Summary

We tried 3 ways to estimate NVDA revenue for Q4, after obtaining various data points about NVDA and TSM. Overall we do not find strong connection between NVDA revenue and TSM revenue on a statistical perspective. This stops us here from further look into EPS.

Results are:

Read Data

library(tidyverse)
library(readxl)
library(glmnet)

knitr::opts_chunk$set(echo = TRUE,
                      warning = FALSE,
                      message = FALSE)
options(tibble.width = Inf)
tsm_data_raw <-
  read_excel(
    "data/Historical_Monthly_Revenue_January_2.xlsx",
    sheet = 2,
    skip = 5,
    col_types = "numeric"
  )
knitr::kable(tsm_data_raw, format = "markdown")
Net Revenue Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Total
2006 NA NA NA 27388.00 27124.00 27647.00 27959.00 27284.00 27198.00 27032.00 25060.00 22871.00 317407
2007 21389.00 20947.90 22560.00 23093.77 25711.84 26112.32 29482.67 30018.86 29452.63 32606.42 31264.93 29988.44 322630
2008 31069.02 29282.49 27128.46 28863.00 29801.21 29472.53 31814.18 31849.62 29314.76 29490.00 20644.00 14429.00 333158
2009 13126.00 12176.00 14198.00 22450.00 25247.00 26515.00 31173.00 29827.00 28936.00 30219.00 30322.00 31554.00 295742
2010 30136.00 30132.00 31919.00 33809.00 34819.00 36334.00 37218.00 37391.00 37638.00 38427.00 36846.00 34869.00 419538
2011 35371.00 32691.00 37315.00 37127.00 36709.00 36673.00 35432.00 37645.00 33406.00 37610.00 35859.00 31242.00 427081
2012 34569.00 33856.00 37083.00 40496.00 44138.00 43427.00 48525.00 49497.00 43353.00 49938.00 44253.00 37114.00 506249
2013 47439.00 41182.00 44134.00 50071.00 51788.00 54028.00 52103.00 55091.00 55382.00 51795.00 44330.00 49681.00 597024
2014 51430.00 46829.00 49956.00 61887.00 60789.00 60344.00 64925.00 69279.00 74846.00 80736.00 72275.00 69510.00 762806
2015 87120.00 62645.00 72269.00 75330.00 70155.00 59955.00 80953.00 67038.00 64514.00 81743.00 63428.00 58347.00 843497
2016 70855.00 59551.00 73089.00 66843.00 73576.00 81391.00 76392.00 94311.00 89703.00 91085.00 93030.00 78112.00 947938
2017 76616.00 71423.00 85875.00 56872.00 72796.00 84187.00 71611.00 91917.00 88579.00 94520.00 93153.00 89897.00 977447
2018 79741.00 64641.00 103697.00 81870.00 80969.00 70438.00 74371.00 91055.00 94922.00 101550.00 98389.00 89831.00 1031474
2019 78094.00 60889.00 79722.00 74694.00 80437.00 85868.00 84758.00 106118.00 102170.00 106040.00 107884.00 103313.00 1069985
2020 103683.00 93394.00 113520.00 96002.00 93819.00 120878.00 105963.00 122878.00 127585.00 119303.00 124865.00 117365.00 1339255
2021 126749.00 106534.00 129127.00 111315.00 112360.00 148471.00 124558.00 137427.00 152685.00 134539.00 148268.00 155382.00 1587415
2022 172176.00 146933.00 171967.00 172561.00 185705.00 175874.00 186763.00 218132.00 208248.00 210266.00 222706.00 192560.00 2263891
2023 200051.00 163174.00 145408.00 147900.00 176537.00 156404.00 177616.00 188686.00 180430.00 243203.00 206026.00 176300.00 2161736
2024 215785.00 NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA
NA NA NA NA NA NA NA NA NA NA NA NA NA NA
tsm_data_ex <-
  read_csv("data/TSM_revenue_ex.csv", col_types = "Ddddddddd")
knitr::kable(tsm_data_ex, format = "markdown")
qtr_end_date advanced_tech_pct hpc_pct rev_usd guidance_fwd_usd_low guidance_fwd_usd_high exch_rate adv_tech_5nm_pct adv_tech_7nm_pct
2022-03-31 0.50 0.41 17.57 17.6 18.2 27.95 0.20 0.30
2022-06-30 0.51 0.43 18.16 19.8 20.6 29.42 0.21 0.30
2022-09-30 0.54 0.39 20.23 19.9 20.7 30.32 0.28 0.26
2022-12-31 0.54 0.42 19.93 16.7 17.5 31.39 0.32 0.22
2023-03-31 0.51 0.44 16.72 15.2 16.0 30.42 0.31 0.20
2023-06-30 0.53 0.44 15.68 16.7 17.5 30.67 0.30 0.23
2023-09-30 0.59 0.42 17.28 18.8 19.6 31.64 0.37 0.16
2023-12-31 0.67 0.43 19.62 18.0 18.8 31.88 0.35 0.17
nvda_data_raw <-
  read_csv("data/NVDA_revenue.csv", col_types = "Dddddddd")
knitr::kable(nvda_data_raw, format = "markdown")
qtr_end_date rev rev_data_center rev_gaming eps_gaap eps rev_guidance_fwd_low rev_guidance_fwd_high eps_consensus rev_consensus
2022-01-31 7643 3263 3420 1.18 1.32 7938 8262 1.22 7430
2022-04-30 8288 3750 3620 0.64 1.36 7938 8262 1.29 8100
2022-07-31 6704 3806 2042 0.26 0.51 5782 6018 0.53 6700
2022-10-31 5931 3833 1574 0.27 0.58 5880 6120 0.70 5790
2023-01-31 6051 3616 1831 0.57 0.88 6370 6630 0.81 6020
2023-04-30 7192 4284 2240 0.82 1.09 10780 11220 0.92 6510
2023-07-31 13507 10323 2486 2.48 2.70 15680 16320 2.09 11100
2023-10-31 18120 14514 2856 3.71 4.02 19600 20400 3.36 16100
2024-01-31 NA NA NA NA NA NA NA 4.53 20240

