Changes in PJM Queue between June 8th, 2021 and June 30th, 2021.

Where an existing project has some updated field, you’ll find two rows for that project, with the new entry on top, updated fields highlighted in green, and deprecated fields highlighted in red in the bottom row.

Fully new queue positions appear as individual rows with all fields highlighted green.

create_output_table(ctable_queues)
## Truncating HTML diff table to ${limit_html} rows...
## Creating HTML table for first ${limit_html} rows
QueueNumber chng_type Name CommercialName State County Status TransmissionOwner MaximumFacilityOutput MWEnergy MWCapacity MWInService CapacityorEnergy ProjectType Fuel ProjectACOrDC RightsMW InitialStudy FeasibilityStudy FeasibilityStudyStatus SystemImpactStudy SystemImpactStudyStatus FacilitiesStudy FacilitiesStudyStatus InterimInterconnectionServiceAgreement InterimInterconnectionServiceAgreementStatus WholesaleMarketParticipationAgreement ConstructionServiceAgreement ConstructionServiceAgreementStatus UpgradeConstructionServiceAgreement UpgradeConstructionServiceAgreementStatus BackfeedDate QueueDate LongTermFirmServiceStartDate LongTermFirmServiceEndDate TestEnergyDate WithdrawalDate WithdrawnRemarks ProjectedInServiceDate RevisedInServiceDate ActualInServiceDate SuspensionDate AttachmentType AlternateQueue SlideQueue
AA1-123 + Highland-Sammis 345kV South Field Energy Power Plant OH Columbiana Partially in Service - Under Construction ATSI 1152 1152 1105 345 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1123_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1123_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_123_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_123_csa.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 4/1/2021 7/29/2021 7/29/2021 6/14/2021 N/A N No
AA1-123 - Highland-Sammis 345kV South Field Energy Power Plant OH Columbiana Under Construction ATSI 1152 1152 1105 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa1123_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa1123_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa1123_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa1_123_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa1_123_csa.pdf Document Posted N/A N/A 10/31/2014 N/A N/A 4/1/2021 7/29/2021 7/29/2021 N/A N No
AA2-173 + Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 515 515 515 515 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_173_csa.pdf Document Posted N/A N/A 4/30/2015 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AA2-173 - Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 515 515 515 370 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/aa2173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/aa2173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/aa2173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/aa2_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/aa2_173_csa.pdf Document Posted N/A N/A 4/30/2015 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AB1-056 + Indian River 230kV I Maryland Offshore Wind Energy Project (MOWEP) DE Sussex Engineering and Procurement DPL 247.8 247.8 64.4 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1056_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1056_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1056_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_056_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_056_csa.pdf Document Posted N/A N/A 8/30/2024 8/31/2015 N/A N/A 11/1/2024 12/31/2024 12/31/2024 N/A N No
AB1-056 - Indian River 230kV I Maryland Offshore Wind Energy Project (MOWEP) DE Sussex Engineering and Procurement DPL 247.8 247.8 64.4 Capacity Generation Interconnection Offshore Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1056_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1056_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1056_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_056_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_056_csa.pdf Document Posted N/A N/A 8/31/2015 N/A N/A 9/1/2023 12/31/2024 12/31/2024 N/A N No
AB1-112 + Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 535 20 20 20 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1112_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1112_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_112_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_112_csa.pdf Document Posted N/A N/A 10/27/2015 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AB1-112 - Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 535 20 20 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1112_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1112_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_112_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_112_csa.pdf Document Posted N/A N/A 10/27/2015 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AB1-173 + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 1/1/2022 4/1/2022 4/1/2022 N/A N No
