/A | N/A | 6/24/2019 | N/A | N/A | 5/31/2024 | 5/31/2024 | N/A | N | No | ||||||||||
| AF1-042 | - | Garner DP-Lancaster 115 kV | VA | Lancaster | Active | Dominion | 131 | 45 | 17.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1042_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1042_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1042_fac.pdf | Document Posted | N/A | N/A | 6/24/2019 | N/A | N/A | 11/30/2021 | N/A | N | No | |||||||||||||||||
| AF1-088 | + | Sullivan 345 kV | IN | Sullivan | Active | AEP | 1000 | 1000 | 1000 | Capacity | Merchant Transmission | DC | 1000 F/1000 NFTIR/1000 F/1000 NFTWR | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1088_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/30/2019 | N/A | N/A | 12/31/2025 | N/A | S | No | |||||||||||||||||
| AF1-088 | - | Sullivan 345 kV | IN | Sullivan | Active | AEP | 1000 | 1000 | 1000 | Capacity | Merchant Transmission | DC | 1000 F/1000 NFTIR/1000 F/1000 NFTWR | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1088_imp.pdf | Document Posted | N/A | N/A | 8/30/2019 | N/A | N/A | 12/31/2025 | N/A | S | No | ||||||||||||||||||
| AF1-160 | + | Silver Lake 69 kV | NJ | Camden | Withdrawn | AEC | 40 | 20 | 10 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1160_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1160_imp.pdf | Document Posted | Not Required | Withdrawn | N/A | Withdrawn | N/A | N/A | 9/20/2019 | N/A | N/A | 3/22/2022 | 11/1/2021 | N/A | N | No | ||||||||||||||
| AF1-160 | - | Silver Lake 69 kV | NJ | Camden | Active | AEC | 40 | 20 | 10 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1160_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1160_imp.pdf | Document Posted | Not Required | N/A | N/A | 9/20/2019 | N/A | N/A | 11/1/2021 | N/A | N | No | ||||||||||||||||||
| AF1-217 | + | Edinboro -Cambridge Springs 34.5 kV | Crawford Solar II | PA | Crawford | Suspended | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1217_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1217_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1217_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1217_wmpa.pdf | Not Required | N/A | N/A | 9/27/2019 | N/A | N/A | 9/30/2022 | 9/30/2022 | N/A | N | No | |||||||||||
| AF1-217 | - | Edinboro -Cambridge Springs 34.5 kV | Crawford Solar II | PA | Crawford | Engineering and Procurement | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1217_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1217_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1217_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1217_wmpa.pdf | Not Required | N/A | N/A | 9/27/2019 | N/A | N/A | 9/30/2022 | 9/30/2022 | N/A | N | No | |||||||||||
| AF1-296 | + | Garden Plain 138 kV | IL | Whiteside | Active | ComEd | 212.1 | 212.1 | 37.3296 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1296_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1296_imp.pdf | Document Posted | N/A | N/A | 9/30/2019 | N/A | N/A | 9/15/2022 | N/A | N | No | |||||||||||||||||||
| AF1-296 | - | Garden Plain 138 kV | IL | Whiteside | Active | ComEd | 212.1 | 212.1 | 37.3296 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1296_fea.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2019 | N/A | N/A | 9/15/2022 | N/A | N | No | ||||||||||||||||||||
| AF2-314 | + | Vandergrift-Guffy Junction 25 kV | Ponytail Solar | PA | Armstrong | Engineering and Procurement | APS | 10 | 10 | 6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2314_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2314_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af2314_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af2314_wmpa.pdf | Not Required | N/A | N/A | 3/30/2020 | N/A | N/A | 9/30/2023 | 9/30/2023 | 9/30/2023 | N/A | N | No | ||||||||||
| AF2-314 | - | Vandergrift-Guffy Junction 25 kV | Ponytail Solar | PA | Armstrong | Engineering and Procurement | APS | 10 | 10 | 6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2314_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2314_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af2314_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af2314_wmpa.pdf | Not Required | N/A | N/A | 3/30/2020 | N/A | N/A | 9/30/2023 | 9/30/2023 | N/A | N | No | |||||||||||
| AG1-076 | + | Fostoria Central 138 kV | South Branch Solar | OH | Hancock | Engineering and Procurement | AEP | 205 | 0 | 46 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1076_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1076_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ag1076_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ag1076_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ag1076_csa.pdf | Document Posted | N/A | N/A | 7/31/2020 | N/A | N/A | 12/31/2025 | 12/31/2025 | N/A | N | No | ||||||||||
