Changes in PJM Queue between November 22nd, 2021 and November 29th, 2021.
Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.
Fully new queue positions appear as individual rows with all fields highlighted green.
## old_obs new_obs changes additions removals
## 8081 8092 24 11 0
## Creating HTML table for first ${limit_html} rows
| QueueNumber | chng_type | Name | CommercialName | State | County | Status | TransmissionOwner | MaximumFacilityOutput | MWEnergy | MWCapacity | MWInService | CapacityorEnergy | ProjectType | Fuel | ProjectACOrDC | RightsMW | InitialStudy | FeasibilityStudy | FeasibilityStudyStatus | SystemImpactStudy | SystemImpactStudyStatus | FacilitiesStudy | FacilitiesStudyStatus | InterimInterconnectionServiceAgreement | InterimInterconnectionServiceAgreementStatus | WholesaleMarketParticipationAgreement | ConstructionServiceAgreement | ConstructionServiceAgreementStatus | UpgradeConstructionServiceAgreement | UpgradeConstructionServiceAgreementStatus | BackfeedDate | QueueDate | LongTermFirmServiceStartDate | LongTermFirmServiceEndDate | TestEnergyDate | WithdrawalDate | WithdrawnRemarks | ProjectedInServiceDate | RevisedInServiceDate | ActualInServiceDate | SuspensionDate | AttachmentType | AlternateQueue | SlideQueue |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AA2-039 | + | Kewanee 138 kV | IL | Henry | Withdrawn | ComEd | 150 | 150 | 19.5 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2039_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2039_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 1/23/2015 | N/A | N/A | 4/16/2020 | 12/1/2016 | N/A | N | No | |||||||||||||||||
| AA2-039 | - | Kewanee 138 kV | IL | Henry | Withdrawn | ComEd | 150 | 150 | 19.5 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2039_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2039_imp.pdf | Document Posted | In Progress | N/A | N/A | 1/23/2015 | N/A | N/A | 4/16/2020 | 12/1/2016 | N/A | N | No | |||||||||||||||||
| AB2-085 | + | Adams 138kV | Stone Branch Solar | OH | Adams | Engineering and Procurement | AEP | 49.9 | 49.9 | 33.93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2085_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2085_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_085_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_085_csa.pdf | Document Posted | N/A | N/A | 4/18/2016 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AB2-085 | - | Adams 138kV | OH | Adams | Active | AEP | 49.9 | 49.9 | 33.93 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2085_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2085_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2085_fac.pdf | Document Posted | N/A | N/A | 4/18/2016 | N/A | N/A | 10/31/2017 | N/A | N | No | |||||||||||||||||
| AC2-088 | + | S. Bethel-Brown 69kV | Nestlewood Solar | OH | Clermont | Engineering and Procurement | DEOK | 70 | 70 | 38.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2088_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2088_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_088_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_088_csa.pdf | Document Posted | N/A | N/A | 2/28/2017 | N/A | N/A | 5/15/2022 | 5/15/2022 | N/A | N | No | ||||||||||
| AC2-088 | - | S. Bethel-Brown 69kV | Nestlewood Solar | OH | Clermont | Suspended | DEOK | 70 | 70 | 38.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2088_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2088_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ac2088_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ac2_088_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac2_088_csa.pdf | Document Posted | N/A | N/A | 2/28/2017 | N/A | N/A | 5/15/2022 | 5/15/2022 | N/A | N | No | ||||||||||
| AD2-048 | + | Cynthia-Headquarters 69 kV | KY | Harrison | Active | EKPC | 70 | 70 | 46.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2048_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2048_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/csa/ad2_048_csa.pdf | Document Posted | N/A | N/A | 1/31/2018 | N/A | N/A | 6/1/2020 | N/A | N | No | |||||||||||||||
| AD2-048 | - | Cynthia-Headquarters 69 kV | KY | Harrison | Active | EKPC | 70 | 70 | 46.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2048_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2048_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2048_fac.pdf | Document Posted | N/A | N/A | 1/31/2018 | N/A | N/A | 6/1/2020 | N/A | N | No | |||||||||||||||||
