Changes in PJM Queue between July 6th, 2021 and July 12th, 2021.
Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.
Fully new queue positions appear as individual rows with all fields highlighted green.
create_output_table(ctable_queues)
## Creating HTML table for first ${limit_html} rows
| QueueNumber | chng_type | Name | CommercialName | State | County | Status | TransmissionOwner | MaximumFacilityOutput | MWEnergy | MWCapacity | MWInService | CapacityorEnergy | ProjectType | Fuel | ProjectACOrDC | RightsMW | InitialStudy | FeasibilityStudy | FeasibilityStudyStatus | SystemImpactStudy | SystemImpactStudyStatus | FacilitiesStudy | FacilitiesStudyStatus | InterimInterconnectionServiceAgreement | InterimInterconnectionServiceAgreementStatus | WholesaleMarketParticipationAgreement | ConstructionServiceAgreement | ConstructionServiceAgreementStatus | UpgradeConstructionServiceAgreement | UpgradeConstructionServiceAgreementStatus | BackfeedDate | QueueDate | LongTermFirmServiceStartDate | LongTermFirmServiceEndDate | TestEnergyDate | WithdrawalDate | WithdrawnRemarks | ProjectedInServiceDate | RevisedInServiceDate | ActualInServiceDate | SuspensionDate | AttachmentType | AlternateQueue | SlideQueue |
|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|---|
| AA1-092 | + | Halfway 34.5kV | Perennial Solar Project | MD | Washington | Engineering and Procurement | APS | 12 | 12 | 8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1092_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1092_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa1_092_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa1_092_csa.pdf | Document Posted | N/A | N/A | 10/30/2014 | N/A | N/A | 6/1/2023 | 6/1/2023 | 6/1/2023 | N/A | N | Yes | ||||||||||
| AA1-092 | - | Halfway 34.5kV | Perennial Solar Project | MD | Washington | Engineering and Procurement | APS | 12 | 12 | 8 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1092_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1092_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/aa1_092_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa1_092_csa.pdf | Document Posted | N/A | N/A | 10/30/2014 | N/A | N/A | 12/1/2020 | 6/1/2023 | 6/1/2023 | N/A | N | Yes | ||||||||||
| AA1-146 | + | Nelson | Invenergy Nelson Expansion LLC | IL | Lee | Engineering and Procurement | ComEd | 190 | 190 | 157 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1146_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1146_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa1146_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa1_146_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa1_146_csa.pdf | Document Posted | N/A | N/A | 10/31/2014 | N/A | N/A | 6/1/2024 | 6/1/2024 | N/A | N | No | ||||||||||
| AA1-146 | - | Nelson | Invenergy Nelson Expansion LLC | IL | Lee | Engineering and Procurement | ComEd | 190 | 190 | 157 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1146_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1146_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa1146_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa1_146_isa.pdf | Document Posted | N/A | N/A | N/A | 10/31/2014 | N/A | N/A | 6/1/2024 | 6/1/2024 | N/A | N | No | ||||||||||||
| AA2-030 | + | Nelson | Invenergy Nelson Expansion LLC | IL | Lee | Engineering and Procurement | ComEd | 380 | 190 | 157 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2030_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2030_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2030_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_030_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/aa2_030_csa.pdf | Document Posted | N/A | N/A | 12/23/2014 | N/A | N/A | 3/31/2023 | 3/31/2023 | N/A | N | No | ||||||||||
| AA2-030 | - | Nelson | Invenergy Nelson Expansion LLC | IL | Lee | Engineering and Procurement | ComEd | 380 | 190 | 157 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2030_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2030_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/aa2030_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/aa2_030_isa.pdf | Document Posted | N/A | N/A | N/A | 12/23/2014 | N/A | N/A | 3/31/2023 | 3/31/2023 | N/A | N | No | ||||||||||||