| AG1-076 | - | Fostoria Central 138 kV | OH | Hancock | Active | AEP | 205 | 0 | 46 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1076_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1076_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ag1076_fac.pdf | Document Posted | N/A | N/A | 7/31/2020 | N/A | N/A | 12/29/2023 | N/A | N | No | |||||||||||||||||
| AG1-103 | + | Clayton-Williamstown 69 kV | NJ | Gloucester | Active | AEC | 44 | 0 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1103_imp.pdf | Document Posted | Not Required | N/A | N/A | 8/24/2020 | N/A | N/A | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AG1-103 | - | Clayton-Williamstown 69 kV | NJ | Gloucester | Active | AEC | 44 | 0 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1103_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1103_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/24/2020 | N/A | N/A | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AG1-110 | + | Silver Lake 69 kV | NJ | Camden | Withdrawn | AEC | 40 | 0 | 20 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1110_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1110_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 8/31/2020 | N/A | N/A | 3/22/2022 | 11/1/2022 | N/A | N | No | |||||||||||||||||
| AG1-110 | - | Silver Lake 69 kV | NJ | Camden | Active | AEC | 40 | 0 | 20 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1110_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1110_imp.pdf | Document Posted | In Progress | N/A | N/A | 8/31/2020 | N/A | N/A | 11/1/2022 | N/A | N | No | ||||||||||||||||||
| AG1-197 | + | Morgan Street-Cochranton 34.5 kV | Morgan Street-Cochranton 34.5 kV | PA | Crawford | Engineering and Procurement | PENELEC | 15 | 15 | 9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1197_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1197_imp.pdf | Document Posted | In Progress | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1197_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1197_wmpa.pdf | Not Required | N/A | N/A | 9/18/2020 | N/A | N/A | 3/3/2025 | 3/3/2025 | N/A | N | No | |||||||||||
| AG1-197 | - | Morgan Street-Cochranton 34.5 kV | PA | Crawford | Active | PENELEC | 15 | 15 | 9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1197_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1197_imp.pdf | Document Posted | In Progress | Not Required | N/A | N/A | 9/18/2020 | N/A | N/A | 1/15/2023 | N/A | N | No | |||||||||||||||||
| AG1-198 | + | Union City 34.5 kV | PA | Erie | Active | PENELEC | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1198_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1198_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 9/18/2020 | N/A | N/A | 1/15/2023 | N/A | N | No | |||||||||||||||||
| AG1-198 | - | Union City 34.5 kV | PA | Erie | Active | PENELEC | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1198_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1198_imp.pdf | Document Posted | In Progress | Not Required | N/A | N/A | 9/18/2020 | N/A | N/A | 1/15/2023 | N/A | N | No | |||||||||||||||||
| AG1-246 | + | Gates Hill-Luzerne 25 kV | PA | Fayette | Engineering and Procurement | APS | 7.5 | 7.5 | 4.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1246_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1246_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1246_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1246_wmpa.pdf | Not Required | N/A | N/A | 9/25/2020 | N/A | N/A | 9/1/2024 | 9/1/2024 | N/A | N | No | ||||||||||||
| AG1-246 | - | Gates Hill-Luzerne 25 kV | PA | Fayette | Active | APS | 7.5 | 7.5 | 4.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1246_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1246_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 9/25/2020 | N/A | N/A | 12/31/2022 | N/A | N | No | |||||||||||||||||
| AG1-330 | + | Beavertown 12.47 kV | ASD Brick Plant PA2 Solar | PA | Beaver | Withdrawn | PPL | 5 | 5 | 4.5 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1330_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1330_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1330_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1330_wmpa.pdf | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 3/23/2022 | 3/1/2024 | 3/1/2024 | N/A | N | No | ||||||||||
| AG1-330 | - | Beavertown 12.47 kV | ASD Brick Plant PA2 Solar | PA | Beaver | Engineering and Procurement | PPL | 5 | 5 | 4.5 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1330_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1330_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1330_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1330_wmpa.pdf | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 3/1/2024 | 3/1/2024 | N/A | N | No | |||||||||||
