Daily

Daily Production -> 30-04-2025

Row

Waste Production (ton)

12,999

Waste Phsycal Availability (PA)

100%

Waste Utilisation Availability (UA)

83%

Waste Average Hourly Production (Bcm)

125

Distance Waste (Km)

1.38

Row

Ore Production (ton)

0

Ore Phsycal Availability (PA)

0

Ore Utilisation Availability (UA)

0

Ore Average Hourly Production (ton)

0

Distance Ore (Km)

Row

Stripping Ratio

NA

Row

Waste Working Hours (hours)

41.1

Waste Breakdown (hours)

0

Waste Losttime (hours)

8.2

Row

Waste Delay (hours)

4

Waste Standby (hours)

0

Waste Rain (hours)

1

Waste Slippery (hours)

3.2

Row

Ore Working Hours (hours)

Ore Breakdown (hours)

Ore Losttime (hours)

Row

Ore Delay (hours)

Ore Standby (hours)

Ore Rain (hours)

Ore Slippery (hours)

MTD

Daily Production From 01-04-2025 to 30-04-2025

Row

Plan IBS Waste Monthly (Bcm)

158,776

Plan IBS Waste MTD (Bcm)

158,776

Plan IBS Ore Monthly (Bcm)

18,074

Plan IBS Ore MTD (Bcm)

18,074

Row

Plan Waste Monthly (Bcm)

156,970

Plan Waste MTD (Bcm)

156,970

Plan Ore Monthly (Bcm)

18,166

Plan Ore MTD (Bcm)

18,166

Row

Actual Waste MTD (Bcm)

222,796

Actual Ore + DO MTD (Bcm)

28,089

Row

PA Waste

98%

UA Waste

77%

MA Waste

98%

EU Waste

76%

Prodty Waste (Bcm/hrs)

192

PA Ore

97%

UA Ore

81%

MA Ore

96%

EU Ore

78%

Prodty Ore (Bcm/hrs)

137

Row

Distance Waste (Km)

1.38

Distance Ore + DO (Km)

2.25

Performance MTD

Production From 01-04-2025 to 30-04-2025

Row

MTD Waste Production (Bcm)

MTD Ore Production (Bcm)

PA Waste

PA Ore

PA Trend PC800

PA Trend PC400

UA Waste

UA Ore

UA Trend PC800

UA Trend PC400

WH Trend Waste PC400

WH Trend Waste PC800

WH trend Ore PC400

WH trend Ore PC800

Losttime Waste

Losttime Ore

Waste Production Trend

Ore Production Trend

Productivity

Production From 01-04-2025 to 30-04-2025

Row

Prodty Waste

Prodty Ore

Prodty trend_Waste_PC400

Prodty trend_Waste_PC800

Prodty trend_Ore_PC200

Prodty trend_Ore_PC400

Prodty trend_Ore_PC800

Waste Productivity Hauler

Ore Productivity Hauler

Detail

Row

Rain

Slippery

Production Waste per Location

per Material

Waste Production per Unit

Ore Production per Unit

Prodty Waste

Prodty Ore

Working Hours Main Equipment (MTD)

Working Hours Support Equipment (MTD)

Distance Waste

Distance Ore

Land Development

Production From 01-04-2025 to 30-04-2025

Row

Production (MTD)

Rental

Rental Hours From 01-04-2025 to 30-04-2025

Row

per Location

per Equipment

Scatter (Daily)

Scatter (MTD)

Scatter_vendor (MTD)

Rental Cost by Location

Rental Cost Scatter

Validation

Daily Production -> 30-04-2025

Row

Loader

Hauler

Support

Fuel

Row

Fuel MTD

46,967

Fuel Kontrak

Fuel Kontrak (Ltr/Bcm)

1.35

Actual Fuel (Ltr/Bcm)

0.63

Row

Mining (Liter)

Mining (Liter/Bcm)

Grade Control

Production From 01-04-2025 to 30-04-2025

Row

Rental Unit

Rental Cost

Scatter (MTD)

Mining

Production From 01-04-2025 to 30-04-2025

Row

Rental Unit

Rental Cost

Scatter (MTD)

TSF

Production From 01-04-2025 to 30-04-2025

Row

Volume

Prodty PC800

Prodty PC400

TSF Distance Waste

1.63

Trend Distance

Rental Unit

Rental Cost

Trend WH Excavator

Scatter (MTD)

INFRASTRUCTURE

Production From 01-04-2025 to 30-04-2025

Row

Rental Unit Infrastructure

Rental Unit Land Development

Rental Cost

Scatter (MTD)

OPP

Production From 01-04-2025 to 30-04-2025

Row

Rental Unit

Rental Cost

Scatter (MTD)

Distance Waste
Distance Ore