| AB1-124 | + | Carroll-Monocacy 34.5kV | Legore Bridge Solar Center Facility | MD | Frederick | Engineering and Procurement | APS | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1124_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1124_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1124_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1124_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1124_wmpa.pdf | Not Required | N/A | N/A | 10/29/2015 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | ||||||||||
| AB1-124 | - | Carroll-Monocacy 34.5kV | Legore Bridge Solar Center Facility | MD | Frederick | Engineering and Procurement | APS | 20 | 20 | 7.6 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1124_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1124_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab1124_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1124_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1124_wmpa.pdf | Not Required | N/A | N/A | 10/29/2015 | N/A | N/A | 9/30/2018 | 9/30/2018 | N/A | N | No | ||||||||||
| AB1-125 | + | Carroll-Monocacy 34.5kV | Biggs Ford Solar Facility | MD | Frederick | Engineering and Procurement | APS | 15 | 15 | 5.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1125_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1125_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1125_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1_125_csa.pdf | Not Required | N/A | N/A | 10/29/2015 | N/A | N/A | 12/31/2022 | 12/31/2022 | N/A | N | No | |||||||||||
| AB1-125 | - | Carroll-Monocacy 34.5kV | Biggs Ford Solar Facility | MD | Frederick | Engineering and Procurement | APS | 15 | 15 | 5.7 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1125_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1125_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1125_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1_125_csa.pdf | Not Required | N/A | N/A | 10/29/2015 | N/A | N/A | 3/31/2019 | 3/31/2019 | N/A | N | No | |||||||||||
| AB1-163 | + | Glidden-Van Hiseville 34.5 kV | Legler Landfill Solar Farm | NJ | Ocean | Under Construction | JCPL | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1163_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1163_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1163_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1163_wmpa.pdf | Not Required | N/A | N/A | 10/30/2015 | N/A | N/A | 10/30/2021 | 10/30/2021 | 10/30/2021 | N/A | N | No | ||||||||||
| AB1-163 | - | Glidden-Van Hiseville 34.5 kV | Legler Landfill Solar Farm | NJ | Ocean | Under Construction | JCPL | 5 | 5 | 0 | Energy | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1163_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1163_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab1163_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab1163_wmpa.pdf | Not Required | N/A | N/A | 10/30/2015 | N/A | N/A | 6/29/2021 | 6/29/2021 | N/A | N | No | |||||||||||
| AB2-022 | + | Elizabeth City 34.5kV | Elizabeth City Solar | NC | Camden | Under Construction | Dominion | 20 | 20 | 13 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2022_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2022_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2022_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2022_wmpa.pdf | Not Required | N/A | N/A | 2/4/2016 | N/A | N/A | 8/1/2021 | 6/30/2021 | 6/30/2021 | N/A | N | No | ||||||||||
| AB2-022 | - | Elizabeth City 34.5kV | Elizabeth City Solar | NC | Camden | Under Construction | Dominion | 20 | 20 | 13 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2022_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2022_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ab2022_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ab2022_wmpa.pdf | Not Required | N/A | N/A | 2/4/2016 | N/A | N/A | 6/1/2021 | 6/30/2021 | 6/30/2021 | N/A | N | No | ||||||||||