Data Preprocessing

Transform TSM Data

getLastDayOfYearMonth <- function(year, month) {
  ceiling_date(as.Date(strptime(paste(
    year, month, 1, sep = "-"
  ), format = "%Y-%b-%d")), "month") - 1
}

tsm_data <- tsm_data_raw %>%
  rename(year = `Net Revenue`) %>%
  filter(!is.na(year)) %>%
  gather("month", "revenue", -year) %>%
  filter(month != "Total") %>%
  mutate(month_end_date = getLastDayOfYearMonth(year, month)) %>%
  select(-c(year, month)) %>%
  arrange(month_end_date) %>%
  filter(!is.na(revenue)) %>%
  mutate(revenue_l3m = RcppRoll::roll_sum(revenue, 3, align = "right", fill = NA)) %>%
  left_join(tsm_data_ex, by = join_by(month_end_date == qtr_end_date)) %>%
  filter(month_end_date >= as.Date('2021-01-31')) %>%
  mutate(month_num = seq(1, n()))

Interpolation for Quarterly Indicators

tsm_data <- tsm_data %>%
  mutate(
    advanced_tech_pct = spline(
      month_num,
      advanced_tech_pct,
      xout = month_num,
      method = "natural"
    )$y,
    hpc_pct = spline(month_num, hpc_pct, xout = month_num, method = "natural")$y,
    exch_rate = spline(month_num, exch_rate, xout = month_num, method =
                         "natural")$y,
    adv_tech_5nm_pct = spline(
      month_num,
      adv_tech_5nm_pct,
      xout = month_num,
      method = "natural"
    )$y,
    adv_tech_7nm_pct = spline(
      month_num,
      adv_tech_7nm_pct,
      xout = month_num,
      method = "natural"
    )$y
  ) %>%
  mutate(rev_usd2 = revenue_l3m / exch_rate)

