Changes in PJM Queue between August 2nd, 2021 and August 10th, 2021.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

Summary of Changes

##   old_obs   new_obs   changes additions  removals 
##      7460      7470        53        10         0

Changes

## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
AA1-111 + Moshannon-East Towanda 230kV PA Clinton Active PENELEC 463 463 463 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1111_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1111_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1111_fac.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 10/31/2019 N/A N No This project slid to the next queue
AA1-111 - Moshannon-East Towanda 230kV PA Clinton Active PENELEC 463 463 463 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1111_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1111_imp.pdf Document Posted In Progress N/A N/A 10/31/2014 N/A N/A 10/31/2019 N/A N No This project slid to the next queue
AA2-076 + Linwood 230kV Phillips Island CT1, CT2, CT3 & ST4 PA Delaware In Service PECO 919 0 18 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2076_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_076_isa.pdf Document Posted N/A Not Required N/A N/A 3/27/2015 N/A N/A 4/27/2021 N/A N No This project slid to the next queue
AA2-076 - Linwood 230kV Phillips Island CT1, CT2, CT3 & ST4 PA Delaware Partially in Service - Under Construction PECO 852 0 18 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2076_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/aa2_076_isa.pdf Document Posted N/A Not Required N/A N/A 3/27/2015 N/A N/A 5/31/2018 N/A N No This project slid to the next queue
AB1-072 + Hancock-Marlowe 34.5kV MD Washington Withdrawn APS 2.5 2.5 0.95 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1072_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 9/14/2015 N/A N/A 7/13/2016 Customer Milestone Not Met 7/1/2016 N/A N No
AB1-072 - Hancock-Marlowe 34.5kV MD Washington Withdrawn APS 2.5 2.5 0.95 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1072_fea..pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1072_imp.pdf Document Posted Not Required Withdrawn N/A Withdrawn N/A N/A 9/14/2015 N/A N/A 7/13/2016 Customer Milestone Not Met 7/1/2016 N/A N No
AB1-092 + Moshannon-East Towanda 230kV PA Clinton Active PENELEC 504 41 17 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1092_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1092_fac.pdf Document Posted N/A N/A 9/30/2015 N/A N/A 5/1/2019 N/A N No
AB1-092 - Moshannon-East Towanda 230kV PA Clinton Active PENELEC 504 41 17 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1092_imp.pdf Document Posted In Progress N/A N/A 9/30/2015 N/A N/A 5/1/2019 N/A N No
AB2-013 4776359 + AMIL-PJM N/A N/A Withdrawn Illinois Power Marketing Company 150 150 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4776359_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4776359_ltf2.pdf Executed Agreement and/or Study Withdrawn N/A N/A 12/15/2015 6/1/2020 6/1/2025 4/11/2019 N/A FF No
AB2-013 4776359 - AMIL-PJM N/A N/A Withdrawn Illinois Power Marketing Company 150 150 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4776359_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4776359_lft2.pdf Executed Agreement and/or Study Withdrawn N/A N/A 12/15/2015 6/1/2020 6/1/2025 4/11/2019 N/A FF No
AB2-036 + Church - Oil City 138kV Cherrywood Solar II MD Caroline Engineering and Procurement DPL 92 92 34.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2036_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2036_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2036_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_036_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_036_csa.pdf Document Posted N/A N/A 2/26/2016 N/A N/A 11/15/2023 11/15/2023 N/A N No
