Changes in PJM Queue between December 13th, 2021 and December 20th, 2021.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

Summary of Changes

##   old_obs   new_obs   changes additions  removals 
##      8101      8102        35         1         0

Changes

## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
AC1-107 + Chickahominy 500kV Chickahominy Power VA Charles City Withdrawn Dominion 1600 1600 1600 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1107_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1107_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_107_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_107_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 3/1/2024 12/14/2021 3/1/2024 3/1/2024 N/A N No
AC1-107 - Chickahominy 500kV Chickahominy Power VA Charles City Engineering and Procurement Dominion 1600 1600 1600 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1107_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1107_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_107_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_107_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 3/1/2024 3/1/2024 3/1/2024 N/A N No
AD1-101 + Continental 69 kV Blue Harvest Solar Park OH Putnam Engineering and Procurement AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_101_csa.pdf Document Posted N/A N/A 9/21/2017 N/A N/A 1/31/2023 1/31/2023 N/A N No
AD1-101 - Continental 69 kV Blue Harvest Solar Park OH Putnam Engineering and Procurement AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa2.pdf Interim Study N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_101_csa.pdf Document Posted N/A N/A 9/21/2017 N/A N/A 1/31/2023 1/31/2023 N/A N No
AD2-033 + Chase City-Lunenburg 115 kV VA Lunenburg Active Dominion 130 130 78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2033_imp.pdf Document Posted In Progress N/A N/A 12/22/2017 N/A N/A 10/31/2020 N/A N No
AD2-033 - Chase City-Lunenburg 115 kV VA Lunenburg Active Dominion 130 130 78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2033_imp.pdf Document Posted In Progress N/A N/A 12/22/2017 N/A N/A 10/31/2020 N/A N No
AD2-047 + Davis Creek 138 kV IL Kankakee Active ComEd 200 200 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2047_imp.pdf Document Posted In Progress N/A N/A 1/30/2018 N/A N/A 9/30/2020 N/A N No
AD2-047 - Davis Creek 138 kV IL Kankakee Active ComEd 200 200 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2047_imp.pdf Document Posted N/A N/A 1/30/2018 N/A N/A 9/30/2020 N/A N No
AD2-066 + Mazon-Crescent Ridge 138 kV IL Grundy Active ComEd 116 116 69.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2066_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2066_imp.pdf Document Posted In Progress N/A N/A 2/28/2018 N/A N/A 9/1/2020 N/A N No
AD2-066 - Mazon-Crescent Ridge 138 kV IL Grundy Active ComEd 116 116 69.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2066_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2066_imp.pdf Document Posted N/A N/A 2/28/2018 N/A N/A 9/1/2020 N/A N No
AD2-100 + Kincaid-Pana 345 kV IL Christian Active ComEd 210 210 126 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2100_imp.pdf Document Posted In Progress N/A N/A 3/21/2018 N/A N/A 12/31/2021 N/A N No
AD2-100 - Kincaid-Pana 345 kV IL Christian Active ComEd 210 210 126 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2100_imp.pdf Document Posted N/A N/A 3/21/2018 N/A N/A 12/31/2021 N/A N No
AE1-114 + Maryland-Lancaster 138 kV IL Ogle Active ComEd 150 150 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1114_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1114_imp.pdf Document Posted N/A N/A 9/13/2018 N/A N/A 12/31/2021 N/A N No
AE1-114 - Maryland-Lancaster 138 kV IL Ogle Active ComEd 150 150 34 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1114_fea.pdf Document Posted In Progress N/A N/A 9/13/2018 N/A N/A 12/31/2021 N/A N No
AE1-166 + Loretto-Wilton & Braidwood-Davis Creek IL Kankakee Active ComEd 150 150 78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1166_imp.pdf Document Posted N/A N/A 9/24/2018 N/A N/A 9/30/2020 N/A N No
AE1-166 - Loretto-Wilton & Braidwood-Davis Creek IL Kankakee Active ComEd 150 150 78 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1166_fea.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 9/30/2020 N/A N No