| AG1-336 | + | Hunter 12.47 kV | ASD Hilcrest PA2 Solar | PA | Northumberland | Withdrawn | PPL | 5 | 5 | 3.8 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1336_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1336_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1336_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1336_wmpa.pdf | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 3/23/2022 | 3/1/2024 | 3/1/2024 | N/A | N | No | ||||||||||
| AG1-336 | - | Hunter 12.47 kV | ASD Hilcrest PA2 Solar | PA | Northumberland | Engineering and Procurement | PPL | 5 | 5 | 3.8 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1336_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1336_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1336_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1336_wmpa.pdf | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 3/1/2024 | 3/1/2024 | N/A | N | No | |||||||||||
| AG1-337 | + | Elizabethville 12.47 kV | ASD Market PA2 Solar | PA | Dauphin | Withdrawn | PPL | 5 | 5 | 3.7 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1337_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1337_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1337_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1337_wmpa.pdf | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 3/23/2022 | 3/1/2024 | 3/1/2024 | N/A | N | No | ||||||||||
| AG1-337 | - | Elizabethville 12.47 kV | ASD Market PA2 Solar | PA | Dauphin | Engineering and Procurement | PPL | 5 | 5 | 3.7 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1337_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1337_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1337_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1337_wmpa.pdf | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 3/1/2024 | 3/1/2024 | N/A | N | No | |||||||||||
| AG1-397 | + | Walston 12 kV | Walston Solar | MD | Wicomico | Engineering and Procurement | DPL | 10 | 9.972 | 4.1882 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1397_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1397_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag1397_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag1397_wmpa.pdf | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 3/31/2024 | 3/31/2024 | N/A | N | No | |||||||||||
| AG1-397 | - | Walston 12 kV | MD | Wicomico | Active | DPL | 10 | 9.972 | 4.1882 | Capacity | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1397_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1397_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 11/1/2021 | N/A | N | No | |||||||||||||||||
| AG1-509 | + | Point Lookout 69 kV | VA | Grayson | Withdrawn | AEP | 105.4 | 105.4 | 15.5 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1509_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1509_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 9/30/2020 | N/A | N/A | 3/29/2022 | 3/1/2025 | N/A | N | No | |||||||||||||||||
| AG1-509 | - | Point Lookout 69 kV | VA | Grayson | Active | AEP | 105.4 | 105.4 | 15.5 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1509_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1509_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2020 | N/A | N/A | 3/1/2025 | N/A | N | No | ||||||||||||||||||
| AG2-096 | + | Dauphin PG Tie-Dauphin Juniata Tie 69 kV | PA | Dauphin | Active | PPL | 55 | 0 | 0 | Energy | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 1/28/2021 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||||||
| AG2-096 | - | Dauphin PG Tie-Dauphin Juniata Tie 69 kV | PA | Dauphin | Active | PPL | 55 | 0 | 0 | Energy | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 1/28/2021 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||||||
| AG2-144 | + | Carlls Corner 12 kV | NJ | Salem | Withdrawn | AEC | 1.5 | 1.5 | 0.63 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/16/2021 | N/A | N/A | 3/11/2022 | N/A | N | No | ||||||||||||||||||||||
| AG2-144 | - | Carlls Corner 12 kV | NJ | Salem | Active | AEC | 1.5 | 1.5 | 0.63 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/16/2021 | N/A | N/A | 3/31/2022 | N/A | N | No | ||||||||||||||||||||||
| AG2-199 | + | Birchwood-NUG 230 kV | VA | King George | Active | Dominion | 55 | 55 | 35.7 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/1/2021 | N/A | N/A | 10/10/2023 | N/A | N | No | ||||||||||||||||||||||
| AG2-199 | - | Birchwood-NUG 230 kV | VA | King George | Active | Dominion | 55 | 55 | 35.7 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/28/2021 | N/A | N/A | 10/10/2023 | N/A | N | No | ||||||||||||||||||||||
| AG2-396 | - | Bedford North-Pennsylvania Hollow 23 kV | OH | Montgomery | Active | PENELEC | 4 | 4 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/30/2021 | N/A | N/A | 6/21/2022 | N/A | Y | No | ||||||||||||||||||||||
