Project Objective
To forecast data using different types of time series methods.
Example 1: Naive Approach
Time Series Data
months <- 1:6
values <- c(17, 13, 15, 11, 17, 14)
Part A: Most Recent Values as Forecast
forecast_a <- values[-length(values)] #exclude the last value
actual_a <- values[-1] #exclude the first value
mse_a <- mean((actual_a - forecast_a)^2)
mse_a #result: 16.2
## [1] 16.2
Result: Mean Squared Error: 16.20
forecast_month_7_a <- tail(values, 1)
forecast_month_7_a #result: 14
## [1] 14
Result: Forecast A for week 7 is 14.
Part B: Average All of the Data as Forecast
cumulative_avgs <- cumsum(values[-length(values)]) / (1:(length(values) - 1))
forecast_b <- cumulative_avgs
actual_b <- values[-1] #exclude the first value
mse_b <- mean((actual_b - forecast_b)^2)
mse_b #8.27
## [1] 8.272
Result: Mean Squared Error: 8.27.
forecast_month_7_b <- mean(values) #average of all months as forecast for month 7
forecast_month_7_b #result: 14.5
## [1] 14.5
Result: Forecast B for week 7 is 14.5.
Part C: Which Method is Better?
better_method <- ifelse(mse_a < mse_b, "Most Recent Value", "Average of All Data")
list(
MSE_most_recent_value = mse_a,
forecast_month_7_most_recent = forecast_month_7_a,
MSE_average_of_all_data = mse_b,
forecast_month_7_average = forecast_month_7_b,
Better_Method = better_method
)
## $MSE_most_recent_value
## [1] 16.2
##
## $forecast_month_7_most_recent
## [1] 14
##
## $MSE_average_of_all_data
## [1] 8.272
##
## $forecast_month_7_average
## [1] 14.5
##
## $Better_Method
## [1] "Average of All Data"
Result: The better method is the Average of all Data.
Part D: Finding Mean Absolute Error
mae <- mean(abs(actual_a - forecast_a))
mae #result: 3.8
## [1] 3.8
Result: The mean absolute error is 3.80.
Part E: Finding Mean Absolute Percentage Error
mape <- mean(abs((actual_a - forecast_a) / actual_a)) * 100
mape #result: 27.44
## [1] 27.43778
Result: The mean absolute percentage error is 27.44%.
Example 2
Install and Load Packages
#install.packages("dplyr")
#install.packages("zoo")
library(dplyr)
## Warning: package 'dplyr' was built under R version 4.3.3
##
## Attaching package: 'dplyr'
## The following objects are masked from 'package:stats':
##
## filter, lag
## The following objects are masked from 'package:base':
##
## intersect, setdiff, setequal, union
library(zoo)
## Warning: package 'zoo' was built under R version 4.3.3
##
## Attaching package: 'zoo'
## The following objects are masked from 'package:base':
##
## as.Date, as.Date.numeric
library(magrittr)
Load the Data
df <- data.frame(month=c(1, 2, 3, 4, 5, 6, 7, 8, 9, 10, 11, 12),
data=c(240, 352, 230, 260, 280, 322, 220, 310, 240, 310, 240, 230))
Part A: Time Series Plot
plot(df$month, df$data, type = "o", col = "blue", xlab = "Month", ylab =
"Value of Building Contracts (in millions)",
main = "Value of Alabama Building Contracts Over 12 Month Period")

Interpretation: The time series plot exhibits a horizontal pattern.
Part B: Three-Month Moving Average
df$avg_value <- c(NA, NA, NA,
(df$data[1] + df$data[2] + df$data[3]) / 3,
(df$data[2] + df$data[3] + df$data[4]) / 3,
(df$data[3] + df$data[4] + df$data[5]) / 3,
(df$data[4] + df$data[5] + df$data[6]) / 3,
(df$data[5] + df$data[6] + df$data[7]) / 3,
(df$data[6] + df$data[7] + df$data[8]) / 3,
(df$data[7] + df$data[8] + df$data[9]) / 3,
(df$data[8] + df$data[9] + df$data[10]) / 3,
(df$data[9] + df$data[10] + df$data[11]) / 3)
Calculate the Squared Errors (only for the months where moving avg
is available)
df <- df %>%
mutate(squared_error = ifelse(is.na(avg_value), NA, (data - avg_value)^2)
)
Compute MSE (excluding the initial months with NA)
mse <- mean(df$squared_error, na.rm = TRUE)
mse #result: 2040.44
## [1] 2040.444
Result: The mean squared error for the three-month moving average is 2040.44.
Exponential Smoothing
alpha = 0.2
exp_smooth <- rep(NA, length(df$data))
exp_smooth[1] <- df$data[1] #starting point
for(i in 2:length(df$data)) {
exp_smooth[i] <- alpha * df$data[i - 1] + (1 - alpha) * exp_smooth[i - 1]
}
mse_exp_smooth <- mean((df$data[2:12] - exp_smooth[2:12])^2)
mse_exp_smooth #result: 2593.76
## [1] 2593.762
Result: The mean squared error for exponential smoothing is 2593.76
Compare Both Methods
better_method <- ifelse(mse < mse_exp_smooth, "Three-Month Moving Average", "Exponential Smoothing")
list(
MSE_moving_average = mse,
MSE_exponential_smoothing = mse_exp_smooth,
Better_Method = better_method
)
## $MSE_moving_average
## [1] 2040.444
##
## $MSE_exponential_smoothing
## [1] 2593.762
##
## $Better_Method
## [1] "Three-Month Moving Average"
Result: The better method is the three-month moving average.
Example 3
Load Packages & Data
# Load the packages
library(readxl)
## Warning: package 'readxl' was built under R version 4.3.3
library(ggplot2)
## Warning: package 'ggplot2' was built under R version 4.3.3
# Load the data
df1 <- read_excel("C:/Users/14086/Downloads/R MARKDOWN/Mortgage.xlsx")
Part A: Time Series Plot
ggplot(df1, aes(x = Year, y = Interest_Rate)) +
geom_line() +
geom_point() +
xlab("Year") +
ylab("Interest_Rate (%)") +
ggtitle("Time Series Plot of Interest Rate (%) for a 30-year Fixed-Rate Mortgage")

Interpretation: The time series plot exhibits a decreasing pattern, with a sudden increase in interest rates after the year 2020.
Part B: Develop a Linear Trend Equation
model <- lm(Interest_Rate ~ Period, data = df1)
summary(model)
##
## Call:
## lm(formula = Interest_Rate ~ Period, data = df1)
##
## Residuals:
## Min 1Q Median 3Q Max
## -1.3622 -0.7212 -0.2823 0.5015 3.1847
##
## Coefficients:
## Estimate Std. Error t value Pr(>|t|)
## (Intercept) 6.69541 0.43776 15.295 3.32e-13 ***
## Period -0.12890 0.03064 -4.207 0.000364 ***
## ---
## Signif. codes: 0 '***' 0.001 '**' 0.01 '*' 0.05 '.' 0.1 ' ' 1
##
## Residual standard error: 1.039 on 22 degrees of freedom
## Multiple R-squared: 0.4459, Adjusted R-squared: 0.4207
## F-statistic: 17.7 on 1 and 22 DF, p-value: 0.0003637
Result: Linear Trend Equation: Revenue = 6.70 - 0.13*Period OR y = 6.70 - 0.13t
Part C: Forecast for Period 25 (i.e., 2024)
forecast_period_25 <- predict(model, newdata = data.frame(Period = 25))
forecast_period_25 #3.47
## 1
## 3.472942
Result: The forecast for period 25 is 3.47.