Changes in PJM Queue between January 3rd and March 9th, 2022.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

Summary of Changes

##   old_obs   new_obs   changes additions  removals 
##      8112      8170       311        59         1

Changes

## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
AA1-007 + Smith Gap Regional Landfill VA Roanoke Withdrawn AEP 6 6 6 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1007_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 6/19/2014 N/A N/A 1/7/2016 Customer Milestone Not Met 6/1/2016 N/A N No
AA1-007 - Smith Gap Regional Landfill VA Roanoke Withdrawn AEP 6 6 6 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1007_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 6/19/2014 N/A N/A 1/7/2016 Customer Milestone Not Met 6/1/2016 N/A N No
AA1-024 4661444 + DUK-PJM N/A N/A Withdrawn Ingenco Wholesale Power, LLC 6 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4661444_ltf1.pdf Withdrawn N/A N/A 7/10/2014 6/1/2018 6/1/2023 9/18/2014 N/A FF No
AA1-024 4661444 - DUK-PJM N/A N/A Withdrawn Ingenco Wholesale Power LLC 6 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4661444_ltf1.pdf Withdrawn N/A N/A 7/10/2014 6/1/2018 6/1/2023 9/18/2014 N/A FF No
AA1-038 + Lexington-Low Moor 230kV VA Botetourt Engineering and Procurement Dominion 78.2 78.2 10.1 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1038_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1038_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_038_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_038_csa.pdf Document Posted N/A N/A 9/15/2023 8/19/2014 N/A N/A 9/15/2023 12/31/2023 12/31/2023 N/A N No
AA1-038 - Lexington-Low Moor 230kV VA Botetourt Engineering and Procurement Dominion 76.6 76.6 9.9 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1038_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1038_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_038_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_038_csa.pdf Document Posted N/A N/A 4/15/2022 8/19/2014 N/A N/A 6/1/2022 6/30/2022 6/30/2022 N/A N No
AA1-058 4675070 + CPLE-PJM N/A N/A Withdrawn Ingenco Wholesale Power, LLC 6 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4675070_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4675070_ltf2.pdf Executed Agreement and/or Study N/A N/A 9/15/2014 6/1/2016 6/1/2018 6/1/2018 N/A FF No
AA1-058 4675070 - CPLE-PJM N/A N/A Withdrawn Ingenco Wholesale Power LLC 6 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4675070_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4675070_ltf2.pdf Executed Agreement and/or Study N/A N/A 9/15/2014 6/1/2016 6/1/2018 6/1/2018 N/A FF No
AA1-114 + Harwood-East Hazelton #2 69kV PA Carbon Withdrawn PPL 60 60 7.72 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1114_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1114_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 10/31/2014 N/A N/A 9/20/2016 Customer Initiated Withdrawal 12/30/2017 N/A N No
AA1-114 - Harwood-East Hazelton #2 69kV PA Carbon Withdrawn PPL 60 60 7.72 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1114_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1114_fac.pdf Document Posted Withdrawn N/A N/A N/A 10/31/2014 N/A N/A 9/20/2016 Customer Initiated Withdrawal 12/30/2017 N/A N No
AA1-115 + Thirty First Street 115kV PA Blair Withdrawn PENELEC 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1115_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1115_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 10/31/2014 N/A N/A 11/17/2016 Customer Initiated Withdrawal 6/1/2016 N/A N No
AA1-115 - Thirty First Street 115kV PA Blair Withdrawn PENELEC 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1115_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1115_fac.pdf Document Posted Withdrawn N/A N/A N/A 10/31/2014 N/A N/A 11/17/2016 Customer Initiated Withdrawal 6/1/2016 N/A N No
AA1-146 + Nelson Invenergy Nelson Expansion LLC IL Lee Under Construction ComEd 190 190 157 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1146_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1146_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_146_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_146_csa.pdf Document Posted N/A N/A 8/31/2022 10/31/2014 N/A N/A 10/31/2022 3/31/2023 3/31/2023 N/A N No
AA1-146 - Nelson Invenergy Nelson Expansion LLC IL Lee Engineering and Procurement ComEd 190 190 157 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1146_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1146_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_146_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_146_csa.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 6/1/2024 6/1/2024 N/A N No
AA2-030 + Nelson Invenergy Nelson Expansion LLC IL Lee Under Construction ComEd 380 190 157 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2030_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2030_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2030_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_030_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_030_csa.pdf Document Posted N/A N/A 8/31/2022 12/23/2014 N/A N/A 11/30/2022 3/31/2023 3/31/2023 N/A N No
AA2-030 - Nelson Invenergy Nelson Expansion LLC IL Lee Engineering and Procurement ComEd 380 190 157 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2030_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2030_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2030_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_030_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_030_csa.pdf Document Posted N/A N/A 12/23/2014 N/A N/A 3/31/2023 3/31/2023 N/A N No
AA2-060 + Branchville-Sussex #1 34kV Plains Road Battery Storage Facility NJ Sussex Under Construction JCPL 6 6 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2060_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_060_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_060_csa.pdf Document Posted N/A N/A 2/27/2015 N/A N/A 10/31/2021 6/30/2022 6/30/2022 N/A N No
AA2-060 - Branchville-Sussex #1 34kV Plains Road Battery Storage Facility NJ Sussex Engineering and Procurement JCPL 6 6 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2060_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_060_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_060_csa.pdf Document Posted N/A N/A 2/27/2015 N/A N/A 10/31/2021 10/31/2021 10/31/2021 N/A N No
AA2-061 + Branchville-Sussex #2 34.5kV Mohawk Battery Storage Facility NJ Sussex Under Construction JCPL 8 8 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2061_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_061_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_061_csa.pdf Document Posted N/A N/A 2/27/2015 N/A N/A 10/31/2021 6/30/2022 6/30/2022 N/A N No
AA2-061 - Branchville-Sussex #2 34.5kV Mohawk Battery Storage Facility NJ Sussex Engineering and Procurement JCPL 8 8 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2061_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_061_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_061_csa.pdf Document Posted N/A N/A 2/27/2015 N/A N/A 10/31/2021 10/31/2021 10/31/2021 N/A N No
AA2-076 + Linwood 230kV Phillips Island CT1, CT2, CT3 & ST4 PA Delaware Canceled PECO 919 0 18 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2076_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_076_isa.pdf Document Posted N/A Not Required N/A N/A 3/27/2015 N/A N/A 4/27/2021 N/A N No This project slid to the next queue
AA2-076 - Linwood 230kV Phillips Island CT1, CT2, CT3 & ST4 PA Delaware In Service PECO 919 0 18 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2076_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_076_isa.pdf Document Posted N/A Not Required N/A N/A 3/27/2015 N/A N/A 4/27/2021 N/A N No This project slid to the next queue
AA2-084 + Lappans Road 12.5kV MD Washington Withdrawn APS 4 4 1.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2084_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 3/31/2015 N/A N/A 9/20/2016 Customer Initiated Withdrawal 11/2/2016 N/A N No
AA2-084 - Lappans Road 12.5kV MD Washington Withdrawn APS 4 4 1.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2084_imp.pdf Document Posted Not Required Withdrawn N/A N/A N/A 3/31/2015 N/A N/A 9/20/2016 Customer Initiated Withdrawal 11/2/2016 N/A N No
AA2-116 + Cook-East Elkhart 345kV Indeck Niles Energy Center MI Cass Partially in Service - Under Construction AEP 994 994 994 160 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2116_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2116_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_116_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_116_csa.pdf Document Posted N/A N/A 6/24/2021 4/28/2015 N/A N/A 12/27/2021 3/15/2022 3/15/2022 12/27/2021 N/A N No
AA2-116 - Cook-East Elkhart 345kV Indeck Niles Energy Center MI Cass Under Construction AEP 994 994 994 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2116_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2116_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_116_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_116_csa.pdf Document Posted N/A N/A 6/24/2021 4/28/2015 N/A N/A 12/27/2021 3/15/2022 3/15/2022 N/A N No
AA2-119 + Glenn Falls 138kV Glen Falls Facility WV Harrison Engineering and Procurement APS 550 550 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2119_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2119_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_119_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_119_csa.pdf Document Posted N/A N/A 4/29/2015 N/A N/A 7/30/2021 12/31/2021 12/31/2021 N/A N No
AA2-119 - Glenn Falls 138kV Glen Falls Facility WV Harrison Suspended APS 550 550 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2119_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2119_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_119_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_119_csa.pdf Document Posted N/A N/A 4/29/2015 N/A N/A 7/30/2021 12/31/2021 12/31/2021 N/A N No
AA2-125 + Edison 138kV NJ Middlesex Withdrawn PSEG 580.1 580.08 504 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2125_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 4/29/2015 N/A N/A 9/9/2015 Customer Initiated Withdrawal 5/31/2017 N/A N No
AA2-125 - Edison 138kV NJ Middlesex Withdrawn PSEG 580.1 580.08 504 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2125_imp.pdf Document Posted Not Required Withdrawn N/A N/A N/A 4/29/2015 N/A N/A 9/9/2015 Customer Initiated Withdrawal 5/31/2017 N/A N No
AA2-146 + Catoctin 34.5kV MD Frederick Withdrawn APS 20 20 10.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2146_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 4/30/2015 N/A N/A 7/13/2016 Customer Milestone Not Met 9/15/2016 N/A N No
AA2-146 - Catoctin 34.5kV MD Frederick Withdrawn APS 20 20 10.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2146_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2146_imp.pdf Document Posted Not Required Withdrawn N/A N/A N/A 4/30/2015 N/A N/A 7/13/2016 Customer Milestone Not Met 9/15/2016 N/A N No
AB1-087 + Sullivan 345kV #1 IN Sullivan Active AEP 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1087_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1087_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-087 - Sullivan 345kV #1 IN Sullivan Active AEP 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1087_imp.pdf Document Posted In Progress N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-088 + Sullivan 345kV #2 IN Sullivan Active AEP 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1088_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1088_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-088 - Sullivan 345kV #2 IN Sullivan Active AEP 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1088_imp.pdf Document Posted In Progress N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-089 + Byron-Wayne 345kV #1 Byron to Wayne Thermal #1 Project IL Lee Engineering and Procurement ComEd 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1089_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1089_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_089_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_089_csa.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2026 6/1/2026 N/A N No
AB1-089 - Byron-Wayne 345kV #1 IL Lee Active ComEd 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1089_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1089_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1089_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-091 + Davis Creek 345kV IL Kankakee Active ComEd 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1091_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1091_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-091 - Davis Creek 345kV IL Kankakee Active ComEd 575 575 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1091_imp.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 6/1/2019 N/A N No
AB1-096 + Carroll-Mt. Airy 34.5kV Union Bridge Solar Facility MD Carroll Under Construction APS 9.9 8.2 3.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf Document Posted N/A N/A 10/7/2015 N/A N/A 1/28/2022 2/28/2022 2/28/2022 N/A N No
AB1-096 - Carroll-Mt. Airy 34.5kV Union Bridge Solar Facility MD Carroll Under Construction APS 9.9 8.2 3.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf Document Posted N/A N/A 10/7/2015 N/A N/A 1/28/2022 11/1/2021 11/1/2021 N/A N No
AB1-162 + Price 69 kV MD Queen Anne’s Withdrawn DPL 16.7 16.7 6.34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1162_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1162_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 10/30/2015 N/A N/A 7/1/2019 7/1/2017 N/A N No
AB1-162 - Price 69 kV MD Queen Anne’s Withdrawn DPL 16.7 16.7 6.34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1162_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1162_fac.pdf Document Posted Withdrawn N/A N/A N/A 10/30/2015 N/A N/A 7/1/2019 7/1/2017 N/A N No
AB1-169 + Stuart 345kV Mason Energy Center KY Mason Withdrawn Dayton 1150 1150 1100 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1169_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1169_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_169_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_169_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 6/30/2023 2/9/2022 6/30/2023 6/30/2023 N/A N No
AB1-169 - Stuart 345kV Mason Energy Center KY Mason Suspended Dayton 1150 1150 1100 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1169_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1169_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1169_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_169_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_169_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 6/30/2023 6/30/2023 6/30/2023 N/A N No
AB1-173 + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 3/11/2022 4/1/2022 4/1/2022 N/A N No
AB1-173 - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 4/1/2022 4/1/2022 N/A N No
AB1-173A + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 39.6 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 3/11/2022 4/1/2022 4/1/2022 N/A N No
AB1-173A - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 39.6 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 4/1/2022 4/1/2022 N/A N No
AB2-003 + Halfway-N=Milnor 34.5kV Thornton Solar Facility MD Washington Withdrawn APS 4.4 4.4 1.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2003_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2003_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_003_isa.pdf Document Posted N/A Withdrawn N/A N/A 11/9/2015 N/A N/A 12/19/2016 Customer Initiated Withdrawal 12/31/2017 12/31/2017 N/A N No
AB2-003 - Halfway-N=Milnor 34.5kV Thornton Solar Facility MD Washington Withdrawn APS 4.4 4.4 1.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2003_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2003_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_003_isa.pdf Document Posted N/A N/A N/A 11/9/2015 N/A N/A 12/19/2016 Customer Initiated Withdrawal 12/31/2017 12/31/2017 N/A N No
AB2-015 + Franklin 115kV Tidewater Solar Projects VA Southampton Withdrawn Dominion 91 91 50 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_015_csa.pdf Document Posted N/A N/A 6/1/2023 12/21/2015 N/A N/A 8/31/2023 1/3/2022 12/31/2022 12/31/2022 N/A N No
AB2-015 - Franklin 115kV Tidewater Solar Projects VA Southampton Engineering and Procurement Dominion 91 91 50 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_015_csa.pdf Document Posted N/A N/A 6/1/2023 12/21/2015 N/A N/A 8/31/2023 12/31/2022 12/31/2022 N/A N No
AB2-031 + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 59.6 20 13.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf Document Posted N/A N/A 2/11/2016 N/A N/A 3/11/2022 4/1/2022 4/1/2022 N/A N No
AB2-031 - Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 59.6 20 13.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_031_csa.pdf Document Posted N/A N/A 2/11/2016 N/A N/A 4/1/2022 4/1/2022 N/A N No
AB2-051 + Chesapeake 230kV VA City of Chesapeake Withdrawn Dominion 840 840 765.5 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2051_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2051_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 3/14/2016 N/A N/A 10/3/2018 1/1/2021 N/A N No
AB2-051 - Chesapeake 230kV VA City of Chesapeake Withdrawn Dominion 840 840 765.5 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2051_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2051_fac.pdf Document Posted Withdrawn N/A N/A N/A 3/14/2016 N/A N/A 10/3/2018 1/1/2021 N/A N No
AB2-063 + Price 69kV MD Queen Anne’s Withdrawn DPL 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2063_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2063_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2063_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 3/30/2016 N/A N/A 7/1/2019 12/31/2018 N/A N No
AB2-063 - Price 69kV MD Queen Anne’s Withdrawn DPL 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2063_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2063_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2063_fac.pdf Document Posted Withdrawn N/A N/A N/A 3/30/2016 N/A N/A 7/1/2019 12/31/2018 N/A N No
AB2-066 + Crawfords Corner 23kV NJ Monmouth Withdrawn JCPL 4.1 0.1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2066_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2066_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 3/31/2016 N/A N/A 11/18/2016 Customer Milestone Not Met 7/31/2016 N/A N No
AB2-066 - Crawfords Corner 23kV NJ Monmouth Withdrawn JCPL 4.1 0.1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2066_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2066_imp.pdf Document Posted Not Required Withdrawn N/A N/A N/A 3/31/2016 N/A N/A 11/18/2016 Customer Milestone Not Met 7/31/2016 N/A N No
AB2-067 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1100 1100 1100 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2067_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2067_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_067_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_067_csa.pdf Document Posted N/A N/A 9/23/2021 3/31/2016 N/A N/A 5/11/2022 12/31/2022 12/31/2022 N/A N No
AB2-067 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1100 1100 1100 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2067_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2067_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2067_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_067_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_067_csa.pdf Document Posted N/A N/A 9/23/2021 3/31/2016 N/A N/A 6/11/2022 12/31/2022 12/31/2022 N/A N No
AB2-070 + Mt. Pulaski-Brokaw Alta Farms II IL DeWitt Under Construction ComEd 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2070_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2070_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_070_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_070_csa.pdf Document Posted N/A N/A 10/10/2022 3/31/2016 N/A N/A 10/17/2022 4/16/2023 4/16/2023 N/A N No
AB2-070 - Mt. Pulaski-Brokaw Alta Farms II IL DeWitt Engineering and Procurement ComEd 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2070_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2070_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_070_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_070_csa.pdf Document Posted N/A N/A 3/31/2016 N/A N/A 4/1/2022 4/16/2023 4/16/2023 N/A N No
AB2-077 + Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2077_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2077_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_077_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_077_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-077 - Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2077_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2077_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_077_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_077_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 2/3/2022 2/3/2022 2/3/2022 N/A N No
AB2-078 + Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2078_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2078_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2078_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_078_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_078_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-078 - Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2078_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2078_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2078_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_078_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_078_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 2/3/2022 2/3/2022 2/3/2022 N/A N No
AB2-079 + Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_079_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 11/1/2023 12/1/2023 12/1/2023 N/A N No
AB2-079 - Buggs Island-Chase City 115kV Otter Creek Solar Project VA Mecklenburg Engineering and Procurement Dominion 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_079_csa.pdf Document Posted N/A N/A 4/11/2016 N/A N/A 2/3/2022 2/3/2022 2/3/2022 N/A N No