| AG2-523 | + | Bakers Pond 115 kV | VA | Prince George | Withdrawn | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 3/31/2021 | N/A | N/A | 3/31/2022 | N/A | N | No | ||||||||||||||||||||||
| AG2-523 | - | Bakers Pond 115 kV | VA | Prince George | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/31/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-192 | + | Sunbury-Columbia 69kV | PA | Northumberland | Withdrawn | PPL | 5 | 5 | 3.3 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/1/2021 | N/A | N/A | 3/14/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-192 | - | Sunbury-Columbia 69kV | PA | Northumberland | Active | PPL | 5 | 5 | 3.3 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/1/2021 | N/A | N/A | 9/1/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-193 | + | Sunbury-Danville 69 kV | PA | Northumberland | Withdrawn | PPL | 5 | 5 | 2.6 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/1/2021 | N/A | N/A | 3/14/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-193 | - | Sunbury-Danville 69 kV | PA | Northumberland | Active | PPL | 5 | 5 | 2.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/1/2021 | N/A | N/A | 9/1/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-194 | + | Warfordsburg – Hancock 34.5 kV | PA | Fulton | Withdrawn | APS | 5 | 5 | 2.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/1/2021 | N/A | N/A | 3/14/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-194 | - | Warfordsburg – Hancock 34.5 kV | PA | Fulton | Active | APS | 5 | 5 | 2.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 8/31/2021 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH1-339 | + | West Crawford 69 kV | OH | Wyandot | Active | AEP | 80 | 80 | 53.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH1-339 | - | West Crawford 69 kV | OH | Wyandot | Active | AEP | 80 | 80 | 53.5 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 11/21/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-454 | + | Pinewood- St Johns 115kV | VA | Caroline | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH1-454 | - | Pinewood- St Johns 115kV | VA | Caroline | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-509 | + | TBD 12 kV | PA | Northumberland | Withdrawn | PPL | Energy | Generation Interconnection | Withdrawn | N/A | N/A | 9/10/2021 | N/A | N/A | 3/14/2022 | N/A | Y | No | ||||||||||||||||||||||||||
| AH1-509 | - | TBD 12 kV | IL | Livingston | Active | PPL | Energy | Generation Interconnection | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/31/2023 | N/A | Y | No | ||||||||||||||||||||||||||
| AH1-515A | + | Springdale - Wycoff 12.8 kV | PA | Allegheny | Withdrawn | APS | 5 | 5 | 3.1 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 3/14/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-515A | - | Springdale - Wycoff 12.8 kV | PA | Allegheny | Active | APS | 5 | 5 | 3.1 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/29/2023 | N/A | N | No | ||||||||||||||||||||||
| AH2-014 | - | Crane Solar | PA | Adams | Active | PENELEC | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 10/15/2021 | N/A | N/A | 12/15/2023 | N/A | Y | No | |||||||||||||||||||||||||
| AH2-023 | - | Pine Run Solar 13.2 kV | PA | Clearfield | Active | ATSI | Energy | Generation Interconnection | In Progress | N/A | N/A | 10/29/2021 | N/A | N/A | 12/1/2023 | N/A | Y | No | ||||||||||||||||||||||||||
| AH2-024 | - | Kodiak Solar | PA | Jefferson | Active | PENELEC | 3 | 3 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 10/30/2021 | N/A | N/A | 12/15/2023 | N/A | Y | No | ||||||||||||||||||||||
| AH2-038 | + | Weirton - Arroyo 25 kV | WV | Hancock | Active | APS | 10.8 | 10.75 | 5.4395 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/13/2021 | N/A | N/A | 12/31/2024 | N/A | N | No | ||||||||||||||||||||||
| AH2-038 | - | New Cumberland 12 kV | WV | Hancock | Active | APS | 10.8 | 10.75 | 5.4395 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/13/2021 | N/A | N/A | 12/31/2024 | N/A | N | No | ||||||||||||||||||||||
| AH2-040 | + | William - Blackwater 69 kV | WV | Tucker | Active | APS | 11.5 | 11.5 | 5.7615 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/13/2021 | N/A | N/A | 12/31/2024 | N/A | N | No | ||||||||||||||||||||||
| AH2-040 | - | Blackwater 12.5 kV | WV | Tucker | Active | APS | 11.5 | 11.5 | 5.7615 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/13/2021 | N/A | N/A | 12/31/2024 | N/A | N | No | ||||||||||||||||||||||
| AH2-041 | + | Osage - Collins Ferry 23 kV | WV | Monongalia | Active | APS | 10.2 | 10.15 | 5.0953 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/13/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH2-041 | - | Collins Ferry 12 kV | WV | Monongalia | Active | APS | 10.2 | 10.15 | 5.0953 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/13/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH2-042 | + | Marlowe - North Martinsburg 34.5 kV | WV | Berkeley | Active | APS | 5.8 | 5.75 | 3.6858 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/13/2021 | N/A | N/A | 12/31/2024 | N/A | N | No | ||||||||||||||||||||||