| AD2-062 | + | Roxbury-Greene 138 kV | PA | Franklin | Active | PENELEC | 80.3 | 80.3 | 53.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2062_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2062_imp.pdf | Document Posted | Withdrawn | N/A | N/A | 2/23/2018 | N/A | N/A | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-062 | - | Roxbury-Greene 138 kV | PA | Franklin | Active | PENELEC | 80.3 | 80.3 | 53.5 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2062_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2062_imp.pdf | Document Posted | In Progress | N/A | N/A | 2/23/2018 | N/A | N/A | 6/1/2020 | N/A | N | No | ||||||||||||||||||
| AD2-135 | + | Williamstown 12kV | Monroe-Sicklerville Road LF Solar | NJ | Gloucester | Engineering and Procurement | AEC | 1.6 | 1.62 | 0.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2135_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2135_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2135_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ad2135_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ad2135_wmpa.pdf | Not Required | N/A | N/A | 3/23/2018 | N/A | N/A | 5/1/2023 | 5/1/2023 | N/A | N | No | ||||||||||
| AD2-135 | - | Williamstown 12kV | NJ | Gloucester | Active | AEC | 1.6 | 1.62 | 0.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2135_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2135_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ad2135_fac.pdf | Document Posted | Not Required | N/A | N/A | 3/23/2018 | N/A | N/A | 12/31/2018 | N/A | N | No | ||||||||||||||||
| AE1-044 | + | Morrisville 230 kV | Fitch Solar | VA | Fauquier | Engineering and Procurement | Dominion | 200 | 200 | 111.7933 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1044_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1044_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1044_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae1_044_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae1_044_csa.pdf | Document Posted | N/A | N/A | 7/5/2018 | N/A | N/A | 12/30/2025 | 12/30/2025 | N/A | N | No | ||||||||||
| AE1-044 | - | Morrisville 230 kV | VA | Fauquier | Active | Dominion | 200 | 200 | 111.7933 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1044_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1044_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae1044_fac.pdf | Document Posted | N/A | N/A | 7/5/2018 | N/A | N/A | 11/2/2020 | N/A | N | No | |||||||||||||||||
| AE2-133 | + | Penns Tap-Richfield Tie 69 kV | Cottontail Solar 6 | PA | Snyder | Engineering and Procurement | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2133_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2133_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2133_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ae2_133_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_133_csa.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 12/21/2022 | 12/21/2022 | N/A | N | No | ||||||||||
| AE2-133 | - | Penns Tap-Richfield Tie 69 kV | PA | Snyder | Active | PPL | 20 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2133_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2133_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2133_fac.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 3/5/2021 | N/A | N | No | |||||||||||||||||
| AE2-211 | + | Jackson-Three Mile Island 230 kV | PA | York | Active | ME | 55 | 55 | 23.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2211_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2211_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2211_fac.pdf | Document Posted | N/A | N/A | 3/20/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | |||||||||||||||||
| AE2-211 | - | Jackson-Three Mile Island 230 kV | PA | York | Active | ME | 55 | 55 | 23.1 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2211_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2211_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/20/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AF1-057 | + | Jackson-Three Mile Island 230 kV II | PA | York | Active | ME | 75 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1057_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1057_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/af1057_fac.pdf | Document Posted | N/A | N/A | 7/31/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | |||||||||||||||||