Build Key Indicators

tsm_data <- tsm_data %>%
  mutate(
    rev_adv_tech = rev_usd2 * advanced_tech_pct,
    rev_hpc = rev_usd2 * hpc_pct,
    rev_adv_tech_5nm = rev_usd2 * adv_tech_5nm_pct,
    rev_adv_tech_7nm = rev_usd2 * adv_tech_7nm_pct
  ) %>%
  transmute(
    month_end_date,
    rev = rev_usd2,
    rev_adv_tech = rev_adv_tech,
    rev_adv_tech_5nm = rev_adv_tech_5nm,
    rev_adv_tech_7nm = rev_adv_tech_7nm,
    rev_hpc = rev_hpc,
    revgr_yoy = log(rev_usd2 / lag(rev_usd2, 12)),
    revgr_qoq = log(rev_usd2 / lag(rev_usd2, 3)),
    revgr_adv_tech_yoy = log(rev_adv_tech / lag(rev_adv_tech, 12)),
    revgr_adv_tech_qoq = log(rev_adv_tech / lag(rev_adv_tech, 3)),
    revgr_adv_tech_5nm_yoy = log(rev_adv_tech_5nm / lag(rev_adv_tech_5nm, 12)),
    revgr_adv_tech_5nm_qoq = log(rev_adv_tech_5nm / lag(rev_adv_tech_5nm, 3)),
    revgr_adv_tech_7nm_yoy = log(rev_adv_tech_7nm / lag(rev_adv_tech_7nm, 12)),
    revgr_adv_tech_7nm_qoq = log(rev_adv_tech_7nm / lag(rev_adv_tech_7nm, 3)),
    revgr_hpc_yoy = log(rev_hpc / lag(rev_hpc, 12)),
    revgr_hpc_qoq = log(rev_hpc / lag(rev_hpc, 3)),
  ) %>%
  mutate(
    revgr_qoq_l1m = lag(revgr_qoq, 1),
    revgr_qoq_l2m = lag(revgr_qoq, 2),
    revgr_qoq_l3m = lag(revgr_qoq, 3),
    revgr_adv_tech_qoq_l1m = lag(revgr_adv_tech_qoq, 1),
    revgr_adv_tech_qoq_l2m = lag(revgr_adv_tech_qoq, 2),
    revgr_adv_tech_qoq_l3m = lag(revgr_adv_tech_qoq, 3),
    revgr_adv_tech_5nm_qoq_l1m = lag(revgr_adv_tech_5nm_qoq, 1),
    revgr_adv_tech_5nm_qoq_l2m = lag(revgr_adv_tech_5nm_qoq, 2),
    revgr_adv_tech_5nm_qoq_l3m = lag(revgr_adv_tech_5nm_qoq, 3),
    revgr_adv_tech_7nm_qoq_l1m = lag(revgr_adv_tech_7nm_qoq, 1),
    revgr_adv_tech_7nm_qoq_l2m = lag(revgr_adv_tech_7nm_qoq, 2),
    revgr_adv_tech_7nm_qoq_l3m = lag(revgr_adv_tech_7nm_qoq, 3),
    revgr_hpc_qoq_l1m = lag(revgr_hpc_qoq, 1),
    revgr_hpc_qoq_l2m = lag(revgr_hpc_qoq, 2),
    revgr_hpc_qoq_l3m = lag(revgr_hpc_qoq, 3),
  )

Transform NVDA Data

nvda_data <- nvda_data_raw %>%
  mutate(rev_guidance = (lag(rev_guidance_fwd_low, 1) + lag(rev_guidance_fwd_high, 1)) / 2) %>%
  transmute(
    qtr_end_date,
    rev_nvda = rev,
    rev_nvda_l1q = lag(rev, 1),
    rev_nvda_l1y = lag(rev, 4),
    rev_nvda_data_center_l1q = lag(rev_data_center, 1),
    rev_nvda_data_center_l1y = lag(rev_data_center, 4),
    rev_nvda_data_center = rev_data_center,
    eps_nvda = eps,
    revgr_nvda_yoy = log(rev / lag(rev, 4)),
    revgr_nvda_qoq = log(rev / lag(rev, 1)),
    revgr_nvda_data_center_yoy = log(rev_data_center / lag(rev_data_center, 4)),
    revgr_nvda_data_center_qoq = log(rev_data_center / lag(rev_data_center, 1)),
    epsgr_nvda_yoy = log(eps / lag(eps, 4)),
    epsgr_nvda_qoq = log(eps / lag(eps, 1)),
    revgr_nvda_guidance_qoq = log(rev_guidance / lag(rev, 1)),
    revgr_nvda_analyst_qoq = log(rev_consensus / lag(rev, 1)),
    revgr_nvda_guidance_yoy = log(rev_guidance / lag(rev, 4)),
    revgr_nvda_analyst_yoy = log(rev_consensus / lag(rev, 4))
  )

