Changes in PJM Queue between July 26th, 2021 and August 2nd, 2021.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

Summary of Changes

##   old_obs   new_obs   changes additions  removals 
##      7454      7460        54         6         0

Changes

## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
AA2-173 + Hatfield 500kV Hilltop Energy Center Facility PA Greene In Service APS 515 515 515 515 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_173_csa.pdf Document Posted N/A N/A 4/30/2015 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AA2-173 - Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 515 515 515 515 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_173_csa.pdf Document Posted N/A N/A 4/30/2015 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AB1-014 + Hillcrest 138kV Hillcrest Solar Facility OH Brown In Service DEOK 125 125 47.5 125 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1014_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1014_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_014_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_014_csa.pdf Document Posted N/A N/A 8/19/2020 6/8/2015 N/A N/A 11/15/2020 12/31/2020 12/31/2020 12/18/2020 N/A N No
AB1-014 - Hillcrest 138kV Hillcrest Solar Facility OH Brown Partially in Service - Under Construction DEOK 125 125 47.5 125 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1014_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1014_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1014_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_014_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_014_csa.pdf Document Posted N/A N/A 8/19/2020 6/8/2015 N/A N/A 11/15/2020 12/31/2020 12/31/2020 12/18/2020 N/A N No
AB1-112 + Hatfield 500kV Hilltop Energy Center Facility PA Greene In Service APS 535 20 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1112_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1112_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_112_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_112_csa.pdf Document Posted N/A N/A 10/27/2015 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AB1-112 - Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 535 20 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1112_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1112_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_112_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_112_csa.pdf Document Posted N/A N/A 10/27/2015 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AB2-085 + Adams 138kV OH Adams Active AEP 49.9 49.9 33.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2085_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2085_fac.pdf Document Posted N/A N/A 4/18/2016 N/A N/A 10/31/2017 N/A N No
AB2-085 - Adams 138kV OH Adams Active AEP 49.9 49.9 33.93 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2085_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2085_imp.pdf Document Posted In Progress N/A N/A 4/18/2016 N/A N/A 10/31/2017 N/A N No
AB2-100 + Clubhouse-Lakeview 230kV Sadler Solar VA Greensville In Service Dominion 100 100 67 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2100_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2100_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_100_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_100_csa.pdf Document Posted N/A N/A 4/27/2016 N/A N/A 1/18/2021 12/1/2021 12/1/2021 1/22/2021 N/A N No
AB2-100 - Clubhouse-Lakeview 230kV Sadler Solar VA Greensville Partially in Service - Under Construction Dominion 100 100 67 55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2100_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2100_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2100_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_100_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_100_csa.pdf Document Posted N/A N/A 4/27/2016 N/A N/A 1/18/2021 12/1/2021 12/1/2021 1/22/2021 N/A N No
AB2-129 + Doubs 230kV Potomac Solar, LLC MD Frederick Withdrawn APS 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2129_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2129_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_129_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_129_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 7/30/2021 4/30/2020 4/30/2020 5/30/2021 N/A N No
AB2-129 - Doubs 230kV Potomac Solar, LLC MD Frederick Suspended APS 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2129_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2129_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_129_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_129_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 4/30/2020 4/30/2020 N/A N No
AB2-158 + Louisa-South Anna 230kV Belcher Solar VA Louisa Partially in Service - Under Construction Dominion 88.2 88.2 61 88.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_158_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/31/2021 12/1/2020 12/1/2020 6/30/2021 N/A N No
AB2-158 - Louisa-South Anna 230kV Belcher Solar VA Louisa In Service Dominion 88.2 88.2 61 88.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_158_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/31/2021 12/1/2020 12/1/2020 6/30/2021 N/A N No
AB2-190 + Hopewell-Surry 230kV Fort Powhatan Solar VA Prince George Partially in Service - Under Construction Dominion 160 160 112 22 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 8/6/2021 Customer Milestone Not Met 12/1/2021 12/1/2021 N/A N No