| AF1-057 | - | Jackson-Three Mile Island 230 kV II | PA | York | Active | ME | 75 | 20 | 8.4 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1057_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1057_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/31/2019 | N/A | N/A | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AF1-166 | + | Target-Chambers No.5 34.5 kV | FR-BOYER MILL 1 | PA | Franklin | Suspended | APS | 16 | 16 | 9.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1166_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1166_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1166_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1166_wmpa.pdf | Not Required | N/A | N/A | 9/23/2019 | N/A | N/A | 2/28/2023 | 2/28/2023 | N/A | N | No | |||||||||||
| AF1-166 | - | Target-Chambers No.5 34.5 kV | FR-BOYER MILL 1 | PA | Franklin | Engineering and Procurement | APS | 16 | 16 | 9.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1166_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1166_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1166_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1166_wmpa.pdf | Not Required | N/A | N/A | 9/23/2019 | N/A | N/A | 2/28/2023 | 2/28/2023 | N/A | N | No | |||||||||||
| AF1-209 | + | Guilford 34.5 kV | FR Boyer Mill 2 | PA | Franklin | Suspended | APS | 15.9 | 15.9 | 9.54 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1209_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1209_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1209_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1209_wmpa.pdf | Not Required | N/A | N/A | 9/26/2019 | N/A | N/A | 9/30/2022 | 9/30/2022 | N/A | N | No | |||||||||||
| AF1-209 | - | Guilford 34.5 kV | FR Boyer Mill 2 | PA | Franklin | Engineering and Procurement | APS | 15.9 | 15.9 | 9.54 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af1209_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af1209_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/af1209_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/af1209_wmpa.pdf | Not Required | N/A | N/A | 9/26/2019 | N/A | N/A | 9/30/2022 | 9/30/2022 | N/A | N | No | |||||||||||
| AG1-012 | + | Meadow Brook-Strasburg 138 kV II | Foxglove Solar Storage Uprate | VA | Frederick | Active | APS | 75 | 0 | 0 | Energy | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1012_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1012_imp.pdf | Document Posted | In Progress | N/A | N/A | 5/8/2020 | N/A | N/A | 6/30/2022 | N/A | N | No | |||||||||||||||||
| AG1-012 | - | Mewdow Brook-Strasburg 138 kV II | VA | Frederick | Active | APS | 75 | 0 | 0 | Energy | Generation Interconnection | Solar; Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1012_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1012_imp.pdf | Document Posted | In Progress | N/A | N/A | 5/8/2020 | N/A | N/A | 6/30/2022 | N/A | N | No | ||||||||||||||||||
| AG1-061 | + | Laurel-Sharptown 69 kV | DE | Sussex | Active | DPL | 109.3 | 109.3 | 65.58 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1061_imp.pdf | Document Posted | In Progress | N/A | N/A | 7/29/2020 | N/A | N/A | 12/31/2021 | N/A | N | No | ||||||||||||||||||
| AG1-061 | - | Laurel-Sharptown 69 kV | DE | Sussex | Active | DPL | 109.3 | 109.3 | 65.58 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1061_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1061_imp.pdf | Document Posted | N/A | N/A | 7/29/2020 | N/A | N/A | 12/31/2021 | N/A | N | No | |||||||||||||||||||
| AG2-050 | + | Randle Cliff 13.8 kV | CHESAPEAKE BEACH BESS | MD | Calvert | Engineering and Procurement | BGE | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2050_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2050_imp.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag2050_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag2050_wmpa.pdf | Not Required | N/A | N/A | 11/25/2020 | N/A | N/A | 5/1/2023 | 5/1/2023 | N/A | Y | No | ||||||||||||
| AG2-050 | - | Randle Cliff 13.8 kV | MD | Calvert | Active | BGE | 1 | 1 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2050_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2050_imp.pdf | Document Posted | Not Required | N/A | N/A | 11/25/2020 | N/A | N/A | 9/13/2021 | N/A | Y | No | ||||||||||||||||||