AB2-036 - Church - Oil City 138kV MD Caroline Active DPL 92 92 34.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2036_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2036_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2036_fac.pdf Document Posted N/A N/A 2/26/2016 N/A N/A 11/30/2018 N/A N No
AB2-174 + Emporia-Trego 115kV Greensville County Solar Project VA Greensville In Service Dominion 80 80 42 80 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2174_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2174_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_174_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_174_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/1/2020 12/31/2020 12/31/2020 12/1/2020 N/A N No
AB2-174 - Emporia-Trego 115kV Greensville County Solar Project VA Greensville In Service Dominion 80 80 42 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2174_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2174_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2174_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_174_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_174_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 12/1/2020 12/31/2020 12/31/2020 12/1/2020 N/A N No
AB2-190 + Hopewell-Surry 230kV Fort Powhatan Solar VA Prince George Partially in Service - Under Construction Dominion 160 160 112 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 8/6/2021 Customer Milestone Not Met 12/1/2021 12/1/2021 8/4/2021 N/A N No
AB2-190 - Hopewell-Surry 230kV Fort Powhatan Solar VA Prince George Partially in Service - Under Construction Dominion 160 160 112 22 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 8/6/2021 Customer Milestone Not Met 12/1/2021 12/1/2021 N/A N No
AC1-051 + Willard-S. Greenwich 69kV OH Huron Withdrawn AEP 60 60 7.8 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1051_imp.pdf Document Posted Withdrawn https://www.pjm.com/pub/planning/project-queues/isa/ac1_051_isa2.pdf Interim Study N/A N/A N/A 8/31/2016 N/A N/A 1/12/2021 12/31/2017 N/A N No
AC1-051 - Willard-S. Greenwich 69kV OH Huron Withdrawn AEP 60 60 7.8 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1051_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1051_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ac1_051_isa2.pdf Interim Study N/A N/A N/A 8/31/2016 N/A N/A 1/12/2021 12/31/2017 N/A N No
AC1-060 + Providence Forge 34.5kV Charles City 1 VA Charles City In Service Dominion 24 0 2.5 0 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1060_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1060_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_060_isa.pdf Document Posted N/A Not Required N/A N/A 9/20/2016 N/A N/A 6/1/2017 6/1/2017 6/9/2017 N/A N No
AC1-060 - Providence Forge 34.5kV Charles City 1 VA Charles City In Service Dominion 24 0 2.5 0 Capacity Generation Interconnection Methane https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1060_feas.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1060_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac1_060_isa.pdf Document Posted N/A Not Required N/A N/A 9/20/2016 N/A N/A 6/1/2017 6/1/2017 6/9/2017 N/A N No
AC1-129 4841990 + PJM-CPLE N/A N/A Confirmed North Carolina Electric Membership 25 25 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4841990_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4841990_ltf2.pdf Executed Agreement and/or Study Not Required N/A N/A 10/27/2016 1/1/2018 1/1/2023 N/A FF No
AC1-129 4841990 - PJM-CPLE N/A N/A Confirmed North Carolina Electric Membership 25 25 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/4841990_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ltf-phase-2/4841990_lft2.pdf Executed Agreement and/or Study Not Required N/A N/A 10/27/2016 1/1/2018 1/1/2023 N/A FF No
AC1-194 + Elk 138kV OH Vinton Active AEP 125 125 47.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1194_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/ac1_194_isa2.pdf Interim Study N/A N/A N/A 10/31/2016 N/A N/A 12/31/2018 N/A N No