AB1-173 - Brink-Trego 115kV Meherrin Solar VA Greensville Engineering and Procurement Dominion 19.8 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 1/1/2022 10/4/2021 10/4/2021 N/A N No
AB1-173A + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 39.6 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 1/1/2022 4/1/2022 4/1/2022 N/A N No
AB1-173A - Brink-Trego 115kV Meherrin Solar VA Greensville Engineering and Procurement Dominion 39.6 19.8 13.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab1173a_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab1173a_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab1173a_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab1_173a_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab1_173a_csa.pdf Document Posted N/A N/A 10/30/2015 N/A N/A 1/1/2022 10/4/2021 10/4/2021 N/A N No
AB2-015 + Franklin 115kV Tidewater Solar Projects VA Southampton Engineering and Procurement Dominion 91 91 50 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_015_csa.pdf Document Posted N/A N/A 6/1/2023 12/21/2015 N/A N/A 8/31/2023 12/31/2022 12/31/2022 N/A N No
AB2-015 - Franklin 115kV Tidewater Solar Projects VA Southampton Engineering and Procurement Dominion 91 91 50 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2015_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2015_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2015_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_015_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_015_csa.pdf Document Posted N/A N/A 6/1/2023 12/21/2015 N/A N/A 8/31/2023 12/31/2021 12/31/2021 N/A N No
AB2-028 + Fall Creek-Desoto 345kV IN Henry Withdrawn AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2028_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2028_imp.pdf Document Posted Withdrawn N/A N/A 2/10/2016 N/A N/A 6/17/2021 10/31/2018 N/A N No
AB2-028 - Fall Creek-Desoto 345kV IN Henry Active AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2028_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2028_imp.pdf Document Posted In Progress N/A N/A 2/10/2016 N/A N/A 10/31/2018 N/A N No
AB2-031 + Brink-Trego 115kV Meherrin Solar VA Greensville Under Construction Dominion 59.6 20 13.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf Document Posted N/A Not Required N/A N/A 2/11/2016 N/A N/A 1/1/2022 4/1/2022 4/1/2022 N/A N No
AB2-031 - Brink-Trego 115kV Meherrin Solar VA Greensville Engineering and Procurement Dominion 59.6 20 13.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2031_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2031_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2031_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_031_isa.pdf Document Posted N/A Not Required N/A N/A 2/11/2016 N/A N/A 1/1/2022 10/4/2021 10/4/2021 N/A N No
AB2-038 + Frostburg 138kV PA Somerset In Service APS 139.4 0 4.2 0 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2038_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_038_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_038_csa.pdf Document Posted N/A N/A 2/29/2016 N/A N/A 12/15/2020 10/26/2020 12/31/2020 12/31/2020 N/A N No
AB2-038 - Frostburg 138kV PA Somerset Withdrawn APS 200 0 4.2 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2038_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ab2_038_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_038_csa.pdf Document Posted N/A N/A 2/29/2016 N/A N/A 12/15/2020 10/26/2020 12/31/2020 12/31/2020 N/A N No
AB2-158 + Louisa-South Anna 230kV Belcher Solar VA Louisa Partially in Service - Under Construction Dominion 88.2 88.2 61 88.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_158_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/31/2021 12/1/2020 12/1/2020 5/24/2021 N/A N No
AB2-158 - Louisa-South Anna 230kV Belcher Solar VA Louisa Partially in Service - Under Construction Dominion 88.2 88.2 61 88.2 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_158_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/31/2021 12/1/2020 12/1/2020 N/A N No
AB2-160 + Reams 115kV Reams Solar VA Dinwiddie Engineering and Procurement Dominion 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 1/1/2022 12/31/2022 12/31/2022 N/A N No
AB2-160 - Reams 115kV Reams Solar VA Dinwiddie Engineering and Procurement Dominion 80 80 30.4 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2160_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2160_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2160_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_160_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_160_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 1/1/2022 12/31/2021 12/31/2021 N/A N No
AB2-161 + Waverly #2 DP 115kV Waverly Solar VA Sussex Engineering and Procurement Dominion 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 1/1/2022 9/16/2022 9/16/2022 N/A N No