AB2-190 - Hopewell-Surry 230kV Fort Powhatan Solar VA Prince George Under Construction Dominion 160 160 112 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A Customer Milestone Not Met 12/1/2021 12/1/2021 N/A N No
AC1-054 + Kerr Dam–Eatons Ferry 115 kV Hawtree Creek NC Warren Under Construction Dominion 65 65 44.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1054_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1054_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_054_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_054_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 8/2/2021 6/1/2021 6/1/2021 N/A N No
AC1-054 - Kerr Dam–Eatons Ferry 115 kV Hawtree Creek NC Warren Under Construction Dominion 65 65 44.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1054_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1054_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1054_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_054_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_054_csa.pdf Document Posted N/A N/A 8/31/2016 N/A N/A 8/1/2021 6/1/2021 6/1/2021 N/A N No
AC1-068 + Atlanta 69kV I Pickaway County Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1068_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1068_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1068_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_068_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_068_csa.pdf Document Posted N/A N/A 9/26/2016 N/A N/A 12/1/2021 12/31/2022 12/31/2022 N/A N No
AC1-068 - Atlanta 69kV I Pickaway County Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1068_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1068_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1068_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_068_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_068_csa.pdf Document Posted N/A N/A 9/26/2016 N/A N/A 12/1/2021 12/31/2021 12/31/2021 N/A N No
AC1-069 + Atlanta 69kV II Pickaway County II Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1069_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1069_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1069_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_069_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_069_csa.pdf Document Posted N/A N/A 9/26/2016 N/A N/A 12/1/2021 12/31/2022 12/31/2022 N/A N No
AC1-069 - Atlanta 69kV II Pickaway County II Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 34 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1069_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1069_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1069_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_069_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_069_csa.pdf Document Posted N/A N/A 9/26/2016 N/A N/A 12/1/2021 12/31/2021 12/31/2021 N/A N No
AC1-103 + Nottingham 138kV Harrison Power Plant OH Harrison Suspended AEP 1050 1050 1026 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1103_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1103_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_103_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_103_csa.pdf Document Posted N/A N/A 10/25/2016 N/A N/A 6/11/2024 6/11/2024 N/A N No
AC1-103 - Nottingham 138kV Harrison Power Plant OH Harrison Engineering and Procurement AEP 1050 1050 1026 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1103_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1103_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1103_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_103_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_103_csa.pdf Document Posted N/A N/A 10/25/2016 N/A N/A 6/11/2024 6/11/2024 N/A N No
AC1-165 + Atlanta 69kV III Buckeye Plains II Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1165_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1165_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1165_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_165_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_165_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2021 12/31/2022 12/31/2022 N/A N No
AC1-165 - Atlanta 69kV III Buckeye Plains II Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1165_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1165_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1165_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_165_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_165_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2021 12/31/2021 12/31/2021 N/A N No
AC1-166 + Atlanta 69kV IV Buckeye Plains Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1166_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1116_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_166_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_166_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2021 12/31/2022 12/31/2022 N/A N No
AC1-166 - Atlanta 69kV IV Buckeye Plains Solar OH Pickaway Engineering and Procurement Dayton 49.9 49.9 33.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1166_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1166_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1116_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_166_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_166_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 12/1/2021 12/31/2021 12/31/2021 N/A N No
AC2-059 + Biers Run-Circleville 138kV OH Ross Active AEP 127 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2059_fac.pdf Document Posted N/A N/A 2/16/2017 N/A N/A 12/31/2019 N/A N No
