Changes in PJM Queue between December 7th, 2021 and December 13th, 2021.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

Summary of Changes

##   old_obs   new_obs   changes additions  removals 
##      8094      8101        41         7         0

Changes

## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
AB1-096 + Carroll-Mt. Airy 34.5kV Union Bridge Solar Facility MD Carroll Under Construction APS 9.9 8.2 3.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf Document Posted N/A N/A 10/7/2015 N/A N/A 1/28/2022 11/1/2021 11/1/2021 N/A N No
AB1-096 - Carroll-Mt. Airy 34.5kV Union Bridge Solar Facility MD Carroll Engineering and Procurement APS 9.9 8.2 3.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1096_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1096_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab1_096_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_096_csa.pdf Document Posted N/A N/A 10/7/2015 N/A N/A 1/28/2022 11/1/2021 11/1/2021 N/A N No
AB1-141 + Church-Wye Mills 138 kV I Pondtown Solar 1 MD Queen Anne’s Under Construction DPL 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1141_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1141_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_141_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_141_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 9/23/2022 12/31/2023 12/31/2023 N/A N No
AB1-141 - Church-Wye Mills 138 kV I Bluegrass Solar MD Queen Anne’s Engineering and Procurement DPL 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1141_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1141_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_141_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_141_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 6/1/2022 12/31/2023 12/31/2023 N/A N No
AB1-142 + Church-Wye Mills 138 kV II Pondtown Solar 1 MD Queen Anne’s Under Construction DPL 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1142_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1142_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1142_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_142_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_142_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 9/23/2022 12/31/2023 12/31/2023 N/A N No
AB1-142 - Church-Wye Mills 138 kV II Bluegrass Solar MD Queen Anne’s Engineering and Procurement DPL 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1142_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1142_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1142_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_142_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_142_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 6/1/2022 12/31/2023 12/31/2023 N/A N No
AB2-032 + Church-Wye Mills 138 kV Pondtown Solar 2 MD Queen Anne’s Under Construction DPL 20 20 13.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2032_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2032_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2032_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_032_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_032_csa.pdf Document Posted N/A N/A 2/11/2016 N/A N/A 9/23/2022 12/31/2023 12/31/2023 N/A N No
AB2-032 - Church-Wye Mills 138 kV Bluegrass Solar MD Queen Anne’s Engineering and Procurement DPL 20 20 13.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2032_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2032_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2032_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_032_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_032_csa.pdf Document Posted N/A N/A 2/11/2016 N/A N/A 6/1/2022 12/31/2023 12/31/2023 N/A N No
AB2-153 + Church-Wye Mills 138 kV Pondtown Solar 2 MD Queen Anne’s Under Construction DPL 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2153_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2153_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2153_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_153_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_153_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 9/23/2022 12/31/2023 12/31/2023 N/A N No
AB2-153 - Church-Wye Mills 138 kV Bluegrass Solar MD Queen Anne’s Engineering and Procurement DPL 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2153_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2153_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2153_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_153_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_153_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 6/1/2022 12/31/2023 12/31/2023 N/A N No
AC1-221 + Halifax-Person 230kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 29.2 29.2 14.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/16/2022 12/16/2022 N/A N No