AB2-161 - Waverly #2 DP 115kV Waverly Solar VA Sussex Engineering and Procurement Dominion 50 50 19 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2161_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2161_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2161_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_161_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_161_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 1/1/2022 12/31/2021 12/31/2021 N/A N No
AB2-190 + Hopewell-Surry 230kV Fort Powhatan Solar VA Prince George Under Construction Dominion 160 160 112 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/15/2021 Customer Milestone Not Met 12/1/2021 12/1/2021 N/A N No
AB2-190 - Hopewell-Surry 230kV Fort Powhatan Solar VA Prince George Engineering and Procurement Dominion 160 160 112 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ab2190_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ab2190_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ab2190_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ab2_190_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ab2_190_csa.pdf Document Posted N/A N/A 4/29/2016 N/A N/A 5/15/2021 Customer Milestone Not Met 12/1/2021 12/1/2021 N/A N No
AC1-091 + Cedar Creek 138kV I Cedar Creek Solar DE New Castle Engineering and Procurement DPL 19.8 19.8 7.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1091_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1091_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_091_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_091_csa.pdf Document Posted N/A N/A 10/19/2016 N/A N/A 8/15/2023 8/15/2023 N/A N No
AC1-091 - Cedar Creek 138kV I DE New Castle Active DPL 19.8 19.8 7.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1091_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1091_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1091_fac.pdf Document Posted N/A N/A 10/19/2016 N/A N/A 6/30/2018 N/A N No
AC1-092 + Cedar Creek 138kV II Cedar Creek Solar DE New Castle Engineering and Procurement DPL 19.8 19.8 7.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1092_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1092_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_092_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_092_csa.pdf Document Posted N/A N/A 10/19/2016 N/A N/A 8/15/2023 8/15/2023 N/A N No
AC1-092 - Cedar Creek 138kV II DE New Castle Active DPL 19.8 19.8 7.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1092_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1092_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1092_fac.pdf Document Posted N/A N/A 10/19/2016 N/A N/A 6/30/2018 N/A N No
AC1-093 + Cedar Creek 138kV III Cedar Creek Solar DE New Castle Engineering and Procurement DPL 18.8 18.8 7.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1093_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_093_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_093_csa.pdf Document Posted N/A N/A 10/19/2016 N/A N/A 8/15/2023 8/15/2023 N/A N No
AC1-093 - Cedar Creek 138kV III DE New Castle Active DPL 18.8 18.8 7.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1093_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1093_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1093_fac.pdf Document Posted N/A N/A 10/19/2016 N/A N/A 6/30/2018 N/A N No
AC1-094 + Cedar Creek 138kV IV Cedar Creek Solar DE New Castle Engineering and Procurement DPL 15.9 15.9 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1094_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1094_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1094_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_094_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_094_csa.pdf Document Posted N/A N/A 10/19/2016 N/A N/A 8/15/2023 8/15/2023 N/A N No
AC1-094 - Cedar Creek 138kV IV DE New Castle Active DPL 15.9 15.9 6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1094_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1094_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1094_fac.pdf Document Posted N/A N/A 10/19/2016 N/A N/A 6/30/2018 N/A N No
AC1-107 + Chickahominy 500kV Chickahominy Power VA Charles City Engineering and Procurement Dominion 1600 1600 1600 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1107_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1107_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_107_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_107_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 3/1/2024 3/1/2024 3/1/2024 N/A N No
AC1-107 - Chickahominy 500kV Chickahominy Power VA Charles City Engineering and Procurement Dominion 1600 1600 1600 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1107_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1107_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1107_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_107_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_107_csa.pdf Document Posted N/A N/A 10/26/2016 N/A N/A 3/1/2023 3/1/2024 3/1/2024 N/A N No
AC1-115 + St. Johns 115kV VA Caroline Withdrawn Dominion 14.9 14.9 5.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1115_imp.pdf Document Posted N/A N/A 10/27/2016 N/A N/A 12/29/2017 4/30/2018 N/A N No