| AH2-042 | - | Marlowe 34.5 kV | WV | Berkeley | Active | APS | 5.8 | 5.75 | 3.6858 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/13/2021 | N/A | N/A | 12/31/2024 | N/A | N | No | ||||||||||||||||||||||
| AH2-044 | - | Crow Solar 12.47 kV | VA | Caroline | Active | APS | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/30/2021 | N/A | N/A | 7/1/2024 | N/A | Y | No | ||||||||||||||||||||||
| AH2-052 | + | New Hope 12.47 kV | MD | Allegany | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 12/21/2021 | N/A | N/A | 12/2/2022 | N/A | Y | No | ||||||||||||||||||||||
| AH2-052 | - | TBD 34kV | MD | Allegany | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 12/21/2021 | N/A | N/A | 12/2/2022 | N/A | Y | No | ||||||||||||||||||||||
| AH2-053 | + | Mardela Springs 12.47 kV | MD | Wicomico | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 12/22/2021 | N/A | N/A | 12/2/2022 | N/A | Y | No | ||||||||||||||||||||||
| AH2-053 | - | TBD 34kV | MD | Wicomico | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 12/21/2021 | N/A | N/A | 12/2/2022 | N/A | Y | No | ||||||||||||||||||||||
| AH2-054 | + | Edgewood 12.47 kV I | MD | Wicomico | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 12/21/2021 | N/A | N/A | 12/2/2022 | N/A | Y | No | ||||||||||||||||||||||
| AH2-054 | - | TBD 69kV | WV | Berkeley | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 12/21/2021 | N/A | N/A | 12/2/2022 | N/A | Y | No | ||||||||||||||||||||||
| AH2-066 | - | Cross Creek Solar 12.47 kV | N/A | N/A | Active | PENELEC | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/4/2022 | N/A | N/A | 12/15/2023 | N/A | Y | No | ||||||||||||||||||||||
| AH2-070 | + | Edgewood 12.47 kV II | MD | Wicomico | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/19/2022 | N/A | N/A | N/A | Y | No | |||||||||||||||||||||||
| AH2-070 | - | TBD | MD | Unknown | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/19/2022 | N/A | N/A | N/A | Y | No | |||||||||||||||||||||||
| AH2-071 | + | Edgewood 12.47 kV III | MD | Wicomico | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/19/2022 | N/A | N/A | N/A | Y | No | |||||||||||||||||||||||
| AH2-071 | - | TBD | MD | Unknown | Active | DPL | 2 | 1.98 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/19/2022 | N/A | N/A | N/A | Y | No | |||||||||||||||||||||||
| AH2-074 | + | Ashtabula County PV Project 1 | OH | Ashtabula | Active | ATSI | 10 | 10 | 2.1 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/21/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-080 | + | Brunswick - Gasburg 69 kV | VA | Brunswick | Active | Dominion | 52.7 | 52.65 | 31.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-080 | - | Brodnax - Brunswick 115 kV | VA | Brunswick | Active | Dominion | 98.6 | 98.55 | 59.1 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/27/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-085 | + | Byron-Wayne 345 kV | IL | DeKalb | Active | ComEd | 145.3 | 145.335 | 87.201 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-092 | + | Kidds Store-Sherwood 115 kV | VA | Albemarle | Withdrawn | Dominion | 138 | 0 | 32 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 2/1/2022 | N/A | N/A | 3/9/2022 | N/A | N | No | ||||||||||||||||||||||
| AH2-100 | + | Briery Substation 29.4kV | VA | Prince Edward | Active | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/31/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-101 | + | Briery Substation 29.4kV | VA | Prince Edward | Active | Dominion | 5 | 5 | 3 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/31/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-105 | + | Merck 34.5 kV | VA | Rockingham | Active | Dominion | 16 | 16 | 9.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/4/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-105 | - | TBD 34.5 kV | VA | Rockingham | Active | Dominion | 16 | 16 | 9.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/3/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-107 | + | Suffolk 115 kV | VA | City of Suffolk | Active | Dominion | 69 | 69 | 69 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/12/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-108 | + | Potter-Harlan 69 kV | PA | Lawrence | Withdrawn | ATSI | 95 | 35 | 21 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 2/11/2022 | N/A | N/A | 3/18/2022 | N/A | N | No | ||||||||||||||||||||||
| AH2-110 | + | Wells - Harrington 69 kV | PA | Fulton | Withdrawn | DPL | Energy | Generation Interconnection | Withdrawn | N/A | N/A | 2/19/2022 | N/A | N/A | 3/14/2022 | N/A | Y | No | ||||||||||||||||||||||||||
