Changes in PJM Queue between November 29th, 2021 and December 7th, 2021.
Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.
Fully new queue positions appear as individual rows with all fields highlighted green.
## old_obs new_obs changes additions removals
## 8092 8094 55 2 0
## Creating HTML table for first ${limit_html} rows
| QueueNumber | chng_type | Name | CommercialName | State | County | Status | TransmissionOwner | MaximumFacilityOutput | MWEnergy | MWCapacity | MWInService | CapacityorEnergy | ProjectType | Fuel | ProjectACOrDC | RightsMW | InitialStudy | FeasibilityStudy | FeasibilityStudyStatus | SystemImpactStudy | SystemImpactStudyStatus | FacilitiesStudy | FacilitiesStudyStatus | InterimInterconnectionServiceAgreement | InterimInterconnectionServiceAgreementStatus | WholesaleMarketParticipationAgreement | ConstructionServiceAgreement | ConstructionServiceAgreementStatus | UpgradeConstructionServiceAgreement | UpgradeConstructionServiceAgreementStatus | BackfeedDate | QueueDate | LongTermFirmServiceStartDate | LongTermFirmServiceEndDate | TestEnergyDate | WithdrawalDate | WithdrawnRemarks | ProjectedInServiceDate | RevisedInServiceDate | ActualInServiceDate | SuspensionDate | AttachmentType | AlternateQueue | SlideQueue |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AB1-091 | + | Davis Creek 345kV | IL | Kankakee | Active | ComEd | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1091_imp.pdf | Document Posted | N/A | N/A | 9/30/2015 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||||
| AB1-091 | - | Davis Creek 345kV | IL | Kankakee | Active | ComEd | 575 | 575 | 550 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1091_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1091_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1091_fac.pdf | Document Posted | N/A | N/A | 9/30/2015 | N/A | N/A | 6/1/2019 | N/A | N | No | |||||||||||||||||
| AB1-141 | + | Church-Wye Mills 138 kV I | Bluegrass Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 19.8 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1141_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1141_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_141_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_141_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 6/1/2022 | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||
| AB1-141 | - | Church-Wye Mills 138 kV I | Bluegrass Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 19.8 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1141_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1141_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1141_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_141_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_141_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AB1-142 | + | Church-Wye Mills 138 kV II | Bluegrass Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 19.8 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1142_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1142_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1142_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_142_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_142_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 6/1/2022 | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||
| AB1-142 | - | Church-Wye Mills 138 kV II | Bluegrass Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 19.8 | 19.8 | 13.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1142_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1142_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1142_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab1_142_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab1_142_csa.pdf | Document Posted | N/A | N/A | 10/30/2015 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AB1-176 | + | Price 25kV II | Cedar Lane Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 4 | 4 | 1.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1176_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1176_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1176_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1176_wmpa.pdf | Not Required | N/A | N/A | 10/30/2015 | N/A | N/A | 1/2/2024 | 3/1/2024 | 3/1/2024 | N/A | N | No | |||||||||
| AB1-176 | - | Price 25kV II | Cedar Lane Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 4 | 4 | 1.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1176_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1176_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1176_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1176_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1176_wmpa.pdf | Not Required | N/A | N/A | 10/30/2015 | N/A | N/A | 3/1/2024 | 3/1/2024 | N/A | N | No | ||||||||||
| AB2-032 | + | Church-Wye Mills 138 kV | Bluegrass Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 20 | 20 | 13.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2032_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2032_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2032_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_032_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_032_csa.pdf | Document Posted | N/A | N/A | 2/11/2016 | N/A | N/A | 6/1/2022 | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||
