Daily

Daily Production -> 31-03-2024

Row

Waste Production (Bcm)

5082

Waste Phsycal Availability (PA)

100%

Waste Utilisation Availability (UA)

68%

Waste Average Hourly Production (Bcm)

186

Distance Waste (Km)

0.9

Row

Ore Production (Bcm)

588

Ore Phsycal Availability (PA)

100%

Ore Utilisation Availability (UA)

67%

Ore Average Hourly Production (Bcm)

146

Distance Ore (Km)

1.1

Row

Waste Working Hours (hours)

27.3

Waste Breakdown (hours)

0

Waste Losttime (hours)

12.7

Row

Waste Delay (hours)

3

Waste Standby (hours)

0

Waste Rain (hours)

9.7

Waste Slippery (hours)

0

Row

Ore Working Hours (hours)

4

Ore Breakdown (hours)

0

Ore Losttime (hours)

2

Row

Ore Delay (hours)

0.5

Ore Standby (hours)

0

Ore Rain (hours)

1.5

Ore Slippery (hours)

0

MTD

Daily Production From 01-03-2024 to 31-03-2024

Row

Plan IBS Waste Monthly (Bcm)

73,485

Plan IBS Waste MTD (Bcm)

73,485

Plan IBS Ore Monthly (Bcm)

6,767

Plan IBS Ore MTD (Bcm)

6,767

Row

Plan Waste Monthly (Bcm)

63,149

Plan Waste MTD (Bcm)

63,149

Plan Ore Monthly (Bcm)

8,183

Plan Ore MTD (Bcm)

9,525

Row

Actual Waste MTD (Bcm)

73,036

Actual Ore MTD (Bcm)

7,868

Row

PA Waste

99%

UA Waste

63%

MA Waste

99%

EU Waste

63%

Prodty Waste (Bcm/hrs)

199

PA Ore

100%

UA Ore

57%

MA Ore

99%

EU Ore

57%

Prodty Ore (Bcm/hrs)

28

Row

Distance Waste (Km)

0.92

Distance Ore (Km)

1.4

Performance MTD

Daily Production From 01-03-2024 to 31-03-2024

Row

MTD Waste Production (Bcm)

MTD Ore Production (Bcm)

PA

PA Trend PC800

PA Trend PC400

UA

UA Trend PC800

UA Trend PC400

WH Trend Waste PC400

WH Trend Waste PC800

WH trend Ore PC400

WH trend Ore PC800

Prodty

Losttime Waste

Losttime Ore

Waste Production Trend

Ore Production Trend

Productivity

Daily Production From 01-03-2024 to 31-03-2024

Row

Prodty trend_Waste_PC400

Prodty trend_Waste_PC800

Prodty trend_Ore_PC200

Prodty trend_Ore_PC400

Prodty trend_Ore_PC800

Detail

Row

Rain

Slippery

Production Waste per Location

per Material

Waste Production per Unit

Ore Production per Unit

Prodty Waste

Prodty Ore

Working Hours Main Equipment (MTD)

Working Hours Support Equipment (MTD)

Distance Waste

Distance Ore

Land Development

Row

Production (MTD)

Rental

Rental Hours From 01-03-2024 to 31-03-2024

Row

per Location

per Equipment

Scatter (Daily)

Scatter (MTD)

Rental Cost by Location

Rental Cost Scatter

Validation

Daily Production -> 31-03-2024

Row

Loader

Hauler

Support

Fuel

Row

Fuel MTD

46,967

Fuel Kontrak

Fuel Kontrak (Ltr/Bcm)

1.35

Actual Fuel (Ltr/Bcm)

0.71

Row

Mining (Liter)

Mining (Liter/Bcm)

# A tibble: 5 × 3
  EqType     Rental_Support Total
  <chr>      <chr>          <dbl>
1 CRANE TRUK Infrastructure  55  
2 FT         Infrastructure 100  
3 HM400      Infrastructure  15.6
4 PC300      Infrastructure  13.2
5 WT         Infrastructure  74.6