AC2-059 - Biers Run-Circleville 138kV OH Ross Active AEP 127 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2059_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2059_imp.pdf Document Posted In Progress N/A N/A 2/16/2017 N/A N/A 12/31/2019 N/A N No
AC2-066 + Hillcrest 138kV Hillcrest Solar Facility OH Brown In Service DEOK 200 75 28.5 75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2066_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2066_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_066_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_066_csa.pdf Document Posted N/A N/A 8/19/2020 2/24/2017 N/A N/A 11/15/2020 12/31/2020 12/31/2020 12/18/2020 N/A N No
AC2-066 - Hillcrest 138kV Hillcrest Solar Facility OH Brown Partially in Service - Under Construction DEOK 200 75 28.5 55 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2066_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2066_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_066_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_066_csa.pdf Document Posted N/A N/A 8/19/2020 2/24/2017 N/A N/A 11/15/2020 12/31/2020 12/31/2020 12/18/2020 N/A N No
AC2-142 + Hatfield 500kV Hilltop Energy Center Facility PA Greene In Service APS 664.7 129.7 129.7 129.7 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2142_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2142_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_142_isa.pdf Document Posted N/A Not Required N/A N/A 3/28/2017 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AC2-142 - Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 664.7 129.7 129.7 90 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2142_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2142_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_142_isa.pdf Document Posted N/A Not Required N/A N/A 3/28/2017 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AD1-033 + Fentress-Landstown 230 kV Bedford Solar Center VA City of Chesapeake Under Construction Dominion 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1033_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1033_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_033_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_033_csa.pdf Document Posted N/A N/A 7/26/2017 N/A N/A 8/24/2021 12/1/2021 12/1/2021 N/A N No
AD1-033 - Fentress-Landstown 230 kV Bedford Solar Center VA City of Chesapeake Under Construction Dominion 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1033_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1033_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_033_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_033_csa.pdf Document Posted N/A N/A 7/26/2017 N/A N/A 12/1/2021 12/1/2021 N/A N No
AD1-039 + Kendall-Tazewell & Dresden-Mole Creek IL Grundy Active ComEd 1262.7 102.7 112.7 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1039_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1039_imp.pdf Document Posted In Progress N/A N/A 7/28/2017 N/A N/A 3/1/2022 3/1/2022 N/A N No
AD1-039 - Kendall-Tazewell & Dresden-Mole Creek IL Grundy Active ComEd 1262.7 102.7 112.7 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1039_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1039_imp.pdf Document Posted N/A N/A 7/28/2017 N/A N/A 3/1/2022 3/1/2022 N/A N No
AD1-072 + Biers Run-Circleville 138 kV OH Ross Active AEP 147 20 13.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1072_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1072_fac.pdf Document Posted N/A N/A 8/31/2017 N/A N/A 6/1/2020 N/A N No
AD1-072 - Biers Run-Circleville 138 kV OH Ross Active AEP 147 20 13.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1072_imp.pdf Document Posted In Progress N/A N/A 8/31/2017 N/A N/A 6/1/2020 N/A N No
AD1-129 + Belvidere 34 kV Cherry Valley Solar Project, LLC IL Boone Engineering and Procurement ComEd 12.5 12.5 7.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1129_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1129_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1129_wmpa.pdf Not Required N/A N/A 9/28/2017 N/A N/A 9/30/2022 9/30/2022 N/A N Yes
AD1-129 - Belvidere 34 kV Cherry Valley Solar Project, LLC IL Boone Engineering and Procurement ComEd 12.5 12.5 7.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1129_imp.pdf Document Posted In Progress N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1129_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1129_wmpa.pdf Not Required N/A N/A 9/28/2017 N/A N/A 9/30/2022 9/30/2022 N/A N Yes
AD2-005 + Nottingham 138kV Harrison Power Plant OH Harrison Suspended AEP 1085 35 35 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2005_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2005_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2005_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_005_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_005_csa.pdf Document Posted N/A N/A 10/24/2017 N/A N/A 6/11/2024 6/11/2024 N/A N No
AD2-005 - Nottingham 138kV Harrison Power Plant OH Harrison Engineering and Procurement AEP 1085 35 35 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2005_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2005_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2005_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_005_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_005_csa.pdf Document Posted N/A N/A 10/24/2017 N/A N/A 6/11/2024 6/11/2024 N/A N No
AD2-016 + Biers Run-Circleville 138 kV OH Ross Active AEP 274 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2016_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2016_fac.pdf Document Posted N/A N/A 11/15/2017 N/A N/A 12/31/2020 N/A N No