| AB2-032 | - | Church-Wye Mills 138 kV | Bluegrass Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 20 | 20 | 13.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2032_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2032_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2032_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_032_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_032_csa.pdf | Document Posted | N/A | N/A | 2/11/2016 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AB2-049 | + | Gloucester Township 12kV | GEMS Landfill Solar | NJ | Camden | Engineering and Procurement | AEC | 3 | 3 | 1.14 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2049_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2049_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2049_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2049_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2049_wmpa.pdf | Not Required | N/A | N/A | 3/4/2016 | N/A | N/A | 3/18/2022 | 6/30/2022 | 6/30/2022 | N/A | N | No | |||||||||
| AB2-049 | - | Gloucester Township 12kV | GEMS Landfill Solar | NJ | Camden | Engineering and Procurement | AEC | 3 | 3 | 1.14 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2049_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2049_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2049_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2049_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2049_wmpa.pdf | Not Required | N/A | N/A | 3/4/2016 | N/A | N/A | 6/30/2022 | 6/30/2022 | N/A | N | No | ||||||||||
| AB2-153 | + | Church-Wye Mills 138 kV | Bluegrass Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2153_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2153_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2153_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_153_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_153_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 6/1/2022 | 12/31/2023 | 12/31/2023 | N/A | N | No | |||||||||
| AB2-153 | - | Church-Wye Mills 138 kV | Bluegrass Solar | MD | Queen Anne’s | Engineering and Procurement | DPL | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2153_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2153_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2153_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_153_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_153_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 12/31/2023 | 12/31/2023 | N/A | N | No | ||||||||||
| AB2-179 | + | Townsend 138kV | New Castle Solar | DE | New Castle | Engineering and Procurement | DPL | 50 | 50 | 37.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2179_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2179_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2179_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_179_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_179_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 10/15/2022 | 12/16/2022 | 12/16/2022 | N/A | N | No | |||||||||
| AB2-179 | - | Townsend 138kV | New Castle Solar | DE | New Castle | Engineering and Procurement | DPL | 50 | 50 | 37.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2179_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2179_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2179_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_179_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_179_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 12/16/2022 | 12/16/2022 | N/A | N | No | ||||||||||
| AD1-023 | + | Cashie-Trowbridge 230 kV | NC | Bertie | Active | Dominion | 40 | 40 | 25.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1023_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/19/2017 | N/A | N/A | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AD1-023 | - | Cashie-Trowbridge 230 kV | NC | Bertie | Active | Dominion | 40 | 40 | 25.9 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1023_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1023_imp.pdf | Document Posted | In Progress | N/A | N/A | 6/19/2017 | N/A | N/A | 6/1/2019 | N/A | N | No | ||||||||||||||||||
| AD1-101 | + | Continental 69 kV | OH | Putnam | Active | AEP | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad1101_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/21/2017 | N/A | N/A | 10/31/2020 | N/A | N | No | ||||||||||||||
| AD1-101 | - | Continental 69 kV | OH | Putnam | Active | AEP | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/21/2017 | N/A | N/A | 10/31/2020 | N/A | N | No | |||||||||||||||
| AD2-025 | + | Hillsborough 13 kV | Hillsborough Storage | NJ | Somerset | Suspended | PSEG | 2 | 2 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2025_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2025_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad2025_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad2025_wmpa.pdf | Not Required | N/A | N/A | 12/5/2017 | N/A | N/A | 12/31/2020 | 12/31/2020 | N/A | Y | No | |||||||||||