| AG2-135 | + | Hoffman Estates 12.5 kV | Patel Brothers Energy Storage System | OH | Pickaway | Engineering and Procurement | Unknown | 0.3 | 0.28 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2135_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2135_imp.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ag2135_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ag2135_wmpa.pdf | Not Required | N/A | N/A | 2/4/2021 | N/A | N/A | 4/15/2022 | 4/15/2022 | N/A | Y | No | ||||||||||||
| AG2-135 | - | Hoffman Estates 12.5 kV | OH | Pickaway | Active | Unknown | 0.3 | 0.28 | 0 | Energy | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2135_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2135_imp.pdf | Document Posted | Not Required | N/A | N/A | 2/4/2021 | N/A | N/A | 7/30/2021 | N/A | Y | No | ||||||||||||||||||
| AG2-374 | + | Warfordsburg 12 kV | PA | Tioga | Active | APS | Energy | Generation Interconnection | Not Required | Not Required | N/A | N/A | 3/29/2021 | N/A | N/A | 12/1/2023 | N/A | Y | No | |||||||||||||||||||||||||
| AG2-374 | - | Warfordsburg 12 kV | PA | Tioga | Active | APS | Energy | Generation Interconnection | In Progress | N/A | N/A | 3/29/2021 | N/A | N/A | 12/1/2023 | N/A | Y | No | ||||||||||||||||||||||||||
| AG2-399 | + | Harrisville Jct - All Min 25 kV | N/A | N/A | Active | APS | 3 | 3 | 0 | Energy | Generation Interconnection | Solar | Not Required | Not Required | N/A | N/A | 3/31/2021 | N/A | N/A | 12/1/2023 | N/A | Y | No | |||||||||||||||||||||
| AG2-399 | - | Harrisville Jct - All Min 25 kV | N/A | N/A | Active | APS | 3 | 3 | 0 | Energy | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/31/2021 | N/A | N/A | 12/1/2023 | N/A | Y | No | ||||||||||||||||||||||
| AH1-532 | + | Marion County - Marion Co. Industrial 161 kV | KY | Marion | Active | EKPC | 37.8 | 37.8 | 22.68 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 3/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-532 | - | Marion County - Marion Co. Industrial 161 kV | KY | Marion | Active | EKPC | 37.8 | 37.8 | 22.68 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 3/1/2025 | N/A | N | No | ||||||||||||||||||||||
| AH1-587 | + | Farmers Valley – Ridgeway 115 kV | PA | McKean | Active | PENELEC | 240 | 240 | 144 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/16/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-587 | - | Homer City Station-Pearce Brook 345kV | PA | McKean | Active | PENELEC | 240 | 240 | 144 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 9/10/2021 | N/A | N/A | 12/16/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-630 | + | Penns Tap-Richfield Tie 69 k VV | PA | Snyder | Active | PPL | 35 | 15 | 15 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 9/11/2021 | N/A | N/A | 9/25/2023 | N/A | N | No | ||||||||||||||||||||||
| AH1-635 | + | OH | Champaign | Withdrawn | Dayton | 200 | 200 | 134.3 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 9/13/2021 | N/A | N/A | 10/19/2021 | 10/15/2024 | N/A | N | No | ||||||||||||||||||||||
| AH1-636 | + | OH | Champaign | Withdrawn | Dayton | 200 | 200 | 134.3 | Capacity | Generation Interconnection | Storage | Withdrawn | N/A | N/A | 9/13/2021 | N/A | N/A | 10/19/2021 | 10/15/2024 | N/A | N | No | ||||||||||||||||||||||
| AH2-021 | + | Summer Shade - Barren County 161 kV | KY | Barren | Active | EKPC | 150 | 150 | 105 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 10/27/2021 | N/A | N/A | 11/13/2026 | N/A | N | No | ||||||||||||||||||||||
| AH2-025 | + | Eugene - Dequine 345 kV | IN | Fountain | Active | AEP | 200 | 200 | 200 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 10/29/2021 | N/A | N/A | 6/1/2027 | N/A | N | No | ||||||||||||||||||||||
| AH2-028 | + | Pickaway 1 PV and ESS 69 kV | OH | Pickaway | Active | AEP | 44 | 44 | 44 | Capacity | Generation Interconnection | Solar; Storage | In Progress | N/A | N/A | 11/2/2021 | N/A | N/A | 10/28/2025 | N/A | N | No | ||||||||||||||||||||||
| AH2-028A | + | Pickaway 2 PV 69 kV | OH | Pickaway | Active | AEP | 64 | 20 | 12 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 11/2/2021 | N/A | N/A | 10/28/2025 | N/A | N | No | ||||||||||||||||||||||
| AH2-032 | + | Possum Point 115kV | VA | Prince William | Active | Dominion | 60 | 60 | 60 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 11/9/2021 | N/A | N/A | 12/31/2026 | N/A | N | No | ||||||||||||||||||||||