AB2-102 + Cumberland 230kV Cumberland NJ Cumberland Engineering and Procurement AEC 230 230 225 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2102_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2102_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_102_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_102_csa.pdf Document Posted N/A N/A 4/28/2016 N/A N/A 12/1/2023 12/1/2023 N/A N No
AB2-102 - Cumberland 230kV NJ Cumberland Active AEC 230 230 225 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2102_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2102_fac.pdf Document Posted N/A N/A 4/28/2016 N/A N/A 6/1/2020 N/A N No
AB2-120 + Piney Grove-New Church 138kV MD Worcester Withdrawn DPL 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2120_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2120_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2120_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 4/28/2016 N/A N/A 2/23/2021 12/14/2018 N/A N No
AB2-120 - Piney Grove-New Church 138kV MD Worcester Withdrawn DPL 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2120_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2120_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2120_fac.pdf Document Posted Withdrawn N/A N/A N/A 4/28/2016 N/A N/A 2/23/2021 12/14/2018 N/A N No
AB2-132 + Haumesser Road IL Lee Active ComEd 240 0 2.2 Capacity Generation Interconnection Wind; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2132_imp.pdf Document Posted Not Required N/A N/A 4/29/2016 N/A N/A 12/15/2016 N/A N No
AB2-132 - Haumesser Road IL Lee Active ComEd 240 0 2.2 Capacity Generation Interconnection Wind; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2132_imp.pdf Document Posted In Progress N/A N/A 4/29/2016 N/A N/A 12/15/2016 N/A N No
AB2-158 + Louisa-South Anna 230kV Belcher Solar VA Louisa In Service Dominion 88.2 88.2 61 88.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_158_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/31/2021 12/1/2020 12/1/2020 6/30/2021 N/A N No
AB2-158 - Louisa-South Anna 230kV Belcher Solar VA Louisa Partially in Service - Under Construction Dominion 88.2 88.2 61 88.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_158_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/31/2021 12/1/2020 12/1/2020 6/30/2021 N/A N No
AB2-160 + Reams 115kV Reams Solar VA Dinwiddie Engineering and Procurement Dominion 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AB2-160 - Reams 115kV Reams Solar VA Dinwiddie Engineering and Procurement Dominion 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 6/1/2022 12/31/2022 12/31/2022 N/A N No
AB2-186 + South Hertford 34.5kV NC Perquimans Withdrawn Dominion 5 5 3.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2186_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2186_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 4/29/2016 N/A N/A 1/28/2019 6/30/2017 N/A N No
AB2-186 - South Hertford 34.5kV NC Perquimans Withdrawn Dominion 5 5 3.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2186_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2186_imp.pdf Document Posted Not Required Withdrawn N/A N/A N/A 4/29/2016 N/A N/A 1/28/2019 6/30/2017 N/A N No
AB2-188 + Creswell 34.5kV NC Washington Withdrawn Dominion 20 20 14 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2188_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2188_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 4/29/2016 N/A N/A 2/20/2019 6/30/2017 N/A N No
AB2-188 - Creswell 34.5kV NC Washington Withdrawn Dominion 20 20 14 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2188_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2188_imp.pdf Document Posted Not Required Withdrawn N/A N/A N/A 4/29/2016 N/A N/A 2/20/2019 6/30/2017 N/A N No
AB2-190 + Hopewell-Surry 230kV Fort Powhatan Solar VA Prince George In Service Dominion 160 160 112 160 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 8/6/2021 Customer Milestone Not Met 12/1/2021 12/1/2021 1/19/2022 N/A N No
AB2-190 - Hopewell-Surry 230kV Fort Powhatan Solar VA Prince George Partially in Service - Under Construction Dominion 160 160 112 130 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 8/6/2021 Customer Milestone Not Met 12/1/2021 12/1/2021 8/4/2021 N/A N No
AC1-010 + Gloucester 26kV National Park NJ NJ Gloucester Engineering and Procurement PSEG 6 6 2.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1010_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1010_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_010_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_010_csa.pdf Document Posted N/A N/A 6/20/2016 N/A N/A 12/31/2022 12/10/2021 12/10/2021 N/A N No
AC1-010 - Gloucester 26kV National Park NJ NJ Gloucester Engineering and Procurement PSEG 6 6 2.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1010_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1010_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_010_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_010_csa.pdf Document Posted N/A N/A 6/20/2016 N/A N/A 12/10/2021 12/10/2021 N/A N No
AC1-042 + Altavista-Mt. Airy 69kV Sycamore Solar I VA Pittsylvania Under Construction Dominion 42 42 15.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1042_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1042_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1042_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_042_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_042_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 4/15/2022 12/1/2022 12/1/2022 N/A N No
AC1-042 - Altavista-Mt. Airy 69kV Sycamore Solar I VA Pittsylvania Engineering and Procurement Dominion 42 42 15.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1042_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1042_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1042_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_042_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_042_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 12/1/2022 12/1/2022 N/A N No
AC1-043 + Mountain Run-Mitchell 115 kV Greenwood Solar VA Culpeper Suspended Dominion 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1043_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1043_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_043_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_043_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 10/30/2024 10/30/2021 10/30/2021 N/A N No
AC1-043 - Mountain Run-Mitchell 115 kV Greenwood Solar VA Culpeper Suspended Dominion 100 100 38 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1043_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1043_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_043_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_043_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 10/30/2021 10/30/2021 N/A N No
AC1-044 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1650 550 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1044_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_044_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_044_csa.pdf Document Posted N/A N/A 9/23/2021 8/31/2016 N/A N/A 5/11/2022 12/31/2022 12/31/2022 N/A N No
AC1-044 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1650 550 550 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1044_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1044_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1044_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_044_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_044_csa.pdf Document Posted N/A N/A 9/23/2021 8/31/2016 N/A N/A 6/11/2022 12/31/2022 12/31/2022 N/A N No
AC1-048 + Germantown 115kV Brookview Solar I PA Adams Engineering and Procurement ME 35 35 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1048_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1048_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_048_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_048_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 12/31/2020 12/31/2020 N/A N No
AC1-048 - Germantown 115kV Brookview Solar I PA Adams Suspended ME 35 35 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1048_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1048_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_048_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_048_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 12/31/2020 12/31/2020 N/A N No
AC1-055 + Glen Falls 138kV Glen Falls Facility WV Harrison Engineering and Procurement APS 580 30 30 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1055_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_055_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_055_csa.pdf Document Posted N/A N/A 9/9/2016 N/A N/A 7/30/2021 12/31/2021 12/31/2021 N/A N No
AC1-055 - Glen Falls 138kV Glen Falls Facility WV Harrison Suspended APS 580 30 30 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1055_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_055_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_055_csa.pdf Document Posted N/A N/A 9/9/2016 N/A N/A 7/30/2021 12/31/2021 12/31/2021 N/A N No
AC1-071 + Paupack-Lackawanna 230kV Waymart Wind II PA Wayne Suspended PPL 67.3 67.25 8.74 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1071_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1071_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_071_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_071_csa.pdf Document Posted N/A N/A 9/28/2016 N/A N/A 10/15/2024 10/15/2021 10/15/2021 N/A N No
AC1-071 - Paupack-Lackawanna 230kV Waymart Wind II PA Wayne Suspended PPL 67.3 67.25 8.74 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1071_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1071_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_071_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_071_csa.pdf Document Posted N/A N/A 9/28/2016 N/A N/A 10/15/2021 10/15/2021 N/A N No
AC1-074 + Jacksonville-Renaker 138kV I Bluebird Solar KY Harrison Suspended EKPC 80 80 56 1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1074_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1074_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1074_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_074_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_074_csa.pdf Document Posted N/A N/A 9/29/2016 N/A N/A 6/1/2023 6/1/2023 N/A N No
AC1-074 - Jacksonville-Renaker 138kV I Bluebird Solar KY Harrison Engineering and Procurement EKPC 80 80 56 1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1074_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1074_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1074_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_074_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_074_csa.pdf Document Posted N/A N/A 9/29/2016 N/A N/A 6/1/2023 6/1/2023 N/A N No
AC1-076 + Locust Grove-Paytes 115kV Pine Glade Solar VA Orange Engineering and Procurement Dominion 62.5 62.5 23.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1076_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_076_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_076_csa.pdf Document Posted N/A N/A 10/1/2022 9/30/2016 N/A N/A 10/3/2022 3/30/2023 3/30/2023 N/A N No
AC1-076 - Locust Grove-Paytes 115kV Pine Glade Solar VA Orange Engineering and Procurement Dominion 62.5 62.5 23.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1076_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_076_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_076_csa.pdf Document Posted N/A N/A 4/15/2022 9/30/2016 N/A N/A 4/22/2022 7/1/2022 7/1/2022 N/A N No
AC1-080 + Perth-Hickory Grove 115kV Stagecoach Solar VA Halifax In Service Dominion 20 20 12.8 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1080_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1080_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_080_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_080_csa.pdf Document Posted N/A N/A 3/3/2021 9/30/2016 N/A N/A 3/30/2021 12/31/2021 12/31/2021 4/1/2021 N/A N No
AC1-080 - Perth-Hickory Grove 115kV Stagecoach Solar VA Halifax In Service Dominion 20 20 12.8 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1080_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1080_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_080_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_080_csa.pdf Document Posted N/A N/A 3/3/2021 9/30/2016 N/A N/A 3/30/2021 12/31/2021 12/31/2021 N/A N No
AC1-085 + Stuart-Clinton 345kV Highland County Solar OH Highland Under Construction Dayton 400 400 152 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1085_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1085_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_085_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_085_csa.pdf Document Posted N/A N/A 9/30/2016 N/A N/A 11/1/2020 3/31/2022 3/31/2022 N/A N No
AC1-085 - Stuart-Clinton 345kV Highland County Solar OH Highland Under Construction Dayton 400 400 152 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1085_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1085_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_085_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_085_csa.pdf Document Posted N/A N/A 9/30/2016 N/A N/A 11/1/2020 12/31/2021 12/31/2021 N/A N No
AC1-107 + Chickahominy 500kV Chickahominy Power VA Charles City Withdrawn Dominion 1600 1600 1600 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1107_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1107_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_107_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_107_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 3/1/2024 2/13/2022 3/1/2024 3/1/2024 N/A N No
AC1-107 - Chickahominy 500kV Chickahominy Power VA Charles City Withdrawn Dominion 1600 1600 1600 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1107_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1107_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_107_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_107_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 3/1/2024 12/14/2021 3/1/2024 3/1/2024 N/A N No
AC1-113 + Rockford Rockford I Energy Center IL Winnebago In Service ComEd 320 20 20 4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1113_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_113_isa.pdf Document Posted N/A Not Required N/A N/A 10/27/2016 N/A N/A 12/31/2021 12/31/2021 6/5/2021 N/A N No
AC1-113 - Rockford Rockford I Energy Center IL Winnebago Partially in Service - Under Construction ComEd 320 20 20 4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1113_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_113_isa.pdf Document Posted N/A Not Required N/A N/A 10/27/2016 N/A N/A 12/31/2021 12/31/2021 8/27/2020 N/A N No
AC1-114 + Rockford II Rockford II Energy Center IL Winnebago In Service ComEd 173 20 20 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1114_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_114_isa.pdf Document Posted N/A Not Required N/A N/A 10/27/2016 N/A N/A 12/31/2021 12/31/2021 8/25/2021 N/A N No
AC1-114 - Rockford II Rockford II Energy Center IL Winnebago Partially in Service - Under Construction ComEd 173 20 20 10 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1114_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_114_isa.pdf Document Posted N/A Not Required N/A N/A 10/27/2016 N/A N/A 12/31/2021 12/31/2021 8/27/2020 N/A N No
AC1-141 + Cook-East Elkhart 345kV Indeck Niles Energy Center MI Cass Partially in Service - Under Construction AEP 1085 91 91 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1141_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_141_isa.pdf Document Posted N/A Not Required N/A N/A 6/24/2021 10/28/2016 N/A N/A 12/27/2021 3/15/2022 3/15/2022 12/27/2021 N/A N No
AC1-141 - Cook-East Elkhart 345kV Indeck Niles Energy Center MI Cass Under Construction AEP 1085 91 91 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1141_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_141_isa.pdf Document Posted N/A Not Required N/A N/A 6/24/2021 10/28/2016 N/A N/A 12/27/2021 3/15/2022 3/15/2022 N/A N No
AC1-143 + Brandy-Remington 115kV Elkwood Solar VA Culpeper Suspended Dominion 60 60 41.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1143_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1143_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1143_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_143_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_143_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/16/2023 12/16/2023 N/A N No
AC1-143 - Brandy-Remington 115kV Elkwood Solar VA Culpeper Engineering and Procurement Dominion 60 60 41.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1143_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1143_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1143_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_143_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_143_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/16/2023 12/16/2023 N/A N No
AC1-147 + Grassfield 34.5kV VA City of Chesapeake Under Construction Dominion 20 20 12.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1147_fea.pdf Document Posted Not Required Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1147_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1147_wmpa.pdf Not Required N/A N/A 10/31/2016 N/A N/A 3/4/2022 12/31/2021 12/31/2021 N/A N Yes
AC1-147 - Grassfield 34.5kV VA City of Chesapeake Under Construction Dominion 20 20 12.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1147_fea.pdf Document Posted Not Required Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac1147_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac1147_wmpa.pdf Not Required N/A N/A 10/31/2016 N/A N/A 12/1/2021 12/31/2021 12/31/2021 N/A N Yes
AC1-161 + Septa 500kV Cavalier VA Isle of Wight Engineering and Procurement Dominion 240 240 168.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1161_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1161_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_161_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_161_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/31/2022 1/1/2023 1/1/2023 N/A N No
AC1-161 - Septa 500kV Cavalier VA Isle of Wight Engineering and Procurement Dominion 240 240 168.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1161_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1161_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_161_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_161_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 1/1/2023 1/1/2023 N/A N No
AC1-164 + Chickahominy 230kV Keydet Solar Center One VA Charles City Partially in Service - Under Construction Dominion 320 320 220.8 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1164_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1164_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1164_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_164_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf Document Posted N/A N/A 10/1/2021 10/31/2016 N/A N/A 11/29/2021 6/30/2023 6/30/2023 12/27/2021 N/A N No
AC1-164 - Chickahominy 230kV Keydet Solar Center One VA Charles City Partially in Service - Under Construction Dominion 320 320 220.8 69 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1164_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1164_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1164_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_164_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_164_csa.pdf Document Posted N/A N/A 10/1/2021 10/31/2016 N/A N/A 11/29/2021 6/30/2023 6/30/2023 12/27/2021 N/A N No
AC1-174 + Losantville 345kV Riverstart Solar Park IN Randolph In Service AEP 100 100 38 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1174_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1174_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_174_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_174_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/24/2021 6/1/2022 6/1/2022 9/24/2021 N/A N No
AC1-174 - Losantville 345kV Riverstart Solar Park IN Randolph Partially in Service - Under Construction AEP 100 100 38 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1174_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1174_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_174_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_174_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/24/2021 6/1/2022 6/1/2022 9/24/2021 N/A N No
AC1-175 + Losantville 345kV Riverstart Solar Park IN Randolph In Service AEP 100 100 38 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1175_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1175_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1175_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_175_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_175_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/10/2021 6/1/2022 6/1/2022 9/24/2021 N/A N No
AC1-175 - Losantville 345kV Riverstart Solar Park IN Randolph Partially in Service - Under Construction AEP 100 100 38 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1175_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1175_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1175_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_175_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_175_csa.pdf Document Posted N/A N/A 7/5/2021 10/31/2016 N/A N/A 9/10/2021 6/1/2022 6/1/2022 N/A N No
AC1-182 + W.H. Zimmer Station 345kV Zimmer Station OH Clermont In Service DEOK 1320 20 20 20 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1182_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1182_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_182_isa.pdf Document Posted N/A Not Required N/A N/A 10/31/2016 N/A N/A 12/31/2018 12/31/2018 1/13/2019 N/A N No
AC1-182 - W.H. Zimmer Station 345kV Zimmer Station OH Clermont In Service DEOK 1320 20 20 20 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1182_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1182_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_182_isa.pdf Document Posted N/A Not Required N/A N/A 10/31/2016 N/A N/A 12/31/2018 12/31/2018 N/A N No
