Chapter 5: Problems 6, 7, 8 & 9
5.6)
PCB manufacture model design
Inspection schedules comparison
Inspection schedule as experiment control
Pivot grid
SMORE plot for average time in system
SMORE plot for average number in system
SMORE plot for average number of times processed
5.7)
Model design using additional sink to capture number of PCBs with 3 or more failed inspections
Pivot grid results for single simulation run: 9913 entities entered “ThreeFailures” sink
Model design using output statistic to capture number of PCBs with 3 or more failed inspections
Model element definitions
Add-on processes
Pivot grid results for single simulation run: “NumThreeFailures” output statistic indicates 9913 entities with 3 or more failures
5.8)
Problem 5.8 experiment design and results
Problem 5.8 pivot grid
5.9)
Pharmacy model design
Results of 500 replications
SMORE plot of average fill time for faxed-in prescriptions
SMORE plot of average time time in system for customers
SMORE plot of scheduled utilization of pharmacists
SMORE plot of scheduled utilization of cashiers