Test Equipment Utilization Measurements & Usage Optimization

Zhizheng Wang

Novice at BUCI DUNC PC NDO GW LSV&CI ST Frame Work

2015-02-12

What this project about

  1. Research and investigate existing utilization and usage tools outside and inside of Ericsson for similar products as EPG.
  2. Suggest different improvements for KPIs to measure the equipment utilizations
  3. Propose different alternatives for optimizing equipment usage
  4. Prototype technical solutions (Visualizing) for equipment utilization and usage optimization.

Overview: Software Testing on EPG

  1. UT, CT, Valgrind on UT&CT, Build checks (auto scheduled)
  2. FT (Quite simple, not that costly)
  3. ST: Robustness, Stability, C&C (time/hardware Costly)
  4. NIV-E2E (Not quite interested)