| AD2-025 | - | Hillsborough 13 kV | Hillsborough Storage | NJ | Somerset | Suspended | PSEG | 2 | 2 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2025_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2025_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad2025_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad2025_wmpa.pdf | Not Required | N/A | N/A | 12/4/2017 | N/A | N/A | 12/31/2020 | 12/31/2020 | N/A | Y | No | |||||||||||
| AE2-059 | + | Derry Tap-Derry Bus 69 kV | PA | Northumberland | Active | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2059_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_059_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_059_csa.pdf | Document Posted | N/A | N/A | 2/1/2019 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||||
| AE2-059 | - | Derry Tap-Derry Bus 69 kV | PA | Northumberland | Active | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2059_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2059_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2059_fac.pdf | Document Posted | N/A | N/A | 2/1/2019 | N/A | N/A | 3/5/2021 | N/A | N | No | |||||||||||||||||
| AE2-060 | + | Mifflintown Bus-Mifflintown Tap 69 kV | Cottontail Solar 5 | PA | Juniata | Engineering and Procurement | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2060_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2060_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2060_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_060_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_060_csa.pdf | Document Posted | N/A | N/A | 2/1/2019 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AE2-060 | - | Mifflintown Bus-Mifflintown Tap 69 kV | PA | Juniata | Active | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2060_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2060_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2060_fac.pdf | Document Posted | N/A | N/A | 2/1/2019 | N/A | N/A | 3/5/2021 | N/A | N | No | |||||||||||||||||
| AE2-174 | + | Seneca 138 kV | OH | Seneca | Active | AEP | 198 | 198 | 34.85 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2174_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2174_imp.pdf | Document Posted | N/A | N/A | 3/18/2019 | N/A | N/A | 10/31/2021 | N/A | N | No | |||||||||||||||||||
| AE2-174 | - | Seneca 138 kV | OH | Seneca | Active | AEP | 198 | 198 | 34.85 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2174_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/18/2019 | N/A | N/A | 10/31/2021 | N/A | N | No | ||||||||||||||||||||
| AE2-206 | + | East Sidney-Quincy 138 kV | Clearview Solar I | OH | Champaign | Engineering and Procurement | Dayton | 99 | 99 | 41.58 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2206_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2206_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2206_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_206_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_206_csa.pdf | Document Posted | N/A | N/A | 3/19/2019 | N/A | N/A | 7/1/2024 | 7/1/2024 | N/A | N | No | ||||||||||
| AE2-206 | - | East Sidney-Quincy 138 kV | Clearview Solar I | OH | Champaign | Engineering and Procurement | Dayton | 99 | 99 | 41.58 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2206_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2206_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2206_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/csa/ae2_206_csa.pdf | Document Posted | N/A | N/A | 3/19/2019 | N/A | N/A | 7/1/2024 | 7/1/2024 | N/A | N | No | |||||||||||||
| AE2-290 | + | Nottingham 138 kV | Nottingham Solar | OH | Harrison | Engineering and Procurement | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2290_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2290_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2290_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_290_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_290_csa.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 6/1/2021 | 12/15/2023 | N/A | N | No | ||||||||||
| AE2-290 | - | Nottingham 138 kV | Nottingham Solar | OH | Harrison | Engineering and Procurement | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2290_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2290_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ae2_290_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_290_csa.pdf | Document Posted | N/A | N/A | 3/29/2019 | N/A | N/A | 6/1/2021 | 12/15/2023 | N/A | N | No | |||||||||||
| AE2-341 | + | Sandwich-Plano | IL | Kendall | Active | ComEd | 150 | 150 | 100.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2341_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2341_imp.pdf | Document Posted | N/A | N/A | 3/31/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | |||||||||||||||||||
| AE2-341 | - | Sandwich-Plano | IL | Kendall | Active | ComEd | 150 | 150 | 100.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2341_fea.pdf | Document Posted | In Progress | N/A | N/A | 3/31/2019 | N/A | N/A | 12/1/2022 | N/A | N | No | ||||||||||||||||||||
| AF1-200 | + | Plano 345 kV | IL | Kendall | Active | ComEd | 2100 | 2100 | 2035 | Capacity | Merchant Transmission | DC | 2035 F/NFTIR/2100 NF/TWR | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1200_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/merch-impact-studies/af1200_imp.pdf | Document Posted | N/A | N/A | 9/25/2019 | N/A | N/A | 1/31/2025 | N/A | S | No | ||||||||||||||||||