Merge Data

merged <- tsm_data %>%
  left_join(nvda_data, by = join_by(month_end_date == qtr_end_date))

Statistical Analysis

merged_sel <-
  merged %>% filter(!is.na(revgr_nvda_analyst_qoq) &
                      (month_end_date >= as.Date('2022-01-31'))) %>% mutate(month_num = seq(1, n()))

merged_train <-
  merged_sel %>% filter(month_end_date <= as.Date('2023-10-31'))
merged_test <-
  merged_sel %>% filter(month_end_date > as.Date('2023-10-31'))

Method 1:

We use OLS to predict QoQ revenue growth just using NVDA’s guidance and analyst information.

This model captures information from NVDA’s guidance and analyst information, as well as the historical bias we observed relative to the actual values. Basically it assumes the recent underestimation by the guidance and analyst consensus will continue.

mdl_ols_base <-
  lm(revgr_nvda_qoq ~ revgr_nvda_guidance_qoq + revgr_nvda_analyst_qoq,
     merged_train)

print(summary(mdl_ols_base))
## 
## Call:
## lm(formula = revgr_nvda_qoq ~ revgr_nvda_guidance_qoq + revgr_nvda_analyst_qoq, 
##     data = merged_train)
## 
## Residuals:
##         1         2         3         4         5         6         7 
## -0.039033 -0.002785  0.030537 -0.040982  0.032651  0.003597  0.016015 
## 
## Coefficients:
##                         Estimate Std. Error t value Pr(>|t|)   
## (Intercept)              0.04152    0.01801   2.305  0.08252 . 
## revgr_nvda_guidance_qoq  0.19398    0.27096   0.716  0.51362   
## revgr_nvda_analyst_qoq   1.15836    0.22383   5.175  0.00663 **
## ---
## Signif. codes:  0 '***' 0.001 '**' 0.01 '*' 0.05 '.' 0.1 ' ' 1
## 
## Residual standard error: 0.03701 on 4 degrees of freedom
## Multiple R-squared:  0.9884, Adjusted R-squared:  0.9827 
## F-statistic:   171 on 2 and 4 DF,  p-value: 0.0001337
yhat <- predict(mdl_ols_base, merged_sel, se.fit = TRUE)
merged_sel$yhat <- yhat$fit
merged_sel$error <- 1.96 * yhat$se.fit
merged_sel$lower <- merged_sel$yhat - merged_sel$error
merged_sel$upper <- merged_sel$yhat + merged_sel$error

ggplot(merged_sel, aes(x = month_end_date), show_legend = TRUE) +
  geom_line(aes(y = yhat, colour = "Predicted")) +
  geom_point(aes(y = yhat, colour = "Predicted")) +
  geom_point(aes(y = revgr_nvda_qoq, colour = "Actual")) +
  geom_point(aes(y = revgr_nvda_analyst_qoq, colour = "Analyst")) +
  geom_ribbon(aes(ymin = lower, ymax = upper), alpha = 0.2) +
  ggtitle('QoQ Revenue Growth')

merged_sel$rev_nvda_pred <-
  exp(merged_sel$yhat) * merged_sel$rev_nvda_l1q
merged_sel$rev_nvda_pred_lower <-
  exp(merged_sel$lower) * merged_sel$rev_nvda_l1q
merged_sel$rev_nvda_pred_upper <-
  exp(merged_sel$upper) * merged_sel$rev_nvda_l1q

ggplot(merged_sel, aes(x = month_end_date), show_legend = TRUE) +
  geom_line(aes(y = rev_nvda_pred, colour = "Predicted")) +
  geom_point(aes(y = rev_nvda_pred, colour = "Predicted")) +
  geom_point(aes(y = rev_nvda, colour = "Actual")) +
  geom_ribbon(aes(ymin = rev_nvda_pred_lower, ymax = rev_nvda_pred_upper),
              alpha = 0.2) +
  ggtitle('Quarterly Revenue')

print(sprintf(
  "Method 1 Forecast: %.0f +- %.0f",
  tail(merged_sel$rev_nvda_pred, 1),
  tail((
    merged_sel$rev_nvda_pred_upper - merged_sel$rev_nvda_pred_lower
  ) / 2,
  1
  )
))
## [1] "Method 1 Forecast: 21886 +- 698"