AE1-194 + Crete 345 kV IL Will Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1194_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-194 - Crete 345 kV IL Will Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1194_fea.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-198 + Crete 345 kV IL McHenry Active ComEd 357 357 193 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1198_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1198_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-198 - Crete 345 kV IL McHenry Active ComEd 357 357 193 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1198_fea.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-205 + McLean 345 kV IL Livingston Active ComEd 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1205_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1205_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 12/31/2022 N/A N No
AE1-205 - McLean 345 kV IL Livingston Active ComEd 200 200 84 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1205_fea.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 12/31/2022 N/A N No
AE2-297 + Madison-Tanners Creek 138 kV IN Henry Active AEP 152.5 152.5 91.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2297_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2297_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2297_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae2_297_isa2.pdf Interim Study N/A N/A N/A 4/22/2021 3/22/2019 N/A N/A 9/30/2022 9/30/2022 N/A N No
AE2-297 - Madison-Tanners Creek 138 kV IN Henry Active AEP 152.5 152.5 91.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2297_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2297_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_297_isa2.pdf Interim Study N/A N/A N/A 4/22/2021 3/22/2019 N/A N/A 9/30/2022 9/30/2022 N/A N No
AE2-345 + Hunterstown-Texas Eastern Tap 115 kV PA Adams Active ME 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2345_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2345_imp.pdf Document Posted In Progress N/A N/A 3/13/2019 N/A N/A 10/1/2021 N/A N No
AE2-345 - Hunterstown-Texas Eastern Tap 115 kV PA Adams Active ME 97.5 97.5 58.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2345_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2345_imp.pdf Document Posted In Progress N/A N/A 3/13/2019 N/A N/A 10/1/2021 N/A N No
AF1-086 + Madera-Westover South 115 kV PA Clearfield Active PENELEC 109.9 109.9 20.54 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1086_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1086_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_086_isa2.pdf Interim Study N/A N/A N/A 8/30/2019 N/A N/A 12/31/2022 N/A N No
AF1-086 - Madera-Westover South 115 kV PA Clearfield Active PENELEC 109.9 109.9 20.54 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/af1086_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1086_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 12/31/2022 N/A N No
AG1-013 + Ladysmith CT-St. Johns 230 kV VA Caroline Active Dominion 120 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1013_imp.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 6/30/2022 N/A N No
AG1-013 - Ladysmith CT-St. Johns 230 kV VA Caroline Active Dominion 120 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1013_imp.pdf Document Posted In Progress Withdrawn N/A Withdrawn N/A N/A 5/8/2020 N/A N/A 6/30/2022 N/A N No
AG1-047 + Jay 138 kV IN Jay Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1047_imp.pdf Document Posted In Progress N/A N/A 7/13/2020 N/A N/A 10/1/2023 N/A N No
AG1-047 - Jay 138 kV IN Jay Active AEP 100 100 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1047_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1047_imp.pdf Document Posted N/A N/A 7/13/2020 N/A N/A 10/1/2023 N/A N No
AG1-499 + Lambs 12.47 kV Esky Solar Project NJ Gloucester Engineering and Procurement AEC 10 10 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1499_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1499_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1499_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1499_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 6/1/2024 6/1/2024 N/A N No
AG1-499 - Lambs 12.47 kV NJ Gloucester Active AEC 10 10 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1499_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1499_imp.pdf Document Posted Not Required Not Required N/A N/A 9/30/2020 N/A N/A 9/30/2020 N/A N No
AH1-132 + Double Toll Gate - Strasburg 34.5 kV VA Frederick Active APS 14.4 14.4 14.4 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 8/23/2021 N/A N/A 1/1/2022 N/A N No
AH1-132 - Double Toll Gate - Strasburg 34.5 kV VA Frederick Active APS 14.4 14.4 4 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 8/23/2021 N/A N/A 1/1/2022 N/A N No
AH1-145 + Peter’s Mountain 138 kV VA Giles Active AEP 200 80 80 Capacity Generation Interconnection Storage In Progress N/A N/A 8/26/2021 N/A N/A 12/31/2024 N/A N No
AH1-145 - Peter’s Mountain 138 kV VA Giles Active AEP 200 80 16 Capacity Generation Interconnection Storage In Progress N/A N/A 8/26/2021 N/A N/A 12/31/2024 N/A N No
