Executive Purpose

This document describes typical RAPIDS™ use cases to support:

RAPIDS™ use cases are defined by decision context, not by analytical techniques.

Each use case links: Scenario → Decision → Deliverables → Value


How to Read This Document

Each use case follows the same structure:


Use Case 1 — Operational Disturbance & Event Attribution

Scenario

Unexpected shutdowns, trips, or abnormal operational transients in critical equipment or systems.

Decisions to Support

  • Did the disturbance materially affect other assets?
  • Is there residual operational risk after restart?
  • Can responsibility or causality be technically defended?

Why RAPIDS™

Operational trends alone do not establish causality. RAPIDS™ explicitly separates detection, interpretation, and attribution.

Applicable Deliverables

  • RAPIDS™ Operational Disturbance Assessment (Technical Report)
  • RAPIDS™ Failure Characterization Report (Pre-RCA)
  • RAPIDS™ Decision Memo

Typical Sequence

  1. Operational Disturbance Assessment
  2. Failure Characterization (if escalation is detected)
  3. Decision Memo for management or counterparties

Key Value Delivered

  • Avoids false attribution
  • Protects operational and contractual position

Use Case 2 — Progressive Failure & Degradation Detection

Scenario

Assets operate within nominal limits but exhibit increasing variability, instability, or abnormal patterns.

Decisions to Support

  • Is degradation real or statistical noise?
  • When should intervention occur?
  • What is the short-term and mid-term risk horizon?

Why RAPIDS™

Threshold-based alarms and snapshots miss weak signals and progressive mechanisms.

Applicable Deliverables

  • RAPIDS™ Technical Report (Reliability / Performance)
  • RAPIDS™ Reliability Improvement Assessment
  • RAPIDS™ Decision Memo

Typical Sequence

  1. Technical Report (baseline and deviation analysis)
  2. Reliability Assessment
  3. Decision Memo (intervention strategy)

Key Value Delivered

  • Early risk visibility
  • Optimized maintenance timing

Use Case 3 — Process Performance & Quality Drift

Scenario

Process KPIs remain nominal, but trends suggest approaching specification limits or instability.

Decisions to Support

  • Is the process structurally drifting?
  • When will specifications be breached?
  • What corrective action is justified?

Why RAPIDS™

Point measurements and averages hide structural change and instability.

Applicable Deliverables

  • RAPIDS™ Technical Report (Process Performance)
  • RAPIDS™ Decision Memo

Typical Sequence

  1. Technical Report (change detection and stability)
  2. Decision Memo (corrective action)

Key Value Delivered

  • Prevents late reaction
  • Preserves compliance and margins

Use Case 4 — Environmental Risk Screening & Monitoring

Scenario

Industrial operations under environmental scrutiny, regulatory exposure, or ESG commitments.

Decisions to Support

  • Is there evidence of emerging environmental impact?
  • Where should field verification be prioritized?
  • How can due diligence be demonstrated?

Why RAPIDS™

Traditional sampling is sparse, reactive, and resource-intensive.

Applicable Deliverables

  • RAPIDS™ Environmental Intelligence Assessment
  • RAPIDS™ Decision Memo
  • Evidence Package (audit-ready)

Typical Sequence

  1. Environmental Intelligence Assessment
  2. Field verification (if required)
  3. Decision Memo / Evidence Package

Key Value Delivered

  • Early impact detection
  • Defensible compliance posture

Use Case 5 — Strategic, Market & Technology Scouting

Scenario

Evaluation of new markets, technologies, regions, or strategic positioning.

Decisions to Support

  • Is the opportunity real or speculative?
  • Where are the operational or geopolitical risks?
  • How should the organization position itself?

Why RAPIDS™

Conventional market reports lack operational and technical depth.

Applicable Deliverables

  • RAPIDS™ Scouting Report
  • RAPIDS™ Decision Memo

Typical Sequence

  1. Scouting Report
  2. Decision Memo

Key Value Delivered

  • Faster strategic clarity
  • Reduced blind spots

Use Case 6 — Due Diligence & Investment Support

Scenario

Pre-FID, acquisition, partnership, or capital allocation decisions.

Decisions to Support

  • Is the technical case investable?
  • What risks must be priced or mitigated?
  • What gaps require resolution?

Why RAPIDS™

Investor materials are not technical evidence.

Applicable Deliverables

  • RAPIDS™ Technical Due Diligence Report
  • RAPIDS™ Risk Assessment
  • RAPIDS™ Decision Memo

Typical Sequence

  1. Technical Due Diligence
  2. Risk Assessment
  3. Decision Memo

Key Value Delivered

  • Investor-grade confidence
  • Reduced downside exposure

Closing Note

RAPIDS™ use cases are decision-centric.

Analytics, methods, and tools are selected after the decision context is understood — never before.


Canonical File