AC1-189 + Chinquapin-Everetts 230kV Pitt Solar NC Pitt Engineering and Procurement Dominion 80 80 53.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1189_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1189_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_189_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 9/1/2024 9/1/2024 N/A N No
AC1-189 - Chinquapin-Everetts 230kV NC Pitt Active Dominion 80 80 53.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1189_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1189_fac.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/31/2017 N/A N No
AC1-191 + Elmont 115kV Springfield Solar VA Hanover Engineering and Procurement Dominion 80 80 53.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1191_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1191_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_191_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_191_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 3/31/2024 3/31/2024 N/A N No
AC1-191 - Elmont 115kV VA Hanover Active Dominion 80 80 53.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1191_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1191_fac.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/31/2020 12/31/2020 N/A N No
AC1-204 + Elwood Jackson Generation IL Will Under Construction ComEd 1200.9 1200.9 1115.9 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1204_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1204_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1204_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_204_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_204_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 11/8/2021 4/1/2022 4/1/2022 N/A N No
AC1-204 - Elwood Jackson Generation IL Will Under Construction ComEd 1200.9 1200.9 1115.9 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1204_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1204_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1204_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_204_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_204_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 11/8/2021 11/8/2021 11/8/2021 N/A N No
AC1-222 + Crystal Hill-Halifax 115kV Halifax County Solar VA Halifax Engineering and Procurement Dominion 44.7 44.7 22.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1222_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1222_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1222_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_222_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_222_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 11/19/2022 11/19/2022 N/A N No
AC1-222 - Crystal Hill-Halifax 115kV Halifax County Solar VA Halifax Engineering and Procurement Dominion 44.7 44.7 22.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1222_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1222_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1222_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_222_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_222_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 6/15/2022 6/15/2022 N/A N No
AC2-023 + Hebron 69kV MD Wicomico Active DPL 45.8 45.8 26.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2023_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2023_fac.pdf Document Posted N/A N/A 1/25/2017 N/A N/A 9/30/2019 N/A N No
AC2-023 - Hebron 69kV MD Wicomico Active DPL 45.8 45.8 26.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2023_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2023_imp.pdf Document Posted In Progress N/A N/A 1/25/2017 N/A N/A 9/30/2019 N/A N No
AC2-053 + Germantown 115kV Brookview Solar I PA Adams Engineering and Procurement ME 55 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2053_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2053_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2053_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_053_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_053_csa.pdf Document Posted N/A N/A 2/14/2017 N/A N/A 12/31/2020 12/31/2020 N/A N No
AC2-053 - Germantown 115kV Brookview Solar I PA Adams Suspended ME 55 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2053_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2053_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2053_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_053_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_053_csa.pdf Document Posted N/A N/A 2/14/2017 N/A N/A 12/31/2020 12/31/2020 N/A N No
AC2-060 + Buckskin 69kV OH Ross Active AEP 100 100 64 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2060_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2060_fac.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 12/31/2019 N/A N No
AC2-060 - Buckskin 69kV OH Ross Active AEP 100 100 64 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2060_imp.pdf Document Posted In Progress N/A N/A 2/16/2017 N/A N/A 12/31/2019 N/A N No
AC2-075 + Jacksonville-Renaker 138 kV Bluebird Solar KY Harrison Suspended EKPC 100 20 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2075_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2075_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_075_isa.pdf Document Posted N/A Not Required N/A N/A 2/27/2017 N/A N/A 6/1/2023 6/1/2023 N/A N No
AC2-075 - Jacksonville-Renaker 138 kV Bluebird Solar KY Harrison Engineering and Procurement EKPC 100 20 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2075_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2075_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_075_isa.pdf Document Posted N/A Not Required N/A N/A 2/27/2017 N/A N/A 6/1/2023 6/1/2023 N/A N No
AC2-092 + Susquehanna-Lackawanna 500kV Freedom Generation Plant PA Luzerne Engineering and Procurement PPL 1105 55 65 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2092_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_092_isa.pdf Document Posted N/A N/A N/A 2/28/2017 N/A N/A 6/1/2022 6/1/2022 N/A N No
AC2-092 - Susquehanna-Lackawanna 500kV PA Luzerne Active PPL 1105 55 65 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2092_imp.pdf Document Posted In Progress N/A N/A 2/28/2017 N/A N/A 6/1/2021 N/A N No
AC2-115 + Rockford Rockford I Energy Center IL Winnebago In Service ComEd 360 40 40 40 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2115_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_115_isa.pdf Document Posted N/A Not Required N/A N/A 3/21/2017 N/A N/A 12/31/2021 12/31/2021 8/27/2021 N/A N No
AC2-115 - Rockford Rockford I Energy Center IL Winnebago Partially in Service - Under Construction ComEd 360 40 40 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2115_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_115_isa.pdf Document Posted N/A Not Required N/A N/A 3/21/2017 N/A N/A 12/31/2021 12/31/2021 8/27/2020 N/A N No
AC2-116 + Rockford II Rockford II Energy Center IL Winnebago In Service ComEd 180 7 7 7 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2116_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_116_isa.pdf Document Posted N/A Not Required N/A N/A 3/21/2017 N/A N/A 6/1/2021 6/1/2021 8/25/2021 N/A N No
AC2-116 - Rockford II Rockford II Energy Center IL Winnebago Partially in Service - Under Construction ComEd 180 7 7 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2116_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_116_isa.pdf Document Posted N/A Not Required N/A N/A 3/21/2017 N/A N/A 6/1/2021 6/1/2021 N/A N No
AC2-136 + East Hagerstown 12kV East Hagerstown Solar MD Washington Suspended APS 11.8 11.8 5.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2136_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2136_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2136_wmpa.pdf Not Required N/A N/A 3/27/2017 N/A N/A 12/31/2021 12/30/2021 12/30/2021 N/A N No
AC2-136 - East Hagerstown 12kV East Hagerstown Solar MD Washington Engineering and Procurement APS 11.8 11.8 5.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2136_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2136_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ac2136_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ac2136_wmpa.pdf Not Required N/A N/A 3/27/2017 N/A N/A 12/31/2021 12/30/2021 12/30/2021 N/A N No
AC2-154 + Davis Creek 138kV IL Kankakee Active ComEd 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2154_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2154_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2154_fac.pdf Document Posted N/A N/A 3/29/2017 N/A N/A 12/31/2019 N/A N No
AC2-154 - Davis Creek 138kV IL Kankakee Active ComEd 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2154_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2154_imp.pdf Document Posted In Progress N/A N/A 3/29/2017 N/A N/A 12/31/2019 N/A N No
AC2-170 + Quarryville Keystone Solar PA Lancaster Engineering and Procurement PPL 5 0 1.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2170_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_170_isa.pdf Document Posted N/A Not Required N/A N/A 3/30/2017 N/A N/A 12/31/2022 11/1/2021 11/1/2021 N/A N No
AC2-170 - Quarryville Keystone Solar PA Lancaster Engineering and Procurement PPL 5 0 1.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2170_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2170_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_170_isa.pdf Document Posted N/A Not Required N/A N/A 3/30/2017 N/A N/A 11/1/2021 11/1/2021 11/1/2021 N/A N No
AD1-015 + Frazeysburg 138 kV Muskingum Solar OH Muskingum Withdrawn AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_015_csa.pdf Document Posted N/A N/A 4/21/2017 N/A N/A 2/14/2022 12/31/2023 12/31/2023 N/A N No
AD1-015 - Frazeysburg 138 kV Muskingum Solar OH Muskingum Engineering and Procurement AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_015_csa.pdf Document Posted N/A N/A 4/21/2017 N/A N/A 12/31/2023 12/31/2023 N/A N No
AD1-019 + Ontario 23 kV NJ Atlantic Withdrawn AEC 13.1 7.6 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1019_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1019_imp.pdf Document Posted Withdrawn N/A N/A 5/24/2017 N/A N/A 3/8/2022 6/3/2019 N/A N No
AD1-019 - Ontario 23 kV NJ Atlantic Active AEC 13.1 7.6 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1019_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1019_imp.pdf Document Posted In Progress N/A N/A 5/24/2017 N/A N/A 6/3/2019 N/A N No
AD1-055 + Crystal Hill-Halifax 115 kV Halifax County Solar VA Halifax Engineering and Procurement Dominion 64.7 20 15.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1055_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1055_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_055_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_055_csa.pdf Document Posted N/A N/A 8/14/2017 N/A N/A 11/19/2022 11/19/2022 N/A N No
AD1-055 - Crystal Hill-Halifax 115 kV Halifax County Solar VA Halifax Engineering and Procurement Dominion 64.7 20 15.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1055_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1055_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_055_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_055_csa.pdf Document Posted N/A N/A 8/14/2017 N/A N/A 6/15/2022 6/15/2022 N/A N No
AD1-061 + McConnelsburg-Mercersburg 34 kV PA Franklin Under Construction APS 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1061_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1061_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_061_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_061_csa.pdf Document Posted N/A N/A 8/18/2017 N/A N/A 3/31/2022 3/31/2022 N/A N No
AD1-061 - McConnelsburg-Mercersburg 34 kV PA Franklin Under Construction APS 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1061_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1061_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_061_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_061_csa.pdf Document Posted N/A N/A 8/18/2017 N/A N/A 12/31/2021 N/A N No
AD1-070 + Fostoria Central 138 kV OH Hancock Active AEP 205 205 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1070_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1070_fac.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 9/30/2020 N/A N No
AD1-070 - Fostoria Central 138 kV OH Hancock Active AEP 205 205 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1070_imp.pdf Document Posted In Progress N/A N/A 8/31/2017 N/A N/A 9/30/2020 N/A N No
AD1-073 + Buckskin 69 kV OH Ross Active AEP 120 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1073_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1073_fac.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 6/1/2020 N/A N No
AD1-073 - Buckskin 69 kV OH Ross Active AEP 120 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1073_imp.pdf Document Posted In Progress N/A N/A 8/31/2017 N/A N/A 6/1/2020 N/A N No
AD1-081 + Beatty-London 138 kV Big Plain 2 OH Madison Engineering and Procurement ATSI 196 20 13.2 1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1081_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1081_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1081_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_081_isa.pdf Document Posted N/A Not Required N/A N/A 11/1/2022 9/5/2017 N/A N/A 2/1/2023 3/31/2023 3/31/2023 N/A N No
AD1-081 - Beatty-London 138 kV Big Plain 2 OH Madison Engineering and Procurement ATSI 196 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1081_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1081_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1081_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_081_isa.pdf Document Posted N/A Not Required N/A N/A 9/5/2017 N/A N/A 3/31/2023 3/31/2023 N/A N No
AD1-085 + North Shenandoah-Stanley 34.5 kV North Shenandoah-Stanley 34.5kV VA Page Engineering and Procurement APS 20 20 12.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1085_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1085_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1085_wmpa.pdf Not Required N/A N/A 9/14/2017 N/A N/A 8/29/2021 6/30/2022 6/30/2022 N/A N No
AD1-085 - North Shenandoah-Stanley 34.5 kV North Shenandoah-Stanley 34.5kV VA Page Engineering and Procurement APS 20 20 12.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1085_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1085_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1085_wmpa.pdf Not Required N/A N/A 9/14/2017 N/A N/A 8/29/2021 8/29/2021 8/29/2021 N/A N No
AD1-087 + Clover-Sedge Hill 230 kV Foxhound Solar VA Halifax Engineering and Procurement Dominion 64.2 64.2 43.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1087_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1087_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_087_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_087_csa.pdf Document Posted N/A N/A 9/15/2017 N/A N/A 5/31/2024 5/31/2024 N/A N No
AD1-087 - Clover-Sedge Hill 230 kV VA Halifax Active Dominion 64.2 64.2 43.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1087_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1087_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ad1_087_isa2.pdf Interim Study N/A N/A N/A 9/15/2017 N/A N/A 9/2/2019 N/A N No
AD1-105 + Kings Dominion DP 115 kV VA King William Active Dominion 74 74 44.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1105_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1105_imp.pdf Document Posted Not Required Not Required N/A N/A 9/22/2017 N/A N/A 12/31/2019 N/A N No
AD1-105 - Kings Dominion DP 115 kV VA King William Active Dominion 74 74 44.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1105_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1105_imp.pdf Document Posted In Progress N/A N/A 9/22/2017 N/A N/A 12/31/2019 N/A N No
AD1-113 + Raritan River 230 kV Woodbridge Energy Center NJ Middlesex Withdrawn JCPL 820 35 75 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1113_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad1_113_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_113_csa.pdf Document Posted N/A N/A 9/25/2017 N/A N/A 2/16/2022 6/1/2021 6/1/2021 N/A N No
AD1-113 - Raritan River 230 kV Woodbridge Energy Center NJ Middlesex Suspended JCPL 820 35 75 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1113_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1113_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad1_113_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_113_csa.pdf Document Posted N/A N/A 9/25/2017 N/A N/A 6/1/2021 6/1/2021 N/A N No
AD1-130 + Hardin Switch 345 kV Hardin Energy Center – Phase 2 OH Hardin Engineering and Procurement AEP 170 170 115 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1130_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1130_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_130_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_130_csa.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 6/30/2023 6/30/2023 N/A N No
AD1-130 - Hardin Switch 345 kV OH Hardin Active AEP 170 170 115 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1130_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1130_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_130_isa2.pdf Interim Study N/A N/A N/A 9/28/2017 N/A N/A 7/1/2023 7/1/2023 N/A N No
AD1-143 + Hauto-Siegfried 69 kV Broad Mountain PA Carbon Suspended PPL 90 90 11.84 Capacity Generation Interconnection Wind; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1143_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1143_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1143_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_143_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_143_csa.pdf Document Posted N/A N/A 9/29/2017 N/A N/A 6/30/2024 6/30/2021 6/30/2021 N/A N No
AD1-143 - Hauto-Siegfried 69 kV Broad Mountain PA Carbon Suspended PPL 90 90 11.84 Capacity Generation Interconnection Wind; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1143_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1143_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1143_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_143_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_143_csa.pdf Document Posted N/A N/A 9/29/2017 N/A N/A 6/30/2021 6/30/2021 N/A N No
AD1-152 + Clover-Sedge Hill 230 kV VA Halifax Active Dominion 80 80 48 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf Interim Study N/A N/A N/A 9/30/2017 N/A N/A 12/31/2022 12/31/2020 N/A N No
AD1-152 - Clover-Sedge Hill 230 kV VA Halifax Active Dominion 80 80 48 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1152_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ad1_152_isa2.pdf Interim Study N/A N/A N/A 9/30/2017 N/A N/A 12/31/2020 N/A N No
AD2-020 + Valley 138 kV MI Van Buren Active AEP 100 100 61.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2020_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2020_imp.pdf Document Posted In Progress N/A N/A 11/29/2017 N/A N/A 12/1/2020 N/A N No
AD2-020 - Valley 138 kV MI Van Buren Active AEP 100 100 61.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2020_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2020_imp.pdf Document Posted In Progress N/A N/A 11/28/2017 N/A N/A 12/1/2020 N/A N No
AD2-025 + Hillsborough 13 kV Hillsborough Storage NJ Somerset Suspended PSEG 2 2 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2025_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2025_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad2025_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad2025_wmpa.pdf Not Required N/A N/A 12/5/2017 N/A N/A 12/31/2023 12/31/2020 12/31/2020 N/A Y No
AD2-025 - Hillsborough 13 kV Hillsborough Storage NJ Somerset Suspended PSEG 2 2 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2025_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2025_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad2025_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad2025_wmpa.pdf Not Required N/A N/A 12/5/2017 N/A N/A 12/31/2020 12/31/2020 N/A Y No
AD2-060 + Davis Creek 138kV IL Kankakee Active ComEd 70 20 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2060_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2060_fac.pdf Document Posted N/A N/A 2/21/2018 N/A N/A 12/31/2020 N/A N No
AD2-060 - Davis Creek 138kV IL Kankakee Active ComEd 70 20 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2060_imp.pdf Document Posted In Progress N/A N/A 2/21/2018 N/A N/A 12/31/2020 N/A N No
AD2-074 + Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 86 86 32.68 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2074_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2074_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2074_fac.pdf Document Posted N/A N/A 3/14/2018 N/A N/A 11/30/2021 N/A N No
AD2-074 - Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 86 86 32.68 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2074_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2074_imp.pdf Document Posted In Progress N/A N/A 3/14/2018 N/A N/A 11/30/2021 N/A N No
AD2-083 + Larrabee 230kV NJ Monmouth Withdrawn JCPL Energy Merchant Transmission AC 0 https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ad2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ad2083_imp.pdf Document Posted Withdrawn N/A N/A 3/20/2018 N/A N/A 2/2/2022 N/A S No
AD2-083 - Larrabee 230kV NJ Monmouth Active JCPL 1100 Energy Merchant Transmission AC 0 https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ad2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ad2083_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2025 N/A S No
AD2-084 + Cardiff 230kV NJ Atlantic Withdrawn AEC 1100 Energy Merchant Transmission AC 0 https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ad2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ad2084_imp.pdf Document Posted Withdrawn N/A N/A 3/20/2018 N/A N/A 2/2/2022 12/31/2025 N/A S No
AD2-084 - Cardiff 230kV NJ Atlantic Active AEC 1100 Energy Merchant Transmission AC 0 https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/ad2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/ad2084_imp.pdf Document Posted In Progress N/A N/A 3/20/2018 N/A N/A 12/31/2025 N/A S No
AD2-110 + Guilford 138kV Chambersburg Energy, LLC PA Franklin In Service APS 100 12 12 12 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2110_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2110_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_110_isa.pdf Document Posted N/A Not Required N/A N/A 3/22/2018 N/A N/A 9/30/2022 9/30/2022 9/14/2020 N/A N No
