Changes in PJM Queue between June 30th, 2021 and July 6th, 2021.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

create_output_table(ctable_queues)
## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
AB1-005 + Harrisonville 13kV MD Baltimore County Withdrawn BGE 1.3 1.3 0 Energy Generation Interconnection Natural Gas Not Required Not Required Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab1005_wmpa.pdf Not Required N/A N/A 5/18/2015 N/A N/A 10/1/2020 7/2/2021 12/1/2021 12/1/2021 N/A Y No
AB1-005 - Harrisonville 13kV MD Baltimore County Under Construction BGE 1.3 1.3 0 Energy Generation Interconnection Natural Gas Not Required Not Required Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ab1005_wmpa.pdf Not Required N/A N/A 5/18/2015 N/A N/A 10/1/2020 12/1/2021 12/1/2021 N/A Y No
AB2-158 + Louisa-South Anna 230kV Belcher Solar VA Louisa In Service Dominion 88.2 88.2 61 88.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_158_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/31/2021 12/1/2020 12/1/2020 6/30/2021 N/A N No
AB2-158 - Louisa-South Anna 230kV Belcher Solar VA Louisa Partially in Service - Under Construction Dominion 88.2 88.2 61 88.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_158_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/31/2021 12/1/2020 12/1/2020 5/24/2021 N/A N No
AC1-074 + Jacksonville-Renaker 138kV I Bluebird Solar KY Harrison Engineering and Procurement EKPC 80 80 56 1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1074_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1074_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1074_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_074_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_074_csa.pdf Document Posted N/A N/A 9/29/2016 N/A N/A 6/1/2023 6/1/2023 N/A N No
AC1-074 - Jacksonville-Renaker 138kV I Bluebird Solar KY Harrison Engineering and Procurement EKPC 80 80 56 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1074_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1074_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1074_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_074_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_074_csa.pdf Document Posted N/A N/A 9/29/2016 N/A N/A 11/30/2022 11/30/2022 N/A N No
AC1-075 + Perth-Hickory Grove 115kV Stagecoach Solar VA Halifax In Service Dominion 60 60 38.3 60 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1075_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1075_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_075_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_075_csa.pdf Document Posted N/A N/A 3/3/2021 9/29/2016 N/A N/A 3/30/2021 12/31/2021 12/31/2021 4/1/2021 N/A N No
AC1-075 - Perth-Hickory Grove 115kV Stagecoach Solar VA Halifax Partially in Service - Under Construction Dominion 60 60 38.3 33 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1075_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1075_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_075_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_075_csa.pdf Document Posted N/A N/A 3/3/2021 9/29/2016 N/A N/A 3/30/2021 12/31/2021 12/31/2021 N/A N No
AC1-080 + Perth-Hickory Grove 115kV Stagecoach Solar VA Halifax In Service Dominion 20 20 12.8 20 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1080_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1080_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_080_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_080_csa.pdf Document Posted N/A N/A 3/3/2021 9/30/2016 N/A N/A 3/30/2021 12/31/2021 12/31/2021 N/A N No
AC1-080 - Perth-Hickory Grove 115kV Stagecoach Solar VA Halifax Under Construction Dominion 20 20 12.8 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1080_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1080_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1080_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_080_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_080_csa.pdf Document Posted N/A N/A 3/3/2021 9/30/2016 N/A N/A 3/30/2021 12/31/2021 12/31/2021 N/A N No
AC2-075 + Jacksonville-Renaker 138 kV Bluebird Solar KY Harrison Engineering and Procurement EKPC 100 20 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2075_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2075_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_075_isa.pdf Document Posted N/A N/A N/A 2/27/2017 N/A N/A 6/1/2023 6/1/2023 N/A N No
AC2-075 - Jacksonville-Renaker 138 kV KY Harrison Active EKPC 20 20 13.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2075_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2075_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2075_fac.pdf Document Posted N/A N/A 2/27/2017 N/A N/A 6/1/2019 N/A N No
AD1-119 + Payne 69 kV Timber Road Solar Park OH Paulding Engineering and Procurement AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1119_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1119_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_119_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_119_csa.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 10/1/2022 10/1/2022 N/A N No
AD1-119 - Payne 69 kV OH Paulding Active AEP 49.9 49.9 18.96 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1119_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1119_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1119_fac.pdf Document Posted N/A N/A 9/28/2017 N/A N/A 10/31/2020 N/A N No
AD2-076 + Carville 138 kV Concho Solar I MD Queen Anne’s Engineering and Procurement DPL 49 49 18.62 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2076_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_076_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_076_csa.pdf Document Posted N/A N/A 3/15/2018 N/A N/A 6/3/2024 6/3/2024 N/A N No