AC1-221 - Halifax-Person 230kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 29.2 29.2 14.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 1/1/2022 12/16/2022 12/16/2022 N/A N No
AC2-079 + Ivor-Oak Ridge 115kV Windsor PVI VA Isle of Wight Suspended Dominion 85 85 32.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_079_csa.pdf Document Posted N/A N/A 2/28/2017 N/A N/A 6/1/2022 6/1/2022 N/A N No
AC2-079 - Ivor-Oak Ridge 115kV Windsor PVI VA Isle of Wight Engineering and Procurement Dominion 85 85 32.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_079_csa.pdf Document Posted N/A N/A 2/28/2017 N/A N/A 6/1/2022 6/1/2022 N/A N No
AD1-015 + Frazeysburg 138 kV Muskingum Solar OH Muskingum Engineering and Procurement AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_015_csa.pdf Document Posted N/A N/A 4/21/2017 N/A N/A 12/31/2023 12/31/2023 N/A N No
AD1-015 - Frazeysburg 138 kV Muskingum Solar OH Muskingum Engineering and Procurement AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_015_isa.pdf Document Posted N/A N/A N/A 4/21/2017 N/A N/A 12/31/2023 12/31/2023 N/A N No
AD1-033 + Fentress-Landstown 230 kV Bedford Solar Center VA City of Chesapeake In Service Dominion 70 70 42 70 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1033_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1033_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_033_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_033_csa.pdf Document Posted N/A N/A 7/26/2017 N/A N/A 12/31/2021 12/1/2021 12/1/2021 11/23/2021 N/A N No
AD1-033 - Fentress-Landstown 230 kV Bedford Solar Center VA City of Chesapeake Partially in Service - Under Construction Dominion 70 70 42 14 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1033_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1033_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_033_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_033_csa.pdf Document Posted N/A N/A 7/26/2017 N/A N/A 12/31/2021 12/1/2021 12/1/2021 9/17/2021 N/A N No
AD1-081 + Beatty-London 138 kV Big Plain 2 OH Madison Engineering and Procurement ATSI 196 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1081_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1081_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1081_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_081_isa.pdf Document Posted N/A Not Required N/A N/A 9/5/2017 N/A N/A 3/31/2023 3/31/2023 N/A N No
AD1-081 - Beatty-London 138 kV OH Madison Active ATSI 196 20 13.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1081_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1081_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1081_fac.pdf Document Posted N/A N/A 9/5/2017 N/A N/A 6/1/2020 N/A N No
AD1-101 + Continental 69 kV Blue Harvest Solar Park OH Putnam Engineering and Procurement AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa2.pdf Interim Study N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_101_csa.pdf Document Posted N/A N/A 9/21/2017 N/A N/A 1/31/2023 1/31/2023 N/A N No
AD1-101 - Continental 69 kV OH Putnam Active AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa2.pdf Interim Study N/A N/A N/A 9/21/2017 N/A N/A 10/31/2020 N/A N No
AD2-048 + Cynthia-Headquarters 69 kV Blue Moon Solar KY Harrison Engineering and Procurement EKPC 70 70 46.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2048_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2048_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_048_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_048_csa.pdf Document Posted N/A N/A 1/31/2018 N/A N/A 9/30/2024 9/30/2024 N/A N No
AD2-048 - Cynthia-Headquarters 69 kV KY Harrison Active EKPC 70 70 46.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2048_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2048_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2048_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/csa/ad2_048_csa.pdf Document Posted N/A N/A 1/31/2018 N/A N/A 6/1/2020 N/A N No
AD2-073 + Sanders DP 230 kV Woodbine Road Solar VA Westmoreland In Service Dominion 19.9 19.92 13.32 19.92 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2073_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2073_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad2073_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad2073_wmpa.pdf Not Required N/A N/A 3/14/2018 N/A N/A 12/1/2021 12/1/2021 9/2/2021 N/A N No
AD2-073 - Sanders DP 230 kV Woodbine Road Solar VA Westmoreland Partially in Service - Under Construction Dominion 19.9 19.92 13.32 19.92 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2073_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2073_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad2073_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad2073_wmpa.pdf Not Required N/A N/A 3/14/2018 N/A N/A 12/1/2021 12/1/2021 9/2/2021 N/A N No