AC1-115 - St. Johns 115kV VA Carolina Withdrawn Dominion 14.9 14.9 5.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1115_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1115_imp.pdf Document Posted N/A N/A 10/27/2016 N/A N/A 12/29/2017 4/30/2018 N/A N No
AC1-221 + Halifax-Person 230kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 29.2 29.2 14.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 1/1/2022 12/16/2022 12/16/2022 N/A N No
AC1-221 - Halifax-Person 230kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 29.2 29.2 14.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac1221_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac1221_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac1221_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac1_221_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac1_221_csa.pdf Document Posted N/A N/A 10/31/2016 N/A N/A 1/1/2022 11/30/2021 11/30/2021 N/A N No
AC2-012 + Grassfield-Great Bridge 115kV Chesapeake Solar VA City of Chesapeake Engineering and Procurement Dominion 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2012_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2012_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_012_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_012_csa.pdf Document Posted N/A N/A 12/19/2016 N/A N/A 11/15/2022 12/31/2022 12/31/2022 N/A N No
AC2-012 - Grassfield-Great Bridge 115kV Chesapeake Solar VA City of Chesapeake Engineering and Procurement Dominion 150 150 57 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2012_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2012_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2012_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_012_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_012_csa.pdf Document Posted N/A N/A 12/19/2016 N/A N/A 12/31/2022 12/31/2022 N/A N No
AC2-079 + Ivor-Oak Ridge 115kV Windsor PVI VA Isle of Wight Engineering and Procurement Dominion 85 85 32.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_079_csa.pdf Document Posted N/A N/A 2/28/2017 N/A N/A 6/1/2022 6/1/2022 N/A N No
AC2-079 - Ivor-Oak Ridge 115kV Windsor PVI VA Isle of Wight Active Dominion 85 85 32.3 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2079_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2079_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2079_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_079_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_079_csa.pdf Document Posted N/A N/A 2/28/2017 N/A N/A 6/1/2022 6/1/2022 N/A N No
AC2-112 + Stuarts Draft-Waynesboro 115kV Augusta Solar VA Augusta Suspended Dominion 150 150 103.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2112_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2112_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_112_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_112_csa.pdf Document Posted N/A N/A 3/17/2017 N/A N/A 12/15/2023 12/15/2023 N/A N No
AC2-112 - Stuarts Draft-Waynesboro 115kV Augusta Solar VA Augusta Engineering and Procurement Dominion 150 150 103.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2112_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2112_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ac2112_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ac2_112_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_112_csa.pdf Document Posted N/A N/A 3/17/2017 N/A N/A 12/15/2023 12/15/2023 N/A N No
AC2-125 + Ladysmith 230 kV I Ladysmith Combustion Turbines Unit 1 VA Caroline In Service Dominion 209 19 14.9 19 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2125_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_125_isa.pdf Document Posted N/A Not Required N/A N/A 3/24/2017 N/A N/A 6/1/2021 6/1/2020 6/1/2020 5/17/2019 N/A N No
AC2-125 - Ladysmith 230 kV I Ladysmith Combustion Turbines Unit 1 VA Carolina In Service Dominion 209 19 14.9 19 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2125_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2125_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_125_isa.pdf Document Posted N/A Not Required N/A N/A 3/24/2017 N/A N/A 6/1/2021 6/1/2020 6/1/2020 5/17/2019 N/A N No
AC2-126 + Ladysmith 230 kV II Ladysmith Combustion Turbines Unit 2 VA Caroline In Service Dominion 209 19 15 19 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2126_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2126_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_126_isa.pdf Document Posted N/A Not Required N/A N/A 3/24/2017 N/A N/A 6/1/2021 6/1/2020 6/1/2020 5/17/2019 N/A N No
AC2-126 - Ladysmith 230 kV II Ladysmith Combustion Turbines Unit 2 VA Carolina In Service Dominion 209 19 15 19 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2126_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2126_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_126_isa.pdf Document Posted N/A Not Required N/A N/A 3/24/2017 N/A N/A 6/1/2021 6/1/2020 6/1/2020 5/17/2019 N/A N No