AD2-110 - Guilford 138kV Chambersburg Energy, LLC PA Franklin Partially in Service - Under Construction APS 100 12 12 12 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2110_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2110_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_110_isa.pdf Document Posted N/A Not Required N/A N/A 3/22/2018 N/A N/A 9/30/2022 9/30/2022 9/14/2020 N/A N No
AD2-112 + Springdale CC II 138kV Springdale PA Allegheny Partially in Service - Under Construction APS 610 20 50.4 Capacity Generation Interconnection Natural Gas; Other https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2112_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_112_isa.pdf Document Posted N/A Not Required N/A N/A 3/22/2018 N/A N/A 6/1/2022 6/1/2022 11/30/2021 N/A N No
AD2-112 - Springdale CC II 138kV Springdale PA Allegheny Engineering and Procurement APS 610 20 50.4 Capacity Generation Interconnection Natural Gas; Other https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2112_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_112_isa.pdf Document Posted N/A Not Required N/A N/A 3/22/2018 N/A N/A 6/1/2022 6/1/2022 N/A N No
AD2-116 + Hokes-Grantley 69 kV Cottontail Solar 2 PA York Under Construction ME 20 20 13 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2116_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2116_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_116_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_116_csa.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 5/15/2022 5/15/2022 N/A N No
AD2-116 - Hokes-Grantley 69 kV Cottontail Solar 2 PA York Engineering and Procurement ME 20 20 13 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2116_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2116_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_116_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_116_csa.pdf Document Posted N/A N/A 3/22/2018 N/A N/A 5/15/2022 5/15/2022 N/A N No
AD2-159 + Chestnut 345kV IL Macon Withdrawn ComEd 187.5 187.5 33 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2159_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2159_imp.pdf Document Posted Withdrawn N/A N/A 3/26/2018 N/A N/A 3/4/2022 N/A N No
AD2-159 - Chestnut 345kV IL Macon Active ComEd 187.5 187.5 33 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2159_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2159_imp.pdf Document Posted In Progress N/A N/A 3/26/2018 N/A N/A 9/15/2021 N/A N No
AD2-163 + Broadview-Tangy 138 kV Madison Fields Solar Project OH Madison Engineering and Procurement ATSI 180 180 120.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2163_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2163_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2163_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_163_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_163_csa.pdf Document Posted N/A N/A 5/1/2023 3/26/2018 N/A N/A 10/1/2023 10/1/2023 10/1/2023 N/A N No
AD2-163 - Broadview-Tangy 138 kV Madison Fields Solar Project OH Madison Engineering and Procurement ATSI 180 180 120.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2163_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2163_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2163_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_163_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_163_csa.pdf Document Posted N/A N/A 3/26/2018 N/A N/A 10/1/2023 10/1/2023 N/A N No
AD2-172 + Lena 138kV High Point Solar IL Stephenson Engineering and Procurement ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2172_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2172_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_172_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_172_csa.pdf Document Posted N/A N/A 5/1/2022 3/28/2018 N/A N/A 9/1/2022 2/28/2023 2/28/2023 N/A N No
AD2-172 - Lena 138kV High Point Solar IL Stephenson Engineering and Procurement ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2172_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2172_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_172_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_172_csa.pdf Document Posted N/A N/A 3/28/2018 N/A N/A 2/28/2023 2/28/2023 N/A N No
AD2-180 + Elk Garden-Parr Run 138kV Black Rock Wind WV Mineral In Service APS 110 110 15.08 110 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2180_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2180_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2180_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_180_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_180_csa.pdf Document Posted N/A N/A 3/29/2018 N/A N/A 12/15/2021 12/15/2021 10/25/2021 N/A N No
AD2-180 - Elk Garden-Parr Run 138kV Black Rock Wind WV Mineral Partially in Service - Under Construction APS 110 110 15.08 10 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2180_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2180_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2180_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_180_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_180_csa.pdf Document Posted N/A N/A 3/29/2018 N/A N/A 12/15/2021 12/15/2021 10/25/2021 N/A N No
AD2-189 + Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1875 225 186 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2189_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_189_csa.pdf Document Posted N/A N/A 9/23/2021 3/30/2018 N/A N/A 5/11/2022 12/31/2022 12/31/2022 N/A N No
AD2-189 - Kammer-Vassell 765kV Guernsey Power Station OH Guernsey Under Construction AEP 1875 225 186 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2189_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2189_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_189_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_189_csa.pdf Document Posted N/A N/A 9/23/2021 3/30/2018 N/A N/A 6/11/2022 12/31/2022 12/31/2022 N/A N No
AD2-192 + Glen Falls 138kV Glen Falls Facility WV Harrison Engineering and Procurement APS 625 45 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2192_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2192_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_192_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_192_csa.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 7/30/2021 12/31/2021 12/31/2021 N/A N No
AD2-192 - Glen Falls 138kV Glen Falls Facility WV Harrison Suspended APS 625 45 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2192_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2192_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ad2_192_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_192_csa.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 7/30/2021 12/31/2021 12/31/2021 N/A N No
AD2-194 + Elwood 345 kV IL Will Active ComEd 1260.9 60 120 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2194_imp.pdf Document Posted In Progress N/A N/A 3/30/2018 N/A N/A 3/1/2022 N/A N No
AD2-194 - Elwood IL Will Active ComEd 1260.9 60 120 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2194_imp.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 3/1/2022 N/A N No
AD2-202 + Clover-Sedge Hill 230kV Foxhound Solar VA Halifax Engineering and Procurement Dominion 83 18.8 12.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2202_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2202_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2202_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_202_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_202_csa.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 5/31/2024 5/31/2024 N/A N No
AD2-202 - Clover-Sedge Hill 230kV VA Halifax Active Dominion 83 18.8 12.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2202_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2202_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ad2_202_isa2.pdf Interim Study N/A N/A N/A 3/30/2018 N/A N/A 9/2/2019 N/A N No
AE1-012 + 64th St. 13 kV 1724 64th Street MD Prince George’s Engineering and Procurement PEPCO 0.5 0.54 0.22 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1012_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1012_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1012_wmpa.pdf Not Required N/A N/A 10/2/2018 N/A N/A 12/30/2022 12/30/2022 N/A N No
AE1-012 - 64th St. 13 kV 1724 64th Street MD Prince George’s Engineering and Procurement PEPCO 0.5 0.54 0.22 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1012_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1012_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1012_wmpa.pdf Not Required N/A N/A 10/2/2018 N/A N/A 12/31/2021 12/31/2021 N/A N No
AE1-013 + Suitland Road 13 kV 4179 Suitland Road MD Prince George’s Engineering and Procurement PEPCO 0.9 0.9 0.378 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1013_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1013_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1013_wmpa.pdf Not Required N/A N/A 5/2/2018 N/A N/A 12/31/2022 12/31/2022 N/A N No
AE1-013 - Suitland Road 13 kV 4179 Suitland Road MD Prince George’s Engineering and Procurement PEPCO 0.9 0.9 0.378 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1013_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1013_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1013_wmpa.pdf Not Required N/A N/A 5/2/2018 N/A N/A 12/31/2021 12/31/2021 N/A N No
AE1-015 + St. Barnabas Road 13 kV 5203 Saint Barnabas Road MD Prince George’s Engineering and Procurement PEPCO 1.4 1.4 0.567 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1015_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1015_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1015_wmpa.pdf Not Required N/A N/A 5/2/2018 N/A N/A 12/31/2022 12/31/2022 N/A N No
AE1-015 - St. Barnabas Road 13 kV 5203 Saint Barnabas Road MD Prince George’s Engineering and Procurement PEPCO 1.4 1.4 0.567 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1015_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1015_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1015_wmpa.pdf Not Required N/A N/A 5/2/2018 N/A N/A 12/31/2021 12/31/2021 N/A N No
AE1-021 + Gavin #2 765 kV Gavin Unit No. 2 OH Gallia In Service AEP 1367 11 11 11 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1021_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1021_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_021_isa.pdf Document Posted N/A Not Required N/A N/A 5/24/2018 N/A N/A 6/1/2021 6/1/2021 6/19/2021 N/A N No
AE1-021 - Gavin #2 765 kV Gavin Unit No. 2 OH Gallia Engineering and Procurement AEP 1367 11 11 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1021_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1021_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_021_isa.pdf Document Posted N/A Not Required N/A N/A 5/24/2018 N/A N/A 6/1/2021 6/1/2021 N/A N No
AE1-050 + Gavin Unit 1 765 kV Gavin Unit No. 1 OH Gallia Engineering and Procurement AEP 1349 18 18 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1050_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_050_isa.pdf Document Posted N/A Not Required N/A N/A 7/20/2018 N/A N/A 6/9/2024 6/9/2024 N/A N No
AE1-050 - Gavin Unit 1 765 kV Gavin Unit No. 1 OH Gallia Engineering and Procurement AEP 1349 18 18 Capacity Generation Interconnection Coal https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1050_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_050_isa.pdf Document Posted N/A Not Required N/A N/A 7/20/2018 N/A N/A 5/23/2021 5/23/2021 N/A N No
AE1-056 + Red House-South Creek 115 kV VA Appomattox Active Dominion 60 60 38.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1056_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1056_imp.pdf Document Posted In Progress N/A N/A 7/25/2018 N/A N/A 12/15/2020 N/A N No
AE1-056 - Red House-South Creek 115 kV VA Appomattox Active Dominion 60 60 38.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1056_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1056_imp.pdf Document Posted In Progress N/A N/A 7/25/2018 N/A N/A 12/15/2020 N/A N No
AE1-061 + Minotola 12 kV Panther Branch Storage NJ Atlantic Engineering and Procurement AEC 5.5 5.5 2.75 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1061_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1061_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1061_wmpa.pdf Not Required N/A N/A 7/30/2018 N/A N/A 4/1/2025 4/1/2025 N/A N No
AE1-061 - Minotola 12 kV NJ Atlantic Active AEC 5.5 5.5 2.75 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1061_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1061_imp.pdf Document Posted Not Required Not Required N/A N/A 7/30/2018 N/A N/A 9/1/2020 N/A N No
AE1-062 + Silver Lake 69 kV NJ Camden Active AEC 20 20 10 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1062_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1062_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1062_fac.pdf Document Posted N/A N/A 7/30/2018 N/A N/A 10/30/2020 N/A N No
AE1-062 - Silver Lake 69 kV NJ Camden Active AEC 20 20 10 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1062_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1062_imp.pdf Document Posted In Progress N/A N/A 7/30/2018 N/A N/A 10/30/2020 N/A N No
AE1-070 + Elwood 345 kV IL Will Active ComEd 1485 135 135 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1070_imp.pdf Document Posted In Progress N/A N/A 7/31/2018 N/A N/A 12/31/2020 N/A N No
AE1-070 - Elwood 345 kV IL Will Active ComEd 1485 135 135 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1070_imp.pdf Document Posted N/A N/A 7/31/2018 N/A N/A 12/31/2020 N/A N No
AE1-079 + Maysville-Sharon 69 kV PA Mercer Active ATSI 19.9 19.9 13.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1079_fac.pdf Document Posted N/A N/A 8/10/2018 N/A N/A 6/1/2020 N/A N No
AE1-079 - Maysville-Sharon 69 kV PA Mercer Active ATSI 19.9 19.9 13.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1079_imp.pdf Document Posted In Progress N/A N/A 8/10/2018 N/A N/A 6/1/2020 N/A N No
AE1-100 + Axton 138 kV Caden Energix Axton VA Henry Engineering and Procurement AEP 66 66 41.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1100_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1100_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_100_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_100_csa.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 12/31/2023 12/31/2023 N/A N No
AE1-100 - Axton 138 kV VA Henry Active AEP 66 66 41.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1100_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1100_fac.pdf Document Posted N/A N/A 8/31/2018 N/A N/A 12/15/2021 N/A N No
AE1-103 + Holland-Union Camp 115 kV VA Isle of Wight Active Dominion 40 40 16.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1103_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 4/1/2021 N/A N No
AE1-103 - Holland-Union Camp 115 kV VA Isle of Wight Active Dominion 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1103_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 4/1/2021 N/A N No
AE1-106 + Lake Lynn-Hazelton 138 kV WV Preston Active APS 99.6 99.6 59 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1106_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1106_imp.pdf Document Posted In Progress N/A N/A 9/10/2018 N/A N/A 9/30/2021 N/A N No
AE1-106 - Lake Lynn-Hazelton 138 kV WV Preston Active APS 99.6 99.6 59 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1106_fea.pdf Document Posted In Progress N/A N/A 9/10/2018 N/A N/A 9/30/2021 N/A N No
AE1-114 + Maryland-Lancaster 138 kV IL Ogle Active ComEd 150 150 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1114_imp.pdf Document Posted In Progress N/A N/A 9/13/2018 N/A N/A 12/31/2021 N/A N No
AE1-114 - Maryland-Lancaster 138 kV IL Ogle Active ComEd 150 150 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1114_imp.pdf Document Posted N/A N/A 9/13/2018 N/A N/A 12/31/2021 N/A N No
AE1-123 + Emlenton 34.5 kV Clarion Boards PA Clarion Under Construction PENELEC 18 18 18 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1123_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1123_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1123_wmpa.pdf Not Required N/A N/A 9/19/2018 N/A N/A 6/30/2021 5/31/2021 5/31/2021 N/A N No
AE1-123 - Emlenton 34.5 kV Clarion Boards PA Clarion Engineering and Procurement PENELEC 18 18 18 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1123_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae1123_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae1123_wmpa.pdf Not Required N/A N/A 9/19/2018 N/A N/A 6/30/2021 6/30/2021 6/30/2021 N/A N No
AE1-132 + McConnellsburg 138 kV PA Fulton Withdrawn APS 85 85 51 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1132_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1132_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 9/20/2018 N/A N/A 2/23/2022 12/31/2021 N/A N No
AE1-132 - McConnellsburg 138 kV PA Fulton Active APS 85 85 51 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1132_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1132_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1132_fac.pdf Document Posted N/A N/A 9/20/2018 N/A N/A 12/31/2021 N/A N No
AE1-134 + Nelson 345 kV IL Lee Active ComEd 609 9 24.4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1134_imp.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 12/31/2018 N/A N No
AE1-134 - Nelson 345 kV IL Lee Active ComEd 609 9 24.4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1134_imp.pdf Document Posted N/A N/A 9/24/2018 N/A N/A 12/31/2018 N/A N No
AE1-139 + Hunterstown 115 kV PA Adams Active ME 65 65 39 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1139_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1139_imp.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 12/15/2022 12/15/2022 N/A N No
AE1-139 - Hunterstown 115 kV PA Adams Active ME 65 65 39 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1139_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1139_imp.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 12/31/2021 N/A N No
AE1-153 + Remington-Gordonsville 230 kV VA Culpeper Active Dominion 149 149 89.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1153_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1153_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1153_fac.pdf Document Posted N/A N/A 9/24/2018 N/A N/A 10/23/2020 N/A N No
AE1-153 - Remington-Gordonsville 230 kV VA Culpeper Active Dominion 149 149 89.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1153_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1153_imp.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 10/23/2020 N/A N No
AE1-155 + Garner-Northern Neck 115 kV VA City of Richmond Active Dominion 127 127 76.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1155_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1155_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1155_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_155_isa2.pdf Interim Study N/A N/A N/A 9/24/2018 N/A N/A 12/31/2023 10/23/2020 N/A N No
AE1-155 - Garner-Northern Neck 115 kV VA City of Richmond Active Dominion 127 127 76.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1155_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1155_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae1_155_isa2.pdf Interim Study N/A N/A N/A 9/24/2018 N/A N/A 10/23/2020 N/A N No
AE1-166 + Loretto-Wilton & Braidwood-Davis Creek IL Kankakee Active ComEd 150 150 78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1166_imp.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 9/30/2020 N/A N No
AE1-166 - Loretto-Wilton & Braidwood-Davis Creek IL Kankakee Active ComEd 150 150 78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1166_imp.pdf Document Posted N/A N/A 9/24/2018 N/A N/A 9/30/2020 N/A N No
AE1-178 + Wolf Hills 138 kV Wolf Hills Energy Plant VA Washington In Service AEP 294 19 19 19 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1178_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1178_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_178_isa.pdf Document Posted N/A Not Required N/A N/A 9/25/2018 N/A N/A 12/21/2021 12/21/2021 5/25/2021 N/A N No
AE1-178 - Wolf Hills 138 kV Wolf Hills Energy Plant VA Washington In Service AEP 294 19 19 19 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1178_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1178_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_178_isa.pdf Document Posted N/A Not Required N/A N/A 9/25/2018 N/A N/A 12/21/2021 12/21/2021 N/A N No
AE1-179 + South Millville-Newport 69 kV NJ Cumberland Active AEC 59.7 59.7 35 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1179_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1179_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1179_fac.pdf Document Posted N/A N/A 9/25/2018 N/A N/A 9/30/2021 N/A N No
AE1-179 - South Millville-Newport 69 kV NJ Cumberland Active AEC 59.7 59.7 35 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1179_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1179_imp.pdf Document Posted In Progress N/A N/A 9/25/2018 N/A N/A 9/30/2021 N/A N No
AE1-184 + Pontiac Midpoint-Dresden IL Livingston Withdrawn ComEd 82.7 82.7 Energy Merchant Transmission https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ae1184_imp.pdf Document Posted N/A N/A 9/25/2018 N/A N/A 2/2/2022 6/1/2022 N/A EE No
AE1-184 - Pontiac Midpoint-Dresden IL Livingston Active ComEd 82.7 82.7 Energy Merchant Transmission https://www.pjm.com/pub/planning/project-queues/arr-impact-studies/ae1184_imp.pdf Document Posted N/A N/A 9/25/2018 N/A N/A 6/1/2022 N/A EE No