AH1-172 + Wolf Glade 34.5 kV VA Carroll Active AEP 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 8/31/2021 N/A N/A 12/31/2022 N/A N No
AH1-172 - Cliffview 34.5 kV VA Carroll Active AEP 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 8/31/2021 N/A N/A 12/31/2022 N/A N No
AH1-232 + Wempletown 138 kV IL Winnebago Active ComEd 175 175 105 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 7/31/2025 N/A N No
AH1-232 - Roscoe Bert (TSS-163) 138 kV IL Winnebago Active ComEd 175 175 105 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 7/31/2025 N/A N No
AH1-233 + Wempletown 138 kV IL Winnebago Active ComEd 175 0 70 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 7/31/2025 N/A N No
AH1-233 - Roscoe Bert (TSS-163) 138 kV IL Winnebago Active ComEd 175 0 70 Capacity Generation Interconnection Storage In Progress N/A N/A 9/9/2021 N/A N/A 7/31/2025 N/A N No
AH1-236 + Bane 69 kV OH Carroll Active AEP 8 8 0 Energy Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/31/2023 N/A N No
AH1-236 - Augusta Compressor Facility 69 kV OH Carroll Active AEP 8 8 0 Energy Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/31/2023 N/A N No
AH1-274 + Monroe – North Central 69kV NJ Gloucester Active AEC 16.7 16.7 7.014 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/23/2022 N/A N No
AH1-274 - TBD 69kV NJ Gloucester Active AEC 16.7 16.7 7.014 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/23/2022 N/A N No
AH1-333 + Miller - Canal 69kV OH Butler Active DEOK 48 48 28.8 Capacity Generation Interconnection Solar In Progress N/A N/A 9/11/2021 N/A N/A 4/26/2024 N/A N No
AH1-333 - Miller 69kV OH Butler Active DEOK 48 48 28.8 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 4/26/2024 N/A N No
AH1-371 + Universal 12 kV PA Allegheny Withdrawn DL 13 13 8.1 Capacity Generation Interconnection Solar Withdrawn N/A N/A 9/10/2021 N/A N/A 12/15/2021 6/3/2024 N/A N No
AH1-371 - Universal 12 kV PA Allegheny Active DL 13 13 8.1 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 6/3/2024 N/A N No
AH1-382 + Van Arsdell 69 kV KY Mercer Active EKPC 20 20 17 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 3/10/2025 N/A N No
AH1-382 - Van Arsdell 69 kV KY Mercer Active EKPC 20 20 16 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 3/10/2025 N/A N No
AH1-491 + Union City 34.5 kV PA Erie Active PENELEC 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 7/30/2024 N/A N No
AH1-491 - Union City - Erie South 34.5 kV PA Erie Active PENELEC 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 7/30/2024 N/A N No
AH1-526 + South Canton - Sammis 345 kV OH Carroll Active ATSI 80 80 80 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 10/31/2025 N/A N No
AH1-526 - South Canton - Sammis 345 kV OH Carroll Active ATSI 80 80 33.6 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 10/31/2025 N/A N No
AH1-563 + Aurora E.C. 138kV IL N/A Active ComEd 1306 250 250 Capacity Generation Interconnection Storage In Progress N/A N/A 9/11/2021 N/A N/A 6/1/2025 N/A N No
AH1-563 - AURORA EC;RP 138kV IL N/A Active ComEd 1306 250 250 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 6/1/2025 N/A N No
AH1-587 + Farmers Valley – Ridgeway 115 kV PA McKean Active PENELEC 200 200 120 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/16/2024 N/A N No
AH1-587 - Farmers Valley – Ridgeway 115 kV PA McKean Active PENELEC 240 240 144 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/16/2024 N/A N No
AH1-611 + Perkiomenville 34.5kV PA Montgomery Active PECO 7.5 7.5 5 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 6/30/2024 N/A N No
AH1-611 - Schwenksville 34.5kV PA Montgomery Active PECO 7.5 7.5 5 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 6/30/2024 N/A N No
AH1-630 + Penns Tap-Richfield Tie 69 kV V PA Snyder Active PPL 35 15 15 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/11/2021 N/A N/A 9/25/2023 N/A N No
AH1-630 - Penns Tap-Richfield Tie 69 k VV PA Snyder Active PPL 35 15 15 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/11/2021 N/A N/A 9/25/2023 N/A N No
AH1-641 + Churchtown - Upper Pittsgrove 138kV NJ Salem Active AEC 65 15 15 Capacity Generation Interconnection Solar In Progress N/A N/A 9/14/2021 N/A N/A 12/31/2023 N/A N No
AH1-641 - Deepwater - Upper Pittsgrove 138kV NJ Salem Active AEC 65 15 15 Capacity Generation Interconnection Solar In Progress N/A N/A 9/14/2021 N/A N/A 12/31/2023 N/A N No
AH1-661 + Philo – Cannelville Switch 138 kV OH Muskingum Active AEP 15.3 15.32 15.32 Capacity Generation Interconnection Other In Progress N/A N/A 9/29/2021 N/A N/A 7/1/2023 N/A N No
AH1-661 - Philo - Cannelville 138 kV OH Muskingum Active AEP 15.3 15.32 15.32 Capacity Generation Interconnection Other In Progress N/A N/A 9/29/2021 N/A N/A 7/1/2023 N/A N No
AH2-047 5157311 + PJM-TVA N/A N/A Active Energy Long-Term Firm Transmission N/A N/A 12/15/2021 3/1/2022 3/1/2027 N/A PP No