AC2-127 + Ladysmith CT Unit 3 VA Caroline Withdrawn Dominion 209 19 8.2 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2127_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2127_imp.pdf Document Posted N/A N/A 3/24/2017 N/A N/A 4/12/2019 6/1/2017 N/A N No
AC2-127 - Ladysmith CT Unit 3 VA Carolina Withdrawn Dominion 209 19 8.2 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2127_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2127_imp.pdf Document Posted N/A N/A 3/24/2017 N/A N/A 4/12/2019 6/1/2017 N/A N No
AC2-128 + Ladysmith CT Unit 4 VA Caroline Withdrawn Dominion 209 19 7.9 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2128_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2128_imp.pdf Document Posted N/A N/A 3/24/2017 N/A N/A 4/12/2019 6/1/2017 N/A N No
AC2-128 - Ladysmith CT Unit 4 VA Carolina Withdrawn Dominion 209 19 7.9 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2128_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2128_imp.pdf Document Posted N/A N/A 3/24/2017 N/A N/A 4/12/2019 6/1/2017 N/A N No
AC2-129 + Ladysmith CT Unit 5 VA Caroline Withdrawn Dominion 209 19 7.4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2129_imp.pdf Document Posted N/A N/A 3/24/2017 N/A N/A 4/12/2019 6/1/2017 N/A N No
AC2-129 - Ladysmith CT Unit 5 VA Carolina Withdrawn Dominion 209 19 7.4 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2129_imp.pdf Document Posted N/A N/A 3/24/2017 N/A N/A 4/12/2019 6/1/2017 N/A N No
AC2-142 + Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 664.7 129.7 129.7 15 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2142_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2142_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_142_isa.pdf Document Posted N/A Not Required N/A N/A 3/28/2017 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AC2-142 - Hatfield 500kV Hilltop Energy Center Facility PA Greene Partially in Service - Under Construction APS 664.7 129.7 129.7 0 Capacity Generation Interconnection Natural Gas https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2142_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2142_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_142_isa.pdf Document Posted N/A Not Required N/A N/A 3/28/2017 N/A N/A 3/16/2021 5/9/2021 5/9/2021 4/1/2021 N/A N No
AC2-177 + Desoto-Tanners Creek 345kV IN Henry Withdrawn AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2177_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2177_imp.pdf Document Posted Withdrawn N/A N/A 3/31/2017 N/A N/A 6/17/2021 12/31/2019 N/A N No
AC2-177 - Desoto-Tanners Creek 345kV IN Henry Active AEP 200 200 26 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2177_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2177_imp.pdf Document Posted In Progress N/A N/A 3/31/2017 N/A N/A 12/31/2019 N/A N No
AC2-184 + Cedar Creek 138kV I Cedar Creek Solar DE Kent Engineering and Procurement DPL 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2184_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2184_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_184_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_184_csa.pdf Document Posted N/A N/A 3/31/2017 N/A N/A 8/15/2023 8/15/2023 N/A N No
AC2-184 - Cedar Creek 138kV I DE Kent Active DPL 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2184_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2184_imp.pdf Document Posted Not Required N/A N/A 3/31/2017 N/A N/A 12/15/2018 N/A N No
AC2-185 + Cedar Creek 138kV II Cedar Creek Solar DE Kent Engineering and Procurement DPL 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2185_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2185_imp.pdf Document Posted Not Required https://www.pjm.com/pub/planning/project-queues/isa/ac2_185_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ac2_185_csa.pdf Document Posted N/A N/A 3/31/2017 N/A N/A 8/15/2023 8/15/2023 N/A N No
AC2-185 - Cedar Creek 138kV II DE Kent Active DPL 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ac2185_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ac2185_imp.pdf Document Posted Not Required N/A N/A 3/31/2017 N/A N/A 12/15/2018 N/A N No
AD1-016 + Marengo Marengo Solar, LLC IL McHenry Engineering and Procurement ComEd 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1016_imp.pdf Document Posted Not Required N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1016_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1016_wmpa.pdf Not Required N/A N/A 4/28/2017 N/A N/A 8/31/2022 8/31/2022 N/A N No
AD1-016 - Marengo IL McHenry Active ComEd 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1016_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1016_imp.pdf Document Posted Not Required Not Required N/A N/A 4/28/2017 N/A N/A 12/15/2018 N/A N No
AD1-033 + Fentress-Landstown 230 kV Bedford Solar Center VA City of Chesapeake Under Construction Dominion 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1033_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1033_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_033_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_033_csa.pdf Document Posted N/A N/A 7/26/2017 N/A N/A 12/1/2021 12/1/2021 N/A N No