| AH2-033 | + | Possum Point 115kV | VA | Prince William | Active | Dominion | 60 | 60 | 60 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 11/9/2021 | N/A | N/A | 12/31/2027 | N/A | N | No | ||||||||||||||||||||||
| AH2-034 | + | Possum Point 230kV | VA | Prince William | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 11/9/2021 | N/A | N/A | 12/31/2028 | N/A | N | No | ||||||||||||||||||||||
| AH2-035 | + | Possum Point 500kV | VA | Prince William | Active | Dominion | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | In Progress | N/A | N/A | 11/9/2021 | N/A | N/A | 12/31/2028 | N/A | N | No | ||||||||||||||||||||||
| V4-010 | + | Tiffin Center 138kV | Republic Wind LLC | OH | Seneca | Withdrawn | AEP | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/v4010_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/v4010_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/v4010_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/v4_010_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/v4_010_csa.pdf | Document Posted | N/A | N/A | 11/12/2009 | N/A | N/A | 11/18/2021 | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||
| V4-010 | - | Tiffin Center 138kV | Republic Wind LLC | OH | Seneca | Engineering and Procurement | AEP | 200 | 200 | 26 | Capacity | Generation Interconnection | Wind | https://www.pjm.com/pub/planning/project-queues/feas_docs/v4010_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/v4010_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/v4010_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/v4_010_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/v4_010_csa.pdf | Document Posted | N/A | N/A | 11/12/2009 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| Z2-065 4641473 | + | CPLE-PJM | N/A | N/A | Annulled | North Carolina Electric Membership Corporation | 55 | Energy | Long-Term Firm Transmission | https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4641473_ltf1.pdf | https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4641473_ltf2.pdf | Executed Agreement and/or Study | Not Required | N/A | N/A | 4/17/2014 | 6/1/2019 | 6/1/2024 | N/A | FF | No | |||||||||||||||||||||||
| Z2-065 4641473 | - | CPLE-PJM | N/A | N/A | Confirmed | North Carolina Electric Membership Corporation | 55 | Energy | Long-Term Firm Transmission | https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4641473_ltf1.pdf | https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4641473_ltf2.pdf | Executed Agreement and/or Study | Not Required | N/A | N/A | 4/17/2014 | 6/1/2019 | 6/1/2024 | N/A | FF | No | |||||||||||||||||||||||
| Z2-066 4641474 | + | CPLE-PJM | N/A | N/A | Annulled | North Carolina Electric Membership Corporation | 55 | Energy | Long-Term Firm Transmission | https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4641474_ltf1.pdf | https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4641474_ltf2.pdf | Executed Agreement and/or Study | Not Required | N/A | N/A | 4/17/2014 | 6/1/2019 | 6/1/2024 | N/A | FF | No | |||||||||||||||||||||||
| Z2-066 4641474 | - | CPLE-PJM | N/A | N/A | Confirmed | North Carolina Electric Membership Corporation | 55 | Energy | Long-Term Firm Transmission | https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4641474_ltf1.pdf | https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4641474_ltf2.pdf | Executed Agreement and/or Study | Not Required | N/A | N/A | 4/17/2014 | 6/1/2019 | 6/1/2024 | N/A | FF | No | |||||||||||||||||||||||
| Z2-067 4641475 | + | CPLE-PJM | N/A | N/A | Annulled | North Carolina Electric Membership Corporation | 55 | Energy | Long-Term Firm Transmission | https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4641475_ltf1.pdf | https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4641475_ltf2.pdf | Executed Agreement and/or Study | Not Required | N/A | N/A | 4/17/2014 | 6/1/2019 | 6/1/2024 | N/A | FF | No | |||||||||||||||||||||||
| Z2-067 4641475 | - | CPLE-PJM | N/A | N/A | Confirmed | North Carolina Electric Membership Corporation | 55 | Energy | Long-Term Firm Transmission | https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4641475_ltf1.pdf | https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4641475_ltf2.pdf | Executed Agreement and/or Study | Not Required | N/A | N/A | 4/17/2014 | 6/1/2019 | 6/1/2024 | N/A | FF | No |