AC1-194 - Elk 138kV OH Vinton Active AEP 125 125 47.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1194_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1194_imp.pdf Document Posted In Progress N/A N/A 10/31/2016 N/A N/A 12/31/2018 N/A N No
AC2-075 + Jacksonville-Renaker 138 kV Bluebird Solar KY Harrison Engineering and Procurement EKPC 100 20 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2075_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2075_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_075_isa.pdf Document Posted N/A Not Required N/A N/A 2/27/2017 N/A N/A 6/1/2023 6/1/2023 N/A N No
AC2-075 - Jacksonville-Renaker 138 kV Bluebird Solar KY Harrison Engineering and Procurement EKPC 100 20 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2075_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2075_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_075_isa.pdf Document Posted N/A N/A N/A 2/27/2017 N/A N/A 6/1/2023 6/1/2023 N/A N No
AD1-015 + Frazeysburg 138 kV OH Muskingum Active AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1015_fac.pdf Document Posted N/A N/A 4/21/2017 N/A N/A 6/1/2019 N/A N No
AD1-015 - Frazeysburg 138 kV OH Muskingum Active AEP 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1015_imp.pdf Document Posted In Progress N/A N/A 4/21/2017 N/A N/A 6/1/2019 N/A N No
AD1-041 + Harmony Village-Shackleford 115 kV Carvers Creek Solar VA Gloucester Suspended Dominion 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1041_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1041_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1041_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_041_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_041_csa.pdf Document Posted N/A N/A 7/31/2017 N/A N/A 3/31/2022 3/31/2022 N/A N No
AD1-041 - Harmony Village-Shackleford 115 kV Carvers Creek Solar VA Gloucester Engineering and Procurement Dominion 50 50 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1041_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1041_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1041_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_041_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_041_csa.pdf Document Posted N/A N/A 7/31/2017 N/A N/A 3/31/2022 3/31/2022 N/A N No
AD2-055 + Moshannon-East Towanda 230 kV PA Clinton Active PENELEC 548 44 35 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2055_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2055_fac.pdf Document Posted N/A N/A 2/9/2018 N/A N/A 10/1/2020 N/A N No
AD2-055 - Moshannon-East Towanda 230 kV PA Clinton Active PENELEC 548 44 35 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2055_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2055_imp.pdf Document Posted In Progress N/A N/A 2/9/2018 N/A N/A 10/1/2020 N/A N No
AE1-042 4954950 + TVA-PJM N/A N/A Withdrawn 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1042_fea.pdf Executed Agreement and/or Study N/A N/A 6/26/2018 6/1/2021 6/1/2026 2/1/2019 N/A PP No
AE1-042 4954950 - TVA-PJM N/A N/A Withdrawn 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1041_fea.pdf Executed Agreement and/or Study N/A N/A 6/26/2018 6/1/2021 6/1/2026 2/1/2019 N/A PP No
AE1-097 4966877 + PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1097_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2022 6/1/2027 2/27/2019 N/A PP No
AE1-097 4966877 - PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966877_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2022 6/1/2027 2/27/2019 N/A PP No
AE1-130 + Meads Store 138 kV VA Bedford Withdrawn AEP 83 83 55.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1130_imp.pdf Document Posted Withdrawn N/A N/A 9/11/2018 N/A N/A 8/6/2021 11/30/2020 N/A N No
AE1-130 - Meads Store 138 kV VA Bedford Active AEP 83 83 55.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1130_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1130_imp.pdf Document Posted In Progress N/A N/A 9/11/2018 N/A N/A 11/30/2020 N/A N No