Method 2:

We try to add TSM indicators to the model. Result shows TSM indicators is NOT helpful to the predictability of NVDA revenue (all leads to lower adj. R2). The resulting prediction is not very different from Method 1.

mdl_ols_2.1 <-
  lm(
    revgr_nvda_qoq ~ revgr_adv_tech_qoq + revgr_nvda_guidance_qoq + revgr_nvda_analyst_qoq,
    merged_train
  )

print(summary(mdl_ols_2.1))
## 
## Call:
## lm(formula = revgr_nvda_qoq ~ revgr_adv_tech_qoq + revgr_nvda_guidance_qoq + 
##     revgr_nvda_analyst_qoq, data = merged_train)
## 
## Residuals:
##         1         2         3         4         5         6         7 
## -0.038392 -0.002532  0.027109 -0.039670  0.038378  0.003083  0.012023 
## 
## Coefficients:
##                         Estimate Std. Error t value Pr(>|t|)  
## (Intercept)              0.04158    0.02068   2.010   0.1380  
## revgr_adv_tech_qoq       0.01758    0.09412   0.187   0.8638  
## revgr_nvda_guidance_qoq  0.17629    0.32519   0.542   0.6254  
## revgr_nvda_analyst_qoq   1.17030    0.26480   4.419   0.0215 *
## ---
## Signif. codes:  0 '***' 0.001 '**' 0.01 '*' 0.05 '.' 0.1 ' ' 1
## 
## Residual standard error: 0.04249 on 3 degrees of freedom
## Multiple R-squared:  0.9886, Adjusted R-squared:  0.9771 
## F-statistic:  86.5 on 3 and 3 DF,  p-value: 0.002067
yhat <- predict(mdl_ols_2.1, merged_sel, se.fit = TRUE)
merged_sel$yhat <- yhat$fit
merged_sel$error <- 1.96 * yhat$se.fit
merged_sel$lower <- merged_sel$yhat - merged_sel$error
merged_sel$upper <- merged_sel$yhat + merged_sel$error

ggplot(merged_sel, aes(x = month_end_date), show_legend = TRUE) +
  geom_line(aes(y = yhat, colour = "Predicted")) +
  geom_point(aes(y = yhat, colour = "Predicted")) +
  geom_point(aes(y = revgr_nvda_qoq, colour = "Actual")) +
  geom_point(aes(y = revgr_nvda_analyst_qoq, colour = "Analyst")) +
  geom_ribbon(aes(ymin = lower, ymax = upper), alpha = 0.2) +
  ggtitle('QoQ Revenue Growth')

merged_sel$rev_nvda_pred <-
  exp(merged_sel$yhat) * merged_sel$rev_nvda_l1q
merged_sel$rev_nvda_pred_lower <-
  exp(merged_sel$lower) * merged_sel$rev_nvda_l1q
merged_sel$rev_nvda_pred_upper <-
  exp(merged_sel$upper) * merged_sel$rev_nvda_l1q

ggplot(merged_sel, aes(x = month_end_date), show_legend = TRUE) +
  geom_line(aes(y = rev_nvda_pred, colour = "Predicted")) +
  geom_point(aes(y = rev_nvda_pred, colour = "Predicted")) +
  geom_point(aes(y = rev_nvda, colour = "Actual")) +
  geom_ribbon(aes(ymin = rev_nvda_pred_lower, ymax = rev_nvda_pred_upper),
              alpha = 0.2) +
  ggtitle('Quarterly Revenue')

print(sprintf(
  "Method 2 Forecast: %.0f +- %.0f",
  tail(merged_sel$rev_nvda_pred, 1),
  tail((
    merged_sel$rev_nvda_pred_upper - merged_sel$rev_nvda_pred_lower
  ) / 2,
  1
  )
))
## [1] "Method 2 Forecast: 21916 +- 863"

Method 3:

NVDA data center revenue might be more directly related to TSM. Here we found TSM can predict NVDA data center revenue growth. Assuming the rest of the NVDA revenue stays the same we arrive another estimate.