| AF1-200 | - | Plano 345 kV | IL | Kendall | Active | ComEd | 2100 | 2100 | 2035 | Capacity | Merchant Transmission | DC | 2035 F/NFTIR/2100 NF/TWR | https://www.pjm.com/pub/planning/project-queues/merch-feas_docs/af1200_fea.pdf | Document Posted | In Progress | N/A | N/A | 9/25/2019 | N/A | N/A | 1/31/2025 | N/A | S | No | |||||||||||||||||||
| AF1-210 | + | Burma 23 kV | CL-Route 58 S | PA | Clarion | Suspended | APS | 15.9 | 15.9 | 9.54 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1210_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1210_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1210_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1210_wmpa.pdf | Not Required | N/A | N/A | 9/26/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||
| AF1-210 | - | Burma 23 kV | CL-Route 58 S | PA | Clarion | Engineering and Procurement | APS | 15.9 | 15.9 | 9.54 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1210_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1210_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1210_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1210_wmpa.pdf | Not Required | N/A | N/A | 9/26/2019 | N/A | N/A | 6/1/2022 | N/A | N | No | ||||||||||||
| AF2-055 | + | Plaintation Creek 69 kV | VA | Northampton | Active | ODEC | 45 | 45 | 27 | Capacity | Generation Interconnection | Storage; Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2055_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/16/2020 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||
| AF2-055 | - | Plaintation Creek 69 kV | VA | Northampton | Active | ODEC | 50 | 50 | 30 | Capacity | Generation Interconnection | Storage; Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2055_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2055_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/16/2020 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||
| AG1-499 | + | Lambs 12.47 kV | NJ | Gloucester | Active | AEC | 10 | 10 | 6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1499_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1499_imp.pdf | Document Posted | Not Required | Not Required | N/A | N/A | 9/30/2020 | N/A | N/A | 9/30/2020 | N/A | N | No | |||||||||||||||||
| AG1-499 | - | Lambs 12.47 kV | NJ | Gloucester | Active | AEC | 10 | 10 | 6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1499_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1499_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/30/2020 | N/A | N/A | 9/30/2020 | N/A | N | No | ||||||||||||||||||
| AG2-130 | + | Colby Tap-Valley 138 kV | MI | Van Buren | Active | AEP | 55 | 55 | 34.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/2/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AG2-130 | - | Colby Tap-Valley 138 kV | MI | Van Buren | Active | AEP | 55 | 55 | 34.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/1/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AG2-308 | + | Cumberland 138 kV | MD | Allegany | Active | APS | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 3/23/2021 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AG2-308 | - | Cumberland 138 kV | MD | Allegany | Active | APS | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 3/23/2021 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AG2-483 | + | Bowman’s Mill Tap-Scott 69 kV III | PA | Columbia | Active | PPL | 75 | 0 | 2.8 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/31/2021 | N/A | N/A | 11/15/2022 | N/A | N | No | ||||||||||||||||||||||
| AG2-483 | - | Bowman’s Mill Tap-Scott 69 kV II | PA | Columbia | Active | PPL | 75 | 0 | 2.8 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 3/31/2021 | N/A | N/A | 11/15/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-071 | + | TBD 34.5 kV | VA | Powhatan | Active | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 7/29/2021 | N/A | N/A | 7/1/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-071 | - | TBD 34.5 kV | VA | Powhatan | Active | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 7/29/2021 | N/A | N/A | 7/31/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-154A | + | Mount Rock12 kV II | PA | Snyder | Active | PPL | 5 | 5 | 3 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 8/27/2021 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-154A | - | South Middleburg 12 kV | PA | Snyder | Active | PPL | 5 | 5 | 3 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 8/27/2021 | N/A | N/A | 12/31/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-207 | + | Bethelboro 25 kV-1 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/8/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-207 | - | Bethelboro 26 kV-1 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/7/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-208 | + | Bethelboro 25 kV-2 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/8/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-208 | - | Bethelboro 26 kV-2 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/7/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-209 | + | Bethelboro 25 kV-3 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/8/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-209 | - | Bethelboro 26 kV-3 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/7/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-210 | + | Bethelboro 25 kV-4 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/8/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-210 | - | Bethelboro 26 kV-4 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/7/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-211 | + | Bethelboro 25 kV-5 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/8/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-211 | - | Bethelboro 26 kV-5 | PA | Fayette | Active | APS | 12 | 12 | 7.2 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/7/2021 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-284 | + | West Willow 12 kV | PA | Adams | Active | PPL | 3 | 3 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/9/2021 | N/A | N/A | 12/31/2022 | N/A | Y | No | ||||||||||||||||||||||
| AH1-284 | - | TBD | N/A | N/A | Active | PPL | Energy | Generation Interconnection | In Progress | N/A | N/A | 9/9/2021 | N/A | N/A | 12/31/2022 | N/A | Y | No | ||||||||||||||||||||||||||
| AH1-314 | + | East Danville 138 kV | VA | Pittsylvania | Active | AEP | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-314 | - | East Danville 139 kV | VA | Pittsylvania | Active | AEP | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-332 | + | Kittanning - Craigsville Junction 25 kV | PA | Armstrong | Active | APS | 19.9 | 19.9 | 7.98 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/9/2021 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-332 | - | Kittanning - Craigsville Junction 25 kV | PA | Armstrong | Active | APS | 19.9 | 19.9 | 11.9 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/9/2021 | N/A | N/A | 6/1/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-354 | + | Lena 138 kV | IL | Stephenson | Active | ComEd | 259 | 40 | 40 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 9/10/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-354 | - | Lena 138 kV | IL | Stephenson | Active | ComEd | 40 | 40 | 33.2 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 9/10/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-371 | + | Universal 12 kV | PA | Allegheny | Active | DL | 13 | 13 | 8.1 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/3/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-371 | - | Universal - Evergreen 12 kV | PA | Allegheny | Active | DL | 13 | 13 | 8.1 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/3/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-411 | + | Phillipsburg - Ingersol Rand 34.5 kV | NJ | Warren | Active | JCPL | 5.8 | 5.75 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 9/8/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-411 | - | Gilbert - Morris Park 34.5 kV | NJ | Warren | Active | JCPL | 5.8 | 5.75 | 0 | Energy | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 9/8/2022 | N/A | N | No | ||||||||||||||||||||||
| AH1-421 | + | West Mingo 69 kV | OH | Champaign | Active | Dayton | 40 | 40 | 40 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 7/1/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-421 | - | West Mingo 69 kV | OH | Champaign | Active | Dayton | 40 | 40 | 31.14 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 7/1/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-422 | + | West Mingo 69 kV | OH | Champaign | Active | Dayton | 60 | 20 | 18.85 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 7/1/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-422 | - | West Mingo 69 kV | OH | Champaign | Active | Dayton | 60 | 20 | 14.74 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 7/1/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-494 | + | Wakefield 12 kV | PA | Lancaster | Active | PPL | 10 | 10 | 6.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-494 | - | Wakefield 12 kV | PA | Lancaster | Active | PPL | 10 | 10 | 6.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-495 | + | Middleburg 12 kV | PA | Snyder | Active | PPL | 10 | 10 | 6.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-495 | - | Middleburg 12 kV | PA | Snyder | Active | PPL | 10 | 10 | 6.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-496 | + | West Berwick 12 kV | PA | Columbia | Active | PPL | 10 | 10 | 6.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-496 | - | West Berwick 12 kV | PA | Columbia | Active | PPL | 10 | 10 | 6.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-499 | + | Stoneboro 12.47kV | PA | Mercer | Active | ATSI | 10 | 10 | 6.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-499 | - | Stoneboro 12.47kV | PA | Mercer | Active | ATSI | 10 | 10 | 6.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-501 | + | Tionesta Junction – Crown 34.5 kV | PA | Forest | Active | PENELEC | 10 | 10 | 6.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-501 | - | Tionesta Junction – Crown 34.5 kV | PA | Forest | Active | PENELEC | 10 | 10 | 6.5 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/30/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-510 | + | Clarence Solar 12 kV | N/A | N/A | Withdrawn | PENELEC | Energy | Generation Interconnection | Withdrawn | N/A | N/A | 9/10/2021 | N/A | N/A | 12/1/2021 | 12/31/2023 | N/A | Y | No | |||||||||||||||||||||||||