AD2-016 - Biers Run-Circleville 138 kV OH Ross Active AEP 274 127 62.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2016_imp.pdf Document Posted In Progress N/A N/A 11/15/2017 N/A N/A 12/31/2020 N/A N No
AE1-042 4954950 + TVA-PJM N/A N/A Withdrawn 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1041_fea.pdf Executed Agreement and/or Study N/A N/A 6/26/2018 6/1/2021 6/1/2026 2/1/2019 N/A PP No
AE1-042 4954950 - TVA-PJM N/A N/A Withdrawn 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4954950_ltf1.pdf Executed Agreement and/or Study N/A N/A 6/26/2018 6/1/2021 6/1/2026 2/1/2019 N/A PP No
AE1-094 4966856 + PJM-HUDSON N/A N/A Withdrawn Hudson Transmission Partners, LLC 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1094_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2019 6/1/2020 2/27/2019 N/A PP No
AE1-094 4966856 - PJM-HUDSON N/A N/A Withdrawn Hudson Transmission Partners, LLC 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966856_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2019 6/1/2020 2/27/2019 N/A PP No
AE1-095 4966859 + PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1095_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2020 6/1/2021 2/27/2019 N/A PP No
AE1-095 4966859 - PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966859_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2020 6/1/2021 2/27/2019 N/A PP No
AE1-096 4966862 + PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1096_fea.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2021 6/1/2022 2/27/2019 N/A PP No
AE1-096 4966862 - PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966862_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2021 6/1/2022 2/27/2019 N/A PP No
AE1-110 4966477 + PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966477_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1110_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2030 2/28/2019 N/A PP No
AE1-110 4966477 - PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966477_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966477_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2030 2/28/2019 N/A PP No
AE1-111 4966479 + PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966479_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1111_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2031 2/28/2019 N/A PP No
AE1-111 4966479 - PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966479_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966479_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2031 2/28/2019 N/A PP No
AE1-112 4966484 + PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966484_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/ae1112_fea.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2032 2/28/2019 N/A PP No
AE1-112 4966484 - PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966484_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966484_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2032 2/28/2019 N/A PP No
AE1-120 + Hillcrest 138 kV Hillcrest Solar I OH Brown In Service DEOK 200 0 44 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1120_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1120_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_120_isa.pdf Document Posted N/A Not Required N/A N/A 8/19/2020 9/17/2018 N/A N/A 11/15/2020 12/31/2020 12/31/2020 12/18/2020 N/A N No
AE1-120 - Hillcrest 138 kV Hillcrest Solar I OH Brown Partially in Service - Under Construction DEOK 200 0 44 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1120_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1120_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ae1_120_isa.pdf Document Posted N/A Not Required N/A N/A 8/19/2020 9/17/2018 N/A N/A 11/15/2020 12/31/2020 12/31/2020 12/18/2020 N/A N No
AE1-185 + Hokes-Jackson 69 kV Cottontail Solar 1 PA York Engineering and Procurement ME 20 20 12.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1185_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1185_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1185_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ae1_185_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ae1_185_csa.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 12/31/2022 12/31/2022 N/A N No
AE1-185 - Hokes-Jackson 69 kV PA York Active ME 20 20 12.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1185_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1185_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1185_fac.pdf Document Posted N/A N/A 9/26/2018 N/A N/A 4/1/2021 N/A N No
AE2-206 + East Sidney-Quincy 138 kV OH Champaign Active Dayton 99 99 41.58 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2206_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2206_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2206_fac.pdf Document Posted N/A N/A 3/19/2019 N/A N/A 11/30/2021 N/A N No
AE2-206 - East Sidney-Quincy 138 kV OH Champaign Active Dayton 99 99 41.58 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2206_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2206_imp.pdf Document Posted In Progress N/A N/A 3/19/2019 N/A N/A 11/30/2021 N/A N No