AE1-193 + Crete 345 kV IL Henry Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1193_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1193_imp.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-193 - Crete 345 kV IL Henry Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1193_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1193_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-194 + Crete 345 kV IL Will Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1194_imp.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-194 - Crete 345 kV IL Will Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1194_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-195 + Crete 345 kV IL Will Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1195_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1195_imp.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-195 - Crete 345 kV IL Will Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1195_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1195_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-198 + Crete 345 kV IL McHenry Active ComEd 357 357 193 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1198_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1198_imp.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-198 - Crete 345 kV IL McHenry Active ComEd 357 357 193 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1198_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1198_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-205 + McLean 345 kV IL Livingston Active ComEd 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1205_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1205_imp.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 12/31/2022 N/A N No
AE1-205 - McLean 345 kV IL Livingston Active ComEd 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1205_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1205_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 12/31/2022 N/A N No
AE1-212 + Grandview-Clifftop 138 kV WV Raliegh Active AEP 90 90 53.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1212_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1212_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1212_fac.pdf Document Posted N/A N/A 9/7/2018 N/A N/A 9/30/2021 N/A N No
AE1-212 - Grandview-Clifftop 138 kV WV Raliegh Active AEP 90 90 53.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1212_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1212_imp.pdf Document Posted In Progress N/A N/A 9/7/2018 N/A N/A 9/30/2021 N/A N No
AE1-229 + Deepwater-Upper Pittsgrove 138 kV NJ Salem Active AEC 149.3 149.3 89 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1229_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1229_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1229_fac.pdf Document Posted N/A N/A 9/17/2018 N/A N/A 9/30/2021 N/A N No
AE1-229 - Deepwater-Upper Pittsgrove 138 kV NJ Salem Active AEC 149.3 149.3 89 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1229_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1229_imp.pdf Document Posted In Progress N/A N/A 9/17/2018 N/A N/A 9/30/2021 N/A N No
AE1-237 + Andover (Maysville) 69kV I PA Crawford Active ATSI 19.9 19.9 13.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1237_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1237_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1237_fac.pdf Document Posted N/A N/A 9/28/2018 N/A N/A 6/1/2020 N/A N No
AE1-237 - Andover (Maysville) 69kV I PA Crawford Active ATSI 19.9 19.9 13.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1237_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1237_imp.pdf Document Posted In Progress N/A N/A 9/28/2018 N/A N/A 6/1/2020 N/A N No
AE1-243 + Warren Glen Storage 34.5 kV NJ Warren Active JCPL 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1243_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1243_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1243_fac.pdf Document Posted N/A N/A 9/28/2018 N/A N/A 12/1/2019 N/A N No
AE1-243 - Warren Glen Storage 34.5 kV NJ Warren Active JCPL 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1243_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1243_imp.pdf Document Posted In Progress N/A N/A 9/28/2018 N/A N/A 12/1/2019 N/A N No
AE1-250 + Smith Mountain-E. Danville 138 kV VA Pittsylvania Active AEP 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1250_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1250_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 9/30/2021 N/A N No
AE1-250 - Smith Mountain-E. Danville 138 kV VA Pittsylvania Active AEP 150 150 90 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1250_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1250_imp.pdf Document Posted In Progress N/A N/A 8/31/2018 N/A N/A 9/30/2021 N/A N No
AE1-252 + Loretto-Wilton Center IL Livingston Active ComEd 150 150 90 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1252_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1252_imp.pdf Document Posted In Progress N/A N/A 9/18/2018 N/A N/A 10/1/2021 N/A N No
AE1-252 - Loretto-Wilton Center IL Livingston Active ComEd 150 150 90 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1252_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1252_imp.pdf Document Posted N/A N/A 9/18/2018 N/A N/A 10/1/2021 N/A N No
AE2-029 + Grottoes-Merck 115kV Stonewall Solar VA Rockingham Engineering and Procurement Dominion 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2029_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2029_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_029_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_029_csa.pdf Document Posted N/A N/A 12/27/2018 N/A N/A 12/31/2024 12/31/2024 N/A N No
AE2-029 - Grottoes-Merck 115kV VA Rockingham Active Dominion 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2029_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2029_fac.pdf Document Posted N/A N/A 12/27/2018 N/A N/A 12/30/2022 N/A N No
AE2-030 + Frostburg 138kV MD Allegany Active APS 18 18 7.56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2030_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2030_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2030_fac.pdf Document Posted N/A N/A 12/31/2018 N/A N/A 8/24/2020 N/A N No
AE2-030 - Frostburg 138kV MD Allegany Active APS 18 18 7.56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2030_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2030_imp.pdf Document Posted In Progress N/A N/A 12/31/2018 N/A N/A 8/24/2020 N/A N No
AE2-035 + Lena 138 kV High Point II Solar IL Stephenson Engineering and Procurement ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2035_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2035_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_035_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_035_csa.pdf Document Posted N/A N/A 5/1/2022 1/15/2019 N/A N/A 9/1/2022 2/28/2023 2/28/2023 N/A N No
AE2-035 - Lena 138 kV High Point II Solar IL Stephenson Engineering and Procurement ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2035_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2035_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_035_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_035_csa.pdf Document Posted N/A N/A 1/15/2019 N/A N/A 2/28/2023 2/28/2023 N/A N No
AE2-046 + Harwood-East Hazelton 69 kV PA Schuylkill Active PPL 50 50 24 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2046_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2046_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2046_fac.pdf Document Posted N/A N/A 1/30/2019 N/A N/A 12/31/2020 N/A N No
AE2-046 - Harwood-East Hazelton 69 kV PA Schuylkill Active PPL 50 50 24 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2046_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2046_imp.pdf Document Posted In Progress N/A N/A 1/30/2019 N/A N/A 12/31/2020 N/A N No
AE2-054 + Warfordsburg 34 kV Blairs Valley PA Franklin Engineering and Procurement APS 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2054_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2054_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2054_wmpa.pdf Not Required N/A N/A 1/31/2019 N/A N/A 3/31/2021 3/31/2021 3/31/2021 N/A N No
AE2-054 - Warfordsburg 34 kV Blairs Valley PA Franklin Suspended APS 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2054_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2054_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2054_wmpa.pdf Not Required N/A N/A 1/31/2019 N/A N/A 3/31/2021 3/31/2021 3/31/2021 N/A N No
AE2-071 + Patton Rd-Summer Shade 69 kV KY Metcalfe Active EKPC 35 35 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2071_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_071_isa2.pdf Interim Study N/A N/A N/A 2/14/2019 N/A N/A 12/31/2021 N/A N No
AE2-071 - Patton Rd-Summer Shade 69 kV KY Metcalfe Active EKPC 35 35 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2071_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2071_imp.pdf Document Posted In Progress N/A N/A 2/14/2019 N/A N/A 12/31/2021 N/A N No
AE2-084 + Derry Tap-Derry Bus 69 kV Cottontail Solar 3 PA Montour Suspended PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2084_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2084_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_084_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_084_csa.pdf Document Posted N/A N/A 2/1/2019 N/A N/A 12/15/2022 12/15/2022 N/A N No
AE2-084 - Derry Tap-Derry Bus 69 kV Cottontail Solar 3 PA Montour Engineering and Procurement PPL 20 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2084_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2084_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2084_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_084_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_084_csa.pdf Document Posted N/A N/A 2/1/2019 N/A N/A 12/15/2022 12/15/2022 N/A N No
AE2-104 + Suffolk 115 kV VA Accomack Active Dominion 49 49 18.92 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2104_imp.pdf Document Posted In Progress N/A N/A 3/1/2019 N/A N/A 11/30/2021 N/A N No
AE2-104 - Suffolk 115 kV VA Accomack Active Dominion 49 49 18.92 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2104_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 11/30/2021 N/A N No
AE2-112 + Carville 138 kV II MD Queen Anne’s Active DPL 66 17 6.46 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2112_imp.pdf Document Posted Not Required N/A N/A 2/28/2019 N/A N/A 11/30/2021 N/A N No
AE2-112 - Carville 138 kV II MD Queen Anne’s Active DPL 66 17 6.46 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2112_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 11/30/2021 N/A N No
AE2-134 + Locust Grove-Paytes 115 kV Pine Glade Solar VA Orange Engineering and Procurement Dominion 62.5 0 16.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2134_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_134_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_134_csa.pdf Document Posted N/A N/A 10/1/2022 3/4/2019 N/A N/A 10/3/2022 3/30/2022 3/30/2022 N/A N No
AE2-134 - Locust Grove-Paytes 115 kV Pine Glade Solar VA Orange Engineering and Procurement Dominion 62.5 0 16.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2134_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_134_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_134_csa.pdf Document Posted N/A N/A 4/15/2022 3/4/2019 N/A N/A 4/22/2022 7/1/2022 7/1/2022 N/A N No
AE2-152 + Loretto-Wilton & Braidwood-Davis Creek IL Kankakee Active ComEd 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2152_imp.pdf Document Posted N/A N/A 3/4/2019 N/A N/A 9/30/2020 N/A N No
AE2-152 - Loretto-Wilton & Braidwood-Davis Creek IL Kankakee Active ComEd 150 150 90 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2152_fea.pdf Document Posted In Progress N/A N/A 3/4/2019 N/A N/A 9/30/2020 N/A N No
AE2-174 + Fremont Center-Tiffin Center 138 kV circuit #1 OH Seneca Active AEP 198 198 34.85 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2174_imp.pdf Document Posted In Progress N/A N/A 3/18/2019 N/A N/A 10/31/2021 N/A N No
AE2-174 - Seneca 138 kV OH Seneca Active AEP 198 198 34.85 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2174_imp.pdf Document Posted N/A N/A 3/18/2019 N/A N/A 10/31/2021 N/A N No
AE2-191 + Saxonburg 138 kV PA Butler Withdrawn APS 52 52 21.84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2191_Imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2191_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 3/18/2019 N/A N/A 3/2/2022 12/31/2022 N/A N No
AE2-191 - Saxonburg 138 kV PA Butler Active APS 52 52 21.84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2191_Imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2191_fac.pdf Document Posted N/A N/A 3/18/2019 N/A N/A 12/31/2022 N/A N No
AE2-192 + Orrtanna 115 kV PA Adams Withdrawn ME 65 65 39 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2192_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2192_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2192_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 3/18/2019 N/A N/A 1/28/2022 12/31/2022 N/A N No
AE2-192 - Orrtanna 115 kV PA Adams Active ME 65 65 39 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2192_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2192_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2192_fac.pdf Document Posted N/A N/A 3/18/2019 N/A N/A 12/31/2022 N/A N No
AE2-217 + East Springfield-London 138 kV OH Clark Active ATSI 180 180 108 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2217_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2217_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2217_fac.pdf Document Posted N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-217 - East Springfield-London 138 kV OH Clark Active ATSI 180 180 108 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2217_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2217_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-222 + Higbee 69 kV NJ Atlantic Active AEC 300 300 84.3 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2222_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2222_imp.pdf Document Posted In Progress N/A N/A 3/22/2019 N/A N/A 6/1/2023 N/A N No
AE2-222 - Higbee 69 kV NJ Atlantic Active AEC 300 300 85.424 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2222_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2222_imp.pdf Document Posted In Progress N/A N/A 3/22/2019 N/A N/A 6/1/2023 N/A N No
AE2-261 + Kincaid-Pana IL Christian Active ComEd 299 299 179.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2261_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2261_imp.pdf Document Posted In Progress N/A N/A 3/28/2019 N/A N/A 6/1/2022 N/A N No
AE2-261 - Kincaid-Pana IL Christian Active ComEd 299 299 179.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2261_fea.pdf Document Posted In Progress N/A N/A 3/28/2019 N/A N/A 6/1/2022 N/A N No
AE2-267 + Woodsdale 345 kV OH Butler Active DEOK 49 49 28.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2267_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2267_imp.pdf Document Posted In Progress N/A N/A 3/28/2019 N/A N/A 10/20/2021 N/A N No
AE2-267 - Woodsdale 345 kV OH Butler Active DEOK 50 50 30.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2267_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2267_imp.pdf Document Posted In Progress N/A N/A 3/28/2019 N/A N/A 10/20/2021 N/A N No
AE2-277 + McDowell 138 kV PA Mercer Active ATSI 38.2 38.2 16 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2277_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2277_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2277_fac.pdf Document Posted N/A N/A 3/28/2019 N/A N/A 12/31/2021 N/A N No
AE2-277 - McDowell 138 kV PA Mercer Active ATSI 38.2 38.2 16 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2277_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2277_imp.pdf Document Posted In Progress N/A N/A 3/28/2019 N/A N/A 12/31/2021 N/A N No
AE2-278 + Urbana 138 kV Urbana Solar OH Champaign Withdrawn Dayton 150.7 150.7 90.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2278_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2278_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2278_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_278_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_278_csa.pdf Document Posted N/A N/A 3/26/2019 N/A N/A 1/20/2022 6/30/2023 6/30/2023 N/A N No
AE2-278 - Urbana 138 kV Urbana Solar OH Champaign Engineering and Procurement Dayton 150.7 150.7 90.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2278_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2278_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2278_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_278_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_278_csa.pdf Document Posted N/A N/A 3/26/2019 N/A N/A 6/30/2023 6/30/2023 N/A N No
AE2-297 + Madison-Tanners Creek 138 kV Bellflower Solar 1 IN Henry Engineering and Procurement AEP 152.5 152.5 91.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2297_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2297_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2297_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_297_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_297_csa.pdf Document Posted N/A N/A 4/22/2021 3/22/2019 N/A N/A 12/31/2024 12/31/2024 N/A N No
AE2-297 - Madison-Tanners Creek 138 kV Bellflower Solar 1 IN Henry Engineering and Procurement AEP 152.5 152.5 91.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2297_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2297_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2297_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_297_isa2.pdf Interim Study N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_297_csa.pdf Document Posted N/A N/A 4/22/2021 3/22/2019 N/A N/A 12/31/2024 12/31/2024 N/A N No
AE2-306 + Gunn Road 345 kV OH Hardin Active AEP 30 30 18 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2306_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2306_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2306_fac.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 8/1/2021 N/A N No
AE2-306 - Gunn Road 345 kV OH Hardin Active AEP 30 30 18 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2306_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2306_imp.pdf Document Posted In Progress N/A N/A 3/29/2019 N/A N/A 8/1/2021 N/A N No
AE2-309 + Carlos Junction-Lonaconing 34.5 kV Jade Meadow MD Allegany Engineering and Procurement APS 19.8 19.84 16.66 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2309_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2309_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ae2309_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ae2309_wmpa.pdf Not Required N/A N/A 3/29/2019 N/A N/A 12/31/2023 12/31/2023 N/A N No
AE2-309 - Carlos Junction-Lonaconing 34.5 kV MD Allegany Active APS 19.8 19.84 16.66 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2309_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2309_imp.pdf Document Posted Not Required Not Required N/A N/A 3/29/2019 N/A N/A 10/30/2020 N/A N No
AE2-318 + Ford-Cedarville 138 kV OH Clermont Active DEOK 100 100 67.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2318_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2318_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2318_fac.pdf Document Posted N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-318 - Ford-Cedarville 138 kV OH Clermont Active DEOK 100 100 67.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2318_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2318_imp.pdf Document Posted In Progress N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-319 + Atlanta 69kV I OH Pickaway Active Dayton 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2319_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2319_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2319_fac.pdf Document Posted N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AE2-319 - Atlanta 69kV I OH Pickaway Active Dayton 100 100 66.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2319_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2319_imp.pdf Document Posted N/A N/A 3/30/2019 N/A N/A 12/1/2022 N/A N No
AF1-006 + Fairview East 34.5 kV Erie Solar PA Erie Engineering and Procurement PENELEC 20 20 12.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1006_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1006_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1006_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1006_wmpa.pdf Not Required N/A N/A 4/1/2019 N/A N/A 12/31/2024 12/31/2024 N/A N No
AF1-006 - Fairview East 34.5 kV Erie Solar PA Erie Active PENELEC 20 20 12.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1006_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1006_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1006_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1006_wmpa.pdf Not Required N/A N/A 4/1/2019 N/A N/A 12/31/2024 12/31/2024 N/A N No
AF1-036 + Carville 138 kV III MD Queen Anne’s Active DPL 86 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1036_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1036_imp.pdf Document Posted Not Required N/A N/A 5/24/2019 N/A N/A 11/30/2021 N/A N No
AF1-036 - Carville 138 kV III MD Queen Anne’s Active DPL 86 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1036_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1036_imp.pdf Document Posted In Progress N/A N/A 5/24/2019 N/A N/A 11/30/2021 N/A N No
AF1-042 + Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 131 45 17.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1042_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1042_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1042_fac.pdf Document Posted N/A N/A 6/24/2019 N/A N/A 11/30/2021 N/A N No
AF1-042 - Garner DP-Lancaster 115 kV VA Lancaster Active Dominion 131 45 17.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1042_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1042_imp.pdf Document Posted In Progress N/A N/A 6/24/2019 N/A N/A 11/30/2021 N/A N No
AF1-045 + Cedarville-Ford 138 kV OH Clermont Active DEOK 152.2 52.2 31.3 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1045_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1045_fac.pdf Document Posted N/A N/A 6/28/2019 N/A N/A 12/1/2023 N/A N No
AF1-045 - Cedarville-Ford 138 kV OH Clermont Active DEOK 152.2 52.2 31.3 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1045_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1045_imp.pdf Document Posted In Progress N/A N/A 6/28/2019 N/A N/A 12/1/2023 N/A N No
AF1-088 + Sullivan 345 kV IN Sullivan Active AEP 1000 1000 1000 Capacity Merchant Transmission DC 1000 F/1000 NFTIR/1000 F/1000 NFTWR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1088_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1088_imp.pdf Document Posted N/A N/A 8/30/2019 N/A N/A 12/31/2025 N/A S No
AF1-088 - Sullivan 345 kV IN Sullivan Active AEP 1000 1000 1000 Capacity Merchant Transmission DC 1000 F/1000 NFTIR/1000 F/1000 NFTWR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1088_fea.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 12/31/2025 N/A S No