AD2-194 + Elwood IL Will Active ComEd 1260.9 60 120 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2194_imp.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 3/1/2022 N/A N No
AD2-194 - Elwood IL Will Active ComEd 1260.9 60 120 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2194_fea.pdf Document Posted In Progress N/A N/A 3/30/2018 N/A N/A 3/1/2022 N/A N No
AE1-035 + Earleys 230 kV Aulander Holloman Solar Park NC Hertford In Service Dominion 99.9 19.9 13.4 19.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1035_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_035_isa.pdf Document Posted N/A Not Required N/A N/A 6/8/2018 N/A N/A 6/1/2020 6/1/2020 2/24/2020 N/A N No
AE1-035 - Earleys 230 kV Aulander Holloman Solar Park NC Hertford Partially in Service - Under Construction Dominion 100 20 13.4 19.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1035_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_035_isa.pdf Document Posted N/A Not Required N/A N/A 6/8/2018 N/A N/A 6/1/2020 6/1/2020 2/24/2020 N/A N No
AE1-040 + Greenfield 69 kV OH Fayette Active Dayton 48 48 31.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1040_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1040_fac.pdf Document Posted N/A N/A 6/25/2018 N/A N/A 7/1/2022 7/1/2022 N/A N No
AE1-040 - Greenfield 69 kV OH Fayette Active Dayton 48 48 31.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1040_imp.pdf Document Posted In Progress N/A N/A 6/25/2018 N/A N/A 7/1/2022 7/1/2022 N/A N No
AE1-070 + Elwood 345 kV IL Will Active ComEd 1485 135 135 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1070_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1070_imp.pdf Document Posted N/A N/A 7/31/2018 N/A N/A 12/31/2020 N/A N No
AE1-070 - Elwood 345 kV IL Will Active ComEd 1485 135 135 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1070_fea.pdf Document Posted In Progress N/A N/A 7/31/2018 N/A N/A 12/31/2020 N/A N No
AE1-134 + Nelson 345 kV IL Lee Active ComEd 609 9 24.4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1134_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1134_imp.pdf Document Posted N/A N/A 9/24/2018 N/A N/A 12/31/2018 N/A N No
AE1-134 - Nelson 345 kV IL Lee Active ComEd 640 9 24.4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1134_fea.pdf Document Posted In Progress N/A N/A 9/24/2018 N/A N/A 12/31/2018 N/A N No
AE1-193 + Crete 345 kV IL Henry Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1193_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1193_imp.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE1-193 - Crete 345 kV IL Henry Active ComEd 500 500 65 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1193_fea.pdf Document Posted In Progress N/A N/A 9/26/2018 N/A N/A 9/1/2021 N/A N No
AE2-029 + Grottoes-Merck 115kV VA Rockingham Active Dominion 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2029_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2029_fac.pdf Document Posted N/A N/A 12/27/2018 N/A N/A 12/30/2022 N/A N No
AE2-029 - Grottoes-Merck 115kV VA Rockingham Active Dominion 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2029_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2029_imp.pdf Document Posted In Progress N/A N/A 12/27/2018 N/A N/A 12/30/2022 N/A N No
AE2-104 + Suffolk 115 kV VA Accomack Active Dominion 49 49 18.92 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2104_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 11/30/2021 N/A N No
AE2-104 - Suffolk 115 kV VA Accomack Active Dominion 49 49 18.92 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2104_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2104_imp.pdf Document Posted In Progress N/A N/A 2/28/2019 N/A N/A 11/30/2021 N/A N No
AE2-282 + East Fayette 138 kV OH Fulton Active ATSI 67 67 43.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2282_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2282_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_282_isa2.pdf Interim Study N/A N/A N/A 12/1/2022 3/29/2019 N/A N/A 3/1/2023 9/15/2021 N/A N No
AE2-282 - East Fayette 138 kV OH Fulton Engineering and Procurement ATSI 67 67 43.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2282_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2282_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ae2_282_isa2.pdf Interim Study N/A N/A N/A 3/29/2019 N/A N/A 9/15/2021 N/A N No
AE2-309 + Carlos Junction-Lonaconing 34.5 kV MD Allegany Active APS 19.8 19.84 16.66 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2309_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2309_imp.pdf Document Posted Not Required Not Required N/A N/A 3/29/2019 N/A N/A 10/30/2020 N/A N No