AE2-126 + Dubois-Curwensville 34.5 kV UN-Viaduct PA Clearfield Engineering and Procurement PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2126_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2126_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_126_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_126_csa.pdf Document Posted N/A N/A 2/28/2019 N/A N/A 6/1/2022 6/30/2022 6/30/2022 N/A N No
AE2-126 - Dubois-Curwensville 34.5 kV UN-Viaduct PA Clearfield Engineering and Procurement PENELEC 20 20 12 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2126_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2126_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae2_126_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae2_126_csa.pdf Document Posted N/A N/A 2/28/2019 N/A N/A 6/1/2022 6/1/2022 6/1/2022 N/A N No
AF2-122 + Kirk 138 kV OH Licking Active AEP 107.7 107.7 64.62 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2122_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2122_imp.pdf Document Posted In Progress https://www.pjm.com/pub/planning/project-queues/isa/af2_122_isa2.pdf Interim Study N/A N/A N/A 2/28/2020 N/A N/A 10/3/2022 N/A N No
AF2-122 - Kirk 138 kV OH Licking Active AEP 107.7 107.7 64.62 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2122_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2122_imp.pdf Document Posted In Progress N/A N/A 2/28/2020 N/A N/A 10/3/2022 N/A N No
AF2-395 + Flatlick 765 kV OH Vinton Active AEP 1045 51.1 89.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/af2395_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2395_imp.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 3/31/2021 5/1/2022 N/A N No
AF2-395 - Flatlick 765 kV OH Vinton Active AEP 1045 51.1 89.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/af2395_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2395_imp.pdf Document Posted N/A N/A 3/31/2020 N/A N/A 3/31/2021 5/1/2022 N/A N No
AG1-031 + Elk Run D.P.-Gainesville 230 kV VA Fauquier Active Dominion 90 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1031_imp.pdf Document Posted N/A N/A 6/10/2020 N/A N/A 11/30/2021 N/A N No
AG1-031 - Elk Run D.P.-Gainesville 230 kV VA Fauquier Active Dominion 90 20 8.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1031_fea.pdf Document Posted In Progress N/A N/A 6/10/2020 N/A N/A 11/30/2021 N/A N No
AG1-037 + Ahoskie 34.5 kV NC Hertford Active Dominion 5 5 3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1037_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1037_imp.pdf Document Posted N/A N/A 6/16/2020 N/A N/A 12/31/2021 N/A N No
AG1-037 - Ahoskie 34.5 kV NC Hertford Active Dominion 5 5 3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1037_fea.pdf Document Posted In Progress N/A N/A 6/16/2020 N/A N/A 12/31/2021 N/A N No
AG1-043 + Sowego 115 kV VA Fauquier Active Dominion 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1043_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1043_imp.pdf Document Posted N/A N/A 6/26/2020 N/A N/A 12/12/2023 N/A N No
AG1-043 - Sowego 115 kV VA Fauquier Active Dominion 60 60 36 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1043_fea.pdf Document Posted In Progress N/A N/A 6/26/2020 N/A N/A 12/12/2023 N/A N No
AG1-079 + New Meredith 69 kV TES Blue Hen Solar 23 DE Kent Withdrawn DPL 1.5 1.5 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1079_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1079_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1079_wmpa.pdf Not Required N/A N/A 7/31/2020 N/A N/A 8/3/2021 11/1/2021 11/1/2021 N/A Y No
AG1-079 - New Meredith 69 kV TES Blue Hen Solar 23 DE Kent Engineering and Procurement DPL 1.5 1.5 0 Energy Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1079_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1079_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1079_wmpa.pdf Not Required N/A N/A 7/31/2020 N/A N/A 11/1/2021 11/1/2021 N/A Y No