AD2-076 - Carville 138 kV Concho Solar I MD Queen Anne’s Engineering and Procurement DPL 49 49 18.62 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2076_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_076_isa.pdf Document Posted N/A N/A N/A 3/15/2018 N/A N/A 6/3/2024 6/3/2024 N/A N No
AE1-095 4966859 + PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966859_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2020 6/1/2021 2/27/2019 N/A PP No
AE1-095 4966859 - PJM-HUDSON N/A N/A Withdrawn Hudson Transmission Partners, LLC 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966859_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2020 6/1/2021 2/27/2019 N/A PP No
AE1-096 4966862 + PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966862_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2021 6/1/2022 2/27/2019 N/A PP No
AE1-096 4966862 - PJM-HUDSON N/A N/A Withdrawn Hudson Transmission Partners, LLC 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966862_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2021 6/1/2022 2/27/2019 N/A PP No
AE1-097 4966877 + PJM-HUDSON N/A N/A Withdrawn 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966877_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2022 6/1/2027 2/27/2019 N/A PP No
AE1-097 4966877 - PJM-HUDSON N/A N/A Withdrawn Hudson Transmission Partners, LLC 62 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-feas/4966877_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/30/2018 6/1/2022 6/1/2027 2/27/2019 N/A PP No
AE1-110 4966477 + PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966477_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966477_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2030 2/28/2019 N/A PP No
AE1-110 4966477 - PJM-DUK N/A N/A Withdrawn Morgan Stanley Capital Group Inc. 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966477_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966477_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2030 2/28/2019 N/A PP No
AE1-111 4966479 + PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966479_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966479_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2031 2/28/2019 N/A PP No
AE1-111 4966479 - PJM-DUK N/A N/A Withdrawn Morgan Stanley Capital Group Inc. 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966479_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966479_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2031 2/28/2019 N/A PP No
AE1-112 4966484 + PJM-DUK N/A N/A Withdrawn 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966484_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966484_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2032 2/28/2019 N/A PP No
AE1-112 4966484 - PJM-DUK N/A N/A Withdrawn Morgan Stanley Capital Group Inc. 100 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4966484_ltf1.pdf https://www.pjm.com/pub/planning/project-queues/ft-feas/4966484_ltf1.pdf Executed Agreement and/or Study N/A N/A 8/28/2018 1/1/2025 1/1/2032 2/28/2019 N/A PP No
AE2-035 + Lena 138 kV IL Stephenson Active ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2035_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae2035_fac.pdf Document Posted N/A N/A 1/15/2019 N/A N/A 5/21/2021 N/A N No
AE2-035 - Lena 138 kV IL Stephenson Active ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae2035_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae2035_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/Combined with AD2-172 Document Posted N/A N/A 1/15/2019 N/A N/A 5/21/2021 N/A N No
AG1-008 + Tunis-Mapleton 115 kV NC Hertford Active Dominion 150 150 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1008_fea.pdf Document Posted N/A N/A 5/1/2020 N/A N/A 12/15/2024 N/A N No
AG1-008 - Tunis-Mapleton 115 kV NC Hertford Withdrawn Dominion 150 150 100 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1008_fea.pdf Document Posted N/A N/A 5/1/2020 N/A N/A 4/13/2021 12/15/2024 N/A N No
AG1-048 + Jetersville-Ponton 115 kV VA Amelia Active Dominion 106.3 106.25 52.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1048_fea.pdf Document Posted In Progress N/A N/A 7/17/2020 N/A N/A 12/1/2022 N/A N No
AG1-048 - Jetersville-Ponton 115 kV VA Amelia Active Dominion 106.3 106.25 52.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1048_fea.pdf Document Posted N/A N/A 7/17/2020 N/A N/A 12/1/2022 N/A N No
AG1-075 + Purdy-Sapony 115 kV VA Greensville Active Dominion 150 150 93.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1075_fea.pdf Document Posted N/A N/A 7/31/2020 N/A N/A 10/15/2024 N/A N No
AG1-075 - Purdy-Sapony 115 kV VA Greensville Withdrawn Dominion 150 150 93.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1075_fea.pdf Document Posted N/A N/A 7/31/2020 N/A N/A 4/13/2021 10/15/2024 N/A N No
AG1-106 + Thelma 230 kV NC Northhampton Active Dominion 350 50 34.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1106_fea.pdf Document Posted N/A N/A 8/28/2020 N/A N/A 6/1/2024 N/A N No
AG1-106 - Thelma 230 kV NC Northhampton Withdrawn Dominion 350 50 34.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ag1106_fea.pdf Document Posted N/A N/A 8/28/2020 N/A N/A 4/13/2021 6/1/2024 N/A N No
AG2-006 + Centerburg-Conesville 138 kV OH Licking Active AEP 177.5 50 21 Capacity Generation Interconnection Solar In Progress N/A N/A 10/2/2020 N/A N/A 10/31/2023 N/A N No
AG2-006 - Centerburg-Conesville 138 kV OH Licking Active AEP 200 50 21 Capacity Generation Interconnection Solar In Progress N/A N/A 10/2/2020 N/A N/A 10/31/2023 N/A N No
AH1-031 + National-Tangy 138 kV III OH Madison Active ATSI 77 20 8.4 Capacity Generation Interconnection Solar In Progress N/A N/A 6/8/2021 N/A N/A 12/31/2024 N/A N No
AH1-033 + Sligo Solar NC Currituck Active Dominion 19.5 19.5 13 Capacity Generation Interconnection Solar In Progress N/A N/A 6/14/2021 N/A N/A 8/15/2024 N/A N No
AH1-036 + Centerburg 138 kV OH Licking Active AEP 277.5 100 100 Capacity Generation Interconnection Storage In Progress N/A N/A 6/15/2021 N/A N/A 7/1/2024 N/A N No