AE2-218 + Eldean 138 kV OH Miami Active Dayton 178 178 106 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2218_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2218_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2218_fac.pdf Document Posted N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-218 - Eldean 138 kV OH Miami Active Dayton 178 178 106 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2218_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2218_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-221 + Clinton-Stuart 345 kV OH Clinton Active Dayton 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2221_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2221_fac.pdf Document Posted N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-221 - Clinton-Stuart 345 kV OH Clinton Active Dayton 300 300 180 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2221_imp.pdf Document Posted In Progress N/A N/A 3/21/2019 N/A N/A 12/31/2021 N/A N No
AE2-278 + Urbana 138 kV OH Champaign Active Dayton 150.7 150.7 90.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2278_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2278_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2278_fac.pdf Document Posted N/A N/A 3/26/2019 N/A N/A 10/1/2021 N/A N No
AE2-278 - Urbana 138 kV OH Champaign Active Dayton 150.7 150.7 90.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2278_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2278_imp.pdf Document Posted In Progress N/A N/A 3/26/2019 N/A N/A 10/1/2021 N/A N No
AE2-303 + Honda Marysville Tap-Honda Marysville 69 kV OH Union Active Dayton 49.9 49.9 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2303_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2303_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2303_fac.pdf Document Posted N/A N/A 3/29/2019 N/A N/A 7/1/2022 N/A N No
AE2-303 - Honda Marysville Tap-Honda Marysville 69 kV OH Union Active Dayton 49.9 49.9 30 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2303_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2303_imp.pdf Document Posted In Progress N/A N/A 3/29/2019 N/A N/A 7/1/2022 N/A N No
AE2-342 + Woodstock 69 kV OH Champaign Active Dayton 40 40 26.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2342_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2342_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2342_fac.pdf Document Posted N/A N/A 3/31/2019 N/A N/A 12/1/2022 N/A N No
AE2-342 - Woodstock 69 kV OH Champaign Active Dayton 40 40 26.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2342_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2342_imp.pdf Document Posted In Progress N/A N/A 3/31/2019 N/A N/A 12/1/2022 N/A N No
AF2-015 + Essex-McCarter 230 kV N/A N/A Withdrawn PSEG Energy Merchant Transmission Not Required Withdrawn N/A N/A 10/23/2019 N/A N/A 7/28/2021 10/23/2019 N/A EE No
AF2-015 - Essex-McCarter 230 kV NJ Essex Active PSEG 50 Energy Merchant Transmission Not Required In Progress N/A N/A 10/23/2019 N/A N/A 7/1/2021 N/A EE No
AF2-018 + Inez 138 kV KY Martin Active AEP 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2018_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2018_imp.pdf Document Posted Withdrawn N/A N/A 11/1/2019 N/A N/A 12/1/2023 N/A N No
AF2-018 - Inez 138 kV KY Martin Active AEP 200 200 133.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2018_fea.pdf Document Posted In Progress N/A N/A 11/1/2019 N/A N/A 12/1/2023 N/A N No
AF2-395 + Flatlick 765 kV OH Vinton Active AEP 1045 51.1 89.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/af2395_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2395_imp.pdf Document Posted N/A N/A 3/31/2020 N/A N/A 3/31/2021 5/1/2022 N/A N No
AF2-395 - Flatlick 765 kV OH Vinton Withdrawn AEP 1045 51.1 89.6 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/af2395_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2395_imp.pdf Document Posted N/A N/A 3/31/2020 N/A N/A 3/31/2021 5/1/2022 N/A N No
AF2-398 + Necessity-Dinnerbell 12.47 kV PA Fayette Active APS 3 3 1.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2398_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2398_imp.pdf Document Posted Not Required Not Required N/A N/A 3/31/2020 N/A N/A 12/31/2021 N/A N No
AF2-398 - Necessity-Dinnerbell 12.47 kV PA Fayette Active APS 3 3 1.9 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/af2398_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/af2398_imp.pdf Document Posted In Progress N/A N/A 3/31/2020 N/A N/A 12/31/2021 N/A N No
AG1-254 + Salem-Woodstown 69 kV NJ Salem Active AEC 70 70 46.6667 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1254_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2023 N/A N No
AG1-254 - Salem-Woodstown 69 kV NJ Salem Active AEC 70 70 46.6667 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1254_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2023 N/A N No
AG1-255 + Churchtown-Orchard 230 kV NJ Salem Active AEC 150 55 36.7 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1255_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2023 N/A N No
AG1-255 - Churchtown-Orchard 230 kV NJ Salem Active AEC 150 55 36.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1255_fea.pdf Document Posted In Progress N/A N/A 9/25/2020 N/A N/A 12/31/2023 N/A N No
AG1-330 + Beavertown 12.47 kV ASD Brick Plant PA2 Solar PA Beaver Engineering and Procurement PPL 5 5 4.5 Capacity Generation Interconnection Solar; Battery https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1330_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1330_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1330_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1330_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/1/2024 3/1/2024 N/A N No