AG1-102 + White Marsh 34.5 kV VA Gloucester Active Dominion 19 19 6.16 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1102_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1102_imp.pdf Document Posted N/A N/A 8/21/2020 N/A N/A 7/1/2022 N/A N No
AG1-102 - White Marsh 34.5 kV VA Gloucester Active Dominion 19 19 6.16 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1102_fea.pdf Document Posted In Progress N/A N/A 8/21/2020 N/A N/A 7/1/2022 N/A N No
AG1-152 + Remington CT 230 kV VA Fauquier Active Dominion 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1152_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1152_imp.pdf Document Posted N/A N/A 9/10/2020 N/A N/A 12/1/2023 N/A N No
AG1-152 - Remington CT 230 kV VA Fauquier Active Dominion 100 100 40 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1152_fea.pdf Document Posted In Progress N/A N/A 9/10/2020 N/A N/A 12/1/2023 N/A N No
AG1-210 + Northern Neck 34.5 kV VA Richmond Active Dominion 10 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1210_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1210_imp.pdf Document Posted N/A N/A 9/22/2020 N/A N/A 12/30/2022 N/A N No
AG1-210 - Northern Neck 34.5 kV VA Richmond Active Dominion 10 10 4 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1210_fea.pdf Document Posted In Progress N/A N/A 9/22/2020 N/A N/A 12/30/2022 N/A N No
AG1-221 + Poland Rd-Runway DP 230 kV VA Loudoun Active Dominion 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1221_imp.pdf Document Posted N/A N/A 9/23/2020 N/A N/A 6/1/2023 N/A N No
AG1-221 - Poland Rd-Runway DP 230 kV VA Loudoun Active Dominion 50 50 20 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1221_fea.pdf Document Posted In Progress N/A N/A 9/23/2020 N/A N/A 6/1/2023 N/A N No
AG1-263 + Gloucester 230 kV NJ Camden Active PSEG 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1263_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1263_imp.pdf Document Posted N/A N/A 9/28/2020 N/A N/A 10/31/2021 N/A N No
AG1-263 - Gloucester 230 kV NJ Camden Active PSEG 20 20 8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1263_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2021 N/A N No
AG1-268 + Essex 230 kV NJ Essex Active PSEG 80 80 40.8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1268_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1268_imp.pdf Document Posted N/A N/A 9/28/2020 N/A N/A 10/31/2022 N/A N No
AG1-268 - Essex 230 kV NJ Essex Active PSEG 80 80 40.8 Capacity Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1268_fea.pdf Document Posted In Progress N/A N/A 9/28/2020 N/A N/A 10/31/2022 N/A N No
AG1-339 + Curryville-RKB-Yellow Creek 23 kV II PA Bedford Withdrawn PENELEC 5 5 4.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1339_fea.pdf Document Posted Withdrawn N/A N/A 9/30/2020 N/A N/A 8/4/2021 6/30/2023 N/A N No
AG1-339 - Curryville-RKB-Yellow Creek 23 kV II PA Bedford Active PENELEC 5 5 4.6 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1339_fea.pdf Document Posted In Progress N/A N/A 9/30/2020 N/A N/A 6/30/2023 N/A N No
AG1-462 + Cordova B 345 kV IL Whiteside Active ComEd 255 255 153 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1462_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 10/1/2023 N/A N No
AG1-462 - Cordova B 345 kV IL Whiteside Active ComEd 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1462_fea.pdf Document Posted N/A N/A 9/30/2020 N/A N/A 10/1/2023 N/A N No
AG2-135 + Hoffman Estates 12.5 kV OH Pickaway Active ComEd 0.3 0.28 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag2135_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag2135_imp.pdf Document Posted Not Required N/A N/A 2/4/2021 N/A N/A 7/30/2021 N/A Y No
AG2-135 - Hoffman Estates 12.5 kV OH Pickaway Active ComEd 0.3 0.28 0 Energy Generation Interconnection Storage In Progress N/A N/A 2/4/2021 N/A N/A 7/30/2021 N/A Y No