Note that this method has larger error band because we do not the exact data for data center revenue guidance and analyst estimates. Also TSM data is not very strong in predicting NVDA data center revenue either, and the result is still largely driven by the guidance and historical trends and biases.

mdl_ols_3.1 <-
  lm(
    revgr_nvda_data_center_qoq ~ revgr_adv_tech_qoq + revgr_nvda_guidance_qoq + revgr_nvda_analyst_qoq,
    merged_train
  )

print(summary(mdl_ols_3.1))
## 
## Call:
## lm(formula = revgr_nvda_data_center_qoq ~ revgr_adv_tech_qoq + 
##     revgr_nvda_guidance_qoq + revgr_nvda_analyst_qoq, data = merged_train)
## 
## Residuals:
##        1        2        3        4        5        6        7 
## -0.02001 -0.01304  0.11831 -0.12673  0.05535  0.06195 -0.07581 
## 
## Coefficients:
##                         Estimate Std. Error t value Pr(>|t|)
## (Intercept)              0.06680    0.05847   1.143    0.336
## revgr_adv_tech_qoq       0.23698    0.26605   0.891    0.439
## revgr_nvda_guidance_qoq  1.54382    0.91921   1.680    0.192
## revgr_nvda_analyst_qoq   0.13175    0.74853   0.176    0.871
## 
## Residual standard error: 0.1201 on 3 degrees of freedom
## Multiple R-squared:  0.9306, Adjusted R-squared:  0.8611 
## F-statistic:  13.4 on 3 and 3 DF,  p-value: 0.03041
yhat <- predict(mdl_ols_3.1, merged_sel, se.fit = TRUE)
merged_sel$yhat <- yhat$fit
merged_sel$error <- 1.96 * yhat$se.fit
merged_sel$lower <- merged_sel$yhat - merged_sel$error
merged_sel$upper <- merged_sel$yhat + merged_sel$error

ggplot(merged_sel, aes(x = month_end_date), show_legend = TRUE) +
  geom_line(aes(y = yhat, colour = "Predicted")) +
  geom_point(aes(y = yhat, colour = "Predicted")) +
  geom_point(aes(y = revgr_nvda_data_center_qoq, colour = "Actual")) +
  geom_ribbon(aes(ymin = lower, ymax = upper), alpha = 0.2) +
  ggtitle('QoQ Revenue Growth')

merged_sel$rev_nvda_rest_l1q <-
  merged_sel$rev_nvda_l1q - merged_sel$rev_nvda_data_center_l1q

merged_sel$rev_nvda_pred <-
  exp(merged_sel$yhat) * merged_sel$rev_nvda_data_center_l1q + merged_sel$rev_nvda_rest_l1q
merged_sel$rev_nvda_pred_lower <-
  exp(merged_sel$lower) * merged_sel$rev_nvda_data_center_l1q + merged_sel$rev_nvda_rest_l1q
merged_sel$rev_nvda_pred_upper <-
  exp(merged_sel$upper) * merged_sel$rev_nvda_data_center_l1q + merged_sel$rev_nvda_rest_l1q

ggplot(merged_sel, aes(x = month_end_date), show_legend = TRUE) +
  geom_line(aes(y = rev_nvda_pred, colour = "Predicted")) +
  geom_point(aes(y = rev_nvda_pred, colour = "Predicted")) +
  geom_point(aes(y = rev_nvda, colour = "Actual")) +
  geom_ribbon(aes(ymin = rev_nvda_pred_lower, ymax = rev_nvda_pred_upper),
              alpha = 0.2) +
  ggtitle('Quarterly Revenue')

print(sprintf(
  "Method 2 Forecast: %.0f +- %.0f",
  tail(merged_sel$rev_nvda_pred, 1),
  tail((
    merged_sel$rev_nvda_pred_upper - merged_sel$rev_nvda_pred_lower
  ) / 2,
  1
  )
))
## [1] "Method 2 Forecast: 22380 +- 2094"