| AB2-120 | + | Piney Grove-New Church 138kV | MD | Worcester | Withdrawn | DPL | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2120_fac.pdf | Document Posted | Withdrawn | N/A | N/A | N/A | 4/28/2016 | N/A | N/A | 2/23/2021 | 12/14/2018 | N/A | N | No | ||||||||||||||
| AB2-120 | - | Piney Grove-New Church 138kV | MD | Worcester | Withdrawn | DPL | 100 | 100 | 38 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2120_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2120_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2120_fac.pdf | Document Posted | N/A | N/A | 4/28/2016 | N/A | N/A | 2/23/2021 | 12/14/2018 | N/A | N | No | ||||||||||||||||
| AB2-190 | + | Hopewell-Surry 230kV | Fort Powhatan Solar | VA | Prince George | Under Construction | Dominion | 160 | 160 | 112 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | Customer Milestone Not Met | 12/1/2021 | 12/1/2021 | N/A | N | No | |||||||||
| AB2-190 | - | Hopewell-Surry 230kV | Fort Powhatan Solar | VA | Prince George | Under Construction | Dominion | 160 | 160 | 112 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf | Document Posted | N/A | N/A | 4/29/2016 | N/A | N/A | 5/15/2021 | Customer Milestone Not Met | 12/1/2021 | 12/1/2021 | N/A | N | No | ||||||||
| AC1-010 | + | Gloucester 26kV | National Park NJ | NJ | Gloucester | Engineering and Procurement | PSEG | 6 | 6 | 2.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1010_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1010_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_010_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_010_csa.pdf | Document Posted | N/A | N/A | 6/20/2016 | N/A | N/A | 12/10/2021 | 12/10/2021 | N/A | N | No | |||||||||||
| AC1-010 | - | Gloucester 26kV | National Park NJ | NJ | Gloucester | Engineering and Procurement | PSEG | 6 | 6 | 2.2 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1010_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1010_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac1_010_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ac1_010_csa.pdf | Document Posted | N/A | N/A | 6/20/2016 | N/A | N/A | 5/31/2021 | 5/31/2021 | N/A | N | No | |||||||||||
| AC2-142 | + | Hatfield 500kV | Hilltop Energy Center Facility | PA | Greene | Partially in Service - Under Construction | APS | 664.7 | 129.7 | 129.7 | 90 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2142_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2142_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_142_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/28/2017 | N/A | N/A | 3/16/2021 | 5/9/2021 | 5/9/2021 | 4/1/2021 | N/A | N | No | |||||||||
| AC2-142 | - | Hatfield 500kV | Hilltop Energy Center Facility | PA | Greene | Partially in Service - Under Construction | APS | 664.7 | 129.7 | 129.7 | 15 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2142_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2142_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ac2_142_isa.pdf | Document Posted | N/A | Not Required | N/A | N/A | 3/28/2017 | N/A | N/A | 3/16/2021 | 5/9/2021 | 5/9/2021 | 4/1/2021 | N/A | N | No | |||||||||
| AC2-175 | + | Berkshire Solar 12 kV | Berkshire Solar | NJ | Morris | Under Construction | JCPL | 1.6 | 1.6 | 0 | Energy | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2175_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2175_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2175_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2175_wmpa.pdf | Not Required | N/A | N/A | 3/31/2017 | N/A | N/A | 9/30/2021 | 9/30/2021 | 9/30/2021 | N/A | N | Yes | ||||||||||
| AC2-175 | - | Berkshire Solar 12 kV | Berkshire Solar | NJ | Morris | Under Construction | JCPL | 1.6 | 1.6 | 0 | Energy | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2175_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2175_imp.pdf | Document Posted | Not Required | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ac2175_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ac2175_wmpa.pdf | Not Required | N/A | N/A | 3/31/2017 | N/A | N/A | 4/10/2021 | 9/30/2021 | 9/30/2021 | N/A | N | Yes | ||||||||||