AG2-231 + Arrowhead 12 kV PA Monroe Active PPL 10 10 6.2 Capacity Generation Interconnection Solar In Progress N/A N/A 3/12/2021 N/A N/A 12/1/2023 N/A N No
AG2-231 - Arrowhead 12.47 kV PA Monroe Active PPL 10 10 6.2 Capacity Generation Interconnection Solar In Progress N/A N/A 3/12/2021 N/A N/A 12/1/2023 N/A N No
AG2-371 + Newville 12 kV PA Cumberland Active PPL 10 10 6 Capacity Generation Interconnection Solar In Progress N/A N/A 3/29/2021 N/A N/A 6/30/2023 N/A N No
AG2-371 - Newville 69 kV PA Cumberland Active PPL 10 10 6 Capacity Generation Interconnection Solar In Progress N/A N/A 3/29/2021 N/A N/A 6/30/2023 N/A N No
AG2-398 + Fairfield 12 kV PA Lycoming Active PPL 10 10 6 Capacity Generation Interconnection Solar In Progress N/A N/A 3/30/2021 N/A N/A 6/30/2023 N/A N No
AG2-398 - Hughsville 69 kV PA Lycoming Active PPL 10 10 6 Capacity Generation Interconnection Solar In Progress N/A N/A 3/30/2021 N/A N/A 6/30/2023 N/A N No
AG2-422 + Bustleton 13 kV DE Kent Active PSEG Energy Generation Interconnection In Progress N/A N/A 3/30/2021 N/A N/A 12/31/2022 N/A Y No
AG2-422 - Bustleton 13 kV VA Fluvanna Active PSEG 1.2 1.2 0 Energy Generation Interconnection Battery; Solar In Progress N/A N/A 3/30/2021 N/A N/A 12/31/2022 N/A Y No
AG2-430 + Sunbury-Dalmatia 69 kV II PA Northumberland Active PPL 60 60 37.7 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 3/30/2021 N/A N/A 12/31/2024 N/A N No
AG2-430 - Sunbury-Dalmatia 69 kV II PA Northumberland Active PPL 60 60 37.7 Capacity Generation Interconnection Solar In Progress N/A N/A 3/30/2021 N/A N/A 12/31/2024 N/A N No
AG2-556 + Sullivan - Dequine 345 kV IN Vigo Active AEP 339.1 339.1 253.387 Capacity Generation Interconnection Other In Progress N/A N/A 3/31/2021 N/A N/A 1/1/2024 N/A N No
AG2-556 - Sullivan - Dequine 345 kV IN Vigo Active AEP 339.1 339.1 253.387 Capacity Generation Interconnection Natural Gas In Progress N/A N/A 3/31/2021 N/A N/A 1/1/2024 N/A N No
AG2-593 + Benton-Scott 69 kV PA Columbia Active PPL 20 20 12 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 3/31/2021 N/A N/A 6/1/2024 N/A N No
AG2-593 - Benton-Scott 69 kV PA Columbia Active PPL 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 6/1/2024 N/A N No
AG2-594 + Benton-Scott 69 kV II PA Columbia Active PPL 20 20 12 Capacity Generation Interconnection Solar; Storage In Progress N/A N/A 3/31/2021 N/A N/A 6/1/2024 N/A N No
AG2-594 - Benton-Scott 69 kV II PA Columbia Active PPL 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 6/1/2024 N/A N No
AG2-601 + Milton 69 kV III PA Northumberland Active PPL 90 0 0 Energy Generation Interconnection Storage In Progress N/A N/A 3/31/2021 N/A N/A 9/16/2022 N/A N No
AG2-601 - Milton 69 kV III PA Northumberland Active PPL 90 0 0 Energy Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 9/16/2022 N/A N No
AG2-653 + Siegfried-Hauto 69 kV V PA Carbon Active PPL 20 20 8 Capacity Generation Interconnection Storage In Progress N/A N/A 3/31/2021 N/A N/A 3/31/2024 N/A N No
AG2-653 - Siegfried-Hauto 69 kV V PA Carbon Active PPL 20 20 8 Capacity Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 3/31/2024 N/A N No
AH1-007 + Plymouth 69 kV PA Luzerne Withdrawn PPL 20 20 12 Capacity Generation Interconnection Solar Withdrawn N/A N/A 4/9/2021 N/A N/A 7/12/2021 12/1/2022 N/A N No
AH1-009 + IL DeKalb Withdrawn ComEd 86 86 54.3 Capacity Generation Interconnection Solar Withdrawn N/A N/A N/A N/A 12/2/2024 N/A N No
AH1-028 + Freeman1 12.47 kV VA Brunswick Active Dominion 8.8 8.75 3.4 Capacity Generation Interconnection Solar In Progress N/A N/A 5/26/2021 N/A N/A 12/20/2023 N/A N No
AH1-029 + WV-PJM1 12 kV IL Cook Withdrawn AEP Energy Generation Interconnection In Progress N/A N/A 6/3/2021 N/A N/A 8/3/2021 5/31/2021 N/A Y No
AH1-029 - WV-PJM1 12 kV N/A N/A Active AEP 1 Energy Generation Interconnection Solar In Progress N/A N/A 6/3/2021 N/A N/A 5/31/2021 N/A Y No
AH1-030 + WV PJM2 12 kV IL Cook Withdrawn AEP Energy Generation Interconnection In Progress N/A N/A 6/3/2021 N/A N/A 8/3/2021 6/30/2022 N/A Y No
