Daily
Daily Production -> 30-04-2025
Row
Waste Production (ton)
12,999
Waste Phsycal Availability (PA)
100%
Waste Utilisation Availability (UA)
83%
Waste Average Hourly Production (Bcm)
125
Row
Ore Phsycal Availability (PA)
0
Ore Utilisation Availability (UA)
0
Ore Average Hourly Production (ton)
0
Row
Waste Working Hours (hours)
41.1
Waste Breakdown (hours)
0
Waste Losttime (hours)
8.2
Row
Waste Slippery (hours)
3.2
Row
Ore Working Hours (hours)
MTD
Daily Production From 01-04-2025 to 30-04-2025
Row
Plan IBS Waste Monthly (Bcm)
158,776
Plan IBS Waste MTD (Bcm)
158,776
Plan IBS Ore Monthly (Bcm)
18,074
Plan IBS Ore MTD (Bcm)
18,074
Row
Plan Waste Monthly (Bcm)
156,970
Plan Waste MTD (Bcm)
156,970
Plan Ore Monthly (Bcm)
18,166
Plan Ore MTD (Bcm)
18,166
Row
Actual Waste MTD (Bcm)
222,796
Actual Ore + DO MTD (Bcm)
28,089
Row
Prodty Waste (Bcm/hrs)
192
Row
Distance Ore + DO (Km)
2.25
Productivity
Production From 01-04-2025 to 30-04-2025
Row
Prodty Waste

Prodty Ore

Prodty trend_Waste_PC400

Prodty trend_Waste_PC800

Prodty trend_Ore_PC200

Prodty trend_Ore_PC400

Prodty trend_Ore_PC800

Waste Productivity Hauler

Ore Productivity Hauler

Detail
Row
Rain

Slippery

Production Waste per Location

per Material

Waste Production per Unit

Ore Production per Unit

Prodty Waste

Prodty Ore

Working Hours Main Equipment (MTD)

Working Hours Support Equipment (MTD)

Distance Waste

Distance Ore

Land Development
Production From 01-04-2025 to 30-04-2025
Row
Production (MTD)

Rental
Rental Hours From 01-04-2025 to 30-04-2025
Row
per Location

per Equipment

Scatter (Daily)

Scatter (MTD)

Scatter_vendor (MTD)

Rental Cost by Location

Rental Cost Scatter

Validation
Daily Production -> 30-04-2025
Row
Loader

Hauler

Support

Fuel
Row
Fuel Kontrak
Fuel Kontrak (Ltr/Bcm)
1.35
Actual Fuel (Ltr/Bcm)
0.63
Row
Mining (Liter)

Mining (Liter/Bcm)

Grade Control
Production From 01-04-2025 to 30-04-2025
Row
Rental Unit

Rental Cost

Scatter (MTD)

Mining
Production From 01-04-2025 to 30-04-2025
Row
Rental Unit

Rental Cost

Scatter (MTD)

TSF
Production From 01-04-2025 to 30-04-2025
Row
Volume

Prodty PC800

Prodty PC400

Trend Distance

Rental Unit

Rental Cost

Trend WH Excavator

Scatter (MTD)

INFRASTRUCTURE
Production From 01-04-2025 to 30-04-2025
Row
Rental Unit Infrastructure

Rental Unit Land Development

Rental Cost

Scatter (MTD)

OPP
Production From 01-04-2025 to 30-04-2025
Row
Rental Unit

Rental Cost

Scatter (MTD)

Distance Waste
Distance Ore