AD1-033 - Fentress-Landstown 230 kV Bedford Solar Center VA City of Chesapeake Engineering and Procurement Dominion 70 70 42 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1033_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1033_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1033_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_033_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_033_csa.pdf Document Posted N/A N/A 7/26/2017 N/A N/A 12/1/2021 12/1/2021 N/A N No
AD1-058 + Halifax-Person 230 kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 75.1 45.9 36.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1058_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1058_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1058_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_058_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_058_csa.pdf Document Posted N/A N/A 8/15/2017 N/A N/A 12/16/2022 12/16/2022 N/A N No
AD1-058 - Halifax-Person 230 kV Alton Post Office Solar VA Halifax Engineering and Procurement Dominion 75.1 45.9 36.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1058_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1058_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1058_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad1_058_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad1_058_csa.pdf Document Posted N/A N/A 8/15/2017 N/A N/A 11/30/2021 11/30/2021 N/A N No
AD1-083 + Page-Bethel 138 kV VA Page Active APS 100 100 60.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1083_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad1083_fac.pdf Document Posted N/A N/A 9/11/2017 N/A N/A 12/31/2019 N/A N No
AD1-083 - Page-Bethel 138 kV VA Page Active APS 100 100 60.1 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1083_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1083_imp.pdf Document Posted In Progress N/A N/A 9/11/2017 N/A N/A 12/31/2019 N/A N No
AD1-116 + Nevada 345 kV IL Lasalle Active ComEd 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1116_imp.pdf Document Posted In Progress N/A N/A 9/26/2017 N/A N/A 12/31/2020 N/A N No
AD1-116 - Nevada 345 kV IL Lasalle Active ComEd 20 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1116_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1116_imp.pdf Document Posted N/A N/A 9/26/2017 N/A N/A 12/31/2020 N/A N No
AD1-129 + Belvidere 34 kV Cherry Valley Solar Project, LLC IL Boone Engineering and Procurement ComEd 12.5 12.5 7.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1129_imp.pdf Document Posted In Progress N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad1129_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad1129_wmpa.pdf Not Required N/A N/A 9/28/2017 N/A N/A 9/30/2022 9/30/2022 N/A N Yes
AD1-129 - Belvidere 34 kV IL Boone Active ComEd 12.5 12.5 7.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad1129_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad1129_imp.pdf Document Posted In Progress Not Required N/A N/A 9/28/2017 N/A N/A 6/30/2019 N/A N Yes
AD2-038 + Powerton IL Lasalle Active ComEd 150 150 26.4 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2038_imp.pdf Document Posted In Progress N/A N/A 1/19/2018 N/A N/A 12/31/2021 N/A N No
AD2-038 - Powerton IL Lasalle Active ComEd 150 150 26.4 Capacity Generation Interconnection Wind https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2038_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2038_imp.pdf Document Posted N/A N/A 1/19/2018 N/A N/A 12/31/2021 N/A N No
AD2-072 + Van Arsdell-Mercer Industrial 69kV Mercer County Solar Project KY Mercer Suspended EKPC 95 95 63.75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2072_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2072_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_072_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_072_csa.pdf Document Posted N/A N/A 3/14/2018 N/A N/A 11/30/2022 11/30/2022 N/A N No
AD2-072 - Van Arsdell-Mercer Industrial 69kV Mercer County Solar Project KY Mercer Engineering and Procurement EKPC 95 95 63.75 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2072_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2072_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2072_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_072_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_072_csa.pdf Document Posted N/A N/A 3/14/2018 N/A N/A 11/30/2022 11/30/2022 N/A N No
AD2-073 + Sanders DP 230 kV Woodbine Road Solar VA Westmoreland Under Construction Dominion 19.9 19.92 13.32 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2073_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2073_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad2073_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad2073_wmpa.pdf Not Required N/A N/A 3/14/2018 N/A N/A 12/1/2021 12/1/2021 N/A N No