AH1-030 - WV PJM2 12 kV N/A N/A Active AEP 1 Energy Generation Interconnection Solar In Progress N/A N/A 6/3/2021 N/A N/A 6/30/2022 N/A Y No
AH1-042 + Providence Forge-Turner 115kV VA Charles City Active Dominion 154 154 99.9 Capacity Generation Interconnection Solar In Progress N/A N/A 6/25/2021 N/A N/A 9/1/2024 N/A N No
AH1-042 - Stony Run Solar Project, LLC VA Charles City Active Dominion 154 154 99.9 Capacity Generation Interconnection Solar In Progress N/A N/A 6/25/2021 N/A N/A 9/1/2024 N/A N No
AH1-047 + Marengo - Belvidere 138 kV IL Boone Active ComEd 61.6 61.6 36.96 Capacity Generation Interconnection Solar In Progress N/A N/A 7/6/2021 N/A N/A 9/13/2022 N/A N No
AH1-056 + Red House Tap - Sugar Hill 115 kV VA Campbell Active Dominion 100 100 70 Capacity Generation Interconnection Solar In Progress N/A N/A 7/14/2021 N/A N/A 11/15/2026 N/A N No
AH1-063 + Spring Creek 138 kV VA Washington Active AEP 100 100 40 Capacity Generation Interconnection Storage In Progress N/A N/A 7/26/2021 N/A N/A 7/1/2024 N/A N No
AH1-065 + Hopewell 34.5kV II VA City of Hopewell Active Dominion 20 20 8 Capacity Generation Interconnection Storage In Progress N/A N/A 7/27/2021 N/A N/A 5/1/2023 N/A N No
AH1-066 + Hopewell 34.5kV III VA City of Hopewell Active Dominion 10 10 4 Capacity Generation Interconnection Storage In Progress N/A N/A 7/27/2021 N/A N/A 5/1/2023 N/A N No
AH1-079 + Harmony Village 34.5kV VA Middlesex Active Dominion 20 20 12 Capacity Generation Interconnection Solar In Progress N/A N/A 7/30/2021 N/A N/A 12/20/2024 N/A N No
AH1-102 + Seward-Glory 115 kV PA Indiana Active PENELEC 100 100 63.4 Capacity Generation Interconnection Solar In Progress N/A N/A 7/30/2021 N/A N/A 12/31/2024 N/A N No
T07 664042 + PJM-CIN N/A N/A Withdrawn Conectiv Energy Supply 1000 Energy Long-Term Firm Transmission N/A N/A 8/6/2007 1/1/2008 1/1/2010 8/30/2007 N/A FF No
T07 664042 - PJM-CIN N/A N/A Withdrawn Conectiv Energy Supply 1000 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/664042_ltf1.pdf N/A N/A 8/6/2007 1/1/2008 1/1/2010 8/30/2007 N/A FF No
T70 811671 + CPLE-PJM N/A N/A Withdrawn Calpine Energy Services 172 Energy Long-Term Firm Transmission N/A N/A 9/21/2007 6/1/2010 6/1/2011 9/24/2007 N/A FF No
T70 811671 - CPLE-PJM N/A N/A Withdrawn Calpine Energy Services 172 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/811671_ltf1.pdf N/A N/A 9/21/2007 6/1/2010 6/1/2011 9/24/2007 N/A FF No
T87 822067 + PJM-TVA N/A N/A Withdrawn 103 Energy Long-Term Firm Transmission N/A N/A 10/18/2007 1/1/2008 1/1/2009 10/19/2007 N/A FF No
T87 822067 - PJM-TVA N/A N/A Withdrawn 103 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/822067_ltf1.pdf N/A N/A 10/18/2007 1/1/2008 1/1/2009 10/19/2007 N/A FF No
T88 822068 + PJM-TVA N/A N/A Withdrawn 103 Energy Long-Term Firm Transmission N/A N/A 10/18/2007 1/1/2008 1/1/2009 10/19/2007 N/A FF No
T88 822068 - PJM-TVA N/A N/A Withdrawn 103 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ltf-phase-1/822068_ltf1.pdf N/A N/A 10/18/2007 1/1/2008 1/1/2009 10/19/2007 N/A FF No
Z2-083 + Mickleton 230kV West Deptford Energy Station NJ Gloucester In Service AEC 1104 9 9 9 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/z2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2083_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/z2_083_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/z2_083_csa.pdf Document Posted N/A N/A 4/29/2014 N/A N/A 12/31/2018 12/31/2018 12/31/2018 N/A N No
Z2-083 - Mickleton 230kV West Deptford Energy Station NJ Gloucester In Service AEC 1104 9 9 9 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/z2083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/z2083_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/z2_083_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/z2_083_csa.pdf Document Posted N/A N/A 4/29/2014 N/A N/A 11/20/2018 12/31/2018 12/31/2018 12/31/2018 N/A N No