Validation of LSNAI categories

Site location map

Redox potential (Eh; mV) comparison between sites

Red dashed line indicates the boundary between oxidised and reduced conditions.

+200 mV added for ORP correction to Eh

ORP-80-4-D soil redox probe buried 10cm below ground surface.

Monthly averages

Time series