AE2-309 - Carlos Junction-Lonaconing 34.5 kV MD Allegany Active APS 19.8 19.84 16.66 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2309_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2309_imp.pdf Document Posted In Progress N/A N/A 3/29/2019 N/A N/A 10/30/2020 N/A N No
AF1-141 + Varner 138 kV IN DeKalb Active AEP 96 96 62.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1141_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af1_141_isa2.pdf Interim Study N/A N/A N/A 8/30/2019 N/A N/A 5/31/2022 N/A N No
AF1-141 - Varner 138 kV IN DeKalb Active AEP 96 96 62.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af1141_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af1141_imp.pdf Document Posted In Progress N/A N/A 8/30/2019 N/A N/A 5/31/2022 N/A N No
AG1-013 + Ladysmith CT-St. Johns 230 kV VA Caroline Active Dominion 120 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1013_imp.pdf Document Posted In Progress Withdrawn N/A Withdrawn N/A N/A 5/8/2020 N/A N/A 6/30/2022 N/A N No
AG1-013 - Ladysmith CT-St. Johns 230 kV VA Caroline Active Dominion 120 0 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1013_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1013_imp.pdf Document Posted In Progress N/A N/A 5/8/2020 N/A N/A 6/30/2022 N/A N No
AG1-040 + Morgan Street-Mount Hope 34.5 kV PA Crawford Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1040_imp.pdf Document Posted In Progress N/A N/A 6/19/2020 N/A N/A 12/1/2022 N/A N No
AG1-040 - Morgan Street-Mount Hope 34.5 kV PA Crawford Active PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1040_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1040_imp.pdf Document Posted N/A N/A 6/19/2020 N/A N/A 12/1/2022 N/A N No
AG1-502 + Oak Green 115 kV VA Orange Active Dominion 80 80 64 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1502_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-502 - Oak Green 115 kV VA Orange Active Dominion 80 80 64 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1502_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-503 + Oak Green 115 kV VA Orange Active Dominion 20 20 16 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1503_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-503 - Oak Green 115 kV VA Orange Active Dominion 20 20 16 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1503_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG2-422 + Bustleton 13 kV Burlington Energy Storage N/A N/A Engineering and Procurement PSEG 1.2 1.2 0 Energy Generation Interconnection https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2422_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2422_imp.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag2422_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag2422_wmpa.pdf Not Required N/A N/A 3/31/2021 N/A N/A 12/12/2023 12/12/2023 N/A Y No
AG2-422 - Bustleton 13 kV N/A N/A Active PSEG 1.2 1.2 0 Energy Generation Interconnection https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2422_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2422_imp.pdf Document Posted Not Required N/A N/A 3/31/2021 N/A N/A 12/31/2022 N/A Y No
AH1-258 + Belford - Keansburg 34.5 kV NJ Monmouth Active JCPL 19.3 19.25 8.085 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/23/2022 N/A N No
AH1-258 - Taylor Lane 34.5 kV-1 NJ Monmouth Active JCPL 19.3 19.25 8.085 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/23/2022 N/A N No
AH1-299 + Coventry 138 kV IN Allen Withdrawn AEP 100 100 100 Capacity Generation Interconnection Storage Withdrawn N/A N/A 9/10/2021 N/A N/A 12/7/2021 12/31/2025 N/A N No
AH1-299 - Coventry 138 kV IN Allen Active AEP 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2025 N/A N No
AH1-300 + Hacienda 138 kV IN Allen Active AEP 50 50 50 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2025 N/A N No
AH1-300 - Hacienda 138 kV IN Allen Active AEP 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2025 N/A N No
AH1-314 + East Danville 138 kV VA Pittsylvania Active AEP 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/11/2021 N/A N/A 12/31/2025 N/A N No
AH1-314 - East Danville 138 kV VA Pittsylvania Active AEP 100 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2025 N/A N No
AH1-324 + Hopewell – Surry 230 kV VA Surry Active Dominion 80 80 48 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/31/2025 N/A N No
AH1-324 - Floyd - Alum Ridge 138 kV VA Floyd Active AEP 80 80 48 Capacity Generation Interconnection Solar In Progress N/A N/A 9/9/2021 N/A N/A 12/31/2025 N/A N No
AH1-414 + Leslie - Pineville 161 kV KY Leslie Active TVA 80 80 80 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/11/2021 N/A N/A 10/1/2025 N/A N No
AH1-414 - Leslie - Pineville 161 kV KY Leslie Active AEP 80 80 80 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 9/10/2021 N/A N/A 10/1/2025 N/A N No
AH1-514 + Philipsburg - Emeigh 12.47 kV-1 PA Clearfield Active PENELEC 5 5 3.4 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/29/2023 N/A N No