AF1-130 + Inez 138 kV KY Martin Active AEP 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1130_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_130_isa2.pdf Interim Study N/A N/A N/A 9/18/2019 N/A N/A 12/1/2023 N/A N No
AF1-130 - Inez 138 kV KY Martin Active AEP 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1130_imp.pdf Document Posted In Progress N/A N/A 9/18/2019 N/A N/A 12/1/2023 N/A N No
AF1-160 + Silver Lake 69 kV NJ Camden Active AEC 40 20 10 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1160_imp.pdf Document Posted Not Required N/A N/A 9/20/2019 N/A N/A 11/1/2021 N/A N No
AF1-160 - Silver Lake 69 kV NJ Camden Active AEC 40 20 10 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1160_imp.pdf Document Posted In Progress N/A N/A 9/20/2019 N/A N/A 11/1/2021 N/A N No
AF1-162 + Inez 138 kV KY Martin Active AEP 300 100 60 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1162_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_162_isa2.pdf Interim Study N/A N/A N/A 9/20/2019 N/A N/A 12/1/2023 N/A N No
AF1-162 - Inez 138 kV KY Martin Active AEP 300 100 60 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1162_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1162_imp.pdf Document Posted In Progress N/A N/A 9/20/2019 N/A N/A 12/1/2023 N/A N No
AF1-200 + Plano 345 kV IL Kendall Active ComEd 2100 2100 2035 Capacity Merchant Transmission DC 2035 F/NFTIR/2100 NF/TWR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1200_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1200_imp.pdf Document Posted In Progress N/A N/A 9/25/2019 N/A N/A 1/31/2025 N/A S No
AF1-200 - Plano 345 kV IL Kendall Active ComEd 2100 2100 2035 Capacity Merchant Transmission DC 2035 F/NFTIR/2100 NF/TWR https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1200_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1200_imp.pdf Document Posted N/A N/A 9/25/2019 N/A N/A 1/31/2025 N/A S No
AF1-203 + Patton Rd-Summer Shade 69 kV KY Metcalfe Active EKPC 55 20 12 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1203_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1203_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_203_isa2.pdf Interim Study N/A N/A N/A 9/25/2019 N/A N/A 12/31/2022 N/A N No
AF1-203 - Patton Rd-Summer Shade 69 kV KY Metcalfe Active EKPC 55 20 12 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1203_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1203_imp.pdf Document Posted In Progress N/A N/A 9/25/2019 N/A N/A 12/31/2022 N/A N No
AF1-260 + Allenwood-Larrabee 2 34.5 kV Lakewood-Farmingdale Road Solar Farm NJ Monmouth In Service JCPL 7 0 1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1260_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1260_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af1_260_isa.pdf Document Posted N/A Not Required N/A N/A 9/30/2019 N/A N/A 9/1/2023 9/1/2023 9/8/2020 N/A N No
AF1-260 - Allenwood-Larrabee 2 34.5 kV Lakewood-Farmingdale Road Solar Farm NJ Monmouth In Service JCPL 7 0 1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1260_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1260_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af1_260_isa.pdf Document Posted N/A Not Required N/A N/A 9/30/2019 N/A N/A 9/1/2023 9/1/2023 N/A N No
AF1-285 + Gunn Road 345 kV OH Hardin Active AEP 130 100 56 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1285_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1285_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/af1285_fac.pdf Document Posted N/A N/A 9/30/2019 N/A N/A 8/1/2021 N/A N No
AF1-285 - Gunn Road 345 kV OH Hardin Active AEP 130 100 56 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af1285_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1285_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 8/1/2021 N/A N No
AF1-286 + East Sayre 34.5 kV II PA Bradford Active PENELEC 13.6 13.6 5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1286_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1286_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/31/2021 N/A N No
AF1-286 - East Sayre 34.5 kV II PA Bradford Active PENELEC 13.6 13.6 8.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1286_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1286_imp.pdf Document Posted In Progress N/A N/A 9/30/2019 N/A N/A 12/31/2021 N/A N No
AF1-299 + Otter Point 34.5 kV I Fairview Farms II MD Harford Engineering and Procurement BGE 15 15 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1299_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1299_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1299_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1299_wmpa.pdf Not Required N/A N/A 9/30/2019 N/A N/A 10/30/2022 10/30/2022 N/A N No
AF1-299 - Otter Point 34.5 kV I Fairview Farms II MD Harford Engineering and Procurement BGE 15 15 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1299_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1299_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1299_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1299_wmpa.pdf Not Required N/A N/A 9/30/2019 N/A N/A 10/30/2021 10/30/2021 N/A N No
AF1-300 + Otter Point 34.5 kV II Fairview Farms I MD Harford Engineering and Procurement BGE 15 15 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1300_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1300_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1300_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1300_wmpa.pdf Not Required N/A N/A 9/30/2019 N/A N/A 10/30/2022 10/30/2022 N/A N No
AF1-300 - Otter Point 34.5 kV II Fairview Farms I MD Harford Engineering and Procurement BGE 15 15 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1300_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1300_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af1300_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af1300_wmpa.pdf Not Required N/A N/A 9/30/2019 N/A N/A 10/30/2021 10/30/2021 N/A N No
AF2-103 + Haviland 138 kV Northwest Ohio Wind OH Paulding Partially in Service - Under Construction AEP 103.2 3.15 1.32 2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2103_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af2_103_isa.pdf Document Posted N/A Not Required N/A N/A 3/17/2020 N/A N/A 2/1/2021 2/1/2021 6/1/2021 N/A N No
AF2-103 - Haviland 138 kV Northwest Ohio Wind OH Paulding Partially in Service - Under Construction AEP 103.2 3.15 1.32 2 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2103_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/af2_103_isa.pdf Document Posted N/A Not Required N/A N/A 3/17/2020 N/A N/A 2/1/2021 2/1/2021 N/A N No
AF2-139 + Gilbert-Warren Glen 34.5 kV Holland Solar Farm NJ Hunterdon Engineering and Procurement JCPL 16.3 8.8 3.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2139_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2139_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/af2_139_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/af2_139_csa.pdf Document Posted N/A N/A 3/10/2020 N/A N/A 8/31/2022 8/31/2022 N/A N No
AF2-139 - Gilbert-Warren Glen 34.5 kV NJ Hunterdon Active JCPL 16.3 8.8 3.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2139_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2139_imp.pdf Document Posted N/A N/A 3/10/2020 N/A N/A 9/30/2021 N/A N No
AF2-166 + Emlenton 34.5 kV PA Venango Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2166_imp.pdf Document Posted In Progress N/A N/A 3/17/2020 N/A N/A 9/15/2022 N/A N No
AF2-166 - Clark Summit-Emlenton 34 kV PA Venango Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2166_imp.pdf Document Posted In Progress N/A N/A 3/17/2020 N/A N/A 9/15/2022 N/A N No
AF2-249 + Edgewood 12 kV II Citron Storage MD Wicomico Engineering and Procurement DPL 3 3 0.6 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2249_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2249_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2249_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2249_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 11/30/2023 11/30/2023 N/A N No
AF2-249 - Edgewood 12 kV II MD Wicomico Active DPL 3 3 0.6 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2249_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2249_imp.pdf Document Posted Not Required Not Required N/A N/A 3/27/2020 N/A N/A 6/1/2020 N/A N No
AF2-250 + Edgewood 12 kV III Kumquat Solar MD Wicomico Engineering and Procurement DPL 2 1.95 1.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2250_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2250_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2250_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2250_wmpa.pdf Not Required N/A N/A 3/27/2020 N/A N/A 7/31/2022 7/31/2022 N/A N No
AF2-250 - Edgewood 12 kV III MD Wicomico Active DPL 2 1.95 1.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2250_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2250_imp.pdf Document Posted Not Required Not Required N/A N/A 3/27/2020 N/A N/A 6/1/2020 N/A N No
AF2-305 + Brokaw-Lanesville 345 kV IL DeWitt Active ComEd 200 0 9.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af2305_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2305_imp.pdf Document Posted Not Required N/A N/A 3/30/2020 N/A N/A 9/1/2021 N/A N No
AF2-305 - Brokaw-Lanesville 345 kV IL DeWitt Active ComEd 200 0 9.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af2305_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2305_imp.pdf Document Posted In Progress N/A N/A 3/30/2020 N/A N/A 9/1/2021 N/A N No
AF2-314 + Vandergrift-Guffy Junction 25 kV Ponytail Solar PA Armstrong Engineering and Procurement APS 10 10 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2314_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2314_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2314_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2314_wmpa.pdf Not Required N/A N/A 3/30/2020 N/A N/A 9/30/2023 9/30/2023 N/A N No
AF2-314 - Vandergrift-Guffy Junction 25 kV Ponytail Solar PA Armstrong Suspended APS 10 10 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2314_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2314_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/af2314_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/af2314_wmpa.pdf Not Required N/A N/A 3/30/2020 N/A N/A 9/30/2023 9/30/2023 N/A N No
AF2-320 + Dumont-Stillwell 345 kV IN St. Joseph Withdrawn AEP 48 Energy Merchant Transmission Not Required Withdrawn N/A N/A 3/30/2020 N/A N/A 9/23/2020 6/1/2023 N/A EE No
AF2-320 - Dumont-Stillwell 345 kV IN St. Joseph Withdrawn AEP 48 Energy Merchant Transmission Not Required In Progress N/A N/A 3/30/2020 N/A N/A 9/23/2020 6/1/2023 N/A EE No
AF2-391 + Central Hardin 69 kV KY Hardin Active EKPC 120 120 72 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2391_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2391_imp.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 6/15/2023 N/A N No
AF2-391 - Central Hardin 69 kV KY Hardin Active EKPC 120 120 72 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/af2391_fea.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 6/15/2023 N/A N No
AG1-029 + Weirton Solar 24 kV Weirton Solar 24 kV WV Hancock Engineering and Procurement APS 30 30 13.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1029_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1029_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1029_wmpa.pdf Not Required N/A N/A 6/9/2020 N/A N/A 10/1/2024 10/1/2024 N/A N No
AG1-029 - Weirton Solar 24 kV WV Hancock Active APS 30 30 13.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1029_imp.pdf Document Posted In Progress N/A N/A 6/9/2020 N/A N/A 11/15/2021 N/A N No
AG1-046 + Freeport 138 kV N/A N/A Withdrawn ComEd Energy Merchant Transmission Withdrawn N/A N/A 7/9/2020 N/A N/A 8/27/2020 7/6/2020 N/A EE No
AG1-046 - Freeport 138 kV N/A N/A Withdrawn ComEd Energy Merchant Transmission In Progress N/A N/A 7/9/2020 N/A N/A 8/27/2020 7/6/2020 N/A EE No
AG1-076 + Fostoria Central 138 kV OH Hancock Active AEP 205 0 46 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ag1076_fac.pdf Document Posted N/A N/A 7/31/2020 N/A N/A 12/29/2023 N/A N No
AG1-076 - Fostoria Central 138 kV OH Hancock Active AEP 205 0 46 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1076_imp.pdf Document Posted In Progress N/A N/A 7/31/2020 N/A N/A 12/29/2023 N/A N No
AG1-086 + Findlay 23 kV Findlay Solar Park PA Allegheny Engineering and Procurement DL 17.5 17.5 10.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1086_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1086_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1086_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1086_wmpa.pdf Not Required N/A N/A 7/31/2020 N/A N/A 12/31/2023 12/31/2023 N/A N No
AG1-086 - Findlay 23 kV PA Allegheny Active DL 17.5 17.5 10.5 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1086_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1086_imp.pdf Document Posted In Progress Not Required N/A N/A 7/31/2020 N/A N/A 12/31/2020 N/A N No
AG1-148 + McCarter 26.4 kV Rutgers Generation NJ Essex Under Construction PSEG 5 5 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1148_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1148_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1148_wmpa.pdf Not Required N/A N/A 9/9/2020 N/A N/A 10/3/2022 10/3/2022 N/A N No
AG1-148 - McCarter 26.4 kV Rutgers Generation NJ Essex Engineering and Procurement PSEG 5 5 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1148_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1148_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1148_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1148_wmpa.pdf Not Required N/A N/A 9/9/2020 N/A N/A 10/3/2022 10/3/2022 N/A N No
AG1-163 + West Millersport 138 kV OH Fairfield Active AEP 100 100 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1163_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1163_imp.pdf Document Posted In Progress N/A N/A 9/14/2020 N/A N/A 12/31/2023 N/A N No
AG1-163 - West Millersport 138 kV OH Fairfield Active AEP 100 100 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1163_fea.pdf Document Posted In Progress N/A N/A 9/14/2020 N/A N/A 12/31/2023 N/A N No
AG1-191 + Chester-Pohatcong Mountain 34.5 kV NJ Morris Active JCPL 15.4 15.4 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1191_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ag1191_isa2.pdf Interim Study N/A N/A N/A 9/17/2020 N/A N/A 12/17/2021 N/A N No
AG1-191 - Chester-Pohatcong Mountain 34.5 kV NJ Morris Active JCPL 15.4 15.4 6.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1191_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1191_imp.pdf Document Posted In Progress N/A N/A 9/17/2020 N/A N/A 12/17/2021 N/A N No
AG1-197 + Morgan Street-Cochranton 34.5 kV PA Crawford Active PENELEC 15 15 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1197_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1197_imp.pdf Document Posted In Progress Not Required N/A N/A 9/18/2020 N/A N/A 1/15/2023 N/A N No
AG1-197 - Morgan Street-Cochranton 34.5 kV PA Crawford Active PENELEC 15 15 9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1197_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1197_imp.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 1/15/2023 N/A N No
AG1-198 + Union City 34.5 kV PA Erie Active PENELEC 12 12 7.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1198_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1198_imp.pdf Document Posted In Progress Not Required N/A N/A 9/18/2020 N/A N/A 1/15/2023 N/A N No
AG1-198 - Union City 34.5 kV PA Erie Active PENELEC 12 12 7.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1198_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1198_imp.pdf Document Posted In Progress N/A N/A 9/18/2020 N/A N/A 1/15/2023 N/A N No
AG1-246 + Gates Hill-Luzerne 25 kV PA Fayette Active APS 7.5 7.5 4.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1246_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1246_imp.pdf Document Posted Not Required Not Required N/A N/A 9/25/2020 N/A N/A 12/31/2022 N/A N No
AG1-246 - Gates Hill-Luzerne 25 kV PA Fayette Active APS 7.5 7.5 4.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1246_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1246_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2022 N/A N No
AG1-251 + McDowell 12.47 kV Springfield CSG 1 PA Delaware Engineering and Procurement ATSI 3.9 3.88 1.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1251_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1251_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1251_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1251_wmpa.pdf Not Required N/A N/A 9/25/2020 N/A N/A 8/31/2024 8/31/2024 N/A N No
AG1-251 - McDowell 12.47 kV PA Delaware Active ATSI 3.9 3.88 1.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1251_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1251_imp.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2021 N/A N No
AG1-253 + Erie East-Union City 34.5 kV Greenfield CSG 1 PA Erie Engineering and Procurement PENELEC 4 4 2.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1253_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1253_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1253_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1253_wmpa.pdf Not Required N/A N/A 9/25/2020 N/A N/A 9/30/2022 9/30/2022 N/A N No
AG1-253 - Erie East-Union City 34.5 kV Greenfield CSG 1 PA Erie Active PENELEC 4 4 2.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1253_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1253_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1253_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1253_wmpa.pdf Not Required N/A N/A 9/25/2020 N/A N/A 9/30/2022 9/30/2022 N/A N No
AG1-291 + Neville 23 kV PA Allegheny Active DL 16.8 16.8 13.5 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1291_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1291_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1291_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1291_wmpa.pdf Not Required N/A N/A 9/28/2020 N/A N/A 12/31/2023 N/A N No
AG1-291 - Neville 23 kV PA Allegheny Active DL 16.8 16.8 13.5 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1291_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1291_imp.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 12/31/2023 N/A N No
AG1-348 + Pequest River-Washington 34.5 kV NJ Warren Active JCPL 19.8 19.8 8.316 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1348_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1348_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ag1_348_isa2.pdf Interim Study N/A N/A N/A 9/30/2020 N/A N/A 12/17/2021 N/A N No
AG1-348 - Pequest River-Washington 34.5 kV NJ Warren Active JCPL 19.8 19.8 8.316 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1348_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1348_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/17/2021 N/A N No
AG1-360 + Costen 25 kV Costen Solar MD Somerset Engineering and Procurement DPL 8.8 8.75 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1360_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1360_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1360_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1360_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 11/1/2023 11/1/2023 N/A N No
AG1-360 - Costen 25 kV MD Somerset Active DPL 8.8 8.75 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1360_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1360_imp.pdf Document Posted Not Required Not Required N/A N/A 9/30/2020 N/A N/A 9/30/2021 N/A N No
AG1-367 + DeSoto 345 kV IN Delaware Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1367_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 10/31/2024 N/A N No
AG1-367 - DeSoto 345 kV IN Delaware Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1367_fea.pdf Document Posted In Progress Withdrawn N/A N/A 9/30/2020 N/A N/A 10/31/2024 N/A N No
AG1-398 + Brokaw-Lanesville 345 kV IL Fulton Active ComEd 200 0 7.33 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1398_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1398_imp.pdf Document Posted Withdrawn N/A N/A 9/30/2020 N/A N/A 9/30/2021 N/A N No
AG1-398 - Brokaw-Lanesville 345 kV IL Fulton Active ComEd 200 0 7.33 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1398_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1398_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/30/2021 N/A N No
AG1-403 + Blue Mound-Chestnut 345 kV IL McLean Active ComEd 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1403_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/24/2024 N/A N No
AG1-403 - Blue Mound-Chestnut 345 kV IL McLean Active ComEd 200 200 35.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1403_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/24/2024 N/A N No
AG1-404 + Blue Mound-Chestnut 345 kV IL McLean Active ComEd 100 100 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1404_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 9/24/2024 N/A N No
AG1-404 - Blue Mound-Chestnut 345 kV IL McLean Active ComEd 100 100 100 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1404_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 9/24/2024 N/A N No
AG1-448 + Olive-University Park 345 kV IN LaPorte Withdrawn AEP 360 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1448_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1448_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 1/27/2022 12/31/2023 N/A N No
AG1-448 - Olive-University Park 345 kV IN LaPorte Active AEP 360 55 55 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1448_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1448_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 12/31/2023 N/A N No
AG1-450 + Airey-Vienna 69 kV II MD Dorchester Active DPL 125 25 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1450_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1450_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 12/31/2022 N/A N No
AG1-450 - Airey-Vienna 69 kV II MD Dorchester Active DPL 125 25 25 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1450_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1450_imp.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 12/31/2022 N/A N No