| AH2-112 | + | Olive - Dumont 345 kV | IN | St. Joseph | Active | AEP | 250 | 250 | 170 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 2/22/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-113 | + | Dresden – Pontiac Midpoint 345kV | IL | Livingston | Active | ComEd | 250 | 250 | 170 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 2/22/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-117 | + | Dorton - Henry Clay 46 kV | KY | Pike | Active | AEP | 30 | 30 | 18 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/22/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-118 | + | Ripley Switch – Grayton 69kV | MD | Charles | Active | PEPCO | 100 | 100 | 85 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 2/23/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-120 | + | Garden Prairie 345 kV | IL | McHenry | Active | ComEd | 400 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/26/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-121 | + | Garden Prairie 345 kV | IL | McHenry | Active | ComEd | 500 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/25/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-122 | + | Nelson-Lee County 345 kV | IL | Lee | Active | ComEd | 220 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/25/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-123 | + | Nelson - Lee County 345 kV | IL | Lee | Active | ComEd | 420 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/26/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-124 | + | Nelson - Lee County 345 kV | IL | Lee | Active | ComEd | 400 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/25/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-125 | + | Kensington 138 kV | KY | N/A | Active | ComEd | 200 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/26/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-126 | + | Tidd 138 kV | OH | Jefferson | Active | AEP | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/25/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-130 | + | Clark Co - Spencer Road 138 kV | KY | N/A | Active | EKPC | 85 | 85 | 50 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-131 | + | Bridgeport 230kV | NJ | Gloucester | Active | AEC | 225 | 0 | 103.7 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-132 | + | Chambers 230kV | NJ | Salem | Active | AEC | 240 | 0 | 117 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/1/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-134 | + | TBD 34.5 kV | WV | Kanawha | Withdrawn | DPL | Energy | Generation Interconnection | Withdrawn | N/A | N/A | 2/28/2022 | N/A | N/A | 3/21/2022 | N/A | Y | No | ||||||||||||||||||||||||||
| AH2-136 | + | Dunnsville 345 kV | VA | Essex | Active | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-137 | + | Monroe - Coolwell 12.47 kV | VA | Amherst | Active | AEP | 10 | 10 | 6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-138 | + | Arrington Circuit 12.47 kV | VA | Nelson | Active | AEP | 10 | 10 | 6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-144 | + | Birchwood-NUG 230kV | VA | King George | Active | Dominion | 150 | 150 | 150 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-145 | + | Birchwood-NUG 230kV | VA | King George | Active | Dominion | 52.3 | 52.3 | 52.3 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-146 | + | Adams - Seaman 69 kV | OH | Adams | Active | AEP | 87.2 | 87.2 | 52.3 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-147 | + | Marysville - Sorenson 765 kV | OH | Logan | Active | Dayton | 119 | 119 | 108.4 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-148 | + | East Lima - Marysville 345 kV | OH | Union | Active | AEP | 152 | 152 | 143.2 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-149 | + | Stinger - Valley 138 kV | MI | Van Buren | Active | AEP | 150 | 150 | 120 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 2/28/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-155 | + | Lyons-Allen Jct 138 kV | OH | Fulton | Active | ATSI | 95 | 95 | 57 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/1/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-157 | + | Hooversville-Somerset 23 kV | PA | Somerset | Active | PENELEC | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/1/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-158 | + | Somerset-Hooversville 115 kV | PA | Somerset | Active | PENELEC | 80 | 80 | 48 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/1/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-159 | + | Buckskin 69 kV | OH | Highland | Active | AEP | 49 | 49 | 29.