AH1-514 - Philipsburg - Shawville 13.2 kV-1 PA Clearfield Active PENELEC 5 5 3.4 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/29/2023 N/A N No
AH1-515 + Philipsburg - Emeigh 12.47 kV-2 PA Clearfield Active PENELEC 5 5 2.7 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/29/2023 N/A N No
AH1-515 - Philipsburg - Shawville 13.2 kV-2 PA Clearfield Active PENELEC 5 5 2.7 Capacity Generation Interconnection Solar In Progress N/A N/A 9/10/2021 N/A N/A 12/29/2023 N/A N No
AH2-001 + Rattlesnake Hill Waste Heat Recovery PA Susquehanna Active PENELEC 3.6 3.6 2.9 Capacity Generation Interconnection Other In Progress N/A N/A 10/1/2021 N/A N/A 12/31/2023 N/A N No
AH2-011 + National-Tangy 138kV OH Madison Active ATSI 177 100 60 Capacity Generation Interconnection Solar In Progress N/A N/A 10/8/2021 N/A N/A 12/31/2024 N/A N No
AH2-014 + Crane Solar WV Jefferson Active PENELEC Energy Generation Interconnection In Progress N/A N/A 10/15/2021 N/A N/A 12/15/2023 N/A Y No
AH2-019 + N/A N/A Withdrawn DPL Energy Generation Interconnection Withdrawn N/A N/A 10/26/2021 N/A N/A 12/7/2021 2/15/2022 N/A Y No
AH2-030 + Feagan’s Mill 138 kV WV Jefferson Active APS 90 90 54 Capacity Generation Interconnection Solar In Progress N/A N/A 11/3/2021 N/A N/A 6/1/2025 N/A N No
AH2-031 + Feagan’s Mill 138 kV II WV Jefferson Active APS 30 30 30 Capacity Generation Interconnection Storage In Progress N/A N/A 11/3/2021 N/A N/A 6/1/2025 N/A N No
AH2-043 + Cabin Creek 138 kV WV Kanawha Active AEP 200 200 140 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 11/19/2021 N/A N/A 12/31/2025 N/A N No
G21 + Meyersdale North Meyersdale WF PA Somerset In Service PENELEC 30 30 30 Energy Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/g21_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/g21_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/g21_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/g21_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/g21_csa.pdf Document Posted N/A N/A 4/6/2001 N/A N/A 12/3/2003 12/3/2003 12/3/2003 N/A N No
G21 - Meyersdale North Meyersdale WF PA Somerset In Service PENELEC 48 48 48 Energy Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/g21_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/g21_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/g21_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/g21_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/g21_csa.pdf Document Posted N/A N/A 4/6/2001 N/A N/A 12/3/2003 12/3/2003 12/3/2003 N/A N No
K23 + Meyersdale North Meyersdale WF PA Somerset In Service PENELEC 30 0 5.1 0 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/k23_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/k23_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/k23_isa.pdf Document Posted N/A Not Required N/A N/A 7/30/2003 N/A N/A 7/1/2004 7/1/2004 N/A N No
K23 - Meyersdale North Meyersdale WF PA Somerset In Service PENELEC 48 6 0 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/k23_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/k23_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/k23_isa.pdf Document Posted N/A Not Required N/A N/A 7/30/2003 N/A N/A 7/1/2004 7/1/2004 N/A N No
W3-135 + Goose Lake 34.5kV Dresden Island Lock & Dam IL Grundy Engineering and Procurement ComEd 12.1 12.1 12.1 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/w3135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/w3135_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/w3135_wmpa.pdf Not Required N/A N/A 10/29/2010 N/A N/A 10/1/2022 1/31/2022 1/31/2022 N/A N No
W3-135 - Goose Lake 34.5kV Dresden Island Lock & Dam IL Grundy Engineering and Procurement ComEd 12.1 12.1 12.1 Capacity Generation Interconnection Hydro https://www.pjm.com/pub/planning/project-queues/feas_docs/w3135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/w3135_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/w3135_wmpa.pdf Not Required N/A N/A 10/29/2010 N/A N/A 10/1/2021 1/31/2022 1/31/2022 N/A N No
Z2-108 + Meyersdale North 115kV Meyersdale Wind Farm & Battery Energy Storage System PA Somerset In Service PENELEC 18 18 0 18 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/z2108_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2108_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/z2_108_isa.pdf Document Posted N/A Not Required N/A N/A 4/30/2014 N/A N/A 12/31/2015 12/31/2015 12/17/2015 N/A N No
Z2-108 - Meyersdale North 115kV Meyersdale Wind Farm & Battery Energy Storage System PA Somerset In Service PENELEC 48 18 0 18 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/z2108_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2108_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/z2_108_isa.pdf Document Posted N/A Not Required N/A N/A 4/30/2014 N/A N/A 12/31/2015 12/31/2015 12/17/2015 N/A N No