| AD1-101 | + | Continental 69 kV | OH | Putnam | Active | AEP | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf | Document Posted | In Progress | https://www.pjm.com/pub/planning/project-queues/isa/ad1_101_isa2.pdf | Interim Study | N/A | N/A | N/A | 9/21/2017 | N/A | N/A | 10/31/2020 | N/A | N | No | |||||||||||||||
| AD1-101 | - | Continental 69 kV | OH | Putnam | Active | AEP | 49.9 | 49.9 | 18.96 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1101_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1101_imp.pdf | Document Posted | In Progress | N/A | N/A | 9/21/2017 | N/A | N/A | 10/31/2020 | N/A | N | No | ||||||||||||||||||
| AD2-197 | + | Carson-Rodgers Road 500 kV | VA | Greensville | Withdrawn | Dominion | 500 | 500 | 300 | Capacity | Generation Interconnection | Solar | Withdrawn | Withdrawn | N/A | N/A | N/A | 3/30/2018 | N/A | N/A | 4/9/2018 | 5/3/2021 | N/A | N | No | |||||||||||||||||||
| AD2-197 | - | Carson-Rodgers Road 500 kV | VA | Greensville | Withdrawn | Dominion | 500 | 500 | 300 | Capacity | Generation Interconnection | Solar | Withdrawn | N/A | N/A | 3/30/2018 | N/A | N/A | 4/9/2018 | 5/3/2021 | N/A | N | No | |||||||||||||||||||||
| AE2-017 | + | Lexington Park 69 kV | Whitetail VI | MD | St. Mary’s | Withdrawn | SMECO | 20 | 20 | 10.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2017_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2017_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2017_fac.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2017_wmpa.pdf | Withdrawn | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2017_wmpa.pdf | Not Required | N/A | N/A | 11/28/2018 | N/A | N/A | 3/16/2021 | 3/31/2023 | 3/31/2023 | N/A | N | No | |||||||||
| AE2-017 | - | Lexington Park 69 kV | Whitetail VI | MD | St. Mary’s | Withdrawn | SMECO | 20 | 20 | 10.3 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2017_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2017_imp.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/facilities/ae2017_fac.pdf | Document Posted | N/A | Wholesale Market Participation Agreement | https://www.pjm.com/pub/planning/project-queues/wmpa/ae2017_wmpa.pdf | https://www.pjm.com/pub/planning/project-queues/csa/ae2017_wmpa.pdf | Not Required | N/A | N/A | 11/28/2018 | N/A | N/A | 3/16/2021 | 3/31/2023 | 3/31/2023 | N/A | N | No | |||||||||
| AE2-126 | + | Dubois-Curwensville 34.5 kV | UN-Viaduct | PA | Clearfield | Engineering and Procurement | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2126_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2126_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_126_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_126_csa.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 6/1/2022 | 6/1/2022 | 6/1/2022 | N/A | N | No | ||||||||||
| AE2-126 | - | Dubois-Curwensville 34.5 kV | UN-Viaduct | PA | Clearfield | Engineering and Procurement | PENELEC | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2126_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2126_imp.pdf | Document Posted | Not Required | https://www.pjm.com/pub/planning/project-queues/isa/ae2_126_isa.pdf | Document Posted | N/A | https://www.pjm.com/pub/planning/project-queues/csa/ae2_126_csa.pdf | Document Posted | N/A | N/A | 2/28/2019 | N/A | N/A | 5/30/2021 | 5/30/2021 | N/A | N | No | |||||||||||
| AF2-157 | + | Chalk Point CT1 69 kV | MD | Prince George’s | Active | PEPCO | 20 | 0 | 1 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2157_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2157_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/16/2020 | N/A | N/A | 2/28/2021 | N/A | N | No | ||||||||||||||||||
| AF2-157 | - | Chalk Point CT1 69 kV | MD | Prince George’s | Active | PEPCO | 22 | 2 | 2 | Capacity | Generation Interconnection | Natural Gas | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2157_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2157_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/16/2020 | N/A | N/A | 2/28/2021 | N/A | N | No | ||||||||||||||||||