AG1-508 + Point Lookout 69 kV VA Grayson Active AEP 63.3 63.3 9.3 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1508_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1508_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2025 N/A N No
AG1-508 - Independence 69 kV VA Grayson Active AEP 63.3 63.3 9.3 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1508_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1508_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2025 N/A N No
AG1-509 + Point Lookout 69 kV VA Grayson Active AEP 105.4 105.4 15.5 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1509_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1509_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2025 N/A N No
AG1-509 - Independence 69 kV VA Grayson Active AEP 105.4 105.4 15.5 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1509_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1509_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 3/1/2025 N/A N No
AG1-513 + Aurora 138 kV IL Will Active ComEd 1056 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1513_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1513_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-513 - Aurora 138 kV IL Will Active ComEd 1026 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1513_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1513_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/1/2024 N/A N No
AG1-517 + Osage 138 kV WV Monongalia Active APS 50 50 50 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1517_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1517_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 4/1/2022 N/A N No
AG1-517 - Osage 138 kV WV Monongalia Active APS 50 0 0 Energy Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1517_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1517_imp.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 4/1/2022 N/A N No
AG2-012 + Lardin 12 kV PA Fayette Engineering and Procurement APS 0.2 0.165 0 Energy Generation Interconnection Solar Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2012_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2012_wmpa.pdf Not Required N/A N/A 10/14/2020 N/A N/A 12/31/2023 12/31/2023 N/A Y No
AG2-012 - Lardin 12 kV PA Fayette Active APS 0.2 0.165 0 Energy Generation Interconnection Solar In Progress Not Required N/A N/A 10/14/2020 N/A N/A 11/30/2020 N/A Y No
AG2-030 + White Stone-Harmony Village 115 kV N/A N/A Active Dominion Energy Merchant Transmission Not Required N/A N/A 10/27/2020 N/A N/A 10/26/2020 N/A EE No
AG2-030 - White Stone-Harmony Village 115 kV N/A N/A Active Dominion Energy Merchant Transmission Issued N/A N/A 10/27/2020 N/A N/A 10/26/2020 N/A EE No
AG2-050 + Randle Cliff 13.8 kV CHESAPEAKE BEACH BESS MD Calvert Engineering and Procurement BGE 1 1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2050_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2050_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2050_wmpa.pdf Not Required N/A N/A 11/25/2020 N/A N/A 5/1/2023 5/1/2023 N/A Y No
AG2-050 - Randle Cliff 13.8 kV CHESAPEAKE BEACH BESS MD Calvert Engineering and Procurement BGE 1 1 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2050_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2050_imp.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2050_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2050_wmpa.pdf Not Required N/A N/A 11/25/2020 N/A N/A 5/1/2023 5/1/2023 N/A Y No
AG2-135 + Hoffman Estates 12.5 kV Patel Brothers Energy Storage System OH Pickaway Withdrawn Unknown 0.3 0.28 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2135_imp.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2135_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2135_wmpa.pdf Not Required N/A N/A 2/4/2021 N/A N/A 1/10/2022 4/15/2022 4/15/2022 N/A Y No
AG2-135 - Hoffman Estates 12.5 kV Patel Brothers Energy Storage System OH Pickaway Engineering and Procurement Unknown 0.3 0.28 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2135_imp.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2135_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2135_wmpa.pdf Not Required N/A N/A 2/4/2021 N/A N/A 4/15/2022 4/15/2022 N/A Y No
AG2-140 + Wylie Ridge 345 kV N/A N/A Active APS Energy Merchant Transmission Not Required N/A N/A 2/11/2021 N/A N/A 2/22/2021 N/A EE No
AG2-140 - Wylie Ridge 345 kV N/A N/A Active APS Energy Merchant Transmission Issued N/A N/A 2/11/2021 N/A N/A 2/22/2021 N/A EE No
AG2-141 + Wylie Ridge-Toronto 345 kV N/A N/A Active APS Energy Merchant Transmission Not Required N/A N/A 2/11/2021 N/A N/A 2/11/2021 N/A EE No
AG2-141 - Wylie Ridge-Toronto 345 kV N/A N/A Active APS Energy Merchant Transmission Issued N/A N/A 2/11/2021 N/A N/A 2/11/2021 N/A EE No
AG2-205 + Bonney Forge 23 kV N/A N/A Engineering and Procurement PENELEC 3.7 Energy Generation Interconnection Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2205_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2205_wmpa.pdf Not Required N/A N/A 3/5/2021 N/A N/A 3/31/2024 3/31/2024 N/A Y No
AG2-205 - Bonney Forge 23 kV N/A N/A Active PENELEC Energy Generation Interconnection Not Required Not Required N/A N/A 3/5/2021 N/A N/A 5/1/2023 N/A Y No
AG2-255 + South Hampton 13 kV NJ Burlington Active PSEG 4 4 1.68 Capacity Generation Interconnection Solar In Progress N/A N/A 3/18/2021 N/A N/A N/A N No
AG2-255 - South Hampton 13 kV NJ Burlington Active PSEG 4 4 1.7 Capacity Generation Interconnection Solar In Progress N/A N/A 3/18/2021 N/A N/A 3/30/2022 N/A N No
AG2-308 + Cumberland 138 kV MD Allegany Active APS 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 3/23/2021 N/A N/A 12/31/2025 N/A N No
AG2-308 - Cumberland 138 kV MD Allegany Active APS 100 100 100 Capacity Generation Interconnection Storage Withdrawn N/A N/A 3/23/2021 N/A N/A 12/31/2025 N/A N No
AG2-347 + Indian River 230 kV DE Sussex Active DPL 448.8 448.8 121.2 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 3/26/2021 N/A N/A 8/31/2025 N/A N No
AG2-347 - Indian River 230 kV DE Sussex Active DPL 448.8 448.8 121.2 Capacity Generation Interconnection Wind In Progress N/A N/A 3/26/2021 N/A N/A 8/31/2025 N/A N No
AG2-374 + Warfordsburg 12 kV PA Tioga Engineering and Procurement APS 3 Energy Generation Interconnection Solar Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2374_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2374_wmpa.pdf Not Required N/A N/A 3/30/2021 N/A N/A 12/31/2023 12/31/2023 N/A Y No
AG2-374 - Warfordsburg 12 kV PA Tioga Active APS Energy Generation Interconnection Not Required Not Required N/A N/A 3/29/2021 N/A N/A 12/1/2023 N/A Y No
AG2-391 + Route 30-Laurich 12 kV OH Montgomery Engineering and Procurement APS 3 3 0 Energy Generation Interconnection Solar Not Required Not Required Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2391_wmpa.pdf Not Required N/A N/A 3/31/2021 N/A N/A 12/31/2023 12/31/2023 N/A Y No
AG2-391 - Route 30-Laurich 12 kV OH Montgomery Engineering and Procurement APS 3 3 0 Energy Generation Interconnection Solar Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2391_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2391_wmpa.pdf Not Required N/A N/A 3/31/2021 N/A N/A 12/31/2023 12/31/2023 N/A Y No
AG2-392 + Meason 12 kV N/A N/A Engineering and Procurement APS 3 3 0 Energy Generation Interconnection Not Required Not Required Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2392_wmpa.pdf Not Required N/A N/A 3/31/2021 N/A N/A 12/31/2023 12/31/2023 N/A Y No
AG2-392 - Meason 12 kV N/A N/A Engineering and Procurement APS 3 3 0 Energy Generation Interconnection Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2392_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2392_wmpa.pdf Not Required N/A N/A 3/31/2021 N/A N/A 12/31/2023 12/31/2023 N/A Y No
AG2-399 + Harrisville Jct - All Min 25 kV N/A N/A Engineering and Procurement APS 3 3 0 Energy Generation Interconnection Solar Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2399_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2399_wmpa.pdf Not Required N/A N/A 3/31/2021 N/A N/A 12/31/2023 12/31/2023 N/A Y No
AG2-399 - Harrisville Jct - All Min 25 kV N/A N/A Active APS 3 3 0 Energy Generation Interconnection Solar Not Required Not Required N/A N/A 3/31/2021 N/A N/A 12/1/2023 N/A Y No
AG2-422 + Bustleton 13 kV Burlington Energy Storage N/A N/A Withdrawn PSEG 1.2 1.2 0 Energy Generation Interconnection https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2422_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2422_imp.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2422_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2422_wmpa.pdf Not Required N/A N/A 3/31/2021 N/A N/A 12/12/2023 12/12/2023 N/A Y No
AG2-422 - Bustleton 13 kV Burlington Energy Storage N/A N/A Engineering and Procurement PSEG 1.2 1.2 0 Energy Generation Interconnection https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2422_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2422_imp.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2422_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2422_wmpa.pdf Not Required N/A N/A 3/31/2021 N/A N/A 12/12/2023 12/12/2023 N/A Y No
AG2-495 + Phillipsburg Bus I 34.5 kV N/A N/A Withdrawn PENELEC Energy Generation Interconnection Withdrawn N/A N/A 3/31/2021 N/A N/A 2/9/2022 N/A Y No
AG2-495 - Phillipsburg Bus I 34.5 kV PA Bedford Active PENELEC 5 5 0 Energy Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 6/21/2022 N/A Y No
AG2-657 + Carbondale 138 kV WV Fayette Active AEP 90 90 49.8 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 3/31/2021 N/A N/A 6/30/2024 N/A N No
AG2-657 - Carbondale 138 kV WV Fayette Active AEP 90 90 49.8 Capacity Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 6/30/2024 N/A N No
AH1-013 + Hanna - Tanners Creek 345 kV IN Shelby Active AEP 500 0 300 Capacity Generation Interconnection Solar In Progress N/A N/A 4/20/2021 N/A N/A 12/31/2023 N/A N No
AH1-013 - Hanna - Tanners Creek 345 kV IN Shelby Active AEP 500 0 300 Capacity Generation Interconnection Solar In Progress N/A N/A 4/19/2021 N/A N/A 12/31/2023 N/A N No
AH1-037 + Chippewa D557 8.320 kV N/A N/A Active ATSI 2 2 0 Energy Generation Interconnection Solar In Progress N/A N/A 6/16/2021 N/A N/A 11/1/2023 N/A Y No
AH1-037 - Matheny N/A N/A Active ATSI 5 5 0 Energy Generation Interconnection Solar In Progress N/A N/A 6/16/2021 N/A N/A 11/1/2023 N/A Y No
AH1-038 + Kramer N/A N/A Withdrawn PENELEC Energy Generation Interconnection Withdrawn N/A N/A 6/16/2021 N/A N/A 1/4/2022 11/1/2023 N/A Y No
AH1-038 - Kramer N/A N/A Active PENELEC 3.8 3.825 0 Energy Generation Interconnection Solar In Progress N/A N/A 6/16/2021 N/A N/A 11/1/2023 N/A Y No
AH1-039 + Mt. Hermon 23 kV MD Wicomico Withdrawn DPL 20 20 12 Capacity Generation Interconnection Solar Withdrawn N/A N/A 6/19/2021 N/A N/A 1/25/2022 10/1/2023 N/A N No
AH1-039 - Mt. Hermon 23 kV MD Wicomico Active DPL 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 6/18/2021 N/A N/A 10/1/2023 N/A N No
AH1-055 + Kyger Creek - Don Marquis 345 kV OH Jackson Active OVEC 220 220 148.3 Capacity Generation Interconnection Solar In Progress N/A N/A 7/13/2021 N/A N/A 11/15/2026 N/A N No
AH1-055 - Kyger Creek - Don Marquis 345 kV OH Jackson Active OVEC 220 220 154 Capacity Generation Interconnection Solar In Progress N/A N/A 7/13/2021 N/A N/A 11/15/2026 N/A N No
AH1-057 + Edgewood 12.47 kV MD Wicomico Active DPL 7.2 7.2 3.4 Capacity Generation Interconnection Solar In Progress N/A N/A 7/15/2021 N/A N/A N/A N No
AH1-057 - Edgewood 12.47 kV MD Wicomico Active DPL 7.2 7.2 3.4 Capacity Generation Interconnection Solar In Progress N/A N/A 7/15/2021 N/A N/A 1/31/2023 N/A N No
AH1-097 + Jubal Early - Pipers Gap 138 kV VA Carroll Active AEP 20 20 12.9 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 7/30/2021 N/A N/A 6/1/2025 N/A N No
AH1-097 - Jubal Early - Pipers Gap 138 kV VA Carroll Active AEP 20 20 13 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 7/30/2021 N/A N/A 6/1/2025 N/A N No
AH1-123 + Locust Grove D.P. 34.5kV VA Orange Withdrawn Dominion 20 20 20 Capacity Generation Interconnection Storage Withdrawn N/A N/A 8/24/2021 N/A N/A 11/17/2021 2/28/2023 N/A N No
AH1-123 - Locust Grove D.P. 34.5kV VA Orange Withdrawn Dominion 20 20 20 Capacity Generation Interconnection Storage Withdrawn N/A N/A 8/23/2021 N/A N/A 11/17/2021 2/28/2023 N/A N No
AH1-132 + Double Toll Gate - Strasburg 34.5 kV VA Frederick Active APS 14.4 14.4 14.4 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 8/23/2021 N/A N/A N/A N No
AH1-132 - Double Toll Gate - Strasburg 34.5 kV VA Frederick Active APS 14.4 14.4 14.4 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 8/23/2021 N/A N/A 1/1/2022 N/A N No
AH1-139 + Cooper 34.5kV PA York Active PECO 3 3 0 Energy Generation Interconnection Solar In Progress N/A N/A 8/26/2021 N/A N/A 12/31/2022 N/A Y No
AH1-139 - Peach Bottom 13.2kV PA York Active PECO Energy Generation Interconnection In Progress N/A N/A 8/26/2021 N/A N/A 12/31/2022 N/A Y No
AH1-154A + Mount Rock12 kV II PA Snyder Withdrawn PPL 5 5 3 Capacity Generation Interconnection Solar Withdrawn N/A N/A 8/27/2021 N/A N/A 2/14/2022 N/A N No
AH1-154A - Mount Rock12 kV II PA Snyder Active PPL 5 5 3 Capacity Generation Interconnection Solar In Progress N/A N/A 8/27/2021 N/A N/A 12/31/2022 N/A N No
AH1-154B + Hughesville 12 kV PA Lycoming Withdrawn PPL 5 5 3 Capacity Generation Interconnection Solar Withdrawn N/A N/A 8/27/2021 N/A N/A 2/14/2022 N/A N No
AH1-154B - Hughesville 12 kV PA Lycoming Active PPL 5 5 3 Capacity Generation Interconnection Solar In Progress N/A N/A 8/27/2021 N/A N/A 12/31/2022 N/A N No
AH1-155 5139596 + NIPS-PJM N/A N/A Confirmed Northern Indiana Public Service Company 3 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ah1155_fea.pdf Executed Agreement and/or Study N/A N/A 8/27/2021 12/1/2021 12/1/2026 N/A PP No
AH1-155 5139596 - NIPS-PJM N/A N/A Active Northern Indiana Public Service Company 3 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ah1155_fea.pdf Executed Agreement and/or Study N/A N/A 8/27/2021 12/1/2021 12/1/2026 N/A PP No
AH1-162 + Curryville-RKB-Yellow Creek 23 kV PA Bedford Active PENELEC 16 16 11 Capacity Generation Interconnection Solar In Progress N/A N/A 8/31/2021 N/A N/A N/A N No
AH1-162 - Curryville-RKB-Yellow Creek 23 kV PA Bedford Active PENELEC 16 16 11 Capacity Generation Interconnection Solar In Progress N/A N/A 8/31/2021 N/A N/A 11/1/2023 N/A N No
AH1-163 + Millersburg 69 kV KY N/A Active EKPC 100 100 60 Capacity Generation Interconnection Solar In Progress N/A N/A 9/1/2021 N/A N/A 7/31/2025 N/A N No
AH1-163 - Millersburg - Carlisle 69 kV KY Boone Active EKPC 100 100 60 Capacity Generation Interconnection Solar In Progress N/A N/A 8/31/2021 N/A N/A 7/31/2025 N/A N No
AH1-194 + Warfordsburg – Hancock 34.5 kV PA Fulton Active APS 5 5 2.6 Capacity Generation Interconnection Solar In Progress N/A N/A 8/31/2021 N/A N/A N/A N No
AH1-194 - Warfordsburg – Hancock 34.5 kV PA Fulton Active APS 5 5 2.6 Capacity Generation Interconnection Solar In Progress N/A N/A 8/31/2021 N/A N/A 9/1/2023 N/A N No
AH1-206 + Bethelboro 138 kV PA Fayette Active APS 60 60 60 Capacity Generation Interconnection Storage In Progress N/A N/A 9/7/2021 N/A N/A N/A N No
AH1-206 - Bethelboro 138 kV PA Fayette Active APS 60 60 60 Capacity Generation Interconnection Storage In Progress N/A N/A 9/7/2021 N/A N/A 12/31/2024 N/A N No
AH1-207 + Bethelboro 25 kV-1 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A N/A N No
AH1-207 - Bethelboro 25 kV-1 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A 12/31/2023 N/A N No
AH1-208 + Bethelboro 25 kV-2 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A N/A N No
AH1-208 - Bethelboro 25 kV-2 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A 12/31/2023 N/A N No
AH1-209 + Bethelboro 25 kV-3 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A N/A N No
AH1-209 - Bethelboro 25 kV-3 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A 12/31/2023 N/A N No
AH1-210 + Bethelboro 25 kV-4 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A N/A N No
AH1-210 - Bethelboro 25 kV-4 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A 12/31/2023 N/A N No
AH1-211 + Bethelboro 25 kV-5 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A N/A N No
AH1-211 - Bethelboro 25 kV-5 PA Fayette Active APS 12 12 7.2 Capacity Generation Interconnection Solar In Progress N/A N/A 9/8/2021 N/A N/A 12/31/2023 N/A N No
AH1-212 + Bethlehem - Lilly 46 kV PA Cambria Active PENELEC 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 9/7/2021 N/A N/A N/A N No
AH1-212 - Bethlehem - Lilly 46 kV PA Cambria Active PENELEC 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 9/7/2021 N/A N/A 12/31/2022 N/A N No
AH1-217 + Kidds Store - Fork Union 115 kV II VA Fluvanna Active Dominion 57 57 34.2 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/9/2021 N/A N/A 2/1/2025 N/A N No
AH1-217 - Kidds Store - Fork Union 115 kV II VA Accomack Active Dominion 57 57 34.2 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/9/2021 N/A N/A 2/1/2025 N/A N No
AH1-232 + Wempletown 138 kV IL Winnebago Active ComEd 175 175 105 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 7/31/2025 N/A N No
AH1-232 - Wempletown 138 kV IL Winnebago Active ComEd 175 175 105 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 7/31/2025 N/A N No
AH1-257 + Broadway - RichLine Hill Solar 34.5 kV NJ Warren Active JCPL 19.3 19.25 8.085 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A N/A N No
AH1-257 - Broadway - RichLine Hill Solar 34.5 kV NJ Warren Active JCPL 19.3 19.25 8.085 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/23/2022 N/A N No
AH1-275 + Chippewa D557 8.32 kV N/A N/A Active ATSI 2 2 0 Energy Generation Interconnection In Progress N/A N/A 9/9/2021 N/A N/A 11/1/2023 N/A Y No
AH1-275 - Spence 12.47kV N/A N/A Active ATSI Energy Generation Interconnection In Progress N/A N/A 9/9/2021 N/A N/A 11/1/2023 N/A Y No
AH1-277 + Indian River 230kV DE Sussex Active DPL 1035 1035 279 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 9/9/2021 N/A N/A 10/31/2027 N/A N No
AH1-277 - Indian River 230kV DE Sussex Active DPL 1035 1035 279 Capacity Generation Interconnection Wind In Progress N/A N/A 9/9/2021 N/A N/A 10/31/2027 N/A N No
AH1-278 + Milford - Indian River/Cool Springs 230kV DE Sussex Active DPL 1035 1035 279 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 9/9/2021 N/A N/A 10/31/2027 N/A N No
AH1-278 - Milford - Indian River/Cool Springs 230kV DE Sussex Active DPL 1035 1035 279 Capacity Generation Interconnection Wind In Progress N/A N/A 9/9/2021 N/A N/A 10/31/2027 N/A N No
AH1-284 + West Willow 12 kV N/A N/A Active PPL Energy Generation Interconnection In Progress N/A N/A 9/9/2021 N/A N/A N/A Y No
AH1-284 - West Willow 12 kV PA Adams Active PPL 3 3 0 Energy Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/31/2022 N/A Y No
AH1-290 + BASF - Washburn Solar 34.5 kV NJ Warren Active JCPL 19.3 19.25 8.085 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A N/A N No
AH1-290 - BASF - Washburn Solar 34.5 kV NJ Warren Active JCPL 19.3 19.25 8.085 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 9/9/2022 N/A N No
AH1-316 + Todd 25kV MD Dorchester Active DPL 20 0 4.4 Capacity Generation Interconnection Solar In Progress N/A N/A 9/11/2021 N/A N/A 12/31/2025 N/A N No
AH1-316 - Todd 69kV MD Dorchester Active DPL 20 0 4.4 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2025 N/A N No
AH1-317 + Greene - Beatty 345 kV OH Madison Active AEP 200 200 120 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/31/2025 N/A N No
AH1-317 - Greene - Beatty 345 kV OH Madison Active Dayton 200 200 120 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/31/2025 N/A N No
AH1-344 + Sparta Solar 34.5kV N/A N/A Withdrawn JCPL Energy Generation Interconnection Withdrawn N/A N/A 9/11/2021 N/A N/A 1/4/2022 9/20/2023 N/A Y No
AH1-344 - Sparta Solar 34.5kV VA Campbell Active JCPL Energy Generation Interconnection In Progress N/A N/A 9/10/2021 N/A N/A 9/20/2023 N/A Y No
AH1-350 + Sunnyside – Carrolton 138 kV OH Stark Active AEP 92.4 92.4 55.44 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-350 - Sunneyside - Carrolton 138 kV OH Stark Active AEP 92.4 92.4 55.44 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-376 + Ronceverte - Clenden 46 kV WV Greenbrier Active APS 50 50 30 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A N/A N No
AH1-376 - Ronceverte - Clenden 46 kV WV Greenbrier Active APS 50 50 30 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-384 + Indian River 230kV DE Sussex Active DPL 1410 1410 380.7 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 9/10/2021 N/A N/A 10/31/2027 N/A N No
AH1-384 - Indian River 230kV DE Sussex Active DPL 1410 1410 380.7 Capacity Generation Interconnection Wind In Progress N/A N/A 9/10/2021 N/A N/A 10/31/2027 N/A N No
AH1-391 + Maple 138 kV IN St. Joseph Active AEP 100 100 64.1 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 7/16/2025 N/A N No
AH1-391 - Maple 138 kV IN St. Joseph Active AEP 100 100 67 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 7/16/2025 N/A N No
AH1-392 + Gravel Pit 138 kV IN St. Joseph Active AEP 90 90 57.8 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 7/16/2025 N/A N No
AH1-392 - Gravel Pit 138 kV IN St. Joseph Active AEP 90 90 60 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 7/16/2025 N/A N No
AH1-394 + Mainesburg 115 kV PA Tioga Withdrawn PENELEC 10.5 10.5 3.99 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/10/2021 N/A N/A 2/2/2022 N/A N No
AH1-394 - Mainesburg 115 kV PA Tioga Active PENELEC 10.5 10.5 3.99 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2023 N/A N No
AH1-411 + Phillipsburg - Ingersol Rand 34.5 kV NJ Warren Active JCPL 5.8 5.75 0 Energy Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A N/A N No
AH1-411 - Phillipsburg - Ingersol Rand 34.5 kV NJ Warren Active JCPL 5.8 5.75 0 Energy Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 9/8/2022 N/A N No
AH1-413 + Wayne Trace 138 kV IN Allen Active AEP 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 10/1/2025 N/A N No
AH1-413 - Fort Wayne SE 138 kV IN Allen Active AEP 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 10/1/2025 N/A N No
AH1-426A + Jones Branch 138 kV WV Nicholas Active Unknown 100 100 92.3 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A N/A N No
AH1-426A - Jones Branch 138 kV WV Nicholas Active Unknown 100 100 92.3 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2023 N/A N No
AH1-447 + Axton – Danville #2 138 kV VA Pittsylvania Active AEP 60 60 36 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A N/A N No
