Both processes have subgroup size 5, target 100, and specifications 90 to 110. The subgroup correction is . Process A is centered. Process B is five units high but has one-third the within-process standard deviation. B is preferable for meeting the specifications and offers the greatest potential if its mean can be brought back to 100. A has the higher target-based capability index at the current settings. Source: Montgomery, 7th ed., p. 405, Table 8E.1.
| Process | Mean | Sbar | SD | Cp | Cpk | Cpm |
|---|---|---|---|---|---|---|
| A | 100 | 3 | 3.1915 | 1.0444 | 1.0444 | 1.0444 |
| B | 105 | 1 | 1.0638 | 3.1333 | 1.5667 | 0.6521 |
For a sample of 30 parts, the mean is 97, the sample SD is 1.6, and the specifications are 90 to 100. The upper-side index determines Cpk. The entire approximate 95% confidence interval lies below 1. Source: Montgomery, 7th ed., p. 406 and equation 8.21, p. 371.
| Lower-side index | Upper-side index | Cpk | 95% lower | 95% upper |
|---|---|---|---|---|
| 1.4583 | 0.625 | 0.625 | 0.4247 | 0.8253 |
Target 1,050, design SD 25, target shift 1 SD. Using and gives and . The first upper alarm is observation 10 (). The last zero before the alarm occurs at 7, suggesting a shift starting at 8. The moving-range estimate of SD is 34.43, about 38% above 25. The assumed SD looks low; the mean shift can inflate this retrospective estimate. Source: p. 444, Table 9E.1.
| i | Weight | C+ | C- |
|---|---|---|---|
| 1 | 1045 | 0.0 | 0.0 |
| 2 | 1055 | 0.0 | 0.0 |
| 3 | 1037 | 0.0 | 0.5 |
| 4 | 1064 | 1.5 | 0.0 |
| 5 | 1095 | 34.0 | 0.0 |
| 6 | 1008 | 0.0 | 29.5 |
| 7 | 1050 | 0.0 | 17.0 |
| 8 | 1087 | 24.5 | 0.0 |
| 9 | 1125 | 87.0 | 0.0 |
| 10 | 1146 | 170.5 | 0.0 |
| 11 | 1139 | 247.0 | 0.0 |
| 12 | 1169 | 353.5 | 0.0 |
| 13 | 1151 | 442.0 | 0.0 |
| 14 | 1128 | 507.5 | 0.0 |
| 15 | 1238 | 683.0 | 0.0 |
| 16 | 1125 | 745.5 | 0.0 |
| 17 | 1163 | 846.0 | 0.0 |
| 18 | 1188 | 971.5 | 0.0 |
| 19 | 1146 | 1055.0 | 0.0 |
| 20 | 1167 | 1159.5 | 0.0 |
Given . Using (Example 9.2, p. 435) and all 30 observations for the trial limits, and . 0 of 30 EWMA values cross a limit. At observation 30 the raw wait is 36.99 and the smoothed value is 6.893, below the UCL of 7.013. The chart gives no mean-shift signal under these trial limits. The long final wait warrants review. Source: p. 446, data on p. 292, Table 6E.24.
| i | Wait | EWMA | LCL | UCL |
|---|---|---|---|---|
| 1 | 2.49 | 4.430 | 3.613 | 5.679 |
| 2 | 3.39 | 4.326 | 3.256 | 6.035 |
| 3 | 7.41 | 4.634 | 3.024 | 6.268 |
| 4 | 2.88 | 4.459 | 2.857 | 6.434 |
| 5 | 0.76 | 4.089 | 2.733 | 6.558 |
| 6 | 1.32 | 3.812 | 2.638 | 6.653 |
| 7 | 7.05 | 4.136 | 2.565 | 6.727 |
| 8 | 1.37 | 3.859 | 2.507 | 6.784 |
| 9 | 6.17 | 4.090 | 2.461 | 6.830 |
| 10 | 5.12 | 4.193 | 2.425 | 6.867 |
| 11 | 1.34 | 3.908 | 2.396 | 6.896 |
| 12 | 0.50 | 3.567 | 2.373 | 6.919 |
| 13 | 4.35 | 3.646 | 2.354 | 6.937 |
| 14 | 1.67 | 3.448 | 2.339 | 6.952 |
| 15 | 1.63 | 3.266 | 2.327 | 6.965 |
| 16 | 4.88 | 3.428 | 2.317 | 6.974 |
| 17 | 15.19 | 4.604 | 2.309 | 6.982 |
| 18 | 0.67 | 4.210 | 2.303 | 6.988 |
| 19 | 4.14 | 4.203 | 2.298 | 6.994 |
| 20 | 2.16 | 3.999 | 2.294 | 6.998 |
| 21 | 1.14 | 3.713 | 2.290 | 7.001 |
| 22 | 2.66 | 3.608 | 2.288 | 7.004 |
| 23 | 4.67 | 3.714 | 2.285 | 7.006 |
| 24 | 1.54 | 3.497 | 2.284 | 7.008 |
| 25 | 5.06 | 3.653 | 2.282 | 7.009 |
| 26 | 3.40 | 3.628 | 2.281 | 7.010 |
| 27 | 1.39 | 3.404 | 2.280 | 7.011 |
| 28 | 1.11 | 3.175 | 2.279 | 7.012 |
| 29 | 6.92 | 3.549 | 2.279 | 7.013 |
| 30 | 36.99 | 6.893 | 2.278 | 7.013 |
Inspect 50 items. Accept when at most one is defective. For incoming fraction defective , . With 5% defective, the probability of acceptance is 0.2794. Source: p. 686.
| Defective (%) | P(accept) |
|---|---|
| 0 | 1.0000 |
| 1 | 0.9106 |
| 2 | 0.7358 |
| 3 | 0.5553 |
| 4 | 0.4005 |
| 5 | 0.2794 |
| 6 | 0.1900 |
| 8 | 0.0827 |
| 10 | 0.0338 |
| 15 | 0.0029 |
| 20 | 0.0002 |
| 30 | 0.0000 |
Inspect 50 items. Accept for 0–2 defectives, reject for 7 or more, and inspect 100 more for 3–6. After the second sample, accept if the combined count is at most 6. At 5% defective, the first-sample acceptance probability is 0.5405, final acceptance is 0.6159, and first-sample rejection is 0.0118. Source: p. 687.
| Defective (%) | Final accept | First accept | First reject |
|---|---|---|---|
| 0 | 1.0000 | 1.0000 | 0.0000 |
| 1 | 0.9996 | 0.9862 | 0.0000 |
| 2 | 0.9847 | 0.9216 | 0.0001 |
| 3 | 0.9146 | 0.8108 | 0.0007 |
| 4 | 0.7799 | 0.6767 | 0.0036 |
| 5 | 0.6159 | 0.5405 | 0.0118 |
| 6 | 0.4607 | 0.4162 | 0.0289 |
| 8 | 0.2360 | 0.2260 | 0.1019 |
| 10 | 0.1132 | 0.1117 | 0.2298 |
| 15 | 0.0142 | 0.0142 | 0.6387 |
| 20 | 0.0013 | 0.0013 | 0.8966 |
| 30 | 0.0000 | 0.0000 | 0.9975 |
| First count | P(first count) | P(second count ≤ 6 − j) | Contribution |
|---|---|---|---|
| 3 | 0.219875 | 0.257839 | 0.056692 |
| 4 | 0.135975 | 0.118263 | 0.016081 |
| 5 | 0.065841 | 0.037081 | 0.002441 |
| 6 | 0.025990 | 0.005921 | 0.000154 |