AD2-073 - Sanders DP 230 kV Woodbine Road Solar VA Westmoreland Engineering and Procurement Dominion 19.9 19.92 13.32 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2073_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2073_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2073_fac.pdf Document Posted N/A Wholesale Market Participation Agreement https://www.pjm.com/pub/planning/project-queues/wmpa/ad2073_wmpa.pdf https://www.pjm.com/pub/planning/project-queues/csa/ad2073_wmpa.pdf Not Required N/A N/A 3/14/2018 N/A N/A 12/1/2021 12/1/2021 N/A N No
AD2-076 + Carville 138 kV Concho Solar I MD Queen Anne’s Engineering and Procurement DPL 49 49 18.62 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2076_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_076_isa.pdf Document Posted N/A N/A N/A 3/15/2018 N/A N/A 6/3/2024 6/3/2024 N/A N No
AD2-076 - Carville 138 kV MD Queen Anne’s Active DPL 49 49 18.62 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2076_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2076_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2076_fac.pdf Document Posted N/A N/A 3/15/2018 N/A N/A 11/30/2021 N/A N No
AD2-158 + Old Chapel-Millville 138kV Wild Hill Solar WV Jefferson Engineering and Procurement APS 77.5 77.5 46.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_158_isa.pdf Document Posted N/A https://www.pjm.com/pub/planning/project-queues/csa/ad2_158_csa.pdf Document Posted N/A N/A 3/23/2018 N/A N/A 9/1/2023 9/1/2023 N/A N No
AD2-158 - Old Chapel-Millville 138kV Wild Hill Solar WV Jefferson Engineering and Procurement APS 77.5 77.5 46.5 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2158_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2158_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2158_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_158_isa.pdf Document Posted N/A N/A N/A 3/23/2018 N/A N/A 9/1/2023 9/1/2023 N/A N No
AD2-163 + Broadview-Tangy 138 kV OH Madison Active ATSI 180 180 120.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2163_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2163_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2163_fac.pdf Document Posted N/A N/A 3/26/2018 N/A N/A 12/1/2021 N/A N No
AD2-163 - Broadview-Tangy 138 kV OH Madison Active ATSI 180 180 120.7 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2163_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2163_imp.pdf Document Posted In Progress N/A N/A 3/26/2018 N/A N/A 12/1/2021 N/A N No
AD2-172 + Lena 138kV IL Stephenson Active ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2172_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2172_fac.pdf Document Posted N/A N/A 3/28/2018 N/A N/A 5/19/2020 N/A N No
AD2-172 - Lena 138kV IL Stephenson Active ComEd 50 50 21 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2172_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2172_imp.pdf Document Posted In Progress N/A N/A 3/28/2018 N/A N/A 5/19/2020 N/A N No
AD2-213 + East Flemington-Lebanon 34.5 kV VESI - East Flemington Energy Storage NJ Hunterdon Engineering and Procurement JCPL 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2213_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2213_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2213_fac.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/isa/ad2_213_isa.pdf Document Posted N/A N/A N/A 3/30/2018 N/A N/A 8/30/2022 8/30/2022 N/A N No
AD2-213 - East Flemington-Lebanon 34.5 kV NJ Hunterdon Active JCPL 20 20 0 Energy Generation Interconnection Storage https://www.pjm.com/pub/planning/project-queues/feas_docs/ad2213_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ad2213_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ad2213_fac.pdf Document Posted N/A N/A 3/30/2018 N/A N/A 3/29/2019 N/A N No
AE1-007 + Camden-Crystal III 69 kV OH Preble Active Dayton 89.9 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1007_imp.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/facilities/ae1007_fac.pdf Document Posted N/A N/A 4/23/2018 N/A N/A 7/1/2019 N/A N No
AE1-007 - Camden-Crystal III 69 kV OH Preble Active Dayton 89.9 20 7.6 Capacity Generation Interconnection Solar https://www.pjm.com/pub/planning/project-queues/feas_docs/ae1007_fea.pdf Document Posted https://www.pjm.com/pub/planning/project-queues/impact_studies/ae1007_imp.pdf Document Posted In Progress N/A N/A 4/23/2018 N/A N/A 7/1/2019 N/A N No
AE1-032 4948568 + AMIL-PJM N/A N/A Withdrawn 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4954950_ltf1.pdf Withdrawn N/A N/A 5/24/2018 6/1/2021 6/1/2026 10/4/2018 N/A PP No
AE1-032 4948568 - AMIL-PJM N/A N/A Withdrawn Calpine Energy Services, L.P. 180 Energy Long-Term Firm Transmission https://www.pjm.com/pub/planning/project-queues/ft-is/4954950_ltf1.pdf Withdrawn N/A N/A 5/24/2018 6/1/2021 6/1/2026 10/4/2018 N/A PP No
AE1-033 4950965 + ALTE-PJM N/A N/A Withdrawn 165 Energy Long-Term Firm Transmission Withdrawn N/A N/A 6/4/2018 6/1/2022 6/1/2027 12/21/2018 N/A PP No
AE1-033 4950965 - ALTE-PJM N/A N/A Withdrawn Calpine Energy Services, L.P. 165 Energy Long-Term Firm Transmission Withdrawn N/A N/A 6/4/2018 6/1/2022 6/1/2027 12/21/2018 N/A PP No