AG1-330 - Beavertown 12.47 kV ASD Brick Plant PA2 Solar PA Beaver Engineering and Procurement PPL 5 5 4.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1330_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1330_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1330_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1330_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/1/2024 3/1/2024 N/A N No
AG1-336 + Hunter 12.47 kV ASD Hilcrest PA2 Solar PA Northumberland Engineering and Procurement PPL 5 5 3.8 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1336_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1336_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1336_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1336_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/1/2024 3/1/2024 N/A N No
AG1-336 - Hunter 12.47 kV ASD Hilcrest PA2 Solar PA Northumberland Engineering and Procurement PPL 5 5 3.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1336_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1336_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1336_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1336_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/1/2024 3/1/2024 N/A N No
AG1-337 + Elizabethville 12.47 kV ASD Market PA2 Solar PA Dauphin Engineering and Procurement PPL 5 5 3.7 Capacity Generation Interconnection Solar; Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1337_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1337_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1337_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1337_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/1/2024 3/1/2024 N/A N No
AG1-337 - Elizabethville 12.47 kV ASD Market PA2 Solar PA Dauphin Engineering and Procurement PPL 5 5 3.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1337_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1337_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1337_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1337_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 3/1/2024 3/1/2024 N/A N No
AG1-362 + Wernersville 12.47 kV Furnace View Farms PA Berks Engineering and Procurement PPL 5 5 3.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1362_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1362_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ag1362_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ag1362_wmpa.pdf Not Required N/A N/A 9/30/2020 N/A N/A 12/29/2023 12/29/2023 N/A N No
AG1-362 - Wernersville 12.47 kV PA Berks Active PPL 5 5 3.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1362_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ag1362_imp.pdf Document Posted Not Required Not Required N/A N/A 9/30/2020 N/A N/A 12/31/2021 N/A N No
AG2-036 + Mantua 12 kV NJ Gloucester Active AEC 10 10 5.1 Capacity Generation Interconnection Solar In Progress N/A N/A 11/13/2020 N/A N/A 12/31/2021 N/A N No
AG2-036 - Mantua 12 kV NJ Gloucester Active AEC 10 10 6.68 Capacity Generation Interconnection Solar In Progress N/A N/A 11/13/2020 N/A N/A 12/31/2021 N/A N No
AG2-052 5090276 + NIPS-PJM N/A N/A Active Northern Indiana Public Service Company 2 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/ag052_fea.pdf Executed Agreement and/or Study N/A N/A 12/3/2020 2/1/2021 2/1/2026 N/A PP No
AG2-052 5090276 - NIPS-PJM N/A N/A Active Northern Indiana Public Service Company 2 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/5090276_ltf1.pdf Executed Agreement and/or Study N/A N/A 12/3/2020 2/1/2021 2/1/2026 N/A PP No
AG2-138 + Olive-University Park 345 kV IN LaPorte Active AEP Energy Merchant Transmission Not Required N/A N/A 2/9/2021 N/A N/A 2/8/2021 N/A EE No
AG2-138 - Lake Lynn–Lardin 138 kV IN LaPorte Active AEP Energy Merchant Transmission Issued N/A N/A 2/9/2021 N/A N/A 2/8/2021 N/A EE No
AG2-242 + Olive-University Park 345 kV IN Adams Active AEP Energy Merchant Transmission Not Required N/A N/A 3/16/2021 N/A N/A 3/18/2021 N/A EE No
AG2-242 - Olive-University Park 345 kV N/A N/A Active AEP Energy Merchant Transmission Issued N/A N/A 3/16/2021 N/A N/A 3/18/2021 N/A EE No
AG2-568 + Stink Run – Sundial 138 kV WV N/A Active AEP 80 80 48 Capacity Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 2/25/2024 N/A N No
AG2-568 - Sundial - Big Branch 138 kV WV N/A Active AEP 80 80 48 Capacity Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 2/25/2024 N/A N No
AG2-574 + Sowers 138 kV IN Allen Withdrawn AEP 100 100 60 Capacity Generation Interconnection Solar Withdrawn N/A N/A 3/31/2021 N/A N/A 7/30/2021 12/29/2023 N/A N No
AG2-574 - Sowers 138 kV IN Allen Active AEP 100 100 60 Capacity Generation Interconnection Solar In Progress N/A N/A 3/31/2021 N/A N/A 12/29/2023 N/A N No
AH1-037 + Matheny N/A N/A Active ATSI 5 5 0 Energy Generation Interconnection Solar In Progress N/A N/A 6/16/2021 N/A N/A 11/1/2023 N/A Y No
AH1-038 + Kramer N/A N/A Active PENELEC 3.8 3.825 0 Energy Generation Interconnection Solar In Progress N/A N/A 6/16/2021 N/A N/A 11/1/2023 N/A Y No
AH1-043 + Sand Hills - Brunswick NJ Middlesex Active PSEG 90 90 36 Capacity Generation Interconnection Storage In Progress N/A N/A 6/28/2021 N/A N/A 5/15/2024 N/A N No
AH1-045 + Zion Energy Center 345 kV IL Lake Active ComEd 23 23 13.8 Capacity Generation Interconnection Solar In Progress N/A N/A 7/1/2021 N/A N/A 6/1/2023 N/A N No
AH1-055 + Kyger Creek - Don Marquis 345 kV OH Jackson Active AEP 220 220 154 Capacity Generation Interconnection Solar In Progress N/A N/A 7/13/2021 N/A N/A 11/15/2026 N/A N No
AH1-062 + London-Tangy 69 kV II OH Madison Active ATSI 20 20 13.7 Capacity Generation Interconnection Solar In Progress N/A N/A 7/22/2021 N/A N/A 12/31/2024 N/A N No