“Statistical Process Control is not about statistics, it is not about”process-hyphen-control”, and it is not about conformance to specifications. […] It is about the continual improvement of processes and outcomes. And it is, first and foremost, a way of thinking with some tools attached.”
- Donald J. Wheeler. Understanding Variation, 2. ed., p 152

Summary Table
Trebor Plating Room Statistics
Target n CpK Data
RPostCure percdR LResister ITest PTest WD
Rolling 182 days
AY030 1399 0.25 0.69 0.01 0.46 0.04 0.06
AY039 159 −0.43 1.10 −0.74 0.60 0.54 −1.23
AY031 70 −1.27 1.79 −2.26 −1.02 −1.05 −0.54
BD009-02 167 −5.57 0.84 −4.31 −0.44 −5.33 −0.15
BD011 24 −0.50 1.06 −0.41 −0.20 −0.21 −0.12
BD011-02 16 −2.75 1.73 −2.13 −0.93 −0.79 −0.08
BD009-03 5
1.07
−9.33 −16.65 −3.67
BD011-01 26 −0.65 0.19 −3.40 0.11

BD011-04 16 −8.73 1.72 −20.16 −1.69 −3.36 −0.57
AY030T 6 −3.45 −5.26 0.12


Prior 14 days
AY030 217 0.32 0.13 0.01 0.46 0.03 0.04
AY039 1





AY031 2 −3.77 −1.21 −5.61 −2.36 −2.40 −3.21
Last 7 days
AY030 92 0.34 1.34 0.03 0.43 0.18 0.32
AY039 22 −1.14 0.36 −1.28 0.59 −0.26 −1.28
Source: Last 182 days of plating data
Time periods are most recent 7 days, the 14 days before that, and the past 182 days inclusive.
Passing CpK threshold is currently 1