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/1/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-160 | + | Buckskin 69 kV | OH | Highland | Active | AEP | 69 | 20 | 12 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/2/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-164 | + | Chatfield 69 kV | OH | Crawford | Active | AEP | 85 | 85 | 50 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/4/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-170 | + | Byron 345 | IL | Will | Active | ComEd | 140 | 140 | 84 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/7/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-171 | + | Davis Creek 345 kV | IL | Kankakee | Active | ComEd | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/7/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-172 | + | Wilton 345 kV | IL | Will | Active | ComEd | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/7/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-173 | + | Maryland 138 kV | IL | Ogle | Active | ComEd | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/7/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-186 | + | TBD 12kV | VA | King William | Active | Dominion | 20 | 20 | 13.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-195 | + | Seward-Glory 115 kV | PA | Indiana | Active | PENELEC | 65 | 65 | 39 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/8/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-204 | + | Lancaster 138 kV | IL | Stephenson | Active | ComEd | 170 | 170 | 170 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/8/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-207 | + | Hopkins 138 kV | WV | N/A | Active | AEP | 85 | 85 | 57 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-208 | + | VA | Lee | Withdrawn | Dominion | 45 | 45 | 31 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 3/9/2022 | N/A | N/A | 3/17/2022 | N/A | N | No | |||||||||||||||||||||||
| AH2-209 | + | Cabin Creek 138 kV | WV | Kanawha | Active | AEP | 95 | 95 | 63 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-214 | + | OH | Pickaway | Withdrawn | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/9/2022 | N/A | N/A | 4/1/2022 | N/A | N | No | |||||||||||||||||||||||
| AH2-216 | + | OH | Miami | Withdrawn | Dayton | 200 | 200 | 120 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/9/2022 | N/A | N/A | 4/1/2022 | N/A | N | No | |||||||||||||||||||||||
| AH2-219 | + | OH | Pickaway | Withdrawn | AEP | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/9/2022 | N/A | N/A | 4/1/2022 | N/A | N | No | |||||||||||||||||||||||
| AH2-221 | + | OH | Miami | Withdrawn | Dayton | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/9/2022 | N/A | N/A | 4/1/2022 | N/A | N | No | |||||||||||||||||||||||
| AH2-222 | + | Millersburg 69 kV | KY | N/A | Active | EKPC | 60 | 60 | 36 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-223 | + | Bluff Point 138 kV | IN | Jay | Active | AEP | 50 | 50 | 30 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-224 | + | Millersburg 69 kV | KY | N/A | Active | EKPC | 50 | 50 | 50 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-225 | + | Southampton- Handsom 115kV | VA | Southampton | Active | Dominion | 125 | 125 | 125 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-226 | + | Clubhouse- Purdy 115kV | VA | Greensville | Active | Dominion | 175 | 175 | 175 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-227 | + | Bluff Point 138 kV | IN | Jay | Active | AEP | 75 | 75 | 75 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-228 | + | Circleville 138 kV | OH | Pickaway | Active | AEP | 150 | 150 | 150 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-233 | + | Olive - Reynolds 345 kV | IN | Pulaski | Active | AEP | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-234 | + | W Dekalb 138 kV | IL | DeKalb | Active | ComEd | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-238 | + | Clubhouse- Purdy 115kV | VA | Greensville | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-240 | + | Oceanview 230 kV | NJ | Monmouth | Withdrawn | JCPL | 1493 | 1493 | 424.872 | Capacity | Generation Interconnection | Offshore Wind | Withdrawn | N/A | N/A | 3/9/2022 | N/A | N/A | 4/1/2022 | N/A | N | No | ||||||||||||||||||||||
| AH2-250 | + | TBD 13.2 kV | PA | Bucks | Active | PECO | 9.3 | 9.25 | 3.885 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-254 | + | NJ | Mercer | Withdrawn | PSEG | 5 | 5 | 5 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 3/9/2022 | N/A | N/A | 4/1/2022 | N/A | N | No | |||||||||||||||||||||||
