Test Equipment Utilization Measurements & Usage Optimization
Zhizheng Wang
Novice at BUCI DUNC PC NDO GW LSV&CI ST Frame Work
2015-02-12
What this project about
- Research and investigate existing utilization and usage tools outside and inside of Ericsson for similar products as EPG.
- Suggest different improvements for KPIs to measure the equipment utilizations
- Propose different alternatives for optimizing equipment usage
- Prototype technical solutions (Visualizing) for equipment utilization and usage optimization.
Overview: Software Testing on EPG
- UT, CT, Valgrind on UT&CT, Build checks (auto scheduled)
- FT (Quite simple, not that costly)
- ST: Robustness, Stability, C&C (time/hardware Costly)
- NIV-E2E (Not quite interested)