AH1-447 - Westover - Westfork 69 kV VA Pittsylvania Active AEP 60 60 36 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 12/2/2024 N/A N No
AH1-451 + Hopkins 138 kV WV N/A Active AEP 180 180 108 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 5/1/2025 N/A N No
AH1-451 - Hopkins Pole Creek 138 kV WV Barbour Active AEP 180 180 108 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 5/1/2025 N/A N No
AH1-458 + Hampshire - Ridgeley 138 kV 1 WV Hampshire Active APS 100 100 60 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A N/A N No
AH1-458 - Hampshire - Ridgeley 138 kV 1 WV Hampshire Active APS 100 100 60 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2024 N/A N No
AH1-459 + Hampshire - Ridgeley 138 kV 2 WV Hampshire Active APS 150 50 50 Capacity Generation Interconnection Storage In Progress N/A N/A 9/11/2021 N/A N/A N/A N No
AH1-459 - Hampshire - Ridgeley 138 kV 2 WV Hampshire Active APS 150 50 50 Capacity Generation Interconnection Storage In Progress N/A N/A 9/11/2021 N/A N/A 9/30/2024 N/A N No
AH1-460 + Hooversville - Scalp Level 115 kV PA Somerset Active PENELEC 66 66 39.6 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A N/A N No
AH1-460 - Hooversville - Scalp Level 115 kV PA Somerset Active PENELEC 66 66 39.6 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2024 N/A N No
AH1-474 + Edinboro South-Venango Junction 115 kV PA Crawford Active PENELEC 203.5 87 87 Capacity Generation Interconnection Storage In Progress N/A N/A 9/11/2021 N/A N/A N/A N No
AH1-474 - Edinboro South-Venango Junction 115 kV PA Crawford Active PENELEC 203.5 87 87 Capacity Generation Interconnection Storage In Progress N/A N/A 9/11/2021 N/A N/A 9/25/2023 N/A N No
AH1-484 + Madison - Tanners Creek 138 kV IN Henry Active AEP 267.5 115 115 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 9/24/2023 N/A N No
AH1-484 - Madison - Tanners Creek 138 kV IN Henry Active AEP 267.5 115 115 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 9/24/2023 N/A N No
AH1-506 + Oceanview Wind 3 230 kV NJ Monmouth Active JCPL 2056 730 300 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 9/10/2021 N/A N/A 12/30/2028 N/A N No
AH1-506 - Oceanview Wind 3 230 kV NJ Monmouth Active JCPL 2056 730 300 Capacity Generation Interconnection Wind In Progress N/A N/A 9/10/2021 N/A N/A 12/30/2028 N/A N No
AH1-507 + Oceanview Wind 4 230 kV NJ Monmouth Active JCPL 2786 730 300 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 9/10/2021 N/A N/A 12/30/2028 N/A N No
AH1-507 - Oceanview Wind 4 230 kV NJ Monmouth Active JCPL 2786 730 300 Capacity Generation Interconnection Wind In Progress N/A N/A 9/10/2021 N/A N/A 12/30/2028 N/A N No
AH1-540 + Byron to Wayne 345 kV IL Ogle Active ComEd 165 165 99 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 3/1/2025 N/A N No
AH1-540 - Byron to Wayne 345 kV IL Ogle Active ComEd 165 165 99 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 3/1/2025 N/A N No
AH1-552 + Chalk Point 230kV MD Prince George’s Active PEPCO 809.5 809.5 670.2 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-552 - Chalk Point 230kV MD Prince George’s Active PEPCO 804 804 670.2 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-556 + Larrabee 230 kV III NJ Monmouth Active JCPL 805.2 360 63.36 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 9/10/2021 N/A N/A 10/31/2029 N/A N No
AH1-556 - Larrabee 230 kV III NJ Monmouth Active JCPL 805.2 360 63.36 Capacity Generation Interconnection Wind In Progress N/A N/A 9/10/2021 N/A N/A 10/31/2029 N/A N No
AH1-557 + Larrabee 230 kV IV NJ Monmouth Active JCPL 1300 1300 228.8 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 9/10/2021 N/A N/A 10/31/2029 N/A N No
AH1-557 - Larrabee 230 kV IV NJ Monmouth Active JCPL 1300 1300 228.8 Capacity Generation Interconnection Wind In Progress N/A N/A 9/10/2021 N/A N/A 10/31/2029 N/A N No
AH1-560 + University Park 138 kV IL Will Active ComEd 573 250 250 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-560 - UNIV PK E.C 138 kV IL Will Active ComEd 573 250 208 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-564 + Rockford II 138 kV IL Winnebago Active ComEd 430 250 250 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-564 - Rockford 138 kV IL Winnebago Active ComEd 430 250 250 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-567 + University Park 138 kV IL Will Active ComEd 578 5 5 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-567 - UNIV PK E.C 138 kV IL Will Active ComEd 328 5 5 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-615 + Pine Creek 138 kV PA Allegheny Active DL 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 10/1/2025 N/A N No
AH1-615 - North 138 kV PA Allegheny Active DL 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 10/1/2025 N/A N No
AH1-634 + Indian River 230kV DE Sussex Active DPL 323.1 68 17.7 Capacity Generation Interconnection Offshore Wind In Progress N/A N/A 9/13/2021 N/A N/A 12/31/2024 N/A N No
AH1-634 - Indian River 230kV DE Sussex Active DPL 323.1 68 17.7 Capacity Generation Interconnection Wind In Progress N/A N/A 9/13/2021 N/A N/A 12/31/2024 N/A N No
AH1-662 + Wells 69kV DE Kent Withdrawn DPL 7.7 7.66 5.3844 Capacity Generation Interconnection Solar Withdrawn N/A N/A 10/1/2021 N/A N/A 2/15/2022 N/A N No
AH1-662 - Wells 69kV DE Kent Active DPL 7.7 7.66 5.3844 Capacity Generation Interconnection Solar In Progress N/A N/A 9/30/2021 N/A N/A 9/30/2023 N/A N No
AH1-663 + River EC 138 kV IL Cook Active ComEd 57.8 57.78 57.78 Capacity Generation Interconnection Storage In Progress N/A N/A 9/30/2021 N/A N/A 5/31/2024 N/A N No
AH1-663 - River EC Red 138 kV IL Cook Active ComEd 57.8 57.78 57.78 Capacity Generation Interconnection Storage In Progress N/A N/A 9/30/2021 N/A N/A 5/31/2024 N/A N No
AH2-013 + Cartersville 34.5 kV VA Cumberland Active Dominion 16 15.996 15.996 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 10/12/2021 N/A N/A 12/31/2022 N/A N No
AH2-014 + Crane Solar PA Adams Active PENELEC Energy Generation Interconnection Solar In Progress N/A N/A 10/15/2021 N/A N/A 12/15/2023 N/A Y No
AH2-014 - Crane Solar WV Jefferson Active PENELEC Energy Generation Interconnection In Progress N/A N/A 10/15/2021 N/A N/A 12/15/2023 N/A Y No
AH2-024 + Kodiak Solar PA Jefferson Active PENELEC 3 3 0 Energy Generation Interconnection Solar In Progress N/A N/A 10/30/2021 N/A N/A 12/15/2023 N/A Y No
AH2-036 + Young 12.47 PA Bradford Active PENELEC 5 4.99 0 Energy Generation Interconnection Solar In Progress N/A N/A 11/11/2021 N/A N/A 11/1/2023 N/A Y No
AH2-037 + Booth 12.47 PA Fulton Active APS 5 4.99 0 Energy Generation Interconnection Solar In Progress N/A N/A 11/10/2021 N/A N/A 11/1/2023 N/A Y No
AH2-040 + Blackwater 12.5 kV WV Tucker Active APS 11.5 11.5 5.7615 Capacity Generation Interconnection Solar In Progress N/A N/A 11/13/2021 N/A N/A 12/31/2024 N/A N No
AH2-042 + Marlowe 34.5 kV WV Berkeley Active APS 5.8 5.75 3.6858 Capacity Generation Interconnection Solar In Progress N/A N/A 11/13/2021 N/A N/A 12/31/2024 N/A N No
AH2-044 + Crow Solar 12.47 kV VA Caroline Active APS 5 5 0 Energy Generation Interconnection Solar In Progress N/A N/A 11/30/2021 N/A N/A 7/1/2024 N/A Y No
AH2-045 + Kerr Dam - Buggs Island 115kV VA Mecklenburg Active Dominion 40 40 40 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 12/16/2021 N/A N/A 12/15/2025 N/A N No
AH2-046 + Kerr Dam - Buggs Island 115kV VA Mecklenburg Active Dominion 60 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 12/16/2021 N/A N/A 12/15/2025 N/A N No
AH2-048 + Bayview 69kV VA Northampton Active ODEC 20 20 20 Capacity Generation Interconnection Storage In Progress N/A N/A 12/20/2021 N/A N/A N/A N No
AH2-049 + Crisfield 69kV MD Somerset Active DPL 20 20 20 Capacity Generation Interconnection Storage In Progress N/A N/A 12/20/2021 N/A N/A N/A N No
AH2-050 + Tasley 69kV VA Accomack Active ODEC 20 20 20 Capacity Generation Interconnection Storage In Progress N/A N/A 12/19/2021 N/A N/A N/A N No
AH2-051 + Edge Moore 230kV DE New Castle Active DPL 200 200 200 Capacity Generation Interconnection Storage In Progress N/A N/A 12/20/2021 N/A N/A N/A N No
AH2-052 + TBD 34kV MD Allegany Active DPL 2 1.98 0 Energy Generation Interconnection Solar In Progress N/A N/A 12/21/2021 N/A N/A 12/2/2022 N/A Y No
AH2-053 + TBD 34kV MD Wicomico Active DPL 2 1.98 0 Energy Generation Interconnection Solar In Progress N/A N/A 12/21/2021 N/A N/A 12/2/2022 N/A Y No
AH2-054 + TBD 69kV WV Berkeley Active DPL 2 1.98 0 Energy Generation Interconnection Solar In Progress N/A N/A 12/21/2021 N/A N/A 12/2/2022 N/A Y No
AH2-055 + TBD 69kV MD Unknown Active DPL 1 0.99 0 Energy Generation Interconnection Solar In Progress N/A N/A 12/22/2021 N/A N/A 2/15/2022 N/A Y No
AH2-056 + Chesterfield 230 kV II VA Chesterfield Active Dominion 60 0 36 Capacity Generation Interconnection Storage In Progress N/A N/A 12/24/2021 N/A N/A 12/1/2025 N/A N No
AH2-056 - Chesterfield 230 kV II VA Chesterfield Active Dominion 60 0 36 Capacity Generation Interconnection Storage In Progress N/A N/A 12/23/2021 N/A N/A 12/1/2025 N/A N No
AH2-057 + Scottsville - CVEC Delivery Point 46 kV VA Buckingham Active AEP 74.9 29.9 17.9 Capacity Generation Interconnection Solar In Progress N/A N/A 12/23/2021 N/A N/A 12/1/2025 N/A N No
AH2-058 + Possum Point 115 kV VA Prince William Active Dominion 30 30 30 Capacity Generation Interconnection Storage In Progress N/A N/A 12/24/2021 N/A N/A 12/1/2026 N/A N No
AH2-059 + Possum Point 115 kV II VA Prince William Active Dominion 30 30 30 Capacity Generation Interconnection Storage In Progress N/A N/A 12/24/2021 N/A N/A 12/1/2027 N/A N No
AH2-060 + Possum Point 230 kV VA Prince William Active Dominion 55 55 55 Capacity Generation Interconnection Storage In Progress N/A N/A 12/24/2021 N/A N/A 12/1/2027 N/A N No
AH2-061 + Possum Point 230 kV II VA Prince William Active Dominion 55 55 55 Capacity Generation Interconnection Storage In Progress N/A N/A 12/23/2021 N/A N/A 12/1/2028 N/A N No
AH2-062 + TBD 34kV PA Chester Active PECO 5 5 3 Capacity Generation Interconnection Solar In Progress N/A N/A 12/31/2021 N/A N/A 5/1/2023 N/A N No
AH2-063 + North Ramsey 23 kV PA Beaver Active DL 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 12/30/2021 N/A N/A 12/31/2023 N/A N No
AH2-064 + South Ramsey 23 kV PA Beaver Active DL 10 10 6 Capacity Generation Interconnection Solar In Progress N/A N/A 12/31/2021 N/A N/A 12/31/2023 N/A N No
AH2-065 + TBD 69kV MD Prince George’s Active DPL 2 1.992 0 Energy Generation Interconnection Solar In Progress N/A N/A 12/31/2021 N/A N/A 12/1/2022 N/A Y No
AH2-066 + Cross Creek Solar 12.47 kV N/A N/A Active PENELEC 5 5 0 Energy Generation Interconnection Solar In Progress N/A N/A 1/4/2022 N/A N/A 12/15/2023 N/A Y No
AH2-067 + Mount Rose 13 kV IL Cook Withdrawn Unknown Energy Generation Interconnection Withdrawn N/A N/A 1/12/2022 N/A N/A 3/8/2022 N/A Y No
AH2-068 + Pemberville - West End Fostoria 69 kV OH Wood Active AEP 100 100 60 Capacity Generation Interconnection Solar In Progress N/A N/A 1/13/2022 N/A N/A 12/31/2027 N/A N No
AH2-069 + JAckson Ferry - Progress Park 138 kV VA Wythe Active AEP 250 250 150 Capacity Generation Interconnection Solar In Progress N/A N/A 1/13/2022 N/A N/A N/A N No
AH2-070 + TBD MD Unknown Active DPL 2 1.98 0 Energy Generation Interconnection Solar In Progress N/A N/A 1/19/2022 N/A N/A N/A Y No
AH2-071 + TBD MD Unknown Active DPL 2 1.98 0 Energy Generation Interconnection Solar In Progress N/A N/A 1/19/2022 N/A N/A N/A Y No
AH2-072 + Damascus 69 kV VA Washington Active AEP 62.1 62.1 62.1 Capacity Generation Interconnection Storage In Progress N/A N/A 1/21/2022 N/A N/A N/A N No
AH2-075 + Hampton VA 2 VA City of Hampton Active Dominion 29.1 29.12 29.12 Capacity Generation Interconnection Storage In Progress N/A N/A 1/21/2022 N/A N/A N/A N No
AH2-076 + Bonneyman - Softshell 138 kV KY Perry Active AEP 52.5 52.5 48.17 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 1/26/2022 N/A N/A N/A N No
AH2-077 + Indian River 230 kV DE Sussex Active DPL 150 150 150 Capacity Generation Interconnection Storage In Progress N/A N/A 1/27/2022 N/A N/A N/A N No
AH2-078 + Dryburg - Chase City 230 kV VA Charlotte Active Dominion 99.7 99.67 59.8 Capacity Generation Interconnection Solar In Progress N/A N/A 1/27/2022 N/A N/A N/A N No
AH2-079 + VA Charlotte Withdrawn Dominion 69 69 69 Capacity Generation Interconnection Solar Withdrawn N/A N/A 1/27/2022 N/A N/A 2/28/2022 N/A N No
AH2-080 + Brodnax - Brunswick 115 kV VA Brunswick Active Dominion 98.6 98.55 59.1 Capacity Generation Interconnection Solar In Progress N/A N/A 1/27/2022 N/A N/A N/A N No
AH2-081 + Bentley Farms 69 kV OH Fayette Active Dayton 35.5 35.5 21.3 Capacity Generation Interconnection Solar In Progress N/A N/A 1/27/2022 N/A N/A N/A N No
AH2-082 + New Holland - Washington Courthouse 69 kV OH Fayette Active Dayton 33.3 33.25 19.95 Capacity Generation Interconnection Solar In Progress N/A N/A 1/27/2022 N/A N/A N/A N No
AH2-083 + Correctional VA Caroline Active Dominion 140 140 140 Capacity Generation Interconnection Storage In Progress N/A N/A 1/27/2022 N/A N/A N/A N No
AH2-084 + Sowego VA Fauquier Active Dominion 125 125 125 Capacity Generation Interconnection Storage In Progress N/A N/A 1/28/2022 N/A N/A N/A N No
AH2-086 + Byron – Wayne 345 kV IL Ogle Active ComEd 600 0 50 Capacity Generation Interconnection Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-087 + Byron - Wayne 345 kV IL Ogle Active ComEd 600 0 50 Capacity Generation Interconnection Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-088 + Byron - Wayne 345 kV IL Ogle Active ComEd 600 0 50 Capacity Generation Interconnection Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-089 + Nelson-Electric Junction 345 kV IL Lee Active ComEd 1200 0 50 Capacity Generation Interconnection Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-090 + Nelson-Electric Junction 345kV IL Lee Active ComEd 1200 0 50 Capacity Generation Interconnection Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-091 + Nelson-Electric Junction 345kV IL Lee Active ComEd 1200 0 50 Capacity Generation Interconnection Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-093 + Jasper 69 kV OH Greene Active Dayton 32 32 32 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-095 + Crawford 13.8 kV PA Crawford Active PENELEC 3.3 3.3 2 Capacity Generation Interconnection Solar In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-096 + West Cambridge - Airey 69 kV MD Dorchester Active DPL 19.5 19.5 8.19 Capacity Generation Interconnection Solar In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-102 + Blaine - Roanoke 138 kV VA Franklin Active AEP 200 200 200 Capacity Generation Interconnection Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-103 + Gans - South Union 138 kV PA Fayette Active APS 200 200 200 Capacity Generation Interconnection Storage In Progress N/A N/A 1/31/2022 N/A N/A N/A N No
AH2-104 + Willis Mts- Farmville 115kV VA Cumberland Active Dominion 72 72 39.2 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 2/3/2022 N/A N/A N/A N No
AH2-105 + TBD 34.5 kV VA Rockingham Active Dominion 16 16 9.6 Capacity Generation Interconnection Solar In Progress N/A N/A 2/3/2022 N/A N/A N/A N No
AH2-106 + Wellsville 345 kV OH Columbiana Active ATSI 1210 58 69 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 2/4/2022 N/A N/A N/A N No
AH2-109 + TBD 12.47kV NJ Unknown Active AEC 1.5 1.5 0 Energy Generation Interconnection Solar In Progress N/A N/A 2/16/2022 N/A N/A N/A Y No
AH2-111 + Hannibal 138 kV OH Monroe Active AEP 505 20 20 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 2/19/2022 N/A N/A N/A N No
R50 - Liberty - Blue Jacket 69kV OH Logan Withdrawn Dayton 48 48 9.6 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/r50_fea.pdf Document Posted Withdrawn N/A N/A 12/6/2006 N/A N/A 9/6/2007 Customer Milestone Not Met 2/15/2009 N/A N No
V3-009 + Desoto-Tanners Creek #2 345kV IN Randolph Withdrawn AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/v3009_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/v3009_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/v3009_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 8/10/2009 N/A N/A 6/3/2016 Customer Milestone Not Met 5/19/2019 5/19/2019 N/A N No
V3-009 - Desoto-Tanners Creek #2 345kV IN Randolph Withdrawn AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/v3009_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/v3009_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/v3009_fac.pdf Document Posted Withdrawn N/A N/A N/A 8/10/2009 N/A N/A 6/3/2016 Customer Milestone Not Met 5/19/2019 5/19/2019 N/A N No
W3-135 + Goose Lake 34.5kV Dresden Island Lock & Dam IL Grundy Withdrawn ComEd 12.1 12.1 12.1 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/w3135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/w3135_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/w3135_wmpa.pdf Not Required N/A N/A 10/29/2010 N/A N/A 10/1/2022 2/21/2022 1/31/2022 1/31/2022 N/A N No
W3-135 - Goose Lake 34.5kV Dresden Island Lock & Dam IL Grundy Engineering and Procurement ComEd 12.1 12.1 12.1 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/w3135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/w3135_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/w3135_wmpa.pdf Not Required N/A N/A 10/29/2010 N/A N/A 10/1/2022 1/31/2022 1/31/2022 N/A N No
X1-082 + Hazen Switch Point-Warren 34kV Quarry Road Solar Farm NJ Warren Withdrawn JCPL 12 12 4.56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/x1082_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/x1082_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/x1082_wmpa.pdf Withdrawn N/A N/A 4/28/2011 N/A N/A 4/29/2016 Customer Milestone Not Met 12/31/2014 12/31/2014 N/A N No
X1-082 - Hazen Switch Point-Warren 34kV Quarry Road Solar Farm NJ Warren Withdrawn JCPL 12 12 4.56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/x1082_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/x1082_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/x1082_wmpa.pdf Not Required N/A N/A 4/28/2011 N/A N/A 4/29/2016 Customer Milestone Not Met 12/31/2014 12/31/2014 N/A N No
X3-051 + Flatlick 765kV OH Unknown Withdrawn AEP 1460 610 610 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/x3051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/x3051_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/x3051_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 9/27/2011 N/A N/A 5/23/2016 Customer Milestone Not Met 3/1/2017 3/1/2017 N/A N No
X3-051 - Flatlick 765kV OH Unknown Withdrawn AEP 1460 610 610 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/x3051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/x3051_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/x3051_fac.pdf Document Posted Withdrawn N/A N/A N/A 9/27/2011 N/A N/A 5/23/2016 Customer Milestone Not Met 3/1/2017 3/1/2017 N/A N No
Z1-035 + Lake Road 11.5 kV OH Unknown Withdrawn ATSI 18 18 2.34 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/z1035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z1035_imp.pdf Document Posted Not Required Withdrawn N/A Not Required N/A N/A 7/5/2013 N/A N/A 2/7/2022 9/30/2017 N/A N No
Z1-035 - Lake Road 11.5 kV OH Unknown Active ATSI 18 18 2.34 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/z1035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z1035_imp.pdf Document Posted Not Required Not Required N/A N/A 7/5/2013 N/A N/A 9/30/2017 N/A N No
Z1-109 + Tosco-VFT 230kV NJ Union Withdrawn PSEG 208 208 208 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/z1109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z1109_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/z1109_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 10/31/2013 N/A N/A 3/16/2016 Customer Initiated Withdrawal 6/30/2016 N/A N No
Z1-109 - Tosco-VFT 230kV NJ Union Withdrawn PSEG 208 208 208 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/z1109_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z1109_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/z1109_fac.pdf Document Posted Withdrawn N/A N/A N/A 10/31/2013 N/A N/A 3/16/2016 Customer Initiated Withdrawal 6/30/2016 N/A N No
Z2-009 + East Hazelton-Harwood 69kV PA Luzerne Withdrawn PPL 52 52 6.7 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/z2009_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2009_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/z2009_fac.pdf Document Posted Withdrawn N/A Withdrawn N/A N/A 12/23/2013 N/A N/A 1/14/2016 Customer Initiated Withdrawal 12/31/2016 N/A N No
Z2-009 - East Hazelton-Harwood 69kV PA Luzerne Withdrawn PPL 52 52 6.7 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/z2009_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2009_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/z2009_fac.pdf Document Posted Withdrawn N/A N/A N/A 12/23/2013 N/A N/A 1/14/2016 Customer Initiated Withdrawal 12/31/2016 N/A N No
Z2-077 + Worcester North 25kV Worcester North MD Worcester In Service DPL 6 6 3.99 5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/z2077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2077_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/z2077_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/z2077_wmpa.pdf Not Required N/A N/A 4/22/2014 N/A N/A 12/31/2018 12/31/2018 3/15/2019 N/A N No
Z2-077 - Worcester North 25kV Worcester North MD Worcester In Service DPL 6 6 3.99 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/z2077_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2077_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/z2077_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/z2077_wmpa.pdf Not Required N/A N/A 4/22/2014 N/A N/A 12/31/2018 12/31/2018 3/15/2019 N/A N No
Z2-107 + East Carbondale-Lackawanna 69kV Waymart Battery Energy Storage System PA Wayne Suspended PPL 10 10 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/z2107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2107_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/z2107_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/z2_107_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/z2_107_csa.pdf Document Posted N/A N/A 4/30/2014 N/A N/A 12/15/2023 12/15/2020 12/15/2020 N/A N No
Z2-107 - East Carbondale-Lackawanna 69kV Waymart Battery Energy Storage System PA Wayne Suspended PPL 10 10 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/z2107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2107_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/z2107_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/z2_107_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/z2_107_csa.pdf Document Posted N/A N/A 4/30/2014 N/A N/A 12/15/2020 12/15/2020 N/A N No