| AH2-263 | + | Marion Co - Marion Co industrial 161 kV | KY | Marion | Active | EKPC | 63.6 | 25.8 | 15.48 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-265 | + | Oak Grove - Hawkins Gate 230kV | MD | Charles | Active | PEPCO | 200 | 200 | 200 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-266 | + | Hughesville-Cedarville 69kV | MD | Charles | Active | SMECO | 25 | 25 | 15 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-268 | + | Sapony 34.5 kV | VA | Dinwiddie | Active | Dominion | 37 | 37 | 33.7 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/9/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-270 | + | Garden Plain 138 kV | IL | Whiteside | Active | ComEd | 300 | 300 | 51 | Capacity | Generation Interconnection | Wind | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-271 | + | Central VA- Chase City 115kV | VA | Mecklenburg | Active | Dominion | 150 | 150 | 90 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-272 | + | Central VA- Chase City 115kV | VA | Mecklenburg | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-274 | + | Eagle Road 138 kV | OH | Union | Active | ATSI | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-277 | + | Hurley 69 kV | VA | Buchanan | Active | AEP | 60 | 60 | 42 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-278 | + | Cabin Creek 138 kV | WV | Kanawha | Active | AEP | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-293 | + | Gilbert - Morris Park 115 kV | NJ | Warren | Active | JCPL | 50 | 50 | 34 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-295 | + | Emerald 25 kV | PA | Greene | Active | APS | 40 | 40 | 24 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-322 | + | EAST DANVILLE - SMITH MOUNTAIN 138kV LINE | VA | Pittsylvania | Active | Dominion | 290 | 290 | 174 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-338 | + | Wempletown 138 kV | IL | Winnebago | Active | ComEd | 160 | 160 | 96 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-340 | + | Toulon 138kV | IL | Stark | Active | ComEd | 350 | 350 | 210 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-342 | + | Edwards - Kewanee East 138kV | IL | Stark | Active | ComEd | 280 | 280 | 168 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-347 | + | Northern St. Joseph 138 kV | IN | St. Joseph | Active | AEP | 200 | 200 | 164 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-369 | + | Nuttall 138 kV | WV | Fayette | Active | AEP | 200 | 0 | 16 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-386 | + | North Franklin 138 kV | WV | Pendleton | Active | APS | 191.5 | 191.5 | 28.15 | Capacity | Generation Interconnection | Wind | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-398 | + | Four Rivers- St. Johns 230kV | VA | Caroline | Active | Dominion | 80 | 80 | 48 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-408 | + | OH | Wood | Active | ATSI | 49.9 | 49.9 | 29.94 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | ||||||||||||||||||||||||
| AH2-409 | + | OH | Wood | Active | ATSI | 80 | 30.1 | 18.06 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | ||||||||||||||||||||||||
| AH2-421 | + | Dresden 138kV | IL | Grundy | Active | ComEd | 230 | 230 | 230 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/10/2022 | N/A | N/A | N/A | N | No | |||||||||||||||||||||||
| AH2-424 | + | Durbin-Pickens 138 kV | WV | Randolph | Withdrawn | APS | 120 | 120 | 84 | Capacity | Generation Interconnection | Solar; Storage | Withdrawn | N/A | N/A | 3/10/2022 | N/A | N/A | 3/21/2022 | N/A | N | No | ||||||||||||||||||||||
| AI1-034 5180926 | + | N/A | N/A | Active | Duke Energy Carolinas | 1000 | Energy | Long-Term Firm Transmission | N/A | N/A | 3/30/2022 | 6/1/2027 | 6/1/2032 | N/A | PP | No | ||||||||||||||||||||||||||||
| R07 | + | Pleasantville | AC Landfill Energy Units 1-3 | NJ | Atlantic | Deactivated | AEC | 6 | 2 | 2 | 2 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/r07_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/r07_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/r07_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 9/12/2006 | N/A | N/A | 10/1/2007 | 10/1/2007 | 10/1/2007 | N/A | N | No | ||||||||||
| R07 | - | Pleasantville | AC Landfill Energy Units 1-3 | NJ | Atlantic | In Service | AEC | 6 | 2 | 2 | 2 | Capacity | Generation Interconnection | Methane | https://www.pjm.com/pub/planning/project-queues/feas_docs/r07_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/r07_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/r07_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 9/12/2006 | N/A | N/A | 10/1/2007 | 10/1/2007 | 10/1/2007 | N/A | N | No | ||||||||||
| Z1-127 | + | University Park | IL | Will | Partially in Service - Active | ComEd | 320 | 20 | 20 | 20 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/z1127_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/z1127_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/z1_127_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 10/31/2013 | N/A | N/A | 10/31/2013 | 2/10/2014 | N/A | N | No | ||||||||||||
| Z1-127 | - | University Park | IL | Will | Partially in Service - Active | ComEd | 320 | 20 | 20 | 20 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/z1127_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/z1127_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/z1_127_isa.pdf | Document Posted | N/A | N/A | N/A | 10/31/2013 | N/A | N/A | 10/31/2013 | 2/10/2014 | N/A | N | No |