| AF2-260 | + | Stephensburg-Central Hardin 69 kV | KY | Hardin | Active | EKPC | 85 | 85 | 53 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2260_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2260_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/27/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-260 | - | Stephensburg-Central Hardin 69 kV | KY | Hardin | Active | EKPC | 90 | 90 | 60 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2260_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2260_imp.pdf | Document Posted | In Progress | N/A | N/A | 3/27/2020 | N/A | N/A | 12/31/2023 | N/A | N | No | ||||||||||||||||||
| AF2-409 | + | Vienna 138 kV | MD | Dorchester | Withdrawn | DPL | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2409_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2409_imp.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 7/6/2021 | 6/1/2022 | N/A | N | No | ||||||||||||||||||
| AF2-409 | - | Vienna 138 kV | MD | Dorchester | Active | DPL | 100 | 100 | 100 | Capacity | Generation Interconnection | Storage | https://www.pjm.com/pub/planning/project-queues/feas_docs/af2409_fea.pdf | Document Posted | https://www.pjm.com/pub/planning/project-queues/impact_studies/af2409_imp.pdf | Document Posted | N/A | N/A | 3/31/2020 | N/A | N/A | 6/1/2022 | N/A | N | No | |||||||||||||||||||
| AG1-165 | + | East Hazelton-Weatherly Tap 69 kV | PA | Luzerne | Active | PPL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1165_fea.pdf | Document Posted | In Progress | N/A | N/A | 9/16/2020 | N/A | N/A | 5/15/2022 | N/A | N | No | ||||||||||||||||||||
| AG1-165 | - | East Hazelton-Weatherly Tap 69 kV | PA | Luzerne | Active | PPL | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1165_fea.pdf | Document Posted | In Progress | N/A | N/A | 9/16/2020 | N/A | N/A | 1/1/0001 | 5/15/2022 | N/A | N | No | |||||||||||||||||||
| AG1-167 | + | Lone Pine 115 kV | VA | Nottoway | Active | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1167_fea.pdf | Document Posted | In Progress | N/A | N/A | 9/16/2020 | N/A | N/A | 10/15/2021 | N/A | N | No | ||||||||||||||||||||
| AG1-167 | - | Lone Pine 115 kV | VA | Nottoway | Active | Dominion | 20 | 20 | 12 | Capacity | Generation Interconnection | Solar | https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1167_fea.pdf | Document Posted | In Progress | N/A | N/A | 9/16/2020 | N/A | N/A | 1/1/0001 | 10/15/2021 | N/A | N | No | |||||||||||||||||||
| AG2-052 5090276 | + | NIPS-PJM | N/A | N/A | Active | Northern Indiana Public Service Company | 2 | Energy | Long-Term Firm Transmission | https://www.pjm.com/pub/planning/project-queues/ft-feas/5090276_ltf1.pdf | Executed Agreement and/or Study | N/A | N/A | 12/3/2020 | 2/1/2021 | 2/1/2026 | N/A | PP | No | |||||||||||||||||||||||||
| AG2-052 5090276 | - | NIPS-PJM | N/A | N/A | Active | Northern Indiana Public Service Company | 2 | Energy | Long-Term Firm Transmission | In Progress | N/A | N/A | 12/3/2020 | 2/1/2021 | 2/1/2026 | N/A | PP | No | ||||||||||||||||||||||||||
| AG2-090 | + | Scalp Level 23 kV IV | PA | Somerset | Active | PENELEC | 14 | 14 | 8.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/26/2021 | N/A | N/A | 1/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AG2-090 | - | Windber-Hooversville 23 kV | PA | Somerset | Active | PENELEC | 14 | 14 | 8.4 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/26/2021 | N/A | N/A | 1/31/2023 | N/A | N | No | ||||||||||||||||||||||
| AG2-091 | + | Scalp Level 23 kV V | PA | Somerset | Active | PENELEC | 20 | 6 | 3.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/26/2021 | N/A | N/A | 1/15/2023 | N/A | N | No | ||||||||||||||||||||||
| AG2-091 | - | Winber-Hooversville 23 kV II | PA | Somerset | Active | PENELEC | 20 | 6 | 3.6 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 1/26/2021 | N/A | N/A | 1/15/2023 | N/A | N | No | ||||||||||||||||||||||
| AG2-151 | + | Trices Lake - James River Tap 115 kV | VA | Cumberland | Active | Dominion | 100 | 102.2 | 60 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/23/2021 | N/A | N/A | 2/2/2024 | N/A | N | No | ||||||||||||||||||||||
| AG2-151 | - | James River Tap-Bremo 115 kV | VA | Cumberland | Active | Dominion | 100 | 102.2 | 60 | Capacity | Generation Interconnection | Solar | In Progress | N/A | N/A | 2/23/2021 | N/A | N/A | 2/2/2024 | N/A | N | No |