| AH1-510 | - | Clarence Solar 12 kV | IL | Will | Active | PENELEC | Energy | Generation Interconnection | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/31/2023 | N/A | Y | No | ||||||||||||||||||||||||||
| AH1-511 | + | Blacklick Solar 12 kV | N/A | N/A | Withdrawn | PENELEC | Energy | Generation Interconnection | Withdrawn | N/A | N/A | 9/10/2021 | N/A | N/A | 12/1/2021 | 12/31/2023 | N/A | Y | No | |||||||||||||||||||||||||
| AH1-511 | - | Blacklick Solar 12 kV | WV | Berkeley | Active | PENELEC | Energy | Generation Interconnection | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/31/2023 | N/A | Y | No | ||||||||||||||||||||||||||
| AH1-512 | + | Brush Creek Solar 12 kV | N/A | N/A | Withdrawn | PENELEC | Energy | Generation Interconnection | Withdrawn | N/A | N/A | 9/10/2021 | N/A | N/A | 12/1/2021 | 12/31/2023 | N/A | Y | No | |||||||||||||||||||||||||
| AH1-512 | - | Brush Creek Solar 12 kV | PA | Clearfield | Active | PENELEC | Energy | Generation Interconnection | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/31/2023 | N/A | Y | No | ||||||||||||||||||||||||||
| AH1-513 | + | Summit Community Solar 12 kV | N/A | N/A | Withdrawn | APS | Energy | Generation Interconnection | Withdrawn | N/A | N/A | 9/10/2021 | N/A | N/A | 12/1/2021 | 12/31/2023 | N/A | Y | No | |||||||||||||||||||||||||
| AH1-513 | - | Summit Community Solar 12 kV | WV | Monongalia | Active | APS | Energy | Generation Interconnection | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/31/2023 | N/A | Y | No | ||||||||||||||||||||||||||
| AH1-514 | + | Philipsburg - Shawville 13.2 kV-1 | PA | Clearfield | Active | PENELEC | 5 | 5 | 3.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/29/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-514 | - | Philipsburg - Shawville 13.2 kV | PA | Clearfield | Active | PENELEC | 5 | 5 | 3.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/29/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-515 | + | Philipsburg - Shawville 13.2 kV-2 | PA | Clearfield | Active | PENELEC | 5 | 5 | 2.7 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/29/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-515 | - | Philipsburg - Shawville 13.2 kV | PA | Clearfield | Active | PENELEC | 5 | 5 | 2.7 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/29/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-566 | + | South Bend 500kV | PA | Armstrong | Active | APS | 1190 | 400 | 400 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-566 | - | South Bend 500kV | PA | Armstrong | Active | APS | 1600 | 400 | 400 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 6/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-589 | + | Homer City Station-Pearce Brook 345kV | PA | McKean | Active | PENELEC | 410 | 170 | 170 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/16/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-589 | - | Homer City Station-Pearce Brook 345kV | PA | McKean | Active | PENELEC | 170 | 170 | 170 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/16/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-594 | + | Hazelton 138kV | WV | Preston | Active | APS | 97 | 32 | 32 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/16/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-594 | - | Hazelton 138kV | WV | Preston | Active | APS | 32 | 32 | 32 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/16/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-658 | + | R. P. Mone 345 kV | OH | Van Wert | Active | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/23/2021 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-658 | - | R. P. Mone - Maddox Creek 345 kV | OH | Van Wert | Active | AEP | 100 | 100 | 60 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/23/2021 | N/A | N/A | 12/31/2025 | N/A | N | No | ||||||||||||||||||||||
| AH2-020 | + | PA | Columbia | Withdrawn | PSEG | Energy | Generation Interconnection | Withdrawn | N/A | N/A | 10/27/2021 | N/A | N/A | 11/29/2021 | 12/29/2023 | N/A | Y | No | ||||||||||||||||||||||||||
| AH2-026 | + | VA | City of Richmond | Withdrawn | Dominion | 72 | 72 | 72 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 11/2/2021 | N/A | N/A | 12/1/2021 | 9/15/2024 | N/A | N | No | ||||||||||||||||||||||
| R49 | + | Haviland - Milan 138kV | Timber Road II WF | OH | Paulding | In Service | AEP | 99 | 150 | 30 | 99 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/r49_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/r49_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/r49_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/r49_csa.pdf | Document Posted | N/A | N/A | 6/9/2011 | 12/6/2006 | N/A | N/A | 6/13/2011 | 12/31/2012 | 12/31/2012 | 7/15/2011 | N/A | N | No | |||||||
| R49 | - | Haviland - Milan 138kV | Timber Road II WF | OH | Paulding | In Service | AEP | 150 | 150 | 30 | 99 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/r49_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/r49_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/r49_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/r49_csa.pdf | Document Posted | N/A | N/A | 6/9/2011 | 12/6/2006 | N/A | N/A | 6/13/2011 | 12/31/2012 | 12/31/2012